NON-BUDGET ACTIVITIES
• Review and Revise Procedures:
 Add flow chart for easy to understand.
 Add safety requirements into the procedures to improve
safety awareness.
 Improve warehouse operation management.
 Improve stock variance ratio.
 Check-weigher control instruction.
3/30/2015 Tran Thanh Tam 2
Review & Revise Procedures
(Unloading RRB)
3/30/2015 Tran Thanh Tam 3
Review& Revise Procedures
(Unloading PRB)
3/30/2015 Tran Thanh Tam 4
Review & Revise Procedures
(General Procedure)
3/30/2015 Tran Thanh Tam 5
NON-BUDGET ACTIVITIES
(cont.)
• Study to compose new work instructions:
 Belt conveyor Operation Guideline.
 Forklift Operation Guideline.
 Equipment Regularly Maintenance Guideline.
 Shift hand-over Instruction.
 Contractor Operation Management Guideline.
 Inventory Stock Count Work Instruction.
 Warehouse Operation Induction (for new staff).
3/30/2015 Tran Thanh Tam 6
Equipment Regularly Maint. Guideline
3/30/2015 Tran Thanh Tam 7
Forklift truck daily check list
3/30/2015 Tran Thanh Tam 8
Conveyor Belt Safety Operation Guideline
3/30/2015 Tran Thanh Tam 9
Other Activities
• Improve Team & Individual performance
effectiveness:
 Work with HR to make a clear Operation KPI for
Warehouse. Spread it to staff level.
 Re-assignment job allocation.
 Improve shift hand-over activity.
 Improve daily job arrangement activity.
3/30/2015 Tran Thanh Tam 10
Other Activities
• Organize a meeting among departments (Logistic,
Warehouse, QC, Maintenance) on how to improve
communication flow among dept.
• Study how to utilize Jetties during high season.
3/30/2015 Tran Thanh Tam 11
BUDGET NEEDED ACTIVITIES
3/30/2015 Tran Thanh Tam 12
Propose to build Oil Filling Station
3/30/2015 Tran Thanh Tam 13
There is no oil filling station now
Propose to do this in Q2.2012
Propose to repair all conveyor belts
3/30/2015 Tran Thanh Tam 14
Mobile Conveyor Belt: In other to improve HP Operation Efficiency, improve
safety operation of belt conveyor, we need to improve technical condition of
all above critical equipment. In considering to balance between repairing
need and budget spending. The repair plan is proposed as follow:
No. Equipment Description Q4/2011 Q1/2011 Remark
1 Mobilized Conveyor Belt Repair 20 14
2 Suspending Conveyor Belt Repair 5
Propose to repair all conveyor belts
3/30/2015 Tran Thanh Tam 15
Way of execution:
Propose to call for external contractor to do the repair job for all mobilized
conveyor belts. Warehouse will take accountability to execute this task. This
should be done in Q4.2011 & Q1.2012.
Suspending frame Deformed Wheels to be broken
Mobilized conveyor belt
3/30/2015 Tran Thanh Tam 16
Sharp edge to make bag torn
Mobilized conveyor belt
3/30/2015 Tran Thanh Tam 17
Wheels are small: easy to be damaged, difficult to move
Mobilized conveyor belt
3/30/2015 Tran Thanh Tam 18
Loss of drive chain covers
Mobilized conveyor belt
3/30/2015 Tran Thanh Tam 19
Non-appropriated height for arranging in line
Overhead/Stacking conveyor Belts
No. Equipment Description Q4/2011 Q1/2011 Remark
1 Jetty Check and modify Jetty 1 Jetty 2,3 & 4
2 Stacking Check and repair The left side The right side
3/30/2015 Tran Thanh Tam 20
According to the current technical status. We need to do the survey and
make some repairing and modification. The proposed schedule as below
Way of execution: Maintenance Dept. to go with Warehouse Dept. doing
the survey. Make some modification.
Overhead/Stacking conveyor Belts
3/30/2015 Tran Thanh Tam 21
Overhead/Stacking conveyor Belts
3/30/2015 Tran Thanh Tam 22
Need to repair and doing modification
Overhead/Stacking conveyor Belts
3/30/2015 Tran Thanh Tam 23
Material spill out
The floor of Big Warehouse
3/30/2015 Tran Thanh Tam 24
The floor has sunk down. It makes difficulty to Warehouse daily operation.
Propose to make access path between section & at the main doors.
Propose to start this task in Q2.2011
Belt line from Bulk Warehouse to silos
3/30/2015 Tran Thanh Tam 25
Propose to modify: Remove all cover. Install hand rail along side of the belt line
Purposes: Increase ventilation. Reduce temperature and humidity. Prevent the
accumulation of gas and the risk of weevil arising.
Need a belt line links from Jetty 1 to Bulk WH. Do we have a project for it ?.
Propose to do it in Q3.2012
New conveyor belt requirement
3/30/2015 Tran Thanh Tam 26
New Jetty(5): Propose to install fixed conveyor line for this jetty.
Need: 10 more mobilized conveyor belts (08 meters/each) to meet
requirement at high season. These new one should have at Warehouse in
Q1.2012.
New Software for Inventory
Management !
3/30/2015 Tran Thanh Tam 27
From Excel
To a professional soft ware for Inventory
Management !  Can we have it in Q4.2012 ?
Other activities
• Propose to buy 05 walkie-talkie for WH Team.
• Organize External Safety Training for WH Core
Team (From WH Assistant and up).
• Organize Internal Safety Training for Core
Team of Contractor (Team Leader/Supervisor)
3/30/2015 Tran Thanh Tam 28
Thank you !
3/30/2015 Tran Thanh Tam 29

