Quality outlook for
Road construction
in BDP 2031 Project
(ISO 9000)
By
Najeeh Chundakkadan Mohammad Ali
Student ID: 779670
Agenda
• What is Quality in a project view?
• Is it just a control measure?
• Why is it relevant to a project? (Particular for road networks)
• Execution Plan for Quality assessment.
• Approaching International/National bodies to achieve it.
• A sustainable approach considering global issues.
• A “Never-ending investigation”.
Introduction
Definitions of
Quality
Fitness for
use or
purpose
Value or
worthiness for
money, etc.
To do a right
thing at first
time
Conformance
to standards
Freedom from
deficiencies
or defects
To do a right
thing at the
right-time
Features that
meets consumer
needs & gives
customer
satisfaction
Find & know
what
consumer
wants?
Quality as a whole
Quality assessment is for the whole life of a project
Quality (Asphaltic/Bitumen mix)
Before Production,
company must find out
the needs of the
consumers. These needs
must be included in the
product design
specifications. So, the
company must design its
product as per the needs
of consumers.
During Production,
company must have quality
control at all stages of the
production process. There
must have quality control
for raw materials, plant &
machinery, selection and
training of manpower,
finished products, laying of
product, etc.
After Production, the finished-
product must conform (match)
to the product-design
specifications in all aspects,
especially quality. The company
must fix a high quality standard
for its product and see that the
product is manufactured
exactly as per this quality
standard. It must try to make
zero-defect products.
Importance
Importance of Quality (Product)
For Company:
It is because, bad quality
products will affect the
client/consumer’s confidence,
image and sales of the company.
It may even affect the survival of
the company.
For Client/Consumer:
They are ready to pay high
prices, but in return, they expect
best-quality products. If they are
not satisfied with the product
quality of company, they will
depend on the competitors.
“Quality
Statement” when
tendering for a
contract
Execution Plan for Quality
Execution Plan for Quality
(BS Series 900)
• Initial Stage:
1. Inspection of site: To have an idea of quantity of work.
2. Mobilization of Hot Mix Plant: Purchase according to amount of
work & in an easy accessible area to site.
3. Calibration of Hot Mix Plant: Quality check to get desired product.
4. Laboratory set up: “The Quality Check House” easy accessibility
from work site & plant site.
5. Calibrated Laboratory Equipment's: Quality check to get desired
product.
Execution Plan for Quality (Cont.)
• Initial Stage: (Cont.)
1. Machineries: Paver, Rollers, Mix transporting vehicles, earth moving
equipment’s, etc. and a check on their working efficiencies.
2. Alternatives: Incase of a breakdown of machineries (Standby).
3. Trained QA/QC: Appointing a qualified Quality Control Engineer.
4. Skilled Operator & Labors: A skilled plant operator, team of
experienced & disciplined Labors to execute the work.
5. Competent Surveyor: Appointing a qualified Surveyor to keep in
check with the Levels.
Execution Plan for Quality (Cont.)
• Initial Stage: (Cont.)
1. Raw material source: Identifying the source/quarry producing raw
materials suitable for execution of work in accordance with
contract & British Standards.
2. Procurement: Coarse & Fine Aggregates (BS EN 13043),
Bitumen/Asphalt (BS EN 12591), Cement (BSI PD 6691), etc.
3. Stacking: Early stacking of raw materials and easily accessible to
Plant Site.
Execution Plan for Quality (Cont.)
• Production Stage:
1. Tests for Aggregates (BS EN 13043): Sieve Analysis, Specific gravity
& Water absorption test, Shape test, Impact value, Los Angeles
Abrasion value, Crushing value, Soundness test.
2. Tests for Bitumen & Bituminous mix (BS EN 12591): Bitumen
content/Bitumen extraction, Marshall Stability test, Specific gravity
test, Penetration test, etc.
3. Tests for Cement (BSI PD 6691): Fineness & Soundness tests.
4. Temperature Check (BS 594987:2010): Keep in check with
aggregate, bitumen & bituminous mix temperature.
Execution Plan for Quality (Cont.)
• At Site:
1. Paver: Set the levels in accordance with the task in hand.
2. Temperature: In accordance with BS 594987, temperature of
bituminous mix at the time of laying must be kept in check.
3. Tests at site: Field Density, Surface Accuracy.
4. Roller Combinations: For maximum result & density, setting up
roller combination is essential.
International/National Bodies
• International Organization for Standardization (ISO)
• International Association of Public Transport (UITP): For sustainable
mobility and promoter of innovations.
• United Nations Economic Commission for Europe (UNECE): It brings
together Government & Stakeholders for dialogue & cooperation in
transportation sector.
• United Nations Environment Programme (UNEP): It promotes the
integration of environmental considerations into transport-related
decisions at all levels.
• Commission for European Normalization (CEN): It standardizes the quality
of work.
Sustainable Approach
“Building Better Roads”
• Highway Agency (HA): promotes sustainable road construction.
• Constructing Long-life pavements to prevent maintenance.
• Adoption of stabilization techniques for unpaved roads to reduce gravel loss.
• Reuse of recycled materials in road construction or materials from industrial by-
products.
• Use of rubber tyres, glass & broken concrete in underlayers & surfaces of roads
reduces energy consumption & CO2 emission.
• Avoiding water pollution by applying proper drainage system.
• Making use of Intelligent Transport Systems (ITS) to have a controlled traffic
system and contribute to energy savings.
• Quieter Roads: Traffic management strategies combined with road construction
improvements can reduce noise.
Never Ending Investigation
• Road construction from a stakeholder perspective is a never ending
process.
• Maintenance whenever required.
• Field Density check.
• Study the traffic involved in the area.
• Accident case investigation.
• Make use and accessible for the community.
• Encourage Cycling tracks.
• Encourage Innovations.
References
• Joseph M. Juran- Juran’s Quality Control Handbook
• www.google.com
• www.iso.org/
• www.uitp.org/
• https://www.unece.org/
• www.unep.org
• www.highways.gov.uk/
• British Standards Series 900
THANK YOU

