Annexure A1 – Project Profile
• Name of Project: Komoto Copper Company SARL Kolwezi– August 2014-Current
• Type and description of project:
Komoto Copper Company SARL (KCC SARL) operates a large scale copper-cobalt mine
complex at Kolwezi in the Democratic Republic of Congo(DRC).KCC SARL is refurbishing and
expanding this operation to produce a world class copper and cobalt company that brings
benefit to all stakeholders.
CONSTRUCTION OF KOV STONE CRUSHER/COVEYOR BELTS AND TRANSFER TOWERS OF CONVEYORS.
The KOV Stone Crusher is used to Crush Ore Stone by means of Rock Breaker, Apron Feeder,
Vibrating Grizzly and Jaw Crusher for crushing Ore Stone in Small pieces and transporting them to
the stock piles by means of conveyor belts and transfer towers.
Mined ore- gets transported by dump trucks
from the blasting area to the Stone Crusher
then to Vibrating Grizzly from where the small
stones are discharged on conveyor belts and
all the large stones are dispatched to Jaw
crusher where they are crushed in a small
pieces and being transported by means of
conveyor and transfer towers to the stock
piles. Once the crushed ore is in stockpile
conveyors, then to CM5 Cyclone flotation
tanks where the Ore rises and overflows into
tanks. The product is then pumped to
receiving area through belt filters to remove
water and then pumped to Re-pulp area
where it’s mixed with sulphuric acid
electrolyte. The product is then pumped to the
Leaching preparation tanks to remove iron,
then to the CCD area which prepares for the
final Copper rich solution.
• Geographic Location Of project
- Democratic Republic of Congo-Kolwezi Region.(Katanga Copper Belt)
• Name of client and position and contact details of client representative
- KCC SARL DRC Kolwezi- Sabhi Ahmed Project HSE Manager +243 990346 266.
-
• List of participating organizations
- KCC SARL, Sandvik(Vendor), Redis Construction Afrika.
• Year started and year completed (or planned completed date)
- July 2013 - October 2015
• Original Completion date
- 20 October 2015
• Actual completion date
- Project Current
• Percentage of Practical Completion
- 100%
• Total Value of project
- R40 Million
• Percentage Participation of your Organization in the project
- 90%
• Your Specific role in the project
- Site Safety Officer
• Was the project successfully completed
- Yes !

More Related Content

What's hot

GSV_ C-TPAT- SCS_Presentation
GSV_ C-TPAT- SCS_PresentationGSV_ C-TPAT- SCS_Presentation
GSV_ C-TPAT- SCS_Presentation
Sunjib Anwar
 
Briefing hse, minutes sécurité rapport d'observation 1
Briefing hse, minutes sécurité rapport d'observation  1Briefing hse, minutes sécurité rapport d'observation  1
Briefing hse, minutes sécurité rapport d'observation 1
hammani bachir
 
Manuelhse 150717151601-lva1-app6891
Manuelhse 150717151601-lva1-app6891Manuelhse 150717151601-lva1-app6891
Manuelhse 150717151601-lva1-app6891
M'hammed Hamdaoui
 
Mission et attribution du responsable HSE
Mission et attribution du responsable HSE Mission et attribution du responsable HSE
Mission et attribution du responsable HSE
hammani bachir
 
CV ANGLAIS BOUARBI WALID
CV ANGLAIS BOUARBI WALIDCV ANGLAIS BOUARBI WALID
CV ANGLAIS BOUARBI WALIDwalid boua
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
DusanJankovic8
 
Hse specialist cv
Hse specialist cvHse specialist cv
Hse specialist cv
Saad Mohamed
 
Project hse plan kikeh spar
Project hse plan kikeh sparProject hse plan kikeh spar
Project hse plan kikeh spar
Abdul Yusof
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CV
Sony Mani
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
Dwarika Bhushan Sharma
 
Plan hse pedagogique
Plan hse pedagogiquePlan hse pedagogique
Plan hse pedagogique
hammani bachir
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
ignitetribes
 
Visite des chantiers et ouvrages
Visite des chantiers et ouvrages  Visite des chantiers et ouvrages
Visite des chantiers et ouvrages
hammani bachir
 
Briefing hse, minutes sécurité..pre job
Briefing hse, minutes sécurité..pre jobBriefing hse, minutes sécurité..pre job
Briefing hse, minutes sécurité..pre job
hammani bachir
 