More Related Content

Similar to PROPOSAL FOR IMPROVEMENT AT WAREHOUSE1_TAMTT

IRJET- CFD Flow Analysis of Station Pipeline
IRJET- CFD Flow Analysis of Station PipelineIRJET- CFD Flow Analysis of Station Pipeline
IRJET- CFD Flow Analysis of Station Pipeline
IRJET Journal
 
Internship at Pakistan Railways
Internship at Pakistan RailwaysInternship at Pakistan Railways
Internship at Pakistan Railways
Muhammad Usman
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
Mohammad Adnan
 
south east central railway training
south east central railway trainingsouth east central railway training
south east central railway training
vijay patel
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
Itnesh Kumar
 
Technical seminar
 Technical seminar Technical seminar
Technical seminar
QuocVietTran16
 
INDUSTRIAL TRAINING
INDUSTRIAL TRAININGINDUSTRIAL TRAINING
INDUSTRIAL TRAINING
Haziqah Raihah
 
Daily Maintenance improvement Points2.pptx
Daily Maintenance improvement Points2.pptxDaily Maintenance improvement Points2.pptx
Daily Maintenance improvement Points2.pptx
ssuser0af5e81
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
PRASHANT KUMAR PATEL
 
Cop4 locomotive mtc
Cop4 locomotive mtcCop4 locomotive mtc
Cop4 locomotive mtc
Raman Krishnan
 
Cop locomotive mtc
Cop locomotive mtcCop locomotive mtc
Cop locomotive mtc
Raman Krishnan
 
CV 杨文超英文版
CV 杨文超英文版CV 杨文超英文版
CV 杨文超英文版
wenchao yang
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
Vishal Singh
 
amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
AryanYadav924184
 
Maintenance in wet processing Machine
Maintenance in wet processing MachineMaintenance in wet processing Machine
Maintenance in wet processing Machine
Md. Mazadul Hasan Shishir
 
Ankit ic engine pnumetic THREE AXIS MODERN TRAILER
Ankit ic engine pnumetic THREE AXIS MODERN TRAILERAnkit ic engine pnumetic THREE AXIS MODERN TRAILER
Ankit ic engine pnumetic THREE AXIS MODERN TRAILER
shailesh yadav
 
Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891
IstekharALI
 
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE)
SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE) SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE)
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE)
Amit Verma
 
