Project Management Page 1
Jawaharlal Nehru Architecture and Fine Arts University
School of Planning and Architecture
Department- Urban and Regional Planning
Subject- Project Formulation, Appraisal and Management
Topics- Project Management Life cycle
Project appraisal important points
Income and expenditure statement
Name- Adithya A
Roll No- 17011BA001
Project Management Page 2
Phases of Project Management Life cycle
Steps of CSP Preparation (City Sanitation Plan)
Initiating
CSP
•Stakeholder
mapping
•Constitution
of CSTF
•CSTF to kick
start
•the process
of CSP
preparation
Preparation of
status report
•Baseline data
collection
Ex- city profile,
water suppl,
wastewater,
solid waste,
storm water,
access to toilets
•Review baseline
to identify data
gaps
Draft CSP
•Data analysis
and
interpretation
•Demand supply
issue gap
analysis
•Identification
of key issues
•Formulation of
sanitation vision
Final CSP
•Sectorial
strategies
and
recommendati
ons for
identified
issue
•Action plan:
short,
medium and
long term
•Approval of
CSP
Project Management Page 3
Selection of Infrastructure project by ULB
Construction stages for highway project
Road Project
Estimating total project cost
Choosing financing options for project execution
• funding
• revenue
Selecting mode of project implementation
Installation of light poles, road signs and signals
Construction of pavement structure
Contruction of drainage structure
Ex- bridges and culverts
Earthwork for laying embankment
Clearing site
Setting up plant at project site
Project Management Page 4
Construction stages of New Water Supply Scheme
Construction operations for construction of RCC retaining wall
Methodology for Project Formulation and Appraisal
There are five stages in the preparation of a project and its appraisal of a housing project
Construction of water treatment plant
Installation of transmission lines and construction of tunnels
Installation of pumping house
Construction of spillway and controls
Construction of suitable dam type
Clearing reservoir site
Backfilling the earth
Pouring of concrete
Placing of reinforcement
Erection of form work
Excavation by manual labour
Excavation by machine
Project Management Page 5
I. Feasibility studies
Form the initial part of project preparation. Their purpose is to establish whether or not a
project might be successful before committing substantial funds to it.
a) Identify the target population and its housing needs:
i. Identify economic characteristics
ii. Identify household characteristics
iii. Identifying housing demand
b) Outline assessment and selection of project site
i. Assessing the site availability
ii. Initial evaluation of site location
iii. Identifying site area and shape
iv. Identifying existing land tenure
v. Identifying site boundaries
vi. Initial assessment of site topography and landscape
vii. Initial assessment of ground conditions
viii. Identifying pollution problems
c) Assessing initial site development options
i. Initial assessment of housing layouts and densities
ii. Initial assessment of plot development
iii. Initial assessment of commerce and industry
iv. Initial assessment of requirements for public facilities and recreation
v. Identifying other land uses
vi. Initial assessment of circulation and transportation
vii. Initial assessment of requirements for utilities
d) Institutional and financial framework
i. Assess the capacity of the institutional framework
ii. Identifying the financial framework
II. Detailed studies
It will provide descriptions and measures or parameters for which and within which the
project will be designed. Examples are the likely number of families, the existing means of
services, problems involved, likely amounts of money, available, the administrative system
available and the nature and cost of the site.
Project Management Page 6
a) Survey of the target population and its housing needs
i. Economic characteristics of households
ii. Household characteristics
iii. Household attitudes to their locality
iv. Household attitudes to plot characteristics
v. Relationship between households and their dwellings
vi. Potential for community involvement
vii. Nature of housing demand
b) Detailed analysis of project site
i. Site location
ii. Site area and shape
iii. Land tenure
iv. Site boundaries
v. Site topography and vegetation
vi. Ground conditions
vii. Local climate
c) Survey and analysis of existing site development
i. Existing housing layouts and densities
ii. Existing plot sizes and shapes
iii. Existing buildings
iv. Public facilities and recreation provision
v. Commerce and industry
vi. Other existing land uses
vii. Circulation and transportation
viii. Existing utilities
d) Institutional and financial framework
i. Institutional framework
ii. Financial framework
iii. Assessing the ability to pay
III. Options for development
This stage represents the key part of project planning when all the options are likely to be
relevant to the project are identified, their relevant advantages and disadvantages
assessed and a preferred group of options selected
Project Management Page 7
The most important test will be whether the proposals will be appropriate to the people
who will live in the project area. Their needs and resources should thus form the basic
criteria against which options are measured
a) Formulating site development options
i. Housing layout and density
ii. Plot sizes and shapes
iii. Building
iv. Commerce and industry
v. Public facilities and recreation
vi. Incorporation and transportation
vii. Utilities
b) Institutional and financial framework
i. Selecting the institutional framework
ii. Land tenure
iii. Developing financial options
IV. Detailed Development proposals
This is the development of both the physical design and the financial and administrative
aspects in detail
a) Designing site development
i. Housing layouts
ii. Housing building
iii. Commerce and industry
iv. Public facilities and recreation
v. Road layouts
vi. Utilities
b) Institutional and financial framework
i. