HSPA
• All CRs approved
• Rel-12
– Study on Scalable UMTS by filtering
• SI is stopped with 85% completion level
• There is one Note in RAN report that “The study item resulting in TR 25.701 has been
closed but not all open issues have been addressed. Further details can be found in
this final status report of the SI.”
– DCH enhancement
• WI is extended with targeting September completion
• Updated WID (RP-140771) is approved
– UMTS Heterogeneous Networks
• WI is extended with September completion date
3
LTE: Rel-12 (1)
• All CRs approved
• Rel-12
– Further Downlink MIMO Enhancement for LTE-Advanced
• Core part completed
– Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic
Adaptation
• Core part completed
– LTE TDD-FDD joint operation including Carrier Aggregation
• Core part completed
– LTE Coverage Enhancements
• Core part completed
– Low Cost & Enhanced Coverage MTC UE for LTE
• Core part 70% with 100% RAN1 completion
– LTE Device to Device Proximity Services
• WI is extended with targeting September completion
4
LTE: Rel-12 (2)
• Rel-12 (cont.)
– Small Cell Enhancements – Physical-layer Aspects
• WI is extended with targeting September completion
• Way forward related to small cell on/off (RP-141031) is approved with following contents
– Spend no more than 1 TU in RAN1#78 to discuss this open issue:
» “Investigate detailed solution(s) of new L1 procedure for activated Scell operating on/off that further
reduces transition time”
– If a consensus cannot be reached on a complete solution during this limited time, then there will be no new
L1 procedure for activated SCell operating on/off in Rel-12 due to time constraints.
– (RAN2-led) Dual connectivity for LTE
• WI is extended with targeting September completion
• Allocate RAN1 time unit in RAN1 #78 meeting
5
LTE: Others
– New Rel-13 SI approved:
• Study on Indoor Positioning Enhancements for UTRA and LTE (RP-141003)
– Full summary including requested time budgets of all items can be found in RP-141039
(endorsed by RAN)
5
LTE: Others
– New Rel-13 SI approved:
• Study on Indoor Positioning Enhancements for UTRA and LTE (RP-141003)
– Full summary including requested time budgets of all items can be found in RP-141039
(endorsed by RAN)

More Related Content

What's hot

Development of On-Road Emissions for the 2011 National Emissions Inventory
Development of On-Road Emissions for the 2011 National Emissions InventoryDevelopment of On-Road Emissions for the 2011 National Emissions Inventory
Development of On-Road Emissions for the 2011 National Emissions Inventory
Jennifer Sharp
 
Deployment Process Diagram
Deployment Process DiagramDeployment Process Diagram
Deployment Process DiagramKathy Vinatieri
 
Synchronisation
SynchronisationSynchronisation
Synchronisation
Puran Pangeni
 
Ran78 summary
Ran78 summaryRan78 summary
Ran78 summary
Saurabh Verma
 
Rws 150073 chairman summary
Rws 150073 chairman summaryRws 150073 chairman summary
Rws 150073 chairman summary
ssk
 
PROJECT STORYBOARD: Call One Router Installation Process Improvement Project
PROJECT STORYBOARD: Call One Router Installation Process Improvement ProjectPROJECT STORYBOARD: Call One Router Installation Process Improvement Project
PROJECT STORYBOARD: Call One Router Installation Process Improvement Project
GoLeanSixSigma.com
 
Emme iraq march 2011 - final
Emme iraq march 2011 - finalEmme iraq march 2011 - final
Emme iraq march 2011 - finalalsalim
 
CCXG Workshop, May 2021, Camila Labarca
CCXG Workshop, May 2021, Camila LabarcaCCXG Workshop, May 2021, Camila Labarca
CCXG Workshop, May 2021, Camila Labarca
OECD Environment
 
Observations on the anycast Root Using DNSMON
Observations on the anycast Root Using DNSMONObservations on the anycast Root Using DNSMON
Observations on the anycast Root Using DNSMON
RIPE NCC
 
CCXG Workshop, May 2021, Chiara Falduto
CCXG Workshop, May 2021, Chiara FaldutoCCXG Workshop, May 2021, Chiara Falduto
CCXG Workshop, May 2021, Chiara Falduto
OECD Environment
 
RF measurement and optimization Engineer EMERSON EDUARDO RODRIGUES
RF measurement and optimization Engineer EMERSON EDUARDO RODRIGUESRF measurement and optimization Engineer EMERSON EDUARDO RODRIGUES
RF measurement and optimization Engineer EMERSON EDUARDO RODRIGUES
EMERSON EDUARDO RODRIGUES
 
Presentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah IghagbonPresentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah IghagbonAANUOLUWAPO D. IGHAGBON
 
Symp data comm slides
Symp data comm slidesSymp data comm slides
Symp data comm slides
RTCA
 
4th Technical Meeting - WP3
4th Technical Meeting - WP34th Technical Meeting - WP3
4th Technical Meeting - WP3
SLOPE Project
 
Rockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCARockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
All4 Inc.
 
