CONTENTS
Regional Manager’s Report 3 D. Inter Agency Project
Status of Irrigation Development—CY2015 4 CARP-IC Phase III 21-22
Engineering and Operation ARISP 3 (under JBIC loan) 23-28
Project Development and Implemetation Operation and Maintenance Activities
A.1 Locally funded Projects A. National Irrigation Systems (NIS) 29
CY2014 Accomplishment 5-7 Cropping Intensity (CI) 30
CY2015 8-9 Collection Efficiency (CE) 30
A.2 Line Projects (SRIP) Viability Index (VI) 31
Ibingan SRIP 10-14 B. Communal Irrigation System (CIS) 31
Sibagat SRIP 15 C. Institutional Development Program 32
B. Foreign Assisted Projects 16 Financial Management 33-34
THIRIS 17-20 HR Management 35
RIIS 20 Success Factors 36
C. Repair, Operation and Maintenance Hindering Factors 36
of NIS Pump Irrigation Systems 21
No. Title Page
1 Status of Project Implementation of Operations Department
- Monitored Lumpsum Projects for CY 2014 6-7
2 Status of Project Implementation of Operations Department
- Monitored Lumpsum Projects for CY 2015 9
3 NIS - Cropping Intensity 30
4 NIS - Collection Effeciency 30
5 NIS - Viabilty Index 31
6 Service Area of CIS 31
7 No. of IA’s and Farmers 32
8 Summary of Financial Status 34
9 CY2015 Total Personnel Complement 35
LIST OF TABLES
3
REGIONAL MANAGER’S REPORT
I
n 2015, NIA implemented a total of 158 projects
with an approved allocation of P490.2 million.
Out of these, 77 projects were completed as of
December 31, 2015, which generated 197 hectares
of new areas, restored irrigation service to 1,082 hec-
tares and rehabilitated irrigation facilities and struc-
tures covering 1,576 hectares benefitting a total of
2,322 farmers.
Aside from the 78 completed projects, 78 projects are
still ongoing construction and expected to be finished
by end of March 2016, while works in 2 projects have
not yet started due to right-of-way and peace and
order problems.
NIA Bicol’s physical accomplishment of 74.24 per-
cent in 2015 is higher than the 62.06 percent accom-
plishment in 2014.
These construction and rehabilitation activities both
in National and communal irrigation systems (NIS/
CIS) were geared towards the expansion of irrigated
areas to increase palay production in the region in
support of the national government’s food self-
sufficiency program.
In terms of 2015 financial accomplishment, NIA Bicol
earned a total income of P56.7 million consisting of:
P37.9 million in irrigation service fees (ISF); P7.5 mil-
lion in amortizations from communal and pump irriga-
tion systems (CIS/PIS); P2.3 million in farmers’ equity
contributions; P120,000.00 in equipment rental; and
P11 million in bidding documents.
Last year’s ISF collection of P37.9 million is higher by
6.8 percent compared to 2014 collection of P35.5
million, while CIS/PIS amortization posted an in-
crease of 9 percent from P6.9 million in 2014 to P7.5
million in 2015.
As far as the operations of 10 NIS in the region are
concerned, NIA irrigated a total area of 34,520 hec-
tares benefiting some 33,992 farmers in 2015 with a
cropping intensity (CI) of 163.68 percent. For CIS,
the total irrigated area in the same year totaled to
66,381 hectares serving 46,630 farmers with a CI of
162.71.
Overall, the level of irrigation development in the
Bicol region increased from 56.84 percent in 2014 to
57.64 percent in 2015.
ENGR. VICENTE R. VICMUDO, Ph.D.
4
Irrigation Development as of CY 2015
South Quinale Dam,
Libon, Albay
STATUS OF IRRIGATION DEVELOPMENT
5
Project Development and Implementation
A.1 Locally funded Projects (Lump Sum Appropriation)
CY 2014 ACCOMPLISHMENTS
Lump Sum Appropriation includes projects funded under the General Appropriation
Act which are categorized as Small Irrigation Projects (SIPs), Restoration /Rehabilitation of
Existing Irrigation Systems (RREIS), NIS/CIS Extension, Repair of Groundwater Pump
Irrigation System (RGPIS). For the CY 2014 projects, the total direct cost (DBM Bar Code)
is Php 599,680.00 and allotment released is 100% of the approved budget.
A physical target for area generation is 2,570 hectares, 20 hectares for area restora-
tion and 1,114 hectares for rehabilitation
As of December 31, 2015, actual accomplishments for area generation is 1,985
hectares, for area restoration is 10 hectares and for area rehabilitation is 1,074 hectares,
equivalent to 77.24%, 50.00% and 96.41% respectively of the total target for area genera-
tion, restoration and rehabilitation. The Physical accomplishment is 91.42%.
With respect to other fund sources particularly Small Reservoir Irrigation Projects
(SRIP), there is no accomplishment yet since the design of the impounding dam for Ibingan
is submitted to DSD in November 2015. While, the design of Sibagat SRIP is still subject
for finalization the Central office.
ENGINEERING AND OPERATIONS
6
TABLE1:STATUSOFPROJECTIMPLEMENTATIONOFOPERATIONSDEPARTMENT—
MONITOREDLUMPSUMPROJECTSFORCY2014
ASOFDECEMBER31,2015
FUNDSOURCE
PARTICULAR
APPROVEDPOW/
POWDIRECTCOST
(P)
ALLOCATION
(DBMBARCODE)
(P)
NO.OFPROJECTS
PHYSICALTARGET/ACTUALACCOMPLISHMENT
ACCOMPLISHMENT
AREA(has)
FBs
JOB
GEN
TOTAL
ON-GOING
COMPLETED
NEW
REH
RES
AREA(has)
FBs
JOB GENERATED
PHYSICAL STATUS
%
FINANCIAL STATUS
%
NEWREHAB
RE-
STORE
SMALLIRRIGA-
TIONPROJECTS
(SIP)
NIS
-----------------
-----------------
CIS
400,000,000.00400,000,000.00467392,056--3,8702,4001,4773,2362,10187.5463.02
400,000,000.00----------------
TOTAL
400,000,000.00400,000,000.00467392,056--3,8702,4001,4773,2362,10187.5463.02
400,000,000.00----------------
RESTORATION/
REHABILATION
OF
EXISTINGIRRI-
GATIONSYSTEM
(RREIS)
NIS
4,320,000.00----------------
4,000,000.004,000,000.0022-100-70241007024100.0084.75
CIS
33,048,000.00----------------
30,600,000.0030,600,000.0017116-1,014-68018497461317896.7350.08
TOTAL
37,368,000.00----------------
34,600,000.0034,600,000.0019118-1,114-7502081,07468320297.1154.09
NATIONAL/
COMMUNAL
IRRIGATION
SYSTEMEXTEN-
SIONPROJECT
(NIS/CISEXTEN-
SION)
NIS
18,900,000.00----------------
17,500,000.0017,500,000.001180--13410580134105100.0058.11
CIS
105,386,400.00----------------
97,580,000.0097,580,000.0016115434-208385854281095858299.3577.42
TOTAL
124,286,400.00--1-------------
115,080,000.00115,080,000.001716514-20972690508101,09268799.4574.48
REPAIROF
GROUNDWATER
PUMP
IRRIGATION
SYSTEM
(RGPIS)
NIS
54,000,000.00----------------
50,000,000.0050,000,000.001313----300300100.0085.07
TOTAL
54,000,000.00----------------
50,000,000.0050,000,000.001313----300300100.0085.07
7
ASOFDECEMBER31,2015
FUNDSOURCE
PARTICULAR
APPROVED
POW/
POWDIRECT
COST(P)
ALLOCATION
(DBMBAR
CODE)
(P)
NO.OFPROJECTS
PHYSICALTARGET/ACTUALACCOMPLISHMENT
ACCOMPLISHMENT
AREA(has)
FBs
JOB
GEN
TO-
TAL
O
N-
G
OI
N
G
COM
PLE
TED
NEWREHRES
AREA(has)
FBs
JOB
GEN
PHYSICAL STATUS %
FINANCIAL STATUS %
NEW
RE-
HAB
RESTORE
SUMMARYFOR2014PROJECTS
TOTAL
N
I
S
23,220,000.00---------------
21,500,000.0021,500,000.003380100-20412980100204129100.0063.07
TOTAL
C
I
S
592,434,400.00----------------
578,180,000.00578,180,000.00929832,4901,014205,3883,4691,905974104,8073,16091.1066.68
SUBTOTALFOR
LUMPSUMPRO-
JECTS
T
O
T
A
L
615,654,400.00
599,680,000.00959862,5701,114205,5923,5981,9851,074105,0113,28991.4266.55
599,680,000.00
TABLE1—STATUSOFPROJECTIMPLEMENTATIONOFOPERATIONSDEPARTMENT—
MONITOREDLUMPSUMPROJECTSFORCY2014
8
ENGI-CY 2015 ACCOMPLISHMENTS
Under the CY 2015 lump sum allocation, only Restoration /Rehabilitation of Existing Irri-
gation Systems (RREIS), NIS/CIS Extension, and Comprehensive Agrarian Reform Program-
Irrigation Component (CARP-IC) were implemented with a total direct cost (DBM Bar Code)
of Php490,200.00 and allotment released is 97.12% of the approved budget.
As of December 31, 2015, out of the 158 projects for implementation, 78 projects have
been completed, 2 project awaits fund releases and 78 are still on-going. Out of this, a total of
2,322 farmers were benefited and 2,159 jobs were generated.
Physical targets for area generation is 388 hectares, 1670 hectares for area restoration
and 2,442 hectares for rehabilitation. As of December 31, 2015, actual accomplishments for
area generation is 231 hectares, for area restoration is 1,092 hectares and for area rehabilita-
tion is 1,576 hectares, equivalent to 59.54%, 65.41% and 64.52% respectively of the total
target for area generation, restoration and rehabilitation with a 74.24% physical accomplish-
ment.
With respect to other fund sources particularly Small Reservoir Irrigation Projects
(SRIP), there is no accomplishment yet since the design works are still at the NIA Central Of-
fice.
Matagbac CIS,
Milagros, Masbate
9
TABLE2:STATUSOFPROJECTIMPLEMENTATIONOFOPERATIONSDEPARTMENT—
MONITOREDLUMPSUMPROJECTSFORCY2015
ASOFDECEMBER31,2015
FUNDSOURCE
PARTIC-
ULAR
ALLOCATION
(DBMBARCODE)
(P)
NO.OFPROJECTSCYTARGET/ACTUALACCOMPLISHMENT
TOTAL
ON-
GO-
ING
NOT
YET
STAR
TED
COMP
LETED
AREA(has)
FBs
JOB
GENER-
ATION
VALUEOFACCOM-
PLISHMENT
(P)
CASH
DISBURSEMENT
PHYS-
ICAL
STA-
TUS
(%)
FINAN-
CIAL
STATUSNEWREHAB
RE-
STORE
RESTORATION/
REHABILITATIONOF
EXISTINGIRRIGATION
SYSTEMS
(RREIS)
NIS161,600,000.002418-6
-5888871,673970
119,886,581.7018,262,561.9274.1911.30
-522507758719
CIS234,377,000.0011549-66
1,5146552,7301,406
179,781,383.5020,416,164.8276.718.71
-8384851,3111,079
TOTAL395,977,000.0013967-72
-2,1021,5424,4032,376
299,667,965.2038,678,726.7475.689.77
-1,3609922,0691,798
NATIONAL/COMMUNAL
IRRIGATIONSYSTEMEX-
TENSION
PROJECT
(NIS/CISEXTENSION)
NIS17,714,000.0011--
5025020350106
12,821,393.20-72.38-
151501013553
CIS65,509,000.0015825
3289058440393
44,567,122.007,401,963.3568.0311.30
2166650124266
TOTAL83,223,000.0016925
37834078790499
57.388,515.207,401,963.3568.968.89
23121660259319
COMPREHENSIVEAGRARI-
ANREFORM
PROGRAM–IRRIGATION
COMPONENT
(CARP-IC)
NIS11,000,000.00321
10-50-66
6,868,000.00-62.44-
-40-41
CIS11,000,000.00321
10-50-66
6,868,000.00---
-40-41
SUMMARYFOR2015PROJECTS
TOTALFORNISNIS179,314,000.002519-6
508389072.0231,076
132,707,974.9018,262,561.9274.0110.18
15672517893773
TOTALFORCISCIS310,886,000.0013359272
3381,6047633,1701,865
231,216,505.5027,818,128.1774.378.95
2169045751,4351,386
SUBTOTALFORLUMPSUM
PROJECTS
TOTAL490,200,000.0015878278
3882,4421,6705,1932,941
363,924,480.4046,080,690.0974.249.40
2311,5761,0922,3282,159
10
A.2 Line Projects
SMALL RESERVOIR IRRIGATION PROJECTS
The Small Reservoir Irrigation Project (SRIP) is a locally funded project implemented
nationwide. The project requires the identification, investigation, validation, feasibility stud-
ies, detailed engineering and construction of dam and reservoir and irrigation facilities to pro-
vide a year round irrigation.
NIA REGION 5 IS IMPLEMENTING THE FOLLOWING SUB-PROJECTS/ACTIVITIES:
A. Ibingan SRIP, Prieto Diaz, Sorsogon
The project aims to develop the full potential of water to be impounded for irrigation to
provide adequate irrigation water supply to about 255 hectares of agricultural land that
covers the municipality of Prieto Diaz in Sorsogon in Region 5, with 329 farmer benefi-
ciaries. The overall accomplishment for the CY2012 and CY2013 Projects is 94.11%as of
December 2015.
Pictures of Accomplishment for CY2012 and CY2013
Access Road Station
0+000 – 1+240.00
PACKAGE 1
CONST. OF ACCESS & SERVICE ROAD & ROAD STRUCTURES
11
PACKAGE 2
CANALIZATION & CANAL STRUCTURES
Elevated Flume
Station 3+372.50 – 3+623.00 MC
12
15 cm. CHB Canal Lining with Removable Cover
Station 0+676.90 – 0+691.78 MC
0+755.37 – 0+780.00 MC
0+789.00 – 0+906.40 MC
Canalization
Station 0+000.00 – 4+890.00 MC
13
PACKAGE 3
CONSTRUCTION OF SERVICE ROAD
Service Road
Station 4+253 – 8+400
14
Canalization