171713161 953dfggggg36579-nebosh-igc1-revision (4)
171713161 953dfggggg36579-nebosh-igc1-revision (4)171713161 953dfggggg36579-nebosh-igc1-revision (4)
171713161 953dfggggg36579-nebosh-igc1-revision (4)pmbeng
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
Arber Dogani
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Arber Dogani
 

What's hot (20)

13 toolbox meeting form
13 toolbox meeting form13 toolbox meeting form
13 toolbox meeting form
 
GSV_ C-TPAT- SCS_Presentation
GSV_ C-TPAT- SCS_PresentationGSV_ C-TPAT- SCS_Presentation
GSV_ C-TPAT- SCS_Presentation
 
Briefing hse, minutes sécurité rapport d'observation 1
Briefing hse, minutes sécurité rapport d'observation  1Briefing hse, minutes sécurité rapport d'observation  1
Briefing hse, minutes sécurité rapport d'observation 1
 
Manuelhse 150717151601-lva1-app6891
Manuelhse 150717151601-lva1-app6891Manuelhse 150717151601-lva1-app6891
Manuelhse 150717151601-lva1-app6891
 
Mission et attribution du responsable HSE
Mission et attribution du responsable HSE Mission et attribution du responsable HSE
Mission et attribution du responsable HSE
 
CV ANGLAIS BOUARBI WALID
CV ANGLAIS BOUARBI WALIDCV ANGLAIS BOUARBI WALID
CV ANGLAIS BOUARBI WALID
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
 
Hse specialist cv
Hse specialist cvHse specialist cv
Hse specialist cv
 
shamim ahmad HSE manager CV
shamim ahmad HSE manager CVshamim ahmad HSE manager CV
shamim ahmad HSE manager CV
 
FAHID HSE CV
FAHID HSE CVFAHID HSE CV
FAHID HSE CV
 
Project hse plan kikeh spar
Project hse plan kikeh sparProject hse plan kikeh spar
Project hse plan kikeh spar
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CV
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 
Plan hse pedagogique
Plan hse pedagogiquePlan hse pedagogique
Plan hse pedagogique
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
Visite des chantiers et ouvrages
Visite des chantiers et ouvrages  Visite des chantiers et ouvrages
Visite des chantiers et ouvrages
 
Briefing hse, minutes sécurité..pre job
Briefing hse, minutes sécurité..pre jobBriefing hse, minutes sécurité..pre job
Briefing hse, minutes sécurité..pre job
 
171713161 953dfggggg36579-nebosh-igc1-revision (4)
171713161 953dfggggg36579-nebosh-igc1-revision (4)171713161 953dfggggg36579-nebosh-igc1-revision (4)
171713161 953dfggggg36579-nebosh-igc1-revision (4)
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
 

Similar to PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh

CES Capability Statement V1
CES Capability Statement V1CES Capability Statement V1
CES Capability Statement V1Steve Coleman
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
Mining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan ProjectMining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan Project
James AH Campbell
 
Equipment
EquipmentEquipment
Equipment
MohamedAli872129
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022
ContourMC
 
March Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon ResourcesMarch Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon Resources
Symposium
 
Corporate Profile E Version
Corporate Profile E VersionCorporate Profile E Version
Corporate Profile E VersionTrish Spinozzi
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
Paul Heinrich
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
Nora Kohlhase
 
Company Presentation - Kariertau LLP
Company Presentation - Kariertau LLPCompany Presentation - Kariertau LLP
Company Presentation - Kariertau LLPAnuar Seidaliyev
 
Cdm presentation oct
Cdm presentation octCdm presentation oct
Cdm presentation octCobreDelMayo
 
Spectrum 2013 Edition Number 1
Spectrum 2013 Edition Number 1Spectrum 2013 Edition Number 1
Spectrum 2013 Edition Number 1
SNC-Lavalin
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Stephen McKnight
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
ShyamPrasadThiraviam
 
AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17Charl Du Preez
 
STA Capability Statement
STA Capability StatementSTA Capability Statement
STA Capability StatementRoss Yendle
 

Similar to PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh (20)

GEM - EMW Company Profile
GEM - EMW Company ProfileGEM - EMW Company Profile
GEM - EMW Company Profile
 
