This document summarizes a sewer lateral replacement project completed on May 16, 2007 in Clifton, NJ. A 60 foot long 4-inch sewer lateral was replaced, running from the basement of a home to the main sewer line in the street. Special conditions included the lateral exiting the basement foundation about 3 feet above the floor. Tools used included a BC30 hydraulic ram and Powerteam 5.5HP high pressure pump. Photos document each step of the project from initial markings to final inspection.