Cluster optimization procedure v1
Cluster optimization procedure v1Cluster optimization procedure v1
Cluster optimization procedure v1
Terra Sacrifice
 
DSD-INT 2014 - Delft-FEWS Users Meeting - IWP real-time monitoring system for...
DSD-INT 2014 - Delft-FEWS Users Meeting - IWP real-time monitoring system for...DSD-INT 2014 - Delft-FEWS Users Meeting - IWP real-time monitoring system for...
DSD-INT 2014 - Delft-FEWS Users Meeting - IWP real-time monitoring system for...
Deltares
 

What's hot (19)

Development of On-Road Emissions for the 2011 National Emissions Inventory
Development of On-Road Emissions for the 2011 National Emissions InventoryDevelopment of On-Road Emissions for the 2011 National Emissions Inventory
Development of On-Road Emissions for the 2011 National Emissions Inventory
 
Deployment Process Diagram
Deployment Process DiagramDeployment Process Diagram
Deployment Process Diagram
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
 
Synchronisation
SynchronisationSynchronisation
Synchronisation
 
Ran78 summary
Ran78 summaryRan78 summary
Ran78 summary
 
Rws 150073 chairman summary
Rws 150073 chairman summaryRws 150073 chairman summary
Rws 150073 chairman summary
 
PROJECT STORYBOARD: Call One Router Installation Process Improvement Project
PROJECT STORYBOARD: Call One Router Installation Process Improvement ProjectPROJECT STORYBOARD: Call One Router Installation Process Improvement Project
PROJECT STORYBOARD: Call One Router Installation Process Improvement Project
 
Emme iraq march 2011 - final
Emme iraq march 2011 - finalEmme iraq march 2011 - final
Emme iraq march 2011 - final
 
CCXG Workshop, May 2021, Camila Labarca
CCXG Workshop, May 2021, Camila LabarcaCCXG Workshop, May 2021, Camila Labarca
CCXG Workshop, May 2021, Camila Labarca
 
Observations on the anycast Root Using DNSMON
Observations on the anycast Root Using DNSMONObservations on the anycast Root Using DNSMON
Observations on the anycast Root Using DNSMON
 
CCXG Workshop, May 2021, Chiara Falduto
CCXG Workshop, May 2021, Chiara FaldutoCCXG Workshop, May 2021, Chiara Falduto
CCXG Workshop, May 2021, Chiara Falduto
 
RF measurement and optimization Engineer EMERSON EDUARDO RODRIGUES
RF measurement and optimization Engineer EMERSON EDUARDO RODRIGUESRF measurement and optimization Engineer EMERSON EDUARDO RODRIGUES
RF measurement and optimization Engineer EMERSON EDUARDO RODRIGUES
 
Presentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah IghagbonPresentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah Ighagbon
 
Symp data comm slides
Symp data comm slidesSymp data comm slides
Symp data comm slides
 
4th Technical Meeting - WP3
4th Technical Meeting - WP34th Technical Meeting - WP3
4th Technical Meeting - WP3
 
Rockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCARockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCA
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
 
Cluster optimization procedure v1
Cluster optimization procedure v1Cluster optimization procedure v1
Cluster optimization procedure v1
 
DSD-INT 2014 - Delft-FEWS Users Meeting - IWP real-time monitoring system for...
DSD-INT 2014 - Delft-FEWS Users Meeting - IWP real-time monitoring system for...DSD-INT 2014 - Delft-FEWS Users Meeting - IWP real-time monitoring system for...
DSD-INT 2014 - Delft-FEWS Users Meeting - IWP real-time monitoring system for...
 

Viewers also liked

языковая школа президент
языковая школа президентязыковая школа президент
языковая школа президентpodmishka
 
www.botanoo.com/sergio
www.botanoo.com/sergiowww.botanoo.com/sergio
www.botanoo.com/sergio
Алена Кудриницкая
 
Botanoo compensation plan_2012
Botanoo compensation plan_2012Botanoo compensation plan_2012
Botanoo compensation plan_2012
Алена Кудриницкая
 
Botanoo Kiotoi jegyzokonyv
Botanoo Kiotoi jegyzokonyv Botanoo Kiotoi jegyzokonyv
Botanoo Kiotoi jegyzokonyv
Алена Кудриницкая
 
A decade of devices + services
A decade of devices + servicesA decade of devices + services
A decade of devices + services
mattballantine
 

Viewers also liked (6)

языковая школа президент
языковая школа президентязыковая школа президент
языковая школа президент
 
www.botanoo.com/sergio
www.botanoo.com/sergiowww.botanoo.com/sergio
www.botanoo.com/sergio
 
Botanoo compensation plan_2012
Botanoo compensation plan_2012Botanoo compensation plan_2012
Botanoo compensation plan_2012
 