CES Capability Statement V1
CES Capability Statement V1CES Capability Statement V1
CES Capability Statement V1
 
KMOC ASIA Ltd.
KMOC ASIA Ltd.KMOC ASIA Ltd.
KMOC ASIA Ltd.
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
Mining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan ProjectMining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan Project
 
Equipment
EquipmentEquipment
Equipment
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
March Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon ResourcesMarch Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon Resources
 
Corporate Profile E Version
Corporate Profile E VersionCorporate Profile E Version
Corporate Profile E Version
 
Barry-Knight-5
Barry-Knight-5Barry-Knight-5
Barry-Knight-5
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Company Presentation - Kariertau LLP
Company Presentation - Kariertau LLPCompany Presentation - Kariertau LLP
Company Presentation - Kariertau LLP
 
Cdm presentation oct
Cdm presentation octCdm presentation oct
Cdm presentation oct
 
Spectrum 2013 Edition Number 1
Spectrum 2013 Edition Number 1Spectrum 2013 Edition Number 1
Spectrum 2013 Edition Number 1
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17
 
STA Capability Statement
STA Capability StatementSTA Capability Statement
STA Capability Statement
 

More from HITESH RATHOD

PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO HiteshPROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO HiteshHITESH RATHOD
 
SHE ORGANOGRAM QATAR Construction
SHE ORGANOGRAM QATAR ConstructionSHE ORGANOGRAM QATAR Construction
SHE ORGANOGRAM QATAR ConstructionHITESH RATHOD
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOHITESH RATHOD
 

More from HITESH RATHOD (9)

img587
img587img587
img587
 
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO HiteshPROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
 
img589
img589img589
img589
 
SHE ORGANOGRAM QATAR Construction
SHE ORGANOGRAM QATAR ConstructionSHE ORGANOGRAM QATAR Construction
SHE ORGANOGRAM QATAR Construction
 
img581
img581img581
img581
 
img578
img578img578
img578
 
img577
img577img577
img577
 
img576
img576img576
img576
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCO
 

PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh

  • 1. Annexure A1 – Project Profile • Name of Project: Komoto Copper Company SARL Kolwezi– August 2014-Current • Type and description of project: Komoto Copper Company SARL (KCC SARL) operates a large scale copper-cobalt mine complex at Kolwezi in the Democratic Republic of Congo(DRC).KCC SARL is refurbishing and expanding this operation to produce a world class copper and cobalt company that brings benefit to all stakeholders. CONSTRUCTION OF KOV STONE CRUSHER/COVEYOR BELTS AND TRANSFER TOWERS OF CONVEYORS. The KOV Stone Crusher is used to Crush Ore Stone by means of Rock Breaker, Apron Feeder, Vibrating Grizzly and Jaw Crusher for crushing Ore Stone in Small pieces and transporting them to the stock piles by means of conveyor belts and transfer towers. Mined ore- gets transported by dump trucks from the blasting area to the Stone Crusher then to Vibrating Grizzly from where the small stones are discharged on conveyor belts and all the large stones are dispatched to Jaw crusher where they are crushed in a small pieces and being transported by means of conveyor and transfer towers to the stock piles. Once the crushed ore is in stockpile conveyors, then to CM5 Cyclone flotation tanks where the Ore rises and overflows into tanks. The product is then pumped to receiving area through belt filters to remove water and then pumped to Re-pulp area where it’s mixed with sulphuric acid electrolyte. The product is then pumped to the Leaching preparation tanks to remove iron, then to the CCD area which prepares for the final Copper rich solution. • Geographic Location Of project - Democratic Republic of Congo-Kolwezi Region.(Katanga Copper Belt) • Name of client and position and contact details of client representative - KCC SARL DRC Kolwezi- Sabhi Ahmed Project HSE Manager +243 990346 266. - • List of participating organizations - KCC SARL, Sandvik(Vendor), Redis Construction Afrika.
  • 2. • Year started and year completed (or planned completed date) - July 2013 - October 2015 • Original Completion date - 20 October 2015 • Actual completion date - Project Current • Percentage of Practical Completion - 100% • Total Value of project - R40 Million • Percentage Participation of your Organization in the project - 90% • Your Specific role in the project - Site Safety Officer • Was the project successfully completed - Yes !