Harish rathi
Harish rathiHarish rathi
Harish rathi
Harish Rathee
 
Assignment 1 rev1
Assignment 1 rev1Assignment 1 rev1
Assignment 1 rev1
Assignment Help
 

Similar to PROPOSAL FOR IMPROVEMENT AT WAREHOUSE1_TAMTT (20)

IRJET- CFD Flow Analysis of Station Pipeline
IRJET- CFD Flow Analysis of Station PipelineIRJET- CFD Flow Analysis of Station Pipeline
IRJET- CFD Flow Analysis of Station Pipeline
 
Internship at Pakistan Railways
Internship at Pakistan RailwaysInternship at Pakistan Railways
Internship at Pakistan Railways
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
 
south east central railway training
south east central railway trainingsouth east central railway training
south east central railway training
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
 
Technical seminar
 Technical seminar Technical seminar
Technical seminar
 
INDUSTRIAL TRAINING
INDUSTRIAL TRAININGINDUSTRIAL TRAINING
INDUSTRIAL TRAINING
 
Daily Maintenance improvement Points2.pptx
Daily Maintenance improvement Points2.pptxDaily Maintenance improvement Points2.pptx
Daily Maintenance improvement Points2.pptx
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
 
Cop4 locomotive mtc
Cop4 locomotive mtcCop4 locomotive mtc
Cop4 locomotive mtc
 
Cop locomotive mtc
Cop locomotive mtcCop locomotive mtc
Cop locomotive mtc
 
CV 杨文超英文版
CV 杨文超英文版CV 杨文超英文版
CV 杨文超英文版
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
 
Maintenance in wet processing Machine
Maintenance in wet processing MachineMaintenance in wet processing Machine
Maintenance in wet processing Machine
 
Ankit ic engine pnumetic THREE AXIS MODERN TRAILER
Ankit ic engine pnumetic THREE AXIS MODERN TRAILERAnkit ic engine pnumetic THREE AXIS MODERN TRAILER
Ankit ic engine pnumetic THREE AXIS MODERN TRAILER
 
Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891
 
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE)
SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE) SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE)
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE)
 