More Related Content

Similar to Quality Outlook BDP2031.pptx

PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
PPT on GRP pipes and Fittings - manufacturing and testing
PPT on GRP pipes and Fittings - manufacturing and testingPPT on GRP pipes and Fittings - manufacturing and testing
PPT on GRP pipes and Fittings - manufacturing and testing
anoopmanoharan2
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
Anil Singh
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
Ali Khidr
 
Precast QA/QC Manager
Precast QA/QC Manager Precast QA/QC Manager
Precast QA/QC Manager
AnwardeenJawaharlal
 
Precast QAQC Manager CV
Precast QAQC Manager CVPrecast QAQC Manager CV
Precast QAQC Manager CV
AnwardeenJawaharlal
 
Pcv.pdf
Pcv.pdfPcv.pdf
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec
Sirris
 
capstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptxcapstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptx
YogitaSalunke1
 
JAGJEEVAN WARIYA
JAGJEEVAN WARIYAJAGJEEVAN WARIYA
JAGJEEVAN WARIYA
Jagjeevan Wariya NACE-2
 
Final project report
Final project reportFinal project report
Final project report
Ankit Sutaria
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
Anwardeen Jawaharlal
 
wsa
wsawsa
karthick resume
karthick resumekarthick resume
karthick resume
karthick N
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
Seetha Ram P G
 
SDP Presentation.pptx
SDP Presentation.pptxSDP Presentation.pptx
SDP Presentation.pptx
SubhransuPatra3
 
Amir QC
Amir QCAmir QC
Amir QC
aamir waheed
 
AH15019
AH15019AH15019
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
waleed ibrahim
 
MWI CV3
MWI CV3MWI CV3
MWI CV3
Mark Woodman
 

Similar to Quality Outlook BDP2031.pptx (20)

PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
PPT on GRP pipes and Fittings - manufacturing and testing
PPT on GRP pipes and Fittings - manufacturing and testingPPT on GRP pipes and Fittings - manufacturing and testing
PPT on GRP pipes and Fittings - manufacturing and testing
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
Precast QA/QC Manager
Precast QA/QC Manager Precast QA/QC Manager
Precast QA/QC Manager
 
Precast QAQC Manager CV
Precast QAQC Manager CVPrecast QAQC Manager CV
Precast QAQC Manager CV
 
Pcv.pdf
Pcv.pdfPcv.pdf
Pcv.pdf
 
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec
 
capstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptxcapstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptx
 
JAGJEEVAN WARIYA
JAGJEEVAN WARIYAJAGJEEVAN WARIYA
JAGJEEVAN WARIYA
 
Final project report
Final project reportFinal project report
Final project report
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
 
wsa
wsawsa
wsa
 
karthick resume
karthick resumekarthick resume
karthick resume
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
 
SDP Presentation.pptx
SDP Presentation.pptxSDP Presentation.pptx
SDP Presentation.pptx
 
Amir QC
Amir QCAmir QC
Amir QC
 
AH15019
AH15019AH15019
AH15019
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
MWI CV3
MWI CV3MWI CV3
MWI CV3
 

Recently uploaded

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 

Recently uploaded (20)

