SlideShare a Scribd company logo
Palliser Block
Play Summary
• Zone: Glauconite/Ellerslie/Pekisko
• Play: Oil in the Glauconite/ Ellerslie/Pekisko. Oil
production in adjacent pools.
• Thickness: 3-4 meters
• Porosity: 9-20 %
• Oil API: 21-26
• Analog: CVE 7D ALDSON 7-12-18-11 cum to date
82,438 bbls.
• Infrastructure:
• Natural gas infrastructure c/w gas plant in 18-
11W4M.
• Several oil processing facilities in the area.
• Seismic: Extensive seismic available in data room
viewing
• Additional Potential: Glauconite/Ellerslie/Pekisko
Regional Setting
Area Map
Strat Column
T17/18 R11W4 (Palliser Block), Prospect Area
07-31-17-10W403/13-32-17-11W4 02/16-13-17-10W4
Pekisko
Ellerslie
Glauconite
Cross-Section A-A’
T18
T17
R11W4
Ellerslie
Horizontals
Glauconite
Horizontals
Pekisko
Horizontals
A
A’
Play Summary
T18 R11W4 (Palliser Block), Glauconite Prospect
• Zone: Glauconite Channel sands
• Play: Oil in the Glauconite channels. Oil
production in adjacent pool.
• Thickness: 10 meters
• Porosity: 9%
• Oil API: 21.7
• Analog: CVE 8C ALDSON 8-24-18-11 cum to date
91,659 bbls.
• Reservoir:
• Typically low WC (< 50%).
• Typical GOR 2000 to 3000 scf/bbl.
• Seismic: Extensive seismic available in data room
viewing
• Additional Potential: Ellerslie/Detrital/ Pekisko
T 18
R 11W4
91,659 bbls OIL
0.18 Bcf Gas
192,359 bbls wtr
08/2016
16,672 bbls OIL
0.14 Bcf Gas
29,955 bbls wtr
08/2015
10.5
13.0
1.5
2.0
0.0
1.0
0.0
MUD PLUG
Channel Outline
based on
seismic/Geology
Oil show
Regional Setting Glauconite Channel Reservoir
Area Map
Strat Column Type Log
Production Curve
Potential Horizontal
CVE 8C ALDSON 8-24-18-11
02/10-22-18-11W4
Coal
Glauc Regional
Ellerslie
Glauc Channel
Play Summary
T17 R11W4 (Palliser Block), Ellerslie Prospect
• Zone: Ellerslie sands
• Play: Oil in the Ellerslie. Oil production in
adjacent pool.
• Thickness: 5 meters
• Porosity: 9%
• Oil API: 21.7
• Analog: CVE 7D ALDSON 7-12-18-11 cum to date
82,438 bbls.
• Reservoir:
• Typically medium but stable WC (50% to 70%).
• Typical GOR < 1000 scf/bbl.
• Seismic: Extensive seismic available in data room
viewing
• Additional Potential: Glauc/Detrital/Pekisko
Regional Setting
Strat Column
Cross-Section A-A’
07-31-17-10W403/02-25-17-11W4
Ellerslie
Production Curve
CVE 7D ALDSON 7-12-18-11
Ellerslie Reservoir-Area Map
T18
T17R 11W4
0
0
0
0
5
5
5
5
A
A’
Potential Horizontal
Play Summary
Play Summary
Zone: Regional Glauc, marginal marine sands.
Play: Potential Oil in the structural lows (downdip from 8-22 gas). Oil shows in the 6-14 and 10-15-22-18W4 wells.
-Thickness: 3m Pay
-Porosity: 20%
-Oil API: 20 to 30
HZ 04/12-2-20-16W4 Analog Cumulative Production = 44,011 Bbls since 2014.
Infrastructure: Extensive infrastructure in the Palliser region.
Seismic: Used to determine structural lows which are often related to Devonian salt dissolution.
Additional Potential: Stacked regional Glauconite marginal marine sands, and Lower Mannville BQ channels.
14-22-18W4 (Palliser Block), Regional Glauconite Prospect
MERGE P174039 CROPPED
11
5
8 10
4
14
17
21
24
3 1
13
22
9
16
23
12
2
20
15
22-18-W4
-5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
5
5
5
-372
-369
-374
-362
-367
-359
-372-359
-384 -372
-383
-364
-376 -369
-364
-357 -376
-376
-372
-366
-366
-365
-376
-362
-366-376
-369
-358
-369
-366
Regional Setting Regional Glauc Net Reservoir (12% Cutoff)
Glauc Coal Residual StructureStratigraphic Column
T22
R18R19
Regional Glauc Production Example (HZ 04/12-2-20-16W4)
T22
-Glauc
-BQ
-Pekisko
-Banff
-Nisku
Oil Production
By Zone
10-15-22-18W4
Regional Glauconite
6-14-22-18W4 (Oil Show)
A
A
A’
A’

More Related Content

What's hot

Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUMEUse of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUMEMICHAEL OWARUME
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
Jeffrey Pickett
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012ggurudev
 