Harish rathi
Harish rathiHarish rathi
Harish rathi
 
Assignment 1 rev1
Assignment 1 rev1Assignment 1 rev1
Assignment 1 rev1
 

PROPOSAL FOR IMPROVEMENT AT WAREHOUSE1_TAMTT

  • 1. PROPOSAL FOR IMPROVEMENT AT WAREHOUSE TRAN THANH TAM SENIOR WAREHOUSE EXECUTIVE 3/30/2015 Tran Thanh Tam 1
  • 2. NON-BUDGET ACTIVITIES • Review and Revise Procedures:  Add flow chart for easy to understand.  Add safety requirements into the procedures to improve safety awareness.  Improve warehouse operation management.  Improve stock variance ratio.  Check-weigher control instruction. 3/30/2015 Tran Thanh Tam 2
  • 3. Review & Revise Procedures (Unloading RRB) 3/30/2015 Tran Thanh Tam 3
  • 4. Review& Revise Procedures (Unloading PRB) 3/30/2015 Tran Thanh Tam 4
  • 5. Review & Revise Procedures (General Procedure) 3/30/2015 Tran Thanh Tam 5
  • 6. NON-BUDGET ACTIVITIES (cont.) • Study to compose new work instructions:  Belt conveyor Operation Guideline.  Forklift Operation Guideline.  Equipment Regularly Maintenance Guideline.  Shift hand-over Instruction.  Contractor Operation Management Guideline.  Inventory Stock Count Work Instruction.  Warehouse Operation Induction (for new staff). 3/30/2015 Tran Thanh Tam 6
  • 7. Equipment Regularly Maint. Guideline 3/30/2015 Tran Thanh Tam 7
  • 8. Forklift truck daily check list 3/30/2015 Tran Thanh Tam 8
  • 9. Conveyor Belt Safety Operation Guideline 3/30/2015 Tran Thanh Tam 9
  • 10. Other Activities • Improve Team & Individual performance effectiveness:  Work with HR to make a clear Operation KPI for Warehouse. Spread it to staff level.  Re-assignment job allocation.  Improve shift hand-over activity.  Improve daily job arrangement activity. 3/30/2015 Tran Thanh Tam 10
  • 11. Other Activities • Organize a meeting among departments (Logistic, Warehouse, QC, Maintenance) on how to improve communication flow among dept. • Study how to utilize Jetties during high season. 3/30/2015 Tran Thanh Tam 11
  • 13. Propose to build Oil Filling Station 3/30/2015 Tran Thanh Tam 13 There is no oil filling station now Propose to do this in Q2.2012
  • 14. Propose to repair all conveyor belts 3/30/2015 Tran Thanh Tam 14 Mobile Conveyor Belt: In other to improve HP Operation Efficiency, improve safety operation of belt conveyor, we need to improve technical condition of all above critical equipment. In considering to balance between repairing need and budget spending. The repair plan is proposed as follow: No. Equipment Description Q4/2011 Q1/2011 Remark 1 Mobilized Conveyor Belt Repair 20 14 2 Suspending Conveyor Belt Repair 5
  • 15. Propose to repair all conveyor belts 3/30/2015 Tran Thanh Tam 15 Way of execution: Propose to call for external contractor to do the repair job for all mobilized conveyor belts. Warehouse will take accountability to execute this task. This should be done in Q4.2011 & Q1.2012. Suspending frame Deformed Wheels to be broken
  • 16. Mobilized conveyor belt 3/30/2015 Tran Thanh Tam 16 Sharp edge to make bag torn
  • 17. Mobilized conveyor belt 3/30/2015 Tran Thanh Tam 17 Wheels are small: easy to be damaged, difficult to move
  • 18. Mobilized conveyor belt 3/30/2015 Tran Thanh Tam 18 Loss of drive chain covers
  • 19. Mobilized conveyor belt 3/30/2015 Tran Thanh Tam 19 Non-appropriated height for arranging in line
  • 20. Overhead/Stacking conveyor Belts No. Equipment Description Q4/2011 Q1/2011 Remark 1 Jetty Check and modify Jetty 1 Jetty 2,3 & 4 2 Stacking Check and repair The left side The right side 3/30/2015 Tran Thanh Tam 20 According to the current technical status. We need to do the survey and make some repairing and modification. The proposed schedule as below Way of execution: Maintenance Dept. to go with Warehouse Dept. doing the survey. Make some modification.
  • 22. Overhead/Stacking conveyor Belts 3/30/2015 Tran Thanh Tam 22 Need to repair and doing modification
  • 23. Overhead/Stacking conveyor Belts 3/30/2015 Tran Thanh Tam 23 Material spill out
  • 24. The floor of Big Warehouse 3/30/2015 Tran Thanh Tam 24 The floor has sunk down. It makes difficulty to Warehouse daily operation. Propose to make access path between section & at the main doors. Propose to start this task in Q2.2011
  • 25. Belt line from Bulk Warehouse to silos 3/30/2015 Tran Thanh Tam 25 Propose to modify: Remove all cover. Install hand rail along side of the belt line Purposes: Increase ventilation. Reduce temperature and humidity. Prevent the accumulation of gas and the risk of weevil arising. Need a belt line links from Jetty 1 to Bulk WH. Do we have a project for it ?. Propose to do it in Q3.2012
  • 26. New conveyor belt requirement 3/30/2015 Tran Thanh Tam 26 New Jetty(5): Propose to install fixed conveyor line for this jetty. Need: 10 more mobilized conveyor belts (08 meters/each) to meet requirement at high season. These new one should have at Warehouse in Q1.2012.
  • 27. New Software for Inventory Management ! 3/30/2015 Tran Thanh Tam 27 From Excel To a professional soft ware for Inventory Management !  Can we have it in Q4.2012 ?
  • 28. Other activities • Propose to buy 05 walkie-talkie for WH Team. • Organize External Safety Training for WH Core Team (From WH Assistant and up). • Organize Internal Safety Training for Core Team of Contractor (Team Leader/Supervisor) 3/30/2015 Tran Thanh Tam 28