PROJECT HANDLED UNDER CIRIACO CORPORATION
CIRIACO CORPORATION (MAY 07, 2009-MAY 12, 2011)
CANSAGA BAY BRIDGE: CONNECTING MANDAUE AND CONSOLACION
CEBU A 640.3 METERS LONG BRIDGE AMOUNTING TO 2 BILLION
PESO PROJECT WAS AWARDED TO CIRIACO CORPORATION BY DPWH
AFTER A SUCCESSFUL PUBLIC BIDDING. THIS BRIDGE WAS OPENED
LAST 2010
DELFIN ALBANO BRIDGE: ALMOST HALF KILOMETER LONG BRIDGE
CONNECTING 4 PROVINCES OF ISABELA COST 650 MILLION PESOS
HAS MADE TRANSPORTATION CHEAPER AND LESS TRAVEL TIME FOR
ISABELA PEOPLE.
LULLUTAN BRIDGE: 500.6 LINEAL METER BRIDGE IN ISABELA
CROSSING CAGAYAN RIVER CONNECTING BARANGGAY CAMALAGUI
COST 772.924 MILLION PESOS HAVING A LOADING CAPACITY OF 20
TONS.
PROJECT HANDLED UNDER CIRIACO CORPORATION
CIRIACO CORPORATION (MAY 07, 2009-MAY 12, 2011)
MINDANAO-QUIRINO AVE. INTERCHANCGE (G-ARANETA): AN
INTERCHANGE PROJECT CONSISTING OF A FOUR-LANE UNDERPASS
ALONG QUEZON AVENUE CROSSING ARANETA AVENUE, AN AT-GRADE
CROSSING ABOVE THE UNDERPASS FOR ARANETA AVENUE, AND THE
WIDENING OF THE ADJOINING MARIBLO BRIDGE.
ELEVATED U-TURN C-5: IS A ROAD INTERCHANGE IN MAKATI, METRO
MANILA, THE PHILIPPINES. ORIGINALLY A REGULAR FOUR-WAY
INTERSECTION BETWEEN CIRCUMFERENCIAL ROAD 5 (C-5)
AND KALAYAAN AVENUE, IT WAS FITTED IN 2009 WITH THE
COUNTRY'S FIRST ELEVATED U-TURN SLOTS, BUILT IN AN ATTEMPT TO
SPEED UP TRAFFIC ALONG THE C-5 CORRIDOR.

project portfolio - CC

  • 1.
    PROJECT HANDLED UNDERCIRIACO CORPORATION CIRIACO CORPORATION (MAY 07, 2009-MAY 12, 2011) CANSAGA BAY BRIDGE: CONNECTING MANDAUE AND CONSOLACION CEBU A 640.3 METERS LONG BRIDGE AMOUNTING TO 2 BILLION PESO PROJECT WAS AWARDED TO CIRIACO CORPORATION BY DPWH AFTER A SUCCESSFUL PUBLIC BIDDING. THIS BRIDGE WAS OPENED LAST 2010 DELFIN ALBANO BRIDGE: ALMOST HALF KILOMETER LONG BRIDGE CONNECTING 4 PROVINCES OF ISABELA COST 650 MILLION PESOS HAS MADE TRANSPORTATION CHEAPER AND LESS TRAVEL TIME FOR ISABELA PEOPLE. LULLUTAN BRIDGE: 500.6 LINEAL METER BRIDGE IN ISABELA CROSSING CAGAYAN RIVER CONNECTING BARANGGAY CAMALAGUI COST 772.924 MILLION PESOS HAVING A LOADING CAPACITY OF 20 TONS.
  • 2.
    PROJECT HANDLED UNDERCIRIACO CORPORATION CIRIACO CORPORATION (MAY 07, 2009-MAY 12, 2011) MINDANAO-QUIRINO AVE. INTERCHANCGE (G-ARANETA): AN INTERCHANGE PROJECT CONSISTING OF A FOUR-LANE UNDERPASS ALONG QUEZON AVENUE CROSSING ARANETA AVENUE, AN AT-GRADE CROSSING ABOVE THE UNDERPASS FOR ARANETA AVENUE, AND THE WIDENING OF THE ADJOINING MARIBLO BRIDGE. ELEVATED U-TURN C-5: IS A ROAD INTERCHANGE IN MAKATI, METRO MANILA, THE PHILIPPINES. ORIGINALLY A REGULAR FOUR-WAY INTERSECTION BETWEEN CIRCUMFERENCIAL ROAD 5 (C-5) AND KALAYAAN AVENUE, IT WAS FITTED IN 2009 WITH THE COUNTRY'S FIRST ELEVATED U-TURN SLOTS, BUILT IN AN ATTEMPT TO SPEED UP TRAFFIC ALONG THE C-5 CORRIDOR.