Botanoo Kiotoi jegyzokonyv
Botanoo Kiotoi jegyzokonyv Botanoo Kiotoi jegyzokonyv
Botanoo Kiotoi jegyzokonyv
 
A decade of devices + services
A decade of devices + servicesA decade of devices + services
A decade of devices + services
 
Input devise mouse
Input devise mouseInput devise mouse
Input devise mouse
 

Similar to R1 142802 highlight from ran#64 for ran1#78 v2

Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
EMERSON EDUARDO RODRIGUES
 
5G New Radio Timeline after RAN#72 RP-161253
5G New Radio Timeline after RAN#72 RP-1612535G New Radio Timeline after RAN#72 RP-161253
5G New Radio Timeline after RAN#72 RP-161253
Eiko Seidel
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 160681
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 160681Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 160681
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 160681
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
EMERSON EDUARDO RODRIGUES
 
Summary from 3GPP RAN #86
Summary from 3GPP RAN #86Summary from 3GPP RAN #86
Summary from 3GPP RAN #86
3G4G
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-cleanEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-clean
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 2 clean1 new wi proposal perf...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 2 clean1 new wi proposal perf...Emerson Eduardo Rodrigues - ENGINEERING STUDIES 2 clean1 new wi proposal perf...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 2 clean1 new wi proposal perf...
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark new si propos...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark new si propos...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark new si propos...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark new si propos...
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-markEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - cleanEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
EMERSON EDUARDO RODRIGUES
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
EMERSON EDUARDO RODRIGUES
 

Similar to R1 142802 highlight from ran#64 for ran1#78 v2 (20)

Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152272 new work item on e...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
 
5G New Radio Timeline after RAN#72 RP-161253
5G New Radio Timeline after RAN#72 RP-1612535G New Radio Timeline after RAN#72 RP-161253
5G New Radio Timeline after RAN#72 RP-161253
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 160681
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 160681Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 160681
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 160681
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664 new work item on u...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160664
 
Summary from 3GPP RAN #86
Summary from 3GPP RAN #86Summary from 3GPP RAN #86
Summary from 3GPP RAN #86
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-cleanEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-clean
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 152263 v6 with change his...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 3 clean1
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 2 clean1 new wi proposal perf...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 2 clean1 new wi proposal perf...Emerson Eduardo Rodrigues - ENGINEERING STUDIES 2 clean1 new wi proposal perf...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES 2 clean1 new wi proposal perf...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark new si propos...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark new si propos...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark new si propos...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark new si propos...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-markEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160571-mark
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160636 mobility enhanceme...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean new study ...
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - cleanEmerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - clean
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160534 - rm new study ite...
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 

R1 142802 highlight from ran#64 for ran1#78 v2

  • 1. 1 RAN1 ChairmanRAN1 Chairman R1-142802R1-142802 Selected highlights from RAN#64Selected highlights from RAN#64 of relevance to RAN1of relevance to RAN1
  • 2. 2 HSPA • All CRs approved • Rel-12 – Study on Scalable UMTS by filtering • SI is stopped with 85% completion level • There is one Note in RAN report that “The study item resulting in TR 25.701 has been closed but not all open issues have been addressed. Further details can be found in this final status report of the SI.” – DCH enhancement • WI is extended with targeting September completion • Updated WID (RP-140771) is approved – UMTS Heterogeneous Networks • WI is extended with September completion date
  • 3. 3 LTE: Rel-12 (1) • All CRs approved • Rel-12 – Further Downlink MIMO Enhancement for LTE-Advanced • Core part completed – Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation • Core part completed – LTE TDD-FDD joint operation including Carrier Aggregation • Core part completed – LTE Coverage Enhancements • Core part completed – Low Cost & Enhanced Coverage MTC UE for LTE • Core part 70% with 100% RAN1 completion – LTE Device to Device Proximity Services • WI is extended with targeting September completion
  • 4. 4 LTE: Rel-12 (2) • Rel-12 (cont.) – Small Cell Enhancements – Physical-layer Aspects • WI is extended with targeting September completion • Way forward related to small cell on/off (RP-141031) is approved with following contents – Spend no more than 1 TU in RAN1#78 to discuss this open issue: » “Investigate detailed solution(s) of new L1 procedure for activated Scell operating on/off that further reduces transition time” – If a consensus cannot be reached on a complete solution during this limited time, then there will be no new L1 procedure for activated SCell operating on/off in Rel-12 due to time constraints. – (RAN2-led) Dual connectivity for LTE • WI is extended with targeting September completion • Allocate RAN1 time unit in RAN1 #78 meeting
  • 5. 5 LTE: Others – New Rel-13 SI approved: • Study on Indoor Positioning Enhancements for UTRA and LTE (RP-141003) – Full summary including requested time budgets of all items can be found in RP-141039 (endorsed by RAN)