PROJECT OVERVIEW
Name of Project:              Cell Structure                                                                              Duration: 2 weeks
Subject/Course: Science/ cell biology                              Teacher(s): Mrs. Malik                                 Grade Level: 7

Other subject areas to        Health, biology
be included, if any:


Project Idea                  Student will learn the different parts of the cell structure, Research work, compare and contrast and recognize the
Summary of the issue,         diagram of various cell structure.
challenge, investigation,
scenario, or problem:

Driving Question                 1.   What are unit structure of living organisms?
                                 2.   Are all cells of the same type?
                                 3.   How can you differentiate between plant and animal cell?
                                 4.   How can we design a cell model with the help of all eatable things?

Content and Skills               1. Students know cells function similarly in all living organisms.
Standards to be                  2. Students know the characteristics that distinguish plant cells from animal cells, including chloroplasts
addressed:                          and cell wall

                                 3. Students know the nucleus is the repository for genetic information in plant and animal cells.
                                                                                     T+A      E                                                 T+A     E
21st Century Skills           Collaboration                                                         Other: Creative and creative problem        x
to be explicitly taught and
                                                                                     X              solving.
assessed (T+A) or that
will be encouraged (E) by     Presentation
project work, but not
                                                                                     X
taught or assessed:           Critical Thinking:                                     X                                                                 X
                                                                                                                                   Presentation Audience:




                                                                                                                      © 2008 Buck Institute for Education   1
Group:         Design your cell model , use only the materials which are eatable. Which you can eat after                          X
Culminating                       your presentation.                                                                                   Class:
Products and
Performances
                                                                                                                                      School:


                                                                                                                                    Community:

                                  Thinking maps ,                                                                                     Experts:
                   Individual:
                                                                                                                                       Web:
                                                                                                                                 Other:

                                                 PROJECT OVERVIEW
Entry event to       Video from cell organization in living organisms. Make a concept map with cell – why is our made up of many cells.
launch inquiry,
engage students:
                                       Quizzes/Tests                                        X    Practice Presentations                                   X
                                       Journal/Learning Log                                 X    Notes

                                       Preliminary Plans/Outlines/Prototypes                X    Checklists                                               X
                                       Rough Drafts                                              Concept Maps                                             X
                                       Online Tests/Exams                                        Other:

                                       Written Product(s), with rubric:                     X    Other Product(s) or Performance(s), with rubric:
                      Summative        __________________________________________________        __________________________________________________
                     Assessments
                    (End of Project)   Oral Presentation, with rubric                       X    Peer Evaluation

                                       Multiple Choice/Short Answer Test                    X    Self-Evaluation

                                       Essay Test                                                Other:
                                                                            .




                                                                                                                   © 2008 Buck Institute for Education        2
Resources    On-site people, facilities:                Sitting plan in group of three student – one table.
Needed
             Equipment:                                                   LCD projector.
             Materials:                    Material – pasta different shapes, jello.MMs of various colors, paper plates ,
                                                                               fruits .
             Community resources:          None

Reflection                    Journal/Learning Log                       X   Focus Group                                         X
Methods       (Individual,
             Group, and/or    Whole-Class Discussion                     X   Fishbowl Discussion
             Whole Class)
                              Survey                                         Other:




                                                                                           © 2008 Buck Institute for Education       3
P R O J E C T                  C A L E N D A R
Project:                                                                        Start Date:
                                  PROJECT TEACHING AND LEARNING GUIDE
            M O N D A Y                  T U E S D A Y                W E D N E S D A Y             T H U R S D A Y                      F R I D A Y
Project:                                                                       Course/Semester:
                                                          PROJECT             WEEK ONE
                     Knowledge and Skills Needed by Students                              Scaffolding / Materials / LessonsQuiz Provided
                                                                                                                              to be
                  to successfully complete culminating products and                         by the project teacher, other teachers, experts,
                performances, and do well on summative assessments                                  mentors, community members

Business communication                                                             Students write instructions, samples and templates.
                                                                             