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...HPHT Wells Summit
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
Jeffrey Pickett
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
Dan Benson
 
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringAlnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoring
Statoil
 
Four Key Considerations for Mature Fields
Four Key Considerations for Mature FieldsFour Key Considerations for Mature Fields
Four Key Considerations for Mature Fields
susan nash
 
Tourmaline Investor Presentation
Tourmaline Investor PresentationTourmaline Investor Presentation
Tourmaline Investor Presentation
Company Spotlight
 

What's hot (11)

Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUMEUse of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
GCP
GCPGCP
GCP
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringAlnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoring
 
Four Key Considerations for Mature Fields
Four Key Considerations for Mature FieldsFour Key Considerations for Mature Fields
Four Key Considerations for Mature Fields
 
Tourmaline Investor Presentation
Tourmaline Investor PresentationTourmaline Investor Presentation
Tourmaline Investor Presentation
 

Similar to Prospect Presentation Short - Heritage Royalty

Unx presentation nov 8 2010
Unx presentation nov 8 2010Unx presentation nov 8 2010
Unx presentation nov 8 2010unxenergy
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
Unx presentation nov 16 2010 (web)
Unx presentation nov 16 2010 (web)Unx presentation nov 16 2010 (web)
Unx presentation nov 16 2010 (web)Kelsey Anderson
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
John Downs
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
M.T.H Group
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
John Downs
 
spe-problem water.pdf
spe-problem water.pdfspe-problem water.pdf
spe-problem water.pdf
benettoumicelia
 
Spe26043 (fluid entry)
Spe26043 (fluid entry)Spe26043 (fluid entry)
Spe26043 (fluid entry)
Gregg Linville
 
SPE26043 (Fluid Entry)
SPE26043 (Fluid Entry)SPE26043 (Fluid Entry)
SPE26043 (Fluid Entry)Gregg Linville
 
Natural gas storage in the united states
Natural gas storage in the united states Natural gas storage in the united states
Natural gas storage in the united states
BANABAS DOGAH
 
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
jdowns
 
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
Meherunnesha (Nishat)
 
L & M Energy- Resources & Energy Symposium 2012
L & M Energy- Resources & Energy Symposium 2012L & M Energy- Resources & Energy Symposium 2012
L & M Energy- Resources & Energy Symposium 2012Symposium
 
Jory Pacht: Optimizing Operations in a Low Commodity Price Environment
Jory Pacht: Optimizing Operations in a Low Commodity Price EnvironmentJory Pacht: Optimizing Operations in a Low Commodity Price Environment
Jory Pacht: Optimizing Operations in a Low Commodity Price Environment
Daniel Matranga
 
Revithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentationRevithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentation
moniaros
 
Vail Project Primer Final
Vail Project Primer FinalVail Project Primer Final
Vail Project Primer Final
Strata-X Energy
 

Similar to Prospect Presentation Short - Heritage Royalty (20)

Unx presentation nov 8 2010
Unx presentation nov 8 2010Unx presentation nov 8 2010
Unx presentation nov 8 2010
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
Unx presentation nov 16 2010 (web)
Unx presentation nov 16 2010 (web)Unx presentation nov 16 2010 (web)
Unx presentation nov 16 2010 (web)
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
 
spe-problem water.pdf
spe-problem water.pdfspe-problem water.pdf
spe-problem water.pdf
 
Spe26043 (fluid entry)
Spe26043 (fluid entry)Spe26043 (fluid entry)
Spe26043 (fluid entry)
 
SPE26043 (Fluid Entry)
SPE26043 (Fluid Entry)SPE26043 (Fluid Entry)
SPE26043 (Fluid Entry)
 
Natural gas storage in the united states
Natural gas storage in the united states Natural gas storage in the united states
Natural gas storage in the united states
 
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
 
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
“On-site Remediation of Sea Sediment and Soil Contaminated with Crude Oil at ...
 
L & M Energy- Resources & Energy Symposium 2012
L & M Energy- Resources & Energy Symposium 2012L & M Energy- Resources & Energy Symposium 2012
L & M Energy- Resources & Energy Symposium 2012
 
poster-2nd-FINAL
poster-2nd-FINALposter-2nd-FINAL
poster-2nd-FINAL
 
poster-SAK-PETEX2003
poster-SAK-PETEX2003poster-SAK-PETEX2003
poster-SAK-PETEX2003
 
Jory Pacht: Optimizing Operations in a Low Commodity Price Environment
Jory Pacht: Optimizing Operations in a Low Commodity Price EnvironmentJory Pacht: Optimizing Operations in a Low Commodity Price Environment
Jory Pacht: Optimizing Operations in a Low Commodity Price Environment
 
Willden Residence
Willden ResidenceWillden Residence
Willden Residence
 
Revithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentationRevithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentation
 
Vail Project Primer Final
Vail Project Primer FinalVail Project Primer Final
Vail Project Primer Final
 