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 

Quality Outlook BDP2031.pptx

  • 1. Quality outlook for Road construction in BDP 2031 Project (ISO 9000) By Najeeh Chundakkadan Mohammad Ali Student ID: 779670
  • 2. Agenda • What is Quality in a project view? • Is it just a control measure? • Why is it relevant to a project? (Particular for road networks) • Execution Plan for Quality assessment. • Approaching International/National bodies to achieve it. • A sustainable approach considering global issues. • A “Never-ending investigation”.
  • 3. Introduction Definitions of Quality Fitness for use or purpose Value or worthiness for money, etc. To do a right thing at first time Conformance to standards Freedom from deficiencies or defects To do a right thing at the right-time Features that meets consumer needs & gives customer satisfaction Find & know what consumer wants?
  • 4. Quality as a whole Quality assessment is for the whole life of a project Quality (Asphaltic/Bitumen mix) Before Production, company must find out the needs of the consumers. These needs must be included in the product design specifications. So, the company must design its product as per the needs of consumers. During Production, company must have quality control at all stages of the production process. There must have quality control for raw materials, plant & machinery, selection and training of manpower, finished products, laying of product, etc. After Production, the finished- product must conform (match) to the product-design specifications in all aspects, especially quality. The company must fix a high quality standard for its product and see that the product is manufactured exactly as per this quality standard. It must try to make zero-defect products.
  • 5. Importance Importance of Quality (Product) For Company: It is because, bad quality products will affect the client/consumer’s confidence, image and sales of the company. It may even affect the survival of the company. For Client/Consumer: They are ready to pay high prices, but in return, they expect best-quality products. If they are not satisfied with the product quality of company, they will depend on the competitors. “Quality Statement” when tendering for a contract
  • 7. Execution Plan for Quality (BS Series 900) • Initial Stage: 1. Inspection of site: To have an idea of quantity of work. 2. Mobilization of Hot Mix Plant: Purchase according to amount of work & in an easy accessible area to site. 3. Calibration of Hot Mix Plant: Quality check to get desired product. 4. Laboratory set up: “The Quality Check House” easy accessibility from work site & plant site. 5. Calibrated Laboratory Equipment's: Quality check to get desired product.
  • 8. Execution Plan for Quality (Cont.) • Initial Stage: (Cont.) 1. Machineries: Paver, Rollers, Mix transporting vehicles, earth moving equipment’s, etc. and a check on their working efficiencies. 2. Alternatives: Incase of a breakdown of machineries (Standby). 3. Trained QA/QC: Appointing a qualified Quality Control Engineer. 4. Skilled Operator & Labors: A skilled plant operator, team of experienced & disciplined Labors to execute the work. 5. Competent Surveyor: Appointing a qualified Surveyor to keep in check with the Levels.
  • 9. Execution Plan for Quality (Cont.) • Initial Stage: (Cont.) 1. Raw material source: Identifying the source/quarry producing raw materials suitable for execution of work in accordance with contract & British Standards. 2. Procurement: Coarse & Fine Aggregates (BS EN 13043), Bitumen/Asphalt (BS EN 12591), Cement (BSI PD 6691), etc. 3. Stacking: Early stacking of raw materials and easily accessible to Plant Site.
  • 10. Execution Plan for Quality (Cont.) • Production Stage: 1. Tests for Aggregates (BS EN 13043): Sieve Analysis, Specific gravity & Water absorption test, Shape test, Impact value, Los Angeles Abrasion value, Crushing value, Soundness test. 2. Tests for Bitumen & Bituminous mix (BS EN 12591): Bitumen content/Bitumen extraction, Marshall Stability test, Specific gravity test, Penetration test, etc. 3. Tests for Cement (BSI PD 6691): Fineness & Soundness tests. 4. Temperature Check (BS 594987:2010): Keep in check with aggregate, bitumen & bituminous mix temperature.
  • 11. Execution Plan for Quality (Cont.) • At Site: 1. Paver: Set the levels in accordance with the task in hand. 2. Temperature: In accordance with BS 594987, temperature of bituminous mix at the time of laying must be kept in check. 3. Tests at site: Field Density, Surface Accuracy. 4. Roller Combinations: For maximum result & density, setting up roller combination is essential.
  • 12. International/National Bodies • International Organization for Standardization (ISO) • International Association of Public Transport (UITP): For sustainable mobility and promoter of innovations. • United Nations Economic Commission for Europe (UNECE): It brings together Government & Stakeholders for dialogue & cooperation in transportation sector. • United Nations Environment Programme (UNEP): It promotes the integration of environmental considerations into transport-related decisions at all levels. • Commission for European Normalization (CEN): It standardizes the quality of work.
  • 13. Sustainable Approach “Building Better Roads” • Highway Agency (HA): promotes sustainable road construction. • Constructing Long-life pavements to prevent maintenance. • Adoption of stabilization techniques for unpaved roads to reduce gravel loss. • Reuse of recycled materials in road construction or materials from industrial by- products. • Use of rubber tyres, glass & broken concrete in underlayers & surfaces of roads reduces energy consumption & CO2 emission. • Avoiding water pollution by applying proper drainage system. • Making use of Intelligent Transport Systems (ITS) to have a controlled traffic system and contribute to energy savings. • Quieter Roads: Traffic management strategies combined with road construction improvements can reduce noise.
  • 14. Never Ending Investigation • Road construction from a stakeholder perspective is a never ending process. • Maintenance whenever required. • Field Density check. • Study the traffic involved in the area. • Accident case investigation. • Make use and accessible for the community. • Encourage Cycling tracks. • Encourage Innovations.
  • 15. References • Joseph M. Juran- Juran’s Quality Control Handbook • www.google.com • www.iso.org/ • www.uitp.org/ • https://www.unece.org/ • www.unep.org • www.highways.gov.uk/ • British Standards Series 900