Station 4+980—10+415
PACKAGE 4
CANALIZATION & CANAL STRUCTURES
Siphon
Station 9+885—9+922
15
B. SIBAGAT SRIP, Minalabac, Camarines Sur
This ongoing project is located in Brgy. Magadap, Minalabac, Camarines Sur. It is
designed to irrigate 350 hectares of rice lands, broken down as follows: new area = 250 hec-
tares; and rehab area = 100 hectares. This project will benefit 323 farmer beneficiaries.
As of December 2015, the overall accomplishment for civil works contract for CY
2012 and CY 2013 Programs is 83.51%.
Pictures of Accomplishment for CY2012 and CY2013
TURN OUT NO. 1, LATERAL B-2
Sta. 0+120
TURNOUT NO. 3, LATERAL A
Sta. 0+480
LATERAL B-2
STA. 0+970-1+040
16
B. Foreign Assisted Projects
PARTICIPATORY IRRIGATION DEVELOPMENT PROJECT
The Participatory Irrigation Development Project (PIDP) constitutes the first phase of a long-
term program supporting irrigation reforms in the Philippines. The World Bank loan was
approved on November 3, 2009.
The development objective of the overall PIDP Applicable Program Loan (APL 1,2 &3) is to
improve irrigation service delivery on a financially and technically sustainable basis that will
contribute to increased agricultural production and productivity among beneficiary farmers in
irrigation areas.
The projects consist of the following parts:
Part 1 Irrigation Sector Restructuring and Reform
1.1 Implementation of the NIA Rationalization Plan
1.2 NIA Institutional Strengthening and Irrigation Management Transfer
Program
Part 2 Irrigation Infrastructure Development
2.1 Rehabilitation and Modernization of Irrigation Systems
Rehabilitation and modernization of 58 existing National irrigation Systems(14
Core A and 44 Core B NISs) nationwide. In Region 5, the Core A project is be-
ing implemented at Tigman-Hinagyanan-Inarihan River Irrigation System
(THIRIS) and 2 Core B projects, Matogdon RIS in Camarines Norte and Barit
RIS in Nabua, Camarines Sur. The Core B civil works was completed in May
14, 2012 for Barit and the activities being undertaken is focus on the institutional
strengthening, capability training for IA leaders, second line leaders and mem-
bers and the Irrigation Management transfer program.
The Tigman-Hinagyanan Inarihan Rivers Irrigation System is a Core-A project
being implemented in the municipalities of Canaman, Magarao, Bombon and
Calabanga, all in the province of Camarines Sur, in the contract amount of P
87,524,235.41
The project is on-going and the contractor is obliged to observe the Social and
Environmental Management Plan to address the existing and potential environ-
mental impacts that may arise from the rehabilitation of Tigman-Hinagyanan- In-
arihan Rivers Irrigation System.
The contractor, R.D. Policarpio Co. Inc. /TGV Builders (JV) is at present conduct-
ing repair of damaged canal lining, road surfacing and repair of office buildings,
water masters’ and gate keepers’ quarters.
The irrigators’ associations are involved in the community participation aspects of
the project. The nine associations, namely: Hi-Farm IA, Division A IA, Division B
IA, Bombon-Quipayo IA, Centro-Magarao IA, Limbuan IA, Bombon-Habagatan
IA, Canaman-Magarao IA and Franc-Bel-Cas IA, had already completed with
their respective work packages. Desilting works will ensure efficient distribution
of irrigation water within the IA coverage service areas.
B. Foreign Assisted Projects
17
For CY 2015, the activities that were accomplished are the following:
1. Hauling of Road surfacing materials at service roads of main canals and laterals,
2. Repair of concrete canal lining of main canals and laterals,
3. Construction of grouted riprap at approaches of Tigman Dam,
4. Manual de silting works at main canals and laterals and mechanized de silting
works at main canals with higher depth, and;
5. Repair of 6 NIA Buildings and
6. 6. Delivery of steel gates for turn –outs. The actual physical accomplishment as of
December 31, 2015 is 44.52%.
Road surfacing
works at
Lateral B,
Hinagyanan
On-going repair of
Concrete canal
lining at Tigman
Line.
TIGMAN-HINAGYANAN-INARIHAN RIVER IRRIGATION SYSTEM (THIRIS)
18
Completed Grouted Riprap at
Tigman dam
Desilting works of Main canals at
Inarihan and Hinagyanan
19
Completed Grouted Riprap at
Tigman dam
Rehabilitation Field Office
(THIRIS)
20
For CY 2015 the activities centered on the conduct of TSA meetings, seminars
and conferences focused on the discussion of the Operations plan for Barit RIS geared
towards improvement of cropping intensity and commitment of IA leaders on ISF
collection efficiency and participation of the Irrigators’ Association in the pre-Irrigation,
Irrigation and Post Irrigation period. Series of meetings and trainings were conducted to
fully inform the farmer beneficiaries of the current NIA Programs making them a sustain-
able and viable irrigators association. Women leaders and members were also trained
through a Livelihood seminar on food processing as an additional income to uplift the
quality life of farmers.
RINCONADA INTEGRATED IRRIGATION SYSTEM (RIIS)
Livelihood Seminar on Food Processing
(November 27, 2015)
IA Performance Assessment for Barit IA Leaders
(December 23, 2015)
21
D. Inter Agency Project
NIA5 continued the implementation of locally funded projects which is Repair, Opera-
tion & Maintenance of NIS Pump Irrigation System during the year. For CY 2015, a direct
cost of P 4.7 Million was programmed for the operation of Libmanan—Cabusao Pump Irriga-
tion System in Camarines Sur. Allotment released to NIA5was 100% of the approved budget.
By the end of the year, the project was 100.00% completed.
In addition to its regular program, NIA 5 continued the implementation of inter-agency pro-
jects.
C. Repair, Operation & Maintenance of NIS Pump Irrigation Systems
I. Comprehensive Agrarian Reform Program-Irrigation Component (CARP-IC)
Phase III
The CY 2015 CARP Phase III for NIA 5 has a total project allocation of P11 Million. It
is composed of three (3) projects that will restore 10 hectares and a target new area of
10 hectares. This will also rehabilitate 163 hectares of riceland when completed.
Of the three projects that were implemented, only one (1) project was completed
restoring 10 hectares and rehabilitating 55 hectares of Riceland.
Shown is the completed
desilting works at the
Diversion Dam of
Hinipaan CIS,
Taken October 20, 2015
Proposed desilting works
at Diversion dam of
Hinipaan CIS,
taken June 18, 2015
22
COMPLETED CHB LINING OF HINIPAAN CIS
Shown is the completed construction of CHB Lining
at portion of right main canal
Sta. 0+214.56—0+267
Shown is the completed construction of CHB Lining
at portion of right main canal
Sta. 0+214.56—0+267
23
Completed Rehab of
Diversion works at right
Quinale CIS
II. Third Agrarian Reform Infrastructure Support Program (ARISP 3) partly
funded under JBIC loan
The ARISP 3 funded under the 27th
Yen Package of the Government of Japan through
the Japan Bank for International Cooperation together with the Local Government Units
(LGU) was able to complete four (4) projects this CY 2015 in NIA 5 NIA 5 implemented
six (6) projects under ARISP 3 where two(2) of the projects were completed in 2014.
These four (4) projects were able to rehabilitate 810 has and restored 153 has
riceland. It has a total project cost of 72.851 Million. The projects are located in the prov-
inces of Camarines Norte and Albay.
Newly installed
Tandem Type CP-12
Steel Gate at DW of right
Newly installed
Tandem Type CP-12
Steel Gate at DW of right
Quinale CIS
RIGHT QUINALE CIS
24
Completed CHB Lining at
Lateral B of right
Quinale CIS
Completed CHB Lining at
Lateral C of right
Quinale CIS
Completed CHB Lining at
Main Canal of right
Quinale CIS
25
Completed CHB Lining
at Lateral B of San
Agustin CIS
Completed CHB Lining at
Lateral B of right
Quinale CIS
Completed Embankment
Protection at D/S portion
of the Diversion Works of
San Agustin CIS
SAN AGUSTIN CIS
26
Completed CHB Canal
Lining at Main Canal # 1
of Minasag CIS
Completed CHB Lining
at Lateral A of
Minasag CIS
Completed CHB Lining
at Lateral A of
Minasag CIS
MINASAG CIS
27
Newly installed Steel Gate
at Santol Ilaya Dam
Completed Gabion D/S
left and right Slide Slope
Protection
Newly installed Steel Gate
at Santol Ilaya Dam
SANTOL CIS
28
Completed CHB Canal
Lining at Main Canal of
Santol Ilaya
Completed Repair of
Siphon at Santol CIS
Completed CHB Canal
Lining at Main Canal of
Santol Proper
29
Operation and Maintenance Activities
A. National Irrigation Systems (NIS)
NIA 5 operated and maintained 10 NIS region wide with a total Firmed-Up Service Area (FUSA)
of 23,147 hectares serving 33,992 farmer-beneficiaries.
The programmed service area for irrigation for cropped year 2015 is 21,121 hectares. As of De-
cember 2015, irrigated area was 17,075 hectares during the dry season which is 89.59% of the pro-
grammed service area; 16,575 hectares or 94.70% during wet season and 920 hectares or 5.66% for
the third crop or a total of 34,570 hectares which is 82.37% of the programmed area. The irrigated
cropping intensity attained for NIS is 163.68%.
ENGINEERING AND OPERATIONS
ENGI- O & M PERFORMANCE INDICATORS
CROPPING
INTENSITY
(CI)
163.68%
COLLECTION
EFFICIENCY
(CE)
50.03%
VIABILITY
INDEX
(VI)
1.52%
30
NAME OF NIS
NO. OF
FARMERS
BENEF.
FUSA
OPERT’L
AREA
IRRIGATED AREA BENEFITED AREA CROPPING
INTENSITY
WET DRY QTA RATOON WET DRY OPERT’L
AREA
MAHABA-NASISI-
OGSONG-HIBIGA RIS 2,475 2,065 2,065
P 2,010 2,060 108 607 2,010 2,060 231.72
A 2,052 2,052 0 840 2,052 2,052 239.42
SOUTH QUINALE RIS 990 750 750
P 750 750 0 225 750 750 230.00
A 750 750 0 80 750 750 210.67
CABILOG-SAN JUAN 963 793 793
P 340 380 0 0 340 380 90.79
A 150 150 0 0 117.69 144 37.83
ALBAY
SUB TOTAL
4,428 3,608 3,608
P 3,100 3,190 108 832 3,100 3,190 200.39
A 2,952 2,952 0 920 2,920 2,946 189.14
DAET-TALISAY RIS 3,557 3,026 2,810
P 2,400 2,760 92 850 2,400 2,760 217.15
A 2,320 2,431 0 0 2,095 2,431 169.07
MATOGDON RIS 269 471 293
P 230 230 0 0 230 230 157.00
A 230 231 0 0 212 231 157.34
CAM NORTE
SUB TOTAL
3,826 3,497 3,103
P 2,630 2,990 92 850 2,630 2,990 211.47
A 2,550 2,662 0 0 2,307 2,662 167.97
TIGMAN-HINAGYANAN-
INARIHAN RIS 3,765 3,542 3,122
P 2,750 2,900 107 720 2,750 2,900 207.46
A 2,660 2,618 0 0 2,265 2,618 169.06
CAGAYCAY RIS 2,289 2,095 1,915
P 1,520 1,574 63 425 1,520 1,574 187.05
A 1,504 1,528 0 0 1,248 1,528 158.33
RINCONADA INTEG.RATION
IRRIGATION SYSTEM 16,556 7,208 6,295
P 5,402 5,800 300 1,529 5,402 5,800 207.01
A 5,049 5,176 0 0 4,852 4,951 162.43
LIBMANAN-CABUSAO PIS 1,593 2,195 2,076
P 1,150 1,635 0 0 1.150 1,635 134.15
A 920 1,171 0 0 897 843 100.72
CAM SUR
SUB TOTAL
24,203 15,040 13,408
P 10,822 11,909 470 2,674 10,822 11,909 192.98
A 10,133 10,493 0 0 9,261 9,940 153.83
SAN RAMON-SAN
FRANCISCO RIS 1,535 1,002 1,002
P 950 970 30 350 950 970 229.54
A 940 968 0 0 940 968 190.42
SORSOGON
SUB TOTAL
1,535 1,002 1,002
P 950 970 30 350 950 970 229.54
A 940 968 0 0 940 968 190.42
TOTAL 33,992 23,147 21, 121
P 17,502 19,059 700 4,706 17,502 19,059 198.70
A 16,575 17,075 0 920 15,428 16,516 163.68
NAME OF NIS
CA COLLECTIBLES (P’000) CE (%)COLLECTIONS (P’000)
WET
CROP
DRY
CROP
TOTAL
CA (ISF)
(P’000)
BA
(P’000)
E.R.
(P’000)
OTHER
INCOME
PROG.
ACTUAL
BASED ON
BEN. AREA
ACTUAL
MAHABA-NASISI-
OGSONG-HIBIGA RIS
P 228.645 342.967 571.612 571.612 - 20.000 20.000 100.00 -
A 228.645 342.967 571.612 460.260 69.117 30.341 51.861 80.52 80.52
SOUTH QUINALE RIS
P 1,275.000 1,912.500 3,187.500 2,043.563 - - - 64.11 -
A 1,275.000 1,912.500 3,187.500 1,484.380 86.108 - - 46.57 46.57
CABILOG-SAN JUAN