SPE-15101-PA
SPE-15101-PASPE-15101-PA
SPE-15101-PA
 

Recently uploaded

Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
Sysco_Investors
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
f3wjr2q2
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
Valentina Ottini
 
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUESMUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
WilliamRodrigues148
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
ybout
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
Philip Rabenok
 

Recently uploaded (9)

Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
 
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUESMUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
 

Prospect Presentation Short - Heritage Royalty

  • 2. Play Summary • Zone: Glauconite/Ellerslie/Pekisko • Play: Oil in the Glauconite/ Ellerslie/Pekisko. Oil production in adjacent pools. • Thickness: 3-4 meters • Porosity: 9-20 % • Oil API: 21-26 • Analog: CVE 7D ALDSON 7-12-18-11 cum to date 82,438 bbls. • Infrastructure: • Natural gas infrastructure c/w gas plant in 18- 11W4M. • Several oil processing facilities in the area. • Seismic: Extensive seismic available in data room viewing • Additional Potential: Glauconite/Ellerslie/Pekisko Regional Setting Area Map Strat Column T17/18 R11W4 (Palliser Block), Prospect Area 07-31-17-10W403/13-32-17-11W4 02/16-13-17-10W4 Pekisko Ellerslie Glauconite Cross-Section A-A’ T18 T17 R11W4 Ellerslie Horizontals Glauconite Horizontals Pekisko Horizontals A A’
  • 3. Play Summary T18 R11W4 (Palliser Block), Glauconite Prospect • Zone: Glauconite Channel sands • Play: Oil in the Glauconite channels. Oil production in adjacent pool. • Thickness: 10 meters • Porosity: 9% • Oil API: 21.7 • Analog: CVE 8C ALDSON 8-24-18-11 cum to date 91,659 bbls. • Reservoir: • Typically low WC (< 50%). • Typical GOR 2000 to 3000 scf/bbl. • Seismic: Extensive seismic available in data room viewing • Additional Potential: Ellerslie/Detrital/ Pekisko T 18 R 11W4 91,659 bbls OIL 0.18 Bcf Gas 192,359 bbls wtr 08/2016 16,672 bbls OIL 0.14 Bcf Gas 29,955 bbls wtr 08/2015 10.5 13.0 1.5 2.0 0.0 1.0 0.0 MUD PLUG Channel Outline based on seismic/Geology Oil show Regional Setting Glauconite Channel Reservoir Area Map Strat Column Type Log Production Curve Potential Horizontal CVE 8C ALDSON 8-24-18-11 02/10-22-18-11W4 Coal Glauc Regional Ellerslie Glauc Channel
  • 4. Play Summary T17 R11W4 (Palliser Block), Ellerslie Prospect • Zone: Ellerslie sands • Play: Oil in the Ellerslie. Oil production in adjacent pool. • Thickness: 5 meters • Porosity: 9% • Oil API: 21.7 • Analog: CVE 7D ALDSON 7-12-18-11 cum to date 82,438 bbls. • Reservoir: • Typically medium but stable WC (50% to 70%). • Typical GOR < 1000 scf/bbl. • Seismic: Extensive seismic available in data room viewing • Additional Potential: Glauc/Detrital/Pekisko Regional Setting Strat Column Cross-Section A-A’ 07-31-17-10W403/02-25-17-11W4 Ellerslie Production Curve CVE 7D ALDSON 7-12-18-11 Ellerslie Reservoir-Area Map T18 T17R 11W4 0 0 0 0 5 5 5 5 A A’ Potential Horizontal
  • 5. Play Summary Play Summary Zone: Regional Glauc, marginal marine sands. Play: Potential Oil in the structural lows (downdip from 8-22 gas). Oil shows in the 6-14 and 10-15-22-18W4 wells. -Thickness: 3m Pay -Porosity: 20% -Oil API: 20 to 30 HZ 04/12-2-20-16W4 Analog Cumulative Production = 44,011 Bbls since 2014. Infrastructure: Extensive infrastructure in the Palliser region. Seismic: Used to determine structural lows which are often related to Devonian salt dissolution. Additional Potential: Stacked regional Glauconite marginal marine sands, and Lower Mannville BQ channels. 14-22-18W4 (Palliser Block), Regional Glauconite Prospect MERGE P174039 CROPPED 11 5 8 10 4 14 17 21 24 3 1 13 22 9 16 23 12 2 20 15 22-18-W4 -5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 5 5 5 -372 -369 -374 -362 -367 -359 -372-359 -384 -372 -383 -364 -376 -369 -364 -357 -376 -376 -372 -366 -366 -365 -376 -362 -366-376 -369 -358 -369 -366 Regional Setting Regional Glauc Net Reservoir (12% Cutoff) Glauc Coal Residual StructureStratigraphic Column T22 R18R19 Regional Glauc Production Example (HZ 04/12-2-20-16W4) T22 -Glauc -BQ -Pekisko -Banff -Nisku Oil Production By Zone 10-15-22-18W4 Regional Glauconite 6-14-22-18W4 (Oil Show) A A A’ A’