Maintenance/Utility/Process Engg
Meeting Discussion points
MONTH – JAN 2024
Index
 Breakdown Summary/Analysis – Assembly Lines, Sub Shops
 Improvement Points
 Automation Project Status
 Utility projects Status
 Power & Fuel saving Action Plan
 Project Activities
 MES Integration
 PM Plan vs Actual
 PE/ME activity Plan
 Civil Ongoing Activities
 Spare/Store Issues
 Pending Points ( PQCDSM)
Breakdown Summary
0
50
100
150
200
250
300
350
Sub Shop Monthly Breakdown Trend
Moulding shop Press Shop Paint Shop HE Shop CT Shop
Breakdown Analysis (Sub Shop_
Date Shop Machine Name
BD Time
(Min)
Issue Root Cause Corrective action Preventive action Target Date PIC Remark
01-Dec-23 CT Shop CNC Bending -3 15 Cutting unit not ok Grub screw loosen
Proper fitted the rod and
grub screw tighten
1. Both Side grub screw to be provided
2. All machine grub screw tightness to be check
10.12.23 Mayank
08-Dec-23 Press Shop Progressive Press 300 Lub Issue
Contaimination
inside grease
line/pump/manifold
Cleaned grease pump,
Grease line and manifold,
machine under observation.
1. Grease filling port nipple to be provide
2. Will check grease storage condition and keep grease
properly.
20.12.23
20.12.23
Arun
Mani
09-Dec-23 HE Shop EVA Line 6 Upside going issue Alignment not ok Stucking so alignment done 1. Alignment of lifte done 10.12.23 Mayank
09-Dec-23 HE Shop EVA Line 40
Loading Lifter not
working
Sensor Faulty
Door Sensor direct and
started line
1. Need to replace the door proxy Sensor 11.12.23 Arun
11-Dec-23 HE Shop
Auto Brazing-COND
Line
153
Up down
movement issue
One Ball Screw not
ok
Open timings belts and
alignment done for all four
ball screws then set height
ok.
1. Ball Screw Alignement Done
2. Need to Replace the one ball Screw
3. Inform to production team, till ball screw change, if any
model change over then call Maint team. Also Display notice
for same.
1. Done
2. 30.12.23
3. Immidiate
Mayank
13-Dec-23 Press Shop
Transfer Line 2
Manipulator
60
Manipulator cam
down
CAMFollower
bearing thread worn
out
Currently Manipulator take
at home position and line
started in manual mode
1. Need to replace CAMFollower
2. New Thread to be made
3. We will check all other manipulator for CAMfollower
4. Communicated to OEMfor this failure for root cause and
prevetive action
1. 14.12.23
2. 14.12.23
3. 18.12.23
4. 30.12.23
Arun
17-Dec-23 Moulding Chiller 120
Chiller Pressure
issue
Strainer not ok Cleaned the strainer
1. Informed all team that when ever chiller tank cleaning
done, clean Strainer also.
Done Arun
20-Dec-23 Paint Shop Powder Booth 45
Fan 1 too little
exhaust air
Recovery powder
not coming back
Open Both Cover and filters
cleaned also remove
powder from collection bin
1. Open pump and clean it
2. Training given to operators to check recovery powder in
pipe line daily
Done Arun
22-Dec-23 Press Shop SPMSpot welding-2 60 HMI not working HMI Faulty HMI Replaced with New
1. HMI Replaced with back up downloaded
2. Send mail to OEMfor HMI failure
Done Arun
23-Dec-23 Paint Shop PT Zone 150
Oxsillian pump
tipping issue
Pump Motor faulty
Replaced the pump motor
from DM3 spare pump
1. Inform to OEMfor this issue, They will visit and check the
root cause.
2. current use spare pump motor
30.12.23 Arun
27-Dec-23 Paint Shop Conveyor 45 Jerking issue
Drive clutch plate
issue
tighten all 3 drives cluth
plates
1. Tighten All 3 drive clutch plates under observation
2. Ask OEMto Check if any stucking due to Brushes in PT
Zone
27.12.23
01.01.24
Arun
28-Dec-23 HE Shop N2 Flushing 15 N2 not coming Coil faulty
Remove coil and directly
connected the n2 pipe
1. Coil Removed from there and provided Direct connection
2. Also provided Ball valve
28.12.23 Mayank
Breakdown Data Analysis - Sub Shops
Ongoing Improvements Summary
Automation Projects Status
• Strapping Machine number of strap selection option on all Strapping Machines
• Taping Machine Tape Sensor interlock
• Auto Model Change on Strapping Machine
• HVIR Robot on ODU Lines
• AMR
Utility Projects Status
Power & Fuel Saving Action Plan
Action Plan for Reduction :-
Project Activities
 Nano Coating Oven Shifting (Sunday) Improvement Points
 Lacing Table Granite Replacement ( Granite)Utility projects Status
 Duct Chimney Support need to be given
 Duct Opening for Paint Shop chimneys
 MES Integration
 Expander 3 Installation commissioning
 N2 Flushing Aluminum Jig Civil Ongoing Activities
MES Integration Status
PM Plan vs Actual Status
PM Plan vs Actual Status
Process Engineer/ME activity List
Civil Pending Points
Spares/Store/Purchase Issue
0.0
5.6
85.9
43.1
13.8
30.7
48.0
8.2
14.4
- - -
24.1
50 50 50 50 50 50 50 50 50 50 50 50 50
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
April.23 May.23 June.23 July.23 Aug.23 Sept.23 Oct.23 Nov.23 Dec.23 Jan.24 Feb.24 Mar.24 Total
Monthly R&M (911) Consumbale Cost Rs/Ac sets -2023-24
Actual Cost Rs/Set Target Cost Rs/Set
Pending Points PQCDSM

More Related Content

Similar to Daily Maintenance improvement Points2.pptx

TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
Issa Alshaikh
 
Medium artillery ammunition(MAA) Factory (1)
Medium artillery ammunition(MAA) Factory (1)Medium artillery ammunition(MAA) Factory (1)
Medium artillery ammunition(MAA) Factory (1)
Malik Raheel
 
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
Moaz Emad gaber
 
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBGVVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
Indrani7
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
Praveen S R
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013
Aamer Pathan
 

Similar to Daily Maintenance improvement Points2.pptx (20)

Cam gear process improvement shifter assembly manufacturing
Cam gear process improvement  shifter assembly manufacturingCam gear process improvement  shifter assembly manufacturing
Cam gear process improvement shifter assembly manufacturing
 
Process planing and manufacturing of a blow mould
Process planing and manufacturing of a blow mouldProcess planing and manufacturing of a blow mould
Process planing and manufacturing of a blow mould
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
 
TPM ppt.pptx
TPM ppt.pptxTPM ppt.pptx
TPM ppt.pptx
 
Medium artillery ammunition(MAA) Factory (1)
Medium artillery ammunition(MAA) Factory (1)Medium artillery ammunition(MAA) Factory (1)
Medium artillery ammunition(MAA) Factory (1)
 
Introduction to Injection Molding Machine.pptx
Introduction to Injection Molding Machine.pptxIntroduction to Injection Molding Machine.pptx
Introduction to Injection Molding Machine.pptx
 
BP[1] Copy
BP[1] CopyBP[1] Copy
BP[1] Copy
 
SMT Sales 2011
SMT Sales 2011SMT Sales 2011
SMT Sales 2011
 
SMT 2011
SMT 2011SMT 2011
SMT 2011
 
SMT 2011
SMT  2011SMT  2011
SMT 2011
 
Vrm roller bearing_r3_maintenance_report
Vrm roller bearing_r3_maintenance_reportVrm roller bearing_r3_maintenance_report
Vrm roller bearing_r3_maintenance_report
 
2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt
 
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...Report about the repairation of the Raw mill Slide Ring and  shell (Modificat...
Report about the repairation of the Raw mill Slide Ring and shell (Modificat...
 
Automatic high speed bottle washing machine project mechanical engineering ...
Automatic high speed bottle washing machine project   mechanical engineering ...Automatic high speed bottle washing machine project   mechanical engineering ...
Automatic high speed bottle washing machine project mechanical engineering ...
 
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBGVVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
 
A Review Paper on PLC Based Automatic Fly Ash Brick Machine
A Review Paper on PLC Based Automatic Fly Ash Brick MachineA Review Paper on PLC Based Automatic Fly Ash Brick Machine
A Review Paper on PLC Based Automatic Fly Ash Brick Machine
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM Report
CIM ReportCIM Report
CIM Report
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013
 

Recently uploaded

快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
kthcah
 
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
zovambe
 
出售伯明翰大学毕业证研究生文凭证书原版质量
出售伯明翰大学毕业证研究生文凭证书原版质量出售伯明翰大学毕业证研究生文凭证书原版质量
出售伯明翰大学毕业证研究生文凭证书原版质量
kthcah
 
一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理
AS
 
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
wsppdmt
 
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
AS
 
mechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbxmechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbx
joshuaclack73
 
John Deere 990 Compact Utility Tractor Shop Manual.pdf
John Deere 990 Compact Utility Tractor Shop Manual.pdfJohn Deere 990 Compact Utility Tractor Shop Manual.pdf
John Deere 990 Compact Utility Tractor Shop Manual.pdf
Excavator
 
一比一原版(Rutgers毕业证书)罗格斯大学毕业证成绩单原件一模一样
一比一原版(Rutgers毕业证书)罗格斯大学毕业证成绩单原件一模一样一比一原版(Rutgers毕业证书)罗格斯大学毕业证成绩单原件一模一样
一比一原版(Rutgers毕业证书)罗格斯大学毕业证成绩单原件一模一样
A
 

Recently uploaded (20)

Why Won't My Mercedes Key Fob Function After A Battery Swap
Why Won't My Mercedes Key Fob Function After A Battery SwapWhy Won't My Mercedes Key Fob Function After A Battery Swap
Why Won't My Mercedes Key Fob Function After A Battery Swap
 
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
快速办理澳洲昆士兰科技大学毕业证教育部学历认证书一模一样
 
01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc
01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc
01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc
 
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
 
出售伯明翰大学毕业证研究生文凭证书原版质量
出售伯明翰大学毕业证研究生文凭证书原版质量出售伯明翰大学毕业证研究生文凭证书原版质量
出售伯明翰大学毕业证研究生文凭证书原版质量
 
Access to Rural Charging by David Skakel
Access to Rural Charging by David SkakelAccess to Rural Charging by David Skakel
Access to Rural Charging by David Skakel
 
一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理
 
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
 
2014-10-07-Nexteer-Valeo-meeting.pdf troy
2014-10-07-Nexteer-Valeo-meeting.pdf troy2014-10-07-Nexteer-Valeo-meeting.pdf troy
2014-10-07-Nexteer-Valeo-meeting.pdf troy
 
Why Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It IndicateWhy Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It Indicate
 
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
 
EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...
 
How Do I Know If My Volvo Has Throttle Position Sensor Problems
How Do I Know If My Volvo Has Throttle Position Sensor ProblemsHow Do I Know If My Volvo Has Throttle Position Sensor Problems
How Do I Know If My Volvo Has Throttle Position Sensor Problems
 
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
 
mechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbxmechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbx
 
Auto Glass Repair in Redwood City What to Do When Disaster Strikes.pdf
Auto Glass Repair in Redwood City What to Do When Disaster Strikes.pdfAuto Glass Repair in Redwood City What to Do When Disaster Strikes.pdf
Auto Glass Repair in Redwood City What to Do When Disaster Strikes.pdf
 
John Deere 990 Compact Utility Tractor Shop Manual.pdf
John Deere 990 Compact Utility Tractor Shop Manual.pdfJohn Deere 990 Compact Utility Tractor Shop Manual.pdf
John Deere 990 Compact Utility Tractor Shop Manual.pdf
 
Microscope of ppt for botany major this is a project
Microscope of ppt for botany major this is a projectMicroscope of ppt for botany major this is a project
Microscope of ppt for botany major this is a project
 
一比一原版(Rutgers毕业证书)罗格斯大学毕业证成绩单原件一模一样
一比一原版(Rutgers毕业证书)罗格斯大学毕业证成绩单原件一模一样一比一原版(Rutgers毕业证书)罗格斯大学毕业证成绩单原件一模一样
一比一原版(Rutgers毕业证书)罗格斯大学毕业证成绩单原件一模一样
 
Exploring the Heart of Alberta: A Journey from Calgary to Edmonton
Exploring the Heart of Alberta: A Journey from Calgary to EdmontonExploring the Heart of Alberta: A Journey from Calgary to Edmonton
Exploring the Heart of Alberta: A Journey from Calgary to Edmonton
 