P 578.000 969.000 1,547.000 922.320 - - - 59.62 -
A 200.072 367.967 568.039 349.139 60.507 - - 22.57 61.46
ALBAY
SUB TOTAL
P 2,081.645 3,224.467 5,306.112 3,537.495 - 20.000 20.000 66.67 -
A 1,703.717 2,623.434 4,327.150 2,293.779 215.732 30.341 51.861 43.23 53.01
DAET-TALISAY RIS
P 4,080.000 7,038.000 11,118.000 7,226.700 1,700.000 - 10.000 65.00 -
A 3,561.180 6,199.050 9,760.230 5,446.472 3,186.291 - 306.928 48.99 55.80
MATOGDON RIS
P 391.000 586.500 977.500 635.375 200.000 - - 65.00 -
A 359.878 589.050 948.928 335.536 110.104 - 77.300 34.33 35.36
CAM NORTE
SUB TOTAL
P 4,471.000 7,624.500 12,095.500 7,862.075 1,900.000 - 10.000 65.00 -
A 3,921.057 6,788.100 10,709.157 5,782.008 3,296.394 - 384.228 47.80 53.99
TIGMAN-HINAGYANAN-
INARIHAN RIS
P 4,675.000 7,395.000 12,070.000 7,395.000 1,000.000 - - 61.27 -
A 3,849.782 6,676.425 10,526.207 5,347.638 1,197.025 - 2.270 44.31 50.80
CAGAYCAY RIS
P 2,584.000 4,013.700 6,597.700 3,951.088 300.000 - - 59.89 -
A 2,121.240 3,896.400 6,017.640 2,390.941 477.666 - 5.000 36.24 39.73
RINCONADA INTEG.RATION
IRRIGATION SYSTEM
P 9,183.400 14,790.000 23,973.400 14,384.040 500.000 - - 60.00 -
A 8,248.359 12,624.831 20,873.190 10,984.994 1,639.128 - 1.200 45.82 52.63
LIBMANAN-CABUSAO PIS
P 2,932.500 4,169.250 7,101.750 4,370.600 200.000 - - 61.54 -
A 2,287.526 2,148.375 4,435.901 2,214.083 386.999 - - 31.18 49.91
CAM SUR
SUB TOTAL
P 19,374.900 30,367.950 49,742.850 30,100.728 2,000.000 - - 60.51 -
A 16,506.908 25,346.031 41,852.939 20,937.655 3,967.818 - 8.470 42.09 50.03
SAN RAMON-SAN
FRANCISCO RIS
P 1,615.000 2,473.500 4,088.500 2,657.525 30.000 - - 65.00 -
A 1,598.000 2,430.150 4,028.150 1,461.180 176.655 - 39.025 35.47 36.27
SORSOGON
SUB TOTAL
P 1,615.000 2,473.500 4,088.500 44,157.823 30.000 - - 65.00 -
A 1,598.000 2,430.150 4,028.150 30,474.622 176.655 - 39.025 35.74 36.27
TOTAL
P 27,542.545 43,690.417 71,232.962 44,,157.823 3,930.000 20.000 30.000 61.99 -
A 23,729.682 37,187.715 60,917.397 30,474.622 7,656.599 30.341 483.584 42.78 50.03
TABLE 3: CROPPING INTENSITY (CI)
TABLE 4: COLLECTION EFFICIENCY (CE)
31
B. Communal Irrigation System (CIS)
NIA Region 5 assisted 433 CIS regionwide with a total Firmed-up Service Area (FUSA) of
71,746 hectares serving 46,630 farmer-beneficiaries.
As of December 2015, irrigated area was 32,479 hectares during the dry season (November
2014 to April 2015), 31,683 hectares during the wet season (May 2015 to October 2015). The irrigat-
ed cropping intensity attained for CIS was 162.71%.
PROVINCE
NO.
OF
CIS
NO. OF
FBs
WET DRY
Irrigated/
Planted Area
(ha)
Ave. Yield
per ha
Irrigated/
Planted
Area (ha)
Ave.
Yield per
ha
ALBAY 62 10,922 7,569 88.20 7,047 80.72
CAMARINES NORTE 43 2,267 1,260 67.80 1,922 71.00
CAMARINES SUR 189 20,043 15,071 86.00 14,658 85.00
CATANDUANES 38 2,993 1,024 79.00 1,038 77.74
MASBATE 27 2,004 1,138 52.04 1,756 58.02
SORSOGON 74 8,401 5,621 74.00 5.698 75.44
TOTAL 433 46,630 31,683 74.51 32,119 74.65
TABLE 5: VIABILITY INDEX (VI)
NAME OF NIS
O&M EXPENSES
(P’000)
NET INCOME
(P’000)
VIABILITY INDEX
TOTAL INCOME
(P’000)
MAHABA-NASISI-
OGSONG-HIBIGA RIS
P 611.612 2,799.480 (2,187.868) 0.22
A 611.579 1,033.458 (421.879) 0.59
SOUTH QUINALE RIS
P 2,043.563 - 2,043.563 -
A 1,570.488 165.312 1,405.176 -
CABILOG-SAN JUAN
P 922.320 - 922.320 -
A 409.646 112.266 297.379 -
ALBAY
SUB TOTAL
P 3,577.495 2,799.480 778.015 1.28
A 2,591.713 1,311.036 1,280.676 1.98
DAET-TALISAY RIS
P 8,963.700 8,047.671 889.029 1.11
A 8,939.691 6,031.105 2,908.586 1.48
MATOGDON RIS
P 835.375 - 835.375 -
A 522.940 24.113 498.827 21.69
CAM NORTE
SUB TOTAL
P 9,772.075 8,047.671 1,724.40 1.21
A 9,462.631 6,055.218 3,407.413 1.56
TIGMAN-HINAGYANAN-
INARIHAN RIS
P 8,395.000 7,000.000 1,395.000 1.20
A 6,546.933 5,559.014 987.918 1.18
CAGAYCAY RIS
P 4,251.088 2,054.061 2,197.027 2.07
A 3,140.607 1,487.419 1,653.188 2.11
RINCONADA INTEG.RATION
IRRIGATION SYSTEM
P 14,884.040 13,178.835 1,705.205 1.13
A 12,625.322 8,023.045 4,602.277 1.57
LIBMANAN-CABUSAO PIS
P 4,570.600 3,562.424 1,008.176 1.28
A 2,601.081 1,611.614 989.4568 1.61
CAM SUR
SUB TOTAL
P 32,100.728 25,795.320 6,305.408 1.24
A 24,913.943 16,681.092 8,232.851 1.49
SAN RAMON-SAN
FRANCISCO RIS
P 2,687.525 1,150.000 1,537.53 2.34
A 1,676.859 1,294.409 382.450 1.30
SORSOGON
SUB TOTAL
P 2,687.525 1,150.000 1,537.525 2.34
A 1,676.859 1,294.409 382.450 1.30
TOTAL
P 48,137.823 37,792.471 10,345.352 1.27
A 38,645.146 25,341.756 13,303.391 1.52
TABLE 6: SERVICE AREA OF CIS
32
EN
C. Institutional Development Program
A total of 466 IAs regionwide had been organized reorganized/strengthened covering a
total of 71,311.11 hectares with 74,689.00 farmer-beneficiaries. Capability-building program for
NIA staff were conducted to enhance their capability of working harmoniously with the farmers
and of carrying out their O&M responsibilities. On the other hand, farmers are trained on IA
management, operation and maintenance of the irrigation system and IA financial manage-
ment. Linkages with other government agencies engaged in agricultural production were
strengthened.
PROVINCE
CIS NIS
NO. OF IA AREA FARMERS NO. OF IA AREA FARMERS
ALBAY 98 11,277.00 10,230 8 3,608 4,465
CAMARINES NORTE 47 3,074.00 2,156 10 3,496.73 3,908
CAMARINES SUR 155 21,855.00 14,736 57 15,040.38 24,303
LCPIS 0 0 0 6 2,195.38 1,693
THIRIS 0 0 0 9 3,542.00 3,765
CRIS 0 0 0 9 2,095.00 2,289
RIIS 0 0 0 33 7,208.00 16,556
CATANDUANES 49 2,007.00 3,000 0 0 0
MASBATE 36 3,058.00 2,148 0 0 0
SORSOGON 81 6,893.00 8,131 5 1,002 1,612
TOTAL 466 48,164.00 40,401 80 23,147.11 34,288
TABLE 7: NO. OF IA’s AND FARMERS
33
For CY 2014, NIA5 collected a total income of P58,941,112.60. Majority or 57% was derived
from irrigation service fee collection. Other incomes were derived from CIS amortization, equity,
pump amortization, equipment rental and other miscellaneous income.
For the operations of NIA5 responsibility center, the total expenses incurred were
P64,662,837.11 less expenses deductible for Viability Purpose of P9,587,244.18 for a total net
expense of P55,075,952.93.
For CY 2014, NIA region 5 earned a surplus of P3,865,519.67, achieving continuous viability
for each provincial management office, irrigation systems office and the region.
FINANCIAL MANAGEMENT
34
CY 2014
RESPONSIBILITY
CENTER
INCOME
Irrigation Service
Fee
Equipment Rental
CIS Amortization &
Equity
Pump Amort & Equity Other Income Total Income
ALBAY 63,288.00 2,715,982.00 83,100.00 2,862,370.00
CAM. NORTE 369,771.48 279,990.00 649,761.48
CAM. SUR 8,441.02 4,250,183.50 79,603.00 4,338,227.52
CATANDUANES 13,000.00 462,791.60 12,650.00 12,000.00 500,441.60
MASBATE 804,584.00 140,300.00 944,884.00
SORSOGON 1,243,454.80 21,400.00 1,264,854.80
TOTAL PIOs - 84,729.02 9,846,767.38 12,650.00 616,393.00 10,560,539.40
RIIS 12,634,023.42 1,298.60 12,635,322.02
CAGAYCAY 3,127,669.65 12,937.51 3,140,607.16
DAET-TALISAY 8,580,749.26 359,842.11 8,940,591.37
THIRIS 6,435,321.07 111,611.76 6,546,932.83
LCPIS 2,598,258.02 2,823.45 2,601,081.47
MNOH 2,506,114.57 30,341.00 20,520.00 2,556,975.57
MATOGDON 443,346.20 79,593.67 522,939.87
SR-SF 1,637,398.52 39,460.57 1,676,859.09
TOTAL NIS 37,962,880.71 30,341.00 - - 628,087.67 38,621,309.38
REGIONAL OFFICE 5,354.40 9,753,909.42 9,759,263.82
GRAND TOTAL 37,962,880.71 120,424.42 9,846,767.38 12,650.00 10,998,390.09 58,941,112.60
RESPONSIBILITY
CENTER
EXPENSES Less Expenses Deduct-
ible for Viability Pur-
pose
Net Expense Net Income/Loss
Personal Services
Maintenance &
Other Operating
Total Expenses
ALBAY 3,339,291.21 279,463.00 3,618,754.21 966,666.67 2,652,087.54 210,282.46
CAM. NORTE
407,583.00 407,583.00 25,000.00 382,583.00 267,178.48
CAM. SUR 2,984,753.80 370,222.71 3,354,976.51 708,333.33 2,646,643.18 1,691,584.34
CATANDUANES
288,050.84 94,060.00 382,110.84 382,110.84 118,330.76
MASBATE 728,768.32 69,213.68 797,982.00 300,000.00 497,982.00 446,902.00
SORSOGON 1,309,822.64 307,216.14 1,617,038.78 737,500.00 879,538.78 385,316.02
TOTAL PIOs 9,058,269.81 1,120,175.53 10,178,445.34 2,737,500.00 7,440,945.34 3,119,594.06
RIIS 4,841,070.14 3,622,265.53 8,463,335.67 468,749.94 7,994,585.73 4,640,736.29
CAGAYCAY 809,173.90 890,241.21 1,699,415.11 212,499.96 1,486,915.15 1,653,692.01
DAET-TALISAY 5,208,522.61 1,280,832.88 6,489,355.49 440,729.15 6,048,626.34 2,891,965.03
THIRIS 3,549,666.34 2,322,276.40 5,871,942.74 506,250.00 5,365,692.74 1,181,240.09
LCPIS 1,153,368.29 503,037.27 1,656,405.56 44,791.67 1,611,613.89 989,467.58
MNOH
575,237.44 806,367.34 1,381,604.78 1,381,604.78 1,175,370.79
MATOGDON
54,112.24 54,112.24 54,112.24 468,827.63
SR-SF 1,203,394.43 192,085.14 1,395,479.57 150,000.00 1,245,479.57 431,379.52
TOTAL NIS 17,340,433.15 9,671,218.01 27,011,651.16 1,823,020.72 25,188,630.44 13,432,678.94
REGIONAL OFFICE 23,953,370.71 3,519,369.90 27,472,740.61 5,026,723.46 22,446,017.15 (12,686,753.33)
GRAND TOTAL 50,352,073.67 14,310,763.44 64,662,837.11 9,587,244.18 55,075,592.93 3,865,519.67
TABLE 8: SUMMARY OF FINANCIAL STATUS
35
In Region 5, NIA has a total personnel complement of 247 as of December 31, 2014. Below,
in tabulated form, is the breakdown. This number, however, does not include Contracts of Service
and Job Orders. The implementation of the Rationalization Plan, in Region 5, has greatly affected
our performance due to a very limited manpower. Be that as it may, Region 5 continued to strive to
achieve an acceptable performance to maintain its stature to be one of NIA’s performing Regions.
HR MANAGEMENT
AS OF DECEMBER 31, 2015
RESPONSIBILITY CENTER
MONTHLY COB
DAILY/CASUAL
TOTAL
GRANDTOTAL
Rationalization Set – up
Authorized
PERM TEMP
Sub -
Total
COB PROJECT
Sub -
Total
M F M F M F M F M F M F M F
OFFICE OF THE REGIONAL
IRRIGATION MANAGER
5 3 0 0 0 3 0 0 1 0 2 0 3 3 3 6
ENGINEERING &
OPERATION DIVISION
22 11 10 0 0 11 11 0 0 7 2 7 2 18 13 31
ADMINISTRATIVE & FINANCE
DIVISION
20 7 11 0 0 7 11 0 0 5 5 5 5 12 16 28
CAMSUR – NORTE IMO 11 7 2 0 0 7 4 0 1 18 4 18 5 25 9 34
RINCONADA INTEGRATED IS 20 8 4 3 1 11 6 0 0 7 2 7 2 18 8 26
CAGAYCAY RIS 2 1 0 1 0 2 0 0 0 2 1 2 1 4 1 5
TIGMAN – HINAGYANAN –
INARIHAN RIS
16 9 2 3 0 12 2 1 0 4 3 5 3 17 5 22
DAET – TALISAY –
MATOGDON RIS
15 12 2 1 0 13 2 0 0 0 0 0 0 13 2 15
LCPIS 4 3 0 1 0 4 0 0 0 0 0 0 0 4 0 4
ALBAY – CAT – MAS –
SORSOGON IMO
4 3 1 0 0 3 1 1 2 43 22 44 24 47 25 72
SFSR RIS 2 1 0 1 0 2 0 0 0 0 0 0 0 2 0 2
MNOH RIS 2 2 0 0 0 2 0 0 0 0 0 0 0 2 0 2
TOTAL 123 67 36 10 1 77 37 2 4 86 41 88 45 165 82 247
OTHERS (Specify) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CARP – IC 15 0 0 0 0 0 0 0 0 0 0 0 0 4 8 12
PIDP 2 0 0 0 0 0 0 0 0 0 0 0 1 0 1
GRAND TOTAL 140 67 36 10 1 77 37 2 4 86 41 88 45 170 90 260
In our desire to ensure that we have the right people in place with the right mix of skills and
right attitudes, NIA Region 5 regularly conducts Orientation and Reorientation of the different HR
programs. These programs are aimed to develop our workforce with the needed competencies to
successfully implement our programs, projects and initiatives.
TABLE 9: TOTAL PERSONNEL COMPLEMENT
36
SUCCESS FACTORS
 Properly maintained irrigation and drainage facilities
 Prompt payment of Irrigation Service Fee (ISF)
 Prompt/Early release of fund
 Functional and strengthened IAs (even without the
assistance of NIA)
 Efficient implementation of operations plan for NISs/
CISs
 On schedule completion of project implementation
HINDERING FACTORS
 Right of Way Problems
 Inclement Weather Condition
 Presence of Standing Crops
 Peace and Order Situation
 Clearances from Line Agencies
 Hauling of Construction Materials
 Ordinances on Procurement