Online research skills                                                             Work online and worksheet and vocabulary matrix
                                                                                  building led by teacher.


powerpoint                                                                         Steps by teacher’s instruction.
                                                                             


presentation                                                                       Model made by students along with poster (student
                                                                                  made ) presentation.
‘’’’’’’’’’’’’


Report writing                                                                     Write a complete report of cell structure and function.
                                                                             

                                                         PR O JEC T           WEEK         TWO
                                                                                                                           ‘’’’’’’’’’’’’’’’’’’




                                                                             
                                                                                                                 © 2008 Buck Institute for Education   4
Concept map

project planner

  • 1.
    PROJECT OVERVIEW Name ofProject: Cell Structure Duration: 2 weeks Subject/Course: Science/ cell biology Teacher(s): Mrs. Malik Grade Level: 7 Other subject areas to Health, biology be included, if any: Project Idea Student will learn the different parts of the cell structure, Research work, compare and contrast and recognize the Summary of the issue, diagram of various cell structure. challenge, investigation, scenario, or problem: Driving Question 1. What are unit structure of living organisms? 2. Are all cells of the same type? 3. How can you differentiate between plant and animal cell? 4. How can we design a cell model with the help of all eatable things? Content and Skills 1. Students know cells function similarly in all living organisms. Standards to be 2. Students know the characteristics that distinguish plant cells from animal cells, including chloroplasts addressed: and cell wall 3. Students know the nucleus is the repository for genetic information in plant and animal cells. T+A E T+A E 21st Century Skills Collaboration Other: Creative and creative problem x to be explicitly taught and X solving. assessed (T+A) or that will be encouraged (E) by Presentation project work, but not X taught or assessed: Critical Thinking: X X Presentation Audience: © 2008 Buck Institute for Education 1
  • 2.
    Group: Design your cell model , use only the materials which are eatable. Which you can eat after X Culminating your presentation. Class: Products and Performances School: Community: Thinking maps , Experts: Individual: Web: Other: PROJECT OVERVIEW Entry event to Video from cell organization in living organisms. Make a concept map with cell – why is our made up of many cells. launch inquiry, engage students: Quizzes/Tests X Practice Presentations X Journal/Learning Log X Notes Preliminary Plans/Outlines/Prototypes X Checklists X Rough Drafts Concept Maps X Online Tests/Exams Other: Written Product(s), with rubric: X Other Product(s) or Performance(s), with rubric: Summative __________________________________________________ __________________________________________________ Assessments (End of Project) Oral Presentation, with rubric X Peer Evaluation Multiple Choice/Short Answer Test X Self-Evaluation Essay Test Other: . © 2008 Buck Institute for Education 2
  • 3.
    Resources On-site people, facilities: Sitting plan in group of three student – one table. Needed Equipment: LCD projector. Materials: Material – pasta different shapes, jello.MMs of various colors, paper plates , fruits . Community resources: None Reflection Journal/Learning Log X Focus Group X Methods (Individual, Group, and/or Whole-Class Discussion X Fishbowl Discussion Whole Class) Survey Other: © 2008 Buck Institute for Education 3
  • 4.
    P R OJ E C T C A L E N D A R Project: Start Date: PROJECT TEACHING AND LEARNING GUIDE M O N D A Y T U E S D A Y W E D N E S D A Y T H U R S D A Y F R I D A Y Project: Course/Semester: PROJECT WEEK ONE Knowledge and Skills Needed by Students Scaffolding / Materials / LessonsQuiz Provided to be to successfully complete culminating products and by the project teacher, other teachers, experts, performances, and do well on summative assessments mentors, community members Business communication Students write instructions, samples and templates.  Online research skills Work online and worksheet and vocabulary matrix  building led by teacher. powerpoint Steps by teacher’s instruction.  presentation Model made by students along with poster (student  made ) presentation. ‘’’’’’’’’’’’’ Report writing Write a complete report of cell structure and function.  PR O JEC T WEEK TWO  ‘’’’’’’’’’’’’’’’’’’  © 2008 Buck Institute for Education 4 Concept map