Daily Maintenance improvement Points2.pptx

  • 2. Index  Breakdown Summary/Analysis – Assembly Lines, Sub Shops  Improvement Points  Automation Project Status  Utility projects Status  Power & Fuel saving Action Plan  Project Activities  MES Integration  PM Plan vs Actual  PE/ME activity Plan  Civil Ongoing Activities  Spare/Store Issues  Pending Points ( PQCDSM)
  • 3. Breakdown Summary 0 50 100 150 200 250 300 350 Sub Shop Monthly Breakdown Trend Moulding shop Press Shop Paint Shop HE Shop CT Shop
  • 4. Breakdown Analysis (Sub Shop_ Date Shop Machine Name BD Time (Min) Issue Root Cause Corrective action Preventive action Target Date PIC Remark 01-Dec-23 CT Shop CNC Bending -3 15 Cutting unit not ok Grub screw loosen Proper fitted the rod and grub screw tighten 1. Both Side grub screw to be provided 2. All machine grub screw tightness to be check 10.12.23 Mayank 08-Dec-23 Press Shop Progressive Press 300 Lub Issue Contaimination inside grease line/pump/manifold Cleaned grease pump, Grease line and manifold, machine under observation. 1. Grease filling port nipple to be provide 2. Will check grease storage condition and keep grease properly. 20.12.23 20.12.23 Arun Mani 09-Dec-23 HE Shop EVA Line 6 Upside going issue Alignment not ok Stucking so alignment done 1. Alignment of lifte done 10.12.23 Mayank 09-Dec-23 HE Shop EVA Line 40 Loading Lifter not working Sensor Faulty Door Sensor direct and started line 1. Need to replace the door proxy Sensor 11.12.23 Arun 11-Dec-23 HE Shop Auto Brazing-COND Line 153 Up down movement issue One Ball Screw not ok Open timings belts and alignment done for all four ball screws then set height ok. 1. Ball Screw Alignement Done 2. Need to Replace the one ball Screw 3. Inform to production team, till ball screw change, if any model change over then call Maint team. Also Display notice for same. 1. Done 2. 30.12.23 3. Immidiate Mayank 13-Dec-23 Press Shop Transfer Line 2 Manipulator 60 Manipulator cam down CAMFollower bearing thread worn out Currently Manipulator take at home position and line started in manual mode 1. Need to replace CAMFollower 2. New Thread to be made 3. We will check all other manipulator for CAMfollower 4. Communicated to OEMfor this failure for root cause and prevetive action 1. 14.12.23 2. 14.12.23 3. 18.12.23 4. 30.12.23 Arun 17-Dec-23 Moulding Chiller 120 Chiller Pressure issue Strainer not ok Cleaned the strainer 1. Informed all team that when ever chiller tank cleaning done, clean Strainer also. Done Arun 20-Dec-23 Paint Shop Powder Booth 45 Fan 1 too little exhaust air Recovery powder not coming back Open Both Cover and filters cleaned also remove powder from collection bin 1. Open pump and clean it 2. Training given to operators to check recovery powder in pipe line daily Done Arun 22-Dec-23 Press Shop SPMSpot welding-2 60 HMI not working HMI Faulty HMI Replaced with New 1. HMI Replaced with back up downloaded 2. Send mail to OEMfor HMI failure Done Arun 23-Dec-23 Paint Shop PT Zone 150 Oxsillian pump tipping issue Pump Motor faulty Replaced the pump motor from DM3 spare pump 1. Inform to OEMfor this issue, They will visit and check the root cause. 2. current use spare pump motor 30.12.23 Arun 27-Dec-23 Paint Shop Conveyor 45 Jerking issue Drive clutch plate issue tighten all 3 drives cluth plates 1. Tighten All 3 drive clutch plates under observation 2. Ask OEMto Check if any stucking due to Brushes in PT Zone 27.12.23 01.01.24 Arun 28-Dec-23 HE Shop N2 Flushing 15 N2 not coming Coil faulty Remove coil and directly connected the n2 pipe 1. Coil Removed from there and provided Direct connection 2. Also provided Ball valve 28.12.23 Mayank Breakdown Data Analysis - Sub Shops
  • 6. Automation Projects Status • Strapping Machine number of strap selection option on all Strapping Machines • Taping Machine Tape Sensor interlock • Auto Model Change on Strapping Machine • HVIR Robot on ODU Lines • AMR
  • 8. Power & Fuel Saving Action Plan Action Plan for Reduction :-
  • 9. Project Activities  Nano Coating Oven Shifting (Sunday) Improvement Points  Lacing Table Granite Replacement ( Granite)Utility projects Status  Duct Chimney Support need to be given  Duct Opening for Paint Shop chimneys  MES Integration  Expander 3 Installation commissioning  N2 Flushing Aluminum Jig Civil Ongoing Activities
  • 11. PM Plan vs Actual Status
  • 12. PM Plan vs Actual Status
  • 15. Spares/Store/Purchase Issue 0.0 5.6 85.9 43.1 13.8 30.7 48.0 8.2 14.4 - - - 24.1 50 50 50 50 50 50 50 50 50 50 50 50 50 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 April.23 May.23 June.23 July.23 Aug.23 Sept.23 Oct.23 Nov.23 Dec.23 Jan.24 Feb.24 Mar.24 Total Monthly R&M (911) Consumbale Cost Rs/Ac sets -2023-24 Actual Cost Rs/Set Target Cost Rs/Set