More Related Content

What's hot

Communicating value creation through natural capital to the mainstream
Communicating value creation through natural capital to the mainstreamCommunicating value creation through natural capital to the mainstream
Communicating value creation through natural capital to the mainstreamCDSB
 
Greenhouse Gas Inventories -Scope and Purpose
Greenhouse Gas Inventories -Scope and PurposeGreenhouse Gas Inventories -Scope and Purpose
Greenhouse Gas Inventories -Scope and PurposetheREDDdesk
 
Bunaken Island | Nov-15 | Bitung low carbon model town
Bunaken Island | Nov-15 | Bitung low carbon model townBunaken Island | Nov-15 | Bitung low carbon model town
Bunaken Island | Nov-15 | Bitung low carbon model townSmart Villages
 
CCM 02.13.17 - Item #6 Budget amendment fy16-17
CCM 02.13.17 - Item #6   Budget amendment fy16-17CCM 02.13.17 - Item #6   Budget amendment fy16-17
CCM 02.13.17 - Item #6 Budget amendment fy16-17Marian Vargas Mendoza
 
2018 BCA Hazardous Waste Generator Improvement Rule
2018 BCA Hazardous Waste Generator Improvement Rule 2018 BCA Hazardous Waste Generator Improvement Rule
2018 BCA Hazardous Waste Generator Improvement Rule bcaconsultants1
 

What's hot (6)

Communicating value creation through natural capital to the mainstream
Communicating value creation through natural capital to the mainstreamCommunicating value creation through natural capital to the mainstream
Communicating value creation through natural capital to the mainstream
 
Greenhouse Gas Inventories -Scope and Purpose
Greenhouse Gas Inventories -Scope and PurposeGreenhouse Gas Inventories -Scope and Purpose
Greenhouse Gas Inventories -Scope and Purpose
 
Bunaken Island | Nov-15 | Bitung low carbon model town
Bunaken Island | Nov-15 | Bitung low carbon model townBunaken Island | Nov-15 | Bitung low carbon model town
Bunaken Island | Nov-15 | Bitung low carbon model town
 
CCM 02.13.17 - Item #6 Budget amendment fy16-17
CCM 02.13.17 - Item #6   Budget amendment fy16-17CCM 02.13.17 - Item #6   Budget amendment fy16-17
CCM 02.13.17 - Item #6 Budget amendment fy16-17
 
2018 BCA Hazardous Waste Generator Improvement Rule
2018 BCA Hazardous Waste Generator Improvement Rule 2018 BCA Hazardous Waste Generator Improvement Rule
2018 BCA Hazardous Waste Generator Improvement Rule
 
Iwcm green_expo
Iwcm  green_expoIwcm  green_expo
Iwcm green_expo
 

Similar to Annual report 2015 edited

Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water managementhydrologyproject2
 
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxTPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxSantoshkumarGupta67
 
Dar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fDar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fRdc Cordillera
 
Aguas Andinas Q2 Results Presentation
Aguas Andinas Q2 Results Presentation Aguas Andinas Q2 Results Presentation
Aguas Andinas Q2 Results Presentation AguasAndinas
 
Annual Progress Implementation Report (APIR) 2018 finalization workshop_final
Annual Progress Implementation Report (APIR) 2018 finalization workshop_finalAnnual Progress Implementation Report (APIR) 2018 finalization workshop_final
Annual Progress Implementation Report (APIR) 2018 finalization workshop_finalGolam Kibria Madhurza
 

Similar to Annual report 2015 edited (20)

2nd qtr rpmes 2013
2nd qtr rpmes 20132nd qtr rpmes 2013
2nd qtr rpmes 2013
 
Atal Bhujal Yojana: Overview
Atal Bhujal Yojana: Overview Atal Bhujal Yojana: Overview
Atal Bhujal Yojana: Overview
 
3rd qtr rpmes report
3rd qtr rpmes report3rd qtr rpmes report
3rd qtr rpmes report
 
Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water management
 
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxTPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
 
Mp surface water
Mp surface waterMp surface water
Mp surface water
 
2012 yearend report
2012 yearend report2012 yearend report
2012 yearend report
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
 
WASH Presentation - PCIV.pptx
WASH Presentation - PCIV.pptxWASH Presentation - PCIV.pptx
WASH Presentation - PCIV.pptx
 
Puducherry
Puducherry Puducherry
Puducherry
 
FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2
 
Dar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_fDar arisp iii 2nd qtr_f
Dar arisp iii 2nd qtr_f
 
Aguas Andinas Q2 Results Presentation
Aguas Andinas Q2 Results Presentation Aguas Andinas Q2 Results Presentation
Aguas Andinas Q2 Results Presentation
 
Chhattisgarh
ChhattisgarhChhattisgarh
Chhattisgarh
 
Annual Progress Implementation Report (APIR) 2018 finalization workshop_final
Annual Progress Implementation Report (APIR) 2018 finalization workshop_finalAnnual Progress Implementation Report (APIR) 2018 finalization workshop_final
Annual Progress Implementation Report (APIR) 2018 finalization workshop_final
 
Monthly progress report , Resettlement ,Rehabilitation , Livelihood and Rest...
Monthly progress report , Resettlement  ,Rehabilitation , Livelihood and Rest...Monthly progress report , Resettlement  ,Rehabilitation , Livelihood and Rest...
Monthly progress report , Resettlement ,Rehabilitation , Livelihood and Rest...
 
California Carpet Stewardship Program Q2 2020 Results
California Carpet Stewardship Program Q2 2020 ResultsCalifornia Carpet Stewardship Program Q2 2020 Results
California Carpet Stewardship Program Q2 2020 Results
 
Namami gange program-SSB 44
Namami gange  program-SSB 44Namami gange  program-SSB 44
Namami gange program-SSB 44
 
Punjab 8.4.14 edt
Punjab 8.4.14 edtPunjab 8.4.14 edt
Punjab 8.4.14 edt
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
 

Recently uploaded

High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbaisonalikaur4
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…nishakur201
 
Call Girls In Le Meridien hotel New Delhi 9873777170
Call Girls In Le Meridien hotel New Delhi 9873777170Call Girls In Le Meridien hotel New Delhi 9873777170
Call Girls In Le Meridien hotel New Delhi 9873777170avaniranaescorts
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxTechSoupConnectLondo
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Christina Parmionova
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Christina Parmionova
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolSERUDS INDIA
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfyalehistoricalreview
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证mbetknu
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...ankitnayak356677
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleSERUDS INDIA
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 

Recently uploaded (20)

High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
 
Call Girls In Le Meridien hotel New Delhi 9873777170
Call Girls In Le Meridien hotel New Delhi 9873777170Call Girls In Le Meridien hotel New Delhi 9873777170
Call Girls In Le Meridien hotel New Delhi 9873777170
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptx
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnool
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor People
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 

Annual report 2015 edited

  • 1. 1
  • 2. 2 CONTENTS Regional Manager’s Report 3 D. Inter Agency Project Status of Irrigation Development—CY2015 4 CARP-IC Phase III 21-22 Engineering and Operation ARISP 3 (under JBIC loan) 23-28 Project Development and Implemetation Operation and Maintenance Activities A.1 Locally funded Projects A. National Irrigation Systems (NIS) 29 CY2014 Accomplishment 5-7 Cropping Intensity (CI) 30 CY2015 8-9 Collection Efficiency (CE) 30 A.2 Line Projects (SRIP) Viability Index (VI) 31 Ibingan SRIP 10-14 B. Communal Irrigation System (CIS) 31 Sibagat SRIP 15 C. Institutional Development Program 32 B. Foreign Assisted Projects 16 Financial Management 33-34 THIRIS 17-20 HR Management 35 RIIS 20 Success Factors 36 C. Repair, Operation and Maintenance Hindering Factors 36 of NIS Pump Irrigation Systems 21 No. Title Page 1 Status of Project Implementation of Operations Department - Monitored Lumpsum Projects for CY 2014 6-7 2 Status of Project Implementation of Operations Department - Monitored Lumpsum Projects for CY 2015 9 3 NIS - Cropping Intensity 30 4 NIS - Collection Effeciency 30 5 NIS - Viabilty Index 31 6 Service Area of CIS 31 7 No. of IA’s and Farmers 32 8 Summary of Financial Status 34 9 CY2015 Total Personnel Complement 35 LIST OF TABLES
  • 3. 3 REGIONAL MANAGER’S REPORT I n 2015, NIA implemented a total of 158 projects with an approved allocation of P490.2 million. Out of these, 77 projects were completed as of December 31, 2015, which generated 197 hectares of new areas, restored irrigation service to 1,082 hec- tares and rehabilitated irrigation facilities and struc- tures covering 1,576 hectares benefitting a total of 2,322 farmers. Aside from the 78 completed projects, 78 projects are still ongoing construction and expected to be finished by end of March 2016, while works in 2 projects have not yet started due to right-of-way and peace and order problems. NIA Bicol’s physical accomplishment of 74.24 per- cent in 2015 is higher than the 62.06 percent accom- plishment in 2014. These construction and rehabilitation activities both in National and communal irrigation systems (NIS/ CIS) were geared towards the expansion of irrigated areas to increase palay production in the region in support of the national government’s food self- sufficiency program. In terms of 2015 financial accomplishment, NIA Bicol earned a total income of P56.7 million consisting of: P37.9 million in irrigation service fees (ISF); P7.5 mil- lion in amortizations from communal and pump irriga- tion systems (CIS/PIS); P2.3 million in farmers’ equity contributions; P120,000.00 in equipment rental; and P11 million in bidding documents. Last year’s ISF collection of P37.9 million is higher by 6.8 percent compared to 2014 collection of P35.5 million, while CIS/PIS amortization posted an in- crease of 9 percent from P6.9 million in 2014 to P7.5 million in 2015. As far as the operations of 10 NIS in the region are concerned, NIA irrigated a total area of 34,520 hec- tares benefiting some 33,992 farmers in 2015 with a cropping intensity (CI) of 163.68 percent. For CIS, the total irrigated area in the same year totaled to 66,381 hectares serving 46,630 farmers with a CI of 162.71. Overall, the level of irrigation development in the Bicol region increased from 56.84 percent in 2014 to 57.64 percent in 2015. ENGR. VICENTE R. VICMUDO, Ph.D.
  • 4. 4 Irrigation Development as of CY 2015 South Quinale Dam, Libon, Albay STATUS OF IRRIGATION DEVELOPMENT
  • 5. 5 Project Development and Implementation A.1 Locally funded Projects (Lump Sum Appropriation) CY 2014 ACCOMPLISHMENTS Lump Sum Appropriation includes projects funded under the General Appropriation Act which are categorized as Small Irrigation Projects (SIPs), Restoration /Rehabilitation of Existing Irrigation Systems (RREIS), NIS/CIS Extension, Repair of Groundwater Pump Irrigation System (RGPIS). For the CY 2014 projects, the total direct cost (DBM Bar Code) is Php 599,680.00 and allotment released is 100% of the approved budget. A physical target for area generation is 2,570 hectares, 20 hectares for area restora- tion and 1,114 hectares for rehabilitation As of December 31, 2015, actual accomplishments for area generation is 1,985 hectares, for area restoration is 10 hectares and for area rehabilitation is 1,074 hectares, equivalent to 77.24%, 50.00% and 96.41% respectively of the total target for area genera- tion, restoration and rehabilitation. The Physical accomplishment is 91.42%. With respect to other fund sources particularly Small Reservoir Irrigation Projects (SRIP), there is no accomplishment yet since the design of the impounding dam for Ibingan is submitted to DSD in November 2015. While, the design of Sibagat SRIP is still subject for finalization the Central office. ENGINEERING AND OPERATIONS
  • 6. 6 TABLE1:STATUSOFPROJECTIMPLEMENTATIONOFOPERATIONSDEPARTMENT— MONITOREDLUMPSUMPROJECTSFORCY2014 ASOFDECEMBER31,2015 FUNDSOURCE PARTICULAR APPROVEDPOW/ POWDIRECTCOST (P) ALLOCATION (DBMBARCODE) (P) NO.OFPROJECTS PHYSICALTARGET/ACTUALACCOMPLISHMENT ACCOMPLISHMENT AREA(has) FBs JOB GEN TOTAL ON-GOING COMPLETED NEW REH RES AREA(has) FBs JOB GENERATED PHYSICAL STATUS % FINANCIAL STATUS % NEWREHAB RE- STORE SMALLIRRIGA- TIONPROJECTS (SIP) NIS ----------------- ----------------- CIS 400,000,000.00400,000,000.00467392,056--3,8702,4001,4773,2362,10187.5463.02 400,000,000.00---------------- TOTAL 400,000,000.00400,000,000.00467392,056--3,8702,4001,4773,2362,10187.5463.02 400,000,000.00---------------- RESTORATION/ REHABILATION OF EXISTINGIRRI- GATIONSYSTEM (RREIS) NIS 4,320,000.00---------------- 4,000,000.004,000,000.0022-100-70241007024100.0084.75 CIS 33,048,000.00---------------- 30,600,000.0030,600,000.0017116-1,014-68018497461317896.7350.08 TOTAL 37,368,000.00---------------- 34,600,000.0034,600,000.0019118-1,114-7502081,07468320297.1154.09 NATIONAL/ COMMUNAL IRRIGATION SYSTEMEXTEN- SIONPROJECT (NIS/CISEXTEN- SION) NIS 18,900,000.00---------------- 17,500,000.0017,500,000.001180--13410580134105100.0058.11 CIS 105,386,400.00---------------- 97,580,000.0097,580,000.0016115434-208385854281095858299.3577.42 TOTAL 124,286,400.00--1------------- 115,080,000.00115,080,000.001716514-20972690508101,09268799.4574.48 REPAIROF GROUNDWATER PUMP IRRIGATION SYSTEM (RGPIS) NIS 54,000,000.00---------------- 50,000,000.0050,000,000.001313----300300100.0085.07 TOTAL 54,000,000.00---------------- 50,000,000.0050,000,000.001313----300300100.0085.07
  • 7. 7 ASOFDECEMBER31,2015 FUNDSOURCE PARTICULAR APPROVED POW/ POWDIRECT COST(P) ALLOCATION (DBMBAR CODE) (P) NO.OFPROJECTS PHYSICALTARGET/ACTUALACCOMPLISHMENT ACCOMPLISHMENT AREA(has) FBs JOB GEN TO- TAL O N- G OI N G COM PLE TED NEWREHRES AREA(has) FBs JOB GEN PHYSICAL STATUS % FINANCIAL STATUS % NEW RE- HAB RESTORE SUMMARYFOR2014PROJECTS TOTAL N I S 23,220,000.00--------------- 21,500,000.0021,500,000.003380100-20412980100204129100.0063.07 TOTAL C I S 592,434,400.00---------------- 578,180,000.00578,180,000.00929832,4901,014205,3883,4691,905974104,8073,16091.1066.68 SUBTOTALFOR LUMPSUMPRO- JECTS T O T A L 615,654,400.00 599,680,000.00959862,5701,114205,5923,5981,9851,074105,0113,28991.4266.55 599,680,000.00 TABLE1—STATUSOFPROJECTIMPLEMENTATIONOFOPERATIONSDEPARTMENT— MONITOREDLUMPSUMPROJECTSFORCY2014
  • 8. 8 ENGI-CY 2015 ACCOMPLISHMENTS Under the CY 2015 lump sum allocation, only Restoration /Rehabilitation of Existing Irri- gation Systems (RREIS), NIS/CIS Extension, and Comprehensive Agrarian Reform Program- Irrigation Component (CARP-IC) were implemented with a total direct cost (DBM Bar Code) of Php490,200.00 and allotment released is 97.12% of the approved budget. As of December 31, 2015, out of the 158 projects for implementation, 78 projects have been completed, 2 project awaits fund releases and 78 are still on-going. Out of this, a total of 2,322 farmers were benefited and 2,159 jobs were generated. Physical targets for area generation is 388 hectares, 1670 hectares for area restoration and 2,442 hectares for rehabilitation. As of December 31, 2015, actual accomplishments for area generation is 231 hectares, for area restoration is 1,092 hectares and for area rehabilita- tion is 1,576 hectares, equivalent to 59.54%, 65.41% and 64.52% respectively of the total target for area generation, restoration and rehabilitation with a 74.24% physical accomplish- ment. With respect to other fund sources particularly Small Reservoir Irrigation Projects (SRIP), there is no accomplishment yet since the design works are still at the NIA Central Of- fice. Matagbac CIS, Milagros, Masbate
  • 9. 9 TABLE2:STATUSOFPROJECTIMPLEMENTATIONOFOPERATIONSDEPARTMENT— MONITOREDLUMPSUMPROJECTSFORCY2015 ASOFDECEMBER31,2015 FUNDSOURCE PARTIC- ULAR ALLOCATION (DBMBARCODE) (P) NO.OFPROJECTSCYTARGET/ACTUALACCOMPLISHMENT TOTAL ON- GO- ING NOT YET STAR TED COMP LETED AREA(has) FBs JOB GENER- ATION VALUEOFACCOM- PLISHMENT (P) CASH DISBURSEMENT PHYS- ICAL STA- TUS (%) FINAN- CIAL STATUSNEWREHAB RE- STORE RESTORATION/ REHABILITATIONOF EXISTINGIRRIGATION SYSTEMS (RREIS) NIS161,600,000.002418-6 -5888871,673970 119,886,581.7018,262,561.9274.1911.30 -522507758719 CIS234,377,000.0011549-66 1,5146552,7301,406 179,781,383.5020,416,164.8276.718.71 -8384851,3111,079 TOTAL395,977,000.0013967-72 -2,1021,5424,4032,376 299,667,965.2038,678,726.7475.689.77 -1,3609922,0691,798 NATIONAL/COMMUNAL IRRIGATIONSYSTEMEX- TENSION PROJECT (NIS/CISEXTENSION) NIS17,714,000.0011-- 5025020350106 12,821,393.20-72.38- 151501013553 CIS65,509,000.0015825 3289058440393 44,567,122.007,401,963.3568.0311.30 2166650124266 TOTAL83,223,000.0016925 37834078790499 57.388,515.207,401,963.3568.968.89 23121660259319 COMPREHENSIVEAGRARI- ANREFORM PROGRAM–IRRIGATION COMPONENT (CARP-IC) NIS11,000,000.00321 10-50-66 6,868,000.00-62.44- -40-41 CIS11,000,000.00321 10-50-66 6,868,000.00--- -40-41 SUMMARYFOR2015PROJECTS TOTALFORNISNIS179,314,000.002519-6 508389072.0231,076 132,707,974.9018,262,561.9274.0110.18 15672517893773 TOTALFORCISCIS310,886,000.0013359272 3381,6047633,1701,865 231,216,505.5027,818,128.1774.378.95 2169045751,4351,386 SUBTOTALFORLUMPSUM PROJECTS TOTAL490,200,000.0015878278 3882,4421,6705,1932,941 363,924,480.4046,080,690.0974.249.40 2311,5761,0922,3282,159
  • 10. 10 A.2 Line Projects SMALL RESERVOIR IRRIGATION PROJECTS The Small Reservoir Irrigation Project (SRIP) is a locally funded project implemented nationwide. The project requires the identification, investigation, validation, feasibility stud- ies, detailed engineering and construction of dam and reservoir and irrigation facilities to pro- vide a year round irrigation. NIA REGION 5 IS IMPLEMENTING THE FOLLOWING SUB-PROJECTS/ACTIVITIES: A. Ibingan SRIP, Prieto Diaz, Sorsogon The project aims to develop the full potential of water to be impounded for irrigation to provide adequate irrigation water supply to about 255 hectares of agricultural land that covers the municipality of Prieto Diaz in Sorsogon in Region 5, with 329 farmer benefi- ciaries. The overall accomplishment for the CY2012 and CY2013 Projects is 94.11%as of December 2015. Pictures of Accomplishment for CY2012 and CY2013 Access Road Station 0+000 – 1+240.00 PACKAGE 1 CONST. OF ACCESS & SERVICE ROAD & ROAD STRUCTURES
  • 11. 11 PACKAGE 2 CANALIZATION & CANAL STRUCTURES Elevated Flume Station 3+372.50 – 3+623.00 MC
  • 12. 12 15 cm. CHB Canal Lining with Removable Cover Station 0+676.90 – 0+691.78 MC 0+755.37 – 0+780.00 MC 0+789.00 – 0+906.40 MC Canalization Station 0+000.00 – 4+890.00 MC
  • 13. 13 PACKAGE 3 CONSTRUCTION OF SERVICE ROAD Service Road Station 4+253 – 8+400
  • 14. 14 Canalization Station 4+980—10+415 PACKAGE 4 CANALIZATION & CANAL STRUCTURES Siphon Station 9+885—9+922
  • 15. 15 B. SIBAGAT SRIP, Minalabac, Camarines Sur This ongoing project is located in Brgy. Magadap, Minalabac, Camarines Sur. It is designed to irrigate 350 hectares of rice lands, broken down as follows: new area = 250 hec- tares; and rehab area = 100 hectares. This project will benefit 323 farmer beneficiaries. As of December 2015, the overall accomplishment for civil works contract for CY 2012 and CY 2013 Programs is 83.51%. Pictures of Accomplishment for CY2012 and CY2013 TURN OUT NO. 1, LATERAL B-2 Sta. 0+120 TURNOUT NO. 3, LATERAL A Sta. 0+480 LATERAL B-2 STA. 0+970-1+040
  • 16. 16 B. Foreign Assisted Projects PARTICIPATORY IRRIGATION DEVELOPMENT PROJECT The Participatory Irrigation Development Project (PIDP) constitutes the first phase of a long- term program supporting irrigation reforms in the Philippines. The World Bank loan was approved on November 3, 2009. The development objective of the overall PIDP Applicable Program Loan (APL 1,2 &3) is to improve irrigation service delivery on a financially and technically sustainable basis that will contribute to increased agricultural production and productivity among beneficiary farmers in irrigation areas. The projects consist of the following parts: Part 1 Irrigation Sector Restructuring and Reform 1.1 Implementation of the NIA Rationalization Plan 1.2 NIA Institutional Strengthening and Irrigation Management Transfer Program Part 2 Irrigation Infrastructure Development 2.1 Rehabilitation and Modernization of Irrigation Systems Rehabilitation and modernization of 58 existing National irrigation Systems(14 Core A and 44 Core B NISs) nationwide. In Region 5, the Core A project is be- ing implemented at Tigman-Hinagyanan-Inarihan River Irrigation System (THIRIS) and 2 Core B projects, Matogdon RIS in Camarines Norte and Barit RIS in Nabua, Camarines Sur. The Core B civil works was completed in May 14, 2012 for Barit and the activities being undertaken is focus on the institutional strengthening, capability training for IA leaders, second line leaders and mem- bers and the Irrigation Management transfer program. The Tigman-Hinagyanan Inarihan Rivers Irrigation System is a Core-A project being implemented in the municipalities of Canaman, Magarao, Bombon and Calabanga, all in the province of Camarines Sur, in the contract amount of P 87,524,235.41 The project is on-going and the contractor is obliged to observe the Social and Environmental Management Plan to address the existing and potential environ- mental impacts that may arise from the rehabilitation of Tigman-Hinagyanan- In- arihan Rivers Irrigation System. The contractor, R.D. Policarpio Co. Inc. /TGV Builders (JV) is at present conduct- ing repair of damaged canal lining, road surfacing and repair of office buildings, water masters’ and gate keepers’ quarters. The irrigators’ associations are involved in the community participation aspects of the project. The nine associations, namely: Hi-Farm IA, Division A IA, Division B IA, Bombon-Quipayo IA, Centro-Magarao IA, Limbuan IA, Bombon-Habagatan IA, Canaman-Magarao IA and Franc-Bel-Cas IA, had already completed with their respective work packages. Desilting works will ensure efficient distribution of irrigation water within the IA coverage service areas. B. Foreign Assisted Projects
  • 17. 17 For CY 2015, the activities that were accomplished are the following: 1. Hauling of Road surfacing materials at service roads of main canals and laterals, 2. Repair of concrete canal lining of main canals and laterals, 3. Construction of grouted riprap at approaches of Tigman Dam, 4. Manual de silting works at main canals and laterals and mechanized de silting works at main canals with higher depth, and; 5. Repair of 6 NIA Buildings and 6. 6. Delivery of steel gates for turn –outs. The actual physical accomplishment as of December 31, 2015 is 44.52%. Road surfacing works at Lateral B, Hinagyanan On-going repair of Concrete canal lining at Tigman Line. TIGMAN-HINAGYANAN-INARIHAN RIVER IRRIGATION SYSTEM (THIRIS)
  • 18. 18 Completed Grouted Riprap at Tigman dam Desilting works of Main canals at Inarihan and Hinagyanan
  • 19. 19 Completed Grouted Riprap at Tigman dam Rehabilitation Field Office (THIRIS)
  • 20. 20 For CY 2015 the activities centered on the conduct of TSA meetings, seminars and conferences focused on the discussion of the Operations plan for Barit RIS geared towards improvement of cropping intensity and commitment of IA leaders on ISF collection efficiency and participation of the Irrigators’ Association in the pre-Irrigation, Irrigation and Post Irrigation period. Series of meetings and trainings were conducted to fully inform the farmer beneficiaries of the current NIA Programs making them a sustain- able and viable irrigators association. Women leaders and members were also trained through a Livelihood seminar on food processing as an additional income to uplift the quality life of farmers. RINCONADA INTEGRATED IRRIGATION SYSTEM (RIIS) Livelihood Seminar on Food Processing (November 27, 2015) IA Performance Assessment for Barit IA Leaders (December 23, 2015)
  • 21. 21 D. Inter Agency Project NIA5 continued the implementation of locally funded projects which is Repair, Opera- tion & Maintenance of NIS Pump Irrigation System during the year. For CY 2015, a direct cost of P 4.7 Million was programmed for the operation of Libmanan—Cabusao Pump Irriga- tion System in Camarines Sur. Allotment released to NIA5was 100% of the approved budget. By the end of the year, the project was 100.00% completed. In addition to its regular program, NIA 5 continued the implementation of inter-agency pro- jects. C. Repair, Operation & Maintenance of NIS Pump Irrigation Systems I. Comprehensive Agrarian Reform Program-Irrigation Component (CARP-IC) Phase III The CY 2015 CARP Phase III for NIA 5 has a total project allocation of P11 Million. It is composed of three (3) projects that will restore 10 hectares and a target new area of 10 hectares. This will also rehabilitate 163 hectares of riceland when completed. Of the three projects that were implemented, only one (1) project was completed restoring 10 hectares and rehabilitating 55 hectares of Riceland. Shown is the completed desilting works at the Diversion Dam of Hinipaan CIS, Taken October 20, 2015 Proposed desilting works at Diversion dam of Hinipaan CIS, taken June 18, 2015
  • 22. 22 COMPLETED CHB LINING OF HINIPAAN CIS Shown is the completed construction of CHB Lining at portion of right main canal Sta. 0+214.56—0+267 Shown is the completed construction of CHB Lining at portion of right main canal Sta. 0+214.56—0+267
  • 23. 23 Completed Rehab of Diversion works at right Quinale CIS II. Third Agrarian Reform Infrastructure Support Program (ARISP 3) partly funded under JBIC loan The ARISP 3 funded under the 27th Yen Package of the Government of Japan through the Japan Bank for International Cooperation together with the Local Government Units (LGU) was able to complete four (4) projects this CY 2015 in NIA 5 NIA 5 implemented six (6) projects under ARISP 3 where two(2) of the projects were completed in 2014. These four (4) projects were able to rehabilitate 810 has and restored 153 has riceland. It has a total project cost of 72.851 Million. The projects are located in the prov- inces of Camarines Norte and Albay. Newly installed Tandem Type CP-12 Steel Gate at DW of right Newly installed Tandem Type CP-12 Steel Gate at DW of right Quinale CIS RIGHT QUINALE CIS
  • 24. 24 Completed CHB Lining at Lateral B of right Quinale CIS Completed CHB Lining at Lateral C of right Quinale CIS Completed CHB Lining at Main Canal of right Quinale CIS
  • 25. 25 Completed CHB Lining at Lateral B of San Agustin CIS Completed CHB Lining at Lateral B of right Quinale CIS Completed Embankment Protection at D/S portion of the Diversion Works of San Agustin CIS SAN AGUSTIN CIS
  • 26. 26 Completed CHB Canal Lining at Main Canal # 1 of Minasag CIS Completed CHB Lining at Lateral A of Minasag CIS Completed CHB Lining at Lateral A of Minasag CIS MINASAG CIS
  • 27. 27 Newly installed Steel Gate at Santol Ilaya Dam Completed Gabion D/S left and right Slide Slope Protection Newly installed Steel Gate at Santol Ilaya Dam SANTOL CIS
  • 28. 28 Completed CHB Canal Lining at Main Canal of Santol Ilaya Completed Repair of Siphon at Santol CIS Completed CHB Canal Lining at Main Canal of Santol Proper
  • 29. 29 Operation and Maintenance Activities A. National Irrigation Systems (NIS) NIA 5 operated and maintained 10 NIS region wide with a total Firmed-Up Service Area (FUSA) of 23,147 hectares serving 33,992 farmer-beneficiaries. The programmed service area for irrigation for cropped year 2015 is 21,121 hectares. As of De- cember 2015, irrigated area was 17,075 hectares during the dry season which is 89.59% of the pro- grammed service area; 16,575 hectares or 94.70% during wet season and 920 hectares or 5.66% for the third crop or a total of 34,570 hectares which is 82.37% of the programmed area. The irrigated cropping intensity attained for NIS is 163.68%. ENGINEERING AND OPERATIONS ENGI- O & M PERFORMANCE INDICATORS CROPPING INTENSITY (CI) 163.68% COLLECTION EFFICIENCY (CE) 50.03% VIABILITY INDEX (VI) 1.52%
  • 30. 30 NAME OF NIS NO. OF FARMERS BENEF. FUSA OPERT’L AREA IRRIGATED AREA BENEFITED AREA CROPPING INTENSITY WET DRY QTA RATOON WET DRY OPERT’L AREA MAHABA-NASISI- OGSONG-HIBIGA RIS 2,475 2,065 2,065 P 2,010 2,060 108 607 2,010 2,060 231.72 A 2,052 2,052 0 840 2,052 2,052 239.42 SOUTH QUINALE RIS 990 750 750 P 750 750 0 225 750 750 230.00 A 750 750 0 80 750 750 210.67 CABILOG-SAN JUAN 963 793 793 P 340 380 0 0 340 380 90.79 A 150 150 0 0 117.69 144 37.83 ALBAY SUB TOTAL 4,428 3,608 3,608 P 3,100 3,190 108 832 3,100 3,190 200.39 A 2,952 2,952 0 920 2,920 2,946 189.14 DAET-TALISAY RIS 3,557 3,026 2,810 P 2,400 2,760 92 850 2,400 2,760 217.15 A 2,320 2,431 0 0 2,095 2,431 169.07 MATOGDON RIS 269 471 293 P 230 230 0 0 230 230 157.00 A 230 231 0 0 212 231 157.34 CAM NORTE SUB TOTAL 3,826 3,497 3,103 P 2,630 2,990 92 850 2,630 2,990 211.47 A 2,550 2,662 0 0 2,307 2,662 167.97 TIGMAN-HINAGYANAN- INARIHAN RIS 3,765 3,542 3,122 P 2,750 2,900 107 720 2,750 2,900 207.46 A 2,660 2,618 0 0 2,265 2,618 169.06 CAGAYCAY RIS 2,289 2,095 1,915 P 1,520 1,574 63 425 1,520 1,574 187.05 A 1,504 1,528 0 0 1,248 1,528 158.33 RINCONADA INTEG.RATION IRRIGATION SYSTEM 16,556 7,208 6,295 P 5,402 5,800 300 1,529 5,402 5,800 207.01 A 5,049 5,176 0 0 4,852 4,951 162.43 LIBMANAN-CABUSAO PIS 1,593 2,195 2,076 P 1,150 1,635 0 0 1.150 1,635 134.15 A 920 1,171 0 0 897 843 100.72 CAM SUR SUB TOTAL 24,203 15,040 13,408 P 10,822 11,909 470 2,674 10,822 11,909 192.98 A 10,133 10,493 0 0 9,261 9,940 153.83 SAN RAMON-SAN FRANCISCO RIS 1,535 1,002 1,002 P 950 970 30 350 950 970 229.54 A 940 968 0 0 940 968 190.42 SORSOGON SUB TOTAL 1,535 1,002 1,002 P 950 970 30 350 950 970 229.54 A 940 968 0 0 940 968 190.42 TOTAL 33,992 23,147 21, 121 P 17,502 19,059 700 4,706 17,502 19,059 198.70 A 16,575 17,075 0 920 15,428 16,516 163.68 NAME OF NIS CA COLLECTIBLES (P’000) CE (%)COLLECTIONS (P’000) WET CROP DRY CROP TOTAL CA (ISF) (P’000) BA (P’000) E.R. (P’000) OTHER INCOME PROG. ACTUAL BASED ON BEN. AREA ACTUAL MAHABA-NASISI- OGSONG-HIBIGA RIS P 228.645 342.967 571.612 571.612 - 20.000 20.000 100.00 - A 228.645 342.967 571.612 460.260 69.117 30.341 51.861 80.52 80.52 SOUTH QUINALE RIS P 1,275.000 1,912.500 3,187.500 2,043.563 - - - 64.11 - A 1,275.000 1,912.500 3,187.500 1,484.380 86.108 - - 46.57 46.57 CABILOG-SAN JUAN P 578.000 969.000 1,547.000 922.320 - - - 59.62 - A 200.072 367.967 568.039 349.139 60.507 - - 22.57 61.46 ALBAY SUB TOTAL P 2,081.645 3,224.467 5,306.112 3,537.495 - 20.000 20.000 66.67 - A 1,703.717 2,623.434 4,327.150 2,293.779 215.732 30.341 51.861 43.23 53.01 DAET-TALISAY RIS P 4,080.000 7,038.000 11,118.000 7,226.700 1,700.000 - 10.000 65.00 - A 3,561.180 6,199.050 9,760.230 5,446.472 3,186.291 - 306.928 48.99 55.80 MATOGDON RIS P 391.000 586.500 977.500 635.375 200.000 - - 65.00 - A 359.878 589.050 948.928 335.536 110.104 - 77.300 34.33 35.36 CAM NORTE SUB TOTAL P 4,471.000 7,624.500 12,095.500 7,862.075 1,900.000 - 10.000 65.00 - A 3,921.057 6,788.100 10,709.157 5,782.008 3,296.394 - 384.228 47.80 53.99 TIGMAN-HINAGYANAN- INARIHAN RIS P 4,675.000 7,395.000 12,070.000 7,395.000 1,000.000 - - 61.27 - A 3,849.782 6,676.425 10,526.207 5,347.638 1,197.025 - 2.270 44.31 50.80 CAGAYCAY RIS P 2,584.000 4,013.700 6,597.700 3,951.088 300.000 - - 59.89 - A 2,121.240 3,896.400 6,017.640 2,390.941 477.666 - 5.000 36.24 39.73 RINCONADA INTEG.RATION IRRIGATION SYSTEM P 9,183.400 14,790.000 23,973.400 14,384.040 500.000 - - 60.00 - A 8,248.359 12,624.831 20,873.190 10,984.994 1,639.128 - 1.200 45.82 52.63 LIBMANAN-CABUSAO PIS P 2,932.500 4,169.250 7,101.750 4,370.600 200.000 - - 61.54 - A 2,287.526 2,148.375 4,435.901 2,214.083 386.999 - - 31.18 49.91 CAM SUR SUB TOTAL P 19,374.900 30,367.950 49,742.850 30,100.728 2,000.000 - - 60.51 - A 16,506.908 25,346.031 41,852.939 20,937.655 3,967.818 - 8.470 42.09 50.03 SAN RAMON-SAN FRANCISCO RIS P 1,615.000 2,473.500 4,088.500 2,657.525 30.000 - - 65.00 - A 1,598.000 2,430.150 4,028.150 1,461.180 176.655 - 39.025 35.47 36.27 SORSOGON SUB TOTAL P 1,615.000 2,473.500 4,088.500 44,157.823 30.000 - - 65.00 - A 1,598.000 2,430.150 4,028.150 30,474.622 176.655 - 39.025 35.74 36.27 TOTAL P 27,542.545 43,690.417 71,232.962 44,,157.823 3,930.000 20.000 30.000 61.99 - A 23,729.682 37,187.715 60,917.397 30,474.622 7,656.599 30.341 483.584 42.78 50.03 TABLE 3: CROPPING INTENSITY (CI) TABLE 4: COLLECTION EFFICIENCY (CE)
  • 31. 31 B. Communal Irrigation System (CIS) NIA Region 5 assisted 433 CIS regionwide with a total Firmed-up Service Area (FUSA) of 71,746 hectares serving 46,630 farmer-beneficiaries. As of December 2015, irrigated area was 32,479 hectares during the dry season (November 2014 to April 2015), 31,683 hectares during the wet season (May 2015 to October 2015). The irrigat- ed cropping intensity attained for CIS was 162.71%. PROVINCE NO. OF CIS NO. OF FBs WET DRY Irrigated/ Planted Area (ha) Ave. Yield per ha Irrigated/ Planted Area (ha) Ave. Yield per ha ALBAY 62 10,922 7,569 88.20 7,047 80.72 CAMARINES NORTE 43 2,267 1,260 67.80 1,922 71.00 CAMARINES SUR 189 20,043 15,071 86.00 14,658 85.00 CATANDUANES 38 2,993 1,024 79.00 1,038 77.74 MASBATE 27 2,004 1,138 52.04 1,756 58.02 SORSOGON 74 8,401 5,621 74.00 5.698 75.44 TOTAL 433 46,630 31,683 74.51 32,119 74.65 TABLE 5: VIABILITY INDEX (VI) NAME OF NIS O&M EXPENSES (P’000) NET INCOME (P’000) VIABILITY INDEX TOTAL INCOME (P’000) MAHABA-NASISI- OGSONG-HIBIGA RIS P 611.612 2,799.480 (2,187.868) 0.22 A 611.579 1,033.458 (421.879) 0.59 SOUTH QUINALE RIS P 2,043.563 - 2,043.563 - A 1,570.488 165.312 1,405.176 - CABILOG-SAN JUAN P 922.320 - 922.320 - A 409.646 112.266 297.379 - ALBAY SUB TOTAL P 3,577.495 2,799.480 778.015 1.28 A 2,591.713 1,311.036 1,280.676 1.98 DAET-TALISAY RIS P 8,963.700 8,047.671 889.029 1.11 A 8,939.691 6,031.105 2,908.586 1.48 MATOGDON RIS P 835.375 - 835.375 - A 522.940 24.113 498.827 21.69 CAM NORTE SUB TOTAL P 9,772.075 8,047.671 1,724.40 1.21 A 9,462.631 6,055.218 3,407.413 1.56 TIGMAN-HINAGYANAN- INARIHAN RIS P 8,395.000 7,000.000 1,395.000 1.20 A 6,546.933 5,559.014 987.918 1.18 CAGAYCAY RIS P 4,251.088 2,054.061 2,197.027 2.07 A 3,140.607 1,487.419 1,653.188 2.11 RINCONADA INTEG.RATION IRRIGATION SYSTEM P 14,884.040 13,178.835 1,705.205 1.13 A 12,625.322 8,023.045 4,602.277 1.57 LIBMANAN-CABUSAO PIS P 4,570.600 3,562.424 1,008.176 1.28 A 2,601.081 1,611.614 989.4568 1.61 CAM SUR SUB TOTAL P 32,100.728 25,795.320 6,305.408 1.24 A 24,913.943 16,681.092 8,232.851 1.49 SAN RAMON-SAN FRANCISCO RIS P 2,687.525 1,150.000 1,537.53 2.34 A 1,676.859 1,294.409 382.450 1.30 SORSOGON SUB TOTAL P 2,687.525 1,150.000 1,537.525 2.34 A 1,676.859 1,294.409 382.450 1.30 TOTAL P 48,137.823 37,792.471 10,345.352 1.27 A 38,645.146 25,341.756 13,303.391 1.52 TABLE 6: SERVICE AREA OF CIS
  • 32. 32 EN C. Institutional Development Program A total of 466 IAs regionwide had been organized reorganized/strengthened covering a total of 71,311.11 hectares with 74,689.00 farmer-beneficiaries. Capability-building program for NIA staff were conducted to enhance their capability of working harmoniously with the farmers and of carrying out their O&M responsibilities. On the other hand, farmers are trained on IA management, operation and maintenance of the irrigation system and IA financial manage- ment. Linkages with other government agencies engaged in agricultural production were strengthened. PROVINCE CIS NIS NO. OF IA AREA FARMERS NO. OF IA AREA FARMERS ALBAY 98 11,277.00 10,230 8 3,608 4,465 CAMARINES NORTE 47 3,074.00 2,156 10 3,496.73 3,908 CAMARINES SUR 155 21,855.00 14,736 57 15,040.38 24,303 LCPIS 0 0 0 6 2,195.38 1,693 THIRIS 0 0 0 9 3,542.00 3,765 CRIS 0 0 0 9 2,095.00 2,289 RIIS 0 0 0 33 7,208.00 16,556 CATANDUANES 49 2,007.00 3,000 0 0 0 MASBATE 36 3,058.00 2,148 0 0 0 SORSOGON 81 6,893.00 8,131 5 1,002 1,612 TOTAL 466 48,164.00 40,401 80 23,147.11 34,288 TABLE 7: NO. OF IA’s AND FARMERS
  • 33. 33 For CY 2014, NIA5 collected a total income of P58,941,112.60. Majority or 57% was derived from irrigation service fee collection. Other incomes were derived from CIS amortization, equity, pump amortization, equipment rental and other miscellaneous income. For the operations of NIA5 responsibility center, the total expenses incurred were P64,662,837.11 less expenses deductible for Viability Purpose of P9,587,244.18 for a total net expense of P55,075,952.93. For CY 2014, NIA region 5 earned a surplus of P3,865,519.67, achieving continuous viability for each provincial management office, irrigation systems office and the region. FINANCIAL MANAGEMENT
  • 34. 34 CY 2014 RESPONSIBILITY CENTER INCOME Irrigation Service Fee Equipment Rental CIS Amortization & Equity Pump Amort & Equity Other Income Total Income ALBAY 63,288.00 2,715,982.00 83,100.00 2,862,370.00 CAM. NORTE 369,771.48 279,990.00 649,761.48 CAM. SUR 8,441.02 4,250,183.50 79,603.00 4,338,227.52 CATANDUANES 13,000.00 462,791.60 12,650.00 12,000.00 500,441.60 MASBATE 804,584.00 140,300.00 944,884.00 SORSOGON 1,243,454.80 21,400.00 1,264,854.80 TOTAL PIOs - 84,729.02 9,846,767.38 12,650.00 616,393.00 10,560,539.40 RIIS 12,634,023.42 1,298.60 12,635,322.02 CAGAYCAY 3,127,669.65 12,937.51 3,140,607.16 DAET-TALISAY 8,580,749.26 359,842.11 8,940,591.37 THIRIS 6,435,321.07 111,611.76 6,546,932.83 LCPIS 2,598,258.02 2,823.45 2,601,081.47 MNOH 2,506,114.57 30,341.00 20,520.00 2,556,975.57 MATOGDON 443,346.20 79,593.67 522,939.87 SR-SF 1,637,398.52 39,460.57 1,676,859.09 TOTAL NIS 37,962,880.71 30,341.00 - - 628,087.67 38,621,309.38 REGIONAL OFFICE 5,354.40 9,753,909.42 9,759,263.82 GRAND TOTAL 37,962,880.71 120,424.42 9,846,767.38 12,650.00 10,998,390.09 58,941,112.60 RESPONSIBILITY CENTER EXPENSES Less Expenses Deduct- ible for Viability Pur- pose Net Expense Net Income/Loss Personal Services Maintenance & Other Operating Total Expenses ALBAY 3,339,291.21 279,463.00 3,618,754.21 966,666.67 2,652,087.54 210,282.46 CAM. NORTE 407,583.00 407,583.00 25,000.00 382,583.00 267,178.48 CAM. SUR 2,984,753.80 370,222.71 3,354,976.51 708,333.33 2,646,643.18 1,691,584.34 CATANDUANES 288,050.84 94,060.00 382,110.84 382,110.84 118,330.76 MASBATE 728,768.32 69,213.68 797,982.00 300,000.00 497,982.00 446,902.00 SORSOGON 1,309,822.64 307,216.14 1,617,038.78 737,500.00 879,538.78 385,316.02 TOTAL PIOs 9,058,269.81 1,120,175.53 10,178,445.34 2,737,500.00 7,440,945.34 3,119,594.06 RIIS 4,841,070.14 3,622,265.53 8,463,335.67 468,749.94 7,994,585.73 4,640,736.29 CAGAYCAY 809,173.90 890,241.21 1,699,415.11 212,499.96 1,486,915.15 1,653,692.01 DAET-TALISAY 5,208,522.61 1,280,832.88 6,489,355.49 440,729.15 6,048,626.34 2,891,965.03 THIRIS 3,549,666.34 2,322,276.40 5,871,942.74 506,250.00 5,365,692.74 1,181,240.09 LCPIS 1,153,368.29 503,037.27 1,656,405.56 44,791.67 1,611,613.89 989,467.58 MNOH 575,237.44 806,367.34 1,381,604.78 1,381,604.78 1,175,370.79 MATOGDON 54,112.24 54,112.24 54,112.24 468,827.63 SR-SF 1,203,394.43 192,085.14 1,395,479.57 150,000.00 1,245,479.57 431,379.52 TOTAL NIS 17,340,433.15 9,671,218.01 27,011,651.16 1,823,020.72 25,188,630.44 13,432,678.94 REGIONAL OFFICE 23,953,370.71 3,519,369.90 27,472,740.61 5,026,723.46 22,446,017.15 (12,686,753.33) GRAND TOTAL 50,352,073.67 14,310,763.44 64,662,837.11 9,587,244.18 55,075,592.93 3,865,519.67 TABLE 8: SUMMARY OF FINANCIAL STATUS
  • 35. 35 In Region 5, NIA has a total personnel complement of 247 as of December 31, 2014. Below, in tabulated form, is the breakdown. This number, however, does not include Contracts of Service and Job Orders. The implementation of the Rationalization Plan, in Region 5, has greatly affected our performance due to a very limited manpower. Be that as it may, Region 5 continued to strive to achieve an acceptable performance to maintain its stature to be one of NIA’s performing Regions. HR MANAGEMENT AS OF DECEMBER 31, 2015 RESPONSIBILITY CENTER MONTHLY COB DAILY/CASUAL TOTAL GRANDTOTAL Rationalization Set – up Authorized PERM TEMP Sub - Total COB PROJECT Sub - Total M F M F M F M F M F M F M F OFFICE OF THE REGIONAL IRRIGATION MANAGER 5 3 0 0 0 3 0 0 1 0 2 0 3 3 3 6 ENGINEERING & OPERATION DIVISION 22 11 10 0 0 11 11 0 0 7 2 7 2 18 13 31 ADMINISTRATIVE & FINANCE DIVISION 20 7 11 0 0 7 11 0 0 5 5 5 5 12 16 28 CAMSUR – NORTE IMO 11 7 2 0 0 7 4 0 1 18 4 18 5 25 9 34 RINCONADA INTEGRATED IS 20 8 4 3 1 11 6 0 0 7 2 7 2 18 8 26 CAGAYCAY RIS 2 1 0 1 0 2 0 0 0 2 1 2 1 4 1 5 TIGMAN – HINAGYANAN – INARIHAN RIS 16 9 2 3 0 12 2 1 0 4 3 5 3 17 5 22 DAET – TALISAY – MATOGDON RIS 15 12 2 1 0 13 2 0 0 0 0 0 0 13 2 15 LCPIS 4 3 0 1 0 4 0 0 0 0 0 0 0 4 0 4 ALBAY – CAT – MAS – SORSOGON IMO 4 3 1 0 0 3 1 1 2 43 22 44 24 47 25 72 SFSR RIS 2 1 0 1 0 2 0 0 0 0 0 0 0 2 0 2 MNOH RIS 2 2 0 0 0 2 0 0 0 0 0 0 0 2 0 2 TOTAL 123 67 36 10 1 77 37 2 4 86 41 88 45 165 82 247 OTHERS (Specify) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CARP – IC 15 0 0 0 0 0 0 0 0 0 0 0 0 4 8 12 PIDP 2 0 0 0 0 0 0 0 0 0 0 0 1 0 1 GRAND TOTAL 140 67 36 10 1 77 37 2 4 86 41 88 45 170 90 260 In our desire to ensure that we have the right people in place with the right mix of skills and right attitudes, NIA Region 5 regularly conducts Orientation and Reorientation of the different HR programs. These programs are aimed to develop our workforce with the needed competencies to successfully implement our programs, projects and initiatives. TABLE 9: TOTAL PERSONNEL COMPLEMENT
  • 36. 36 SUCCESS FACTORS  Properly maintained irrigation and drainage facilities  Prompt payment of Irrigation Service Fee (ISF)  Prompt/Early release of fund  Functional and strengthened IAs (even without the assistance of NIA)  Efficient implementation of operations plan for NISs/ CISs  On schedule completion of project implementation HINDERING FACTORS  Right of Way Problems  Inclement Weather Condition  Presence of Standing Crops  Peace and Order Situation  Clearances from Line Agencies  Hauling of Construction Materials  Ordinances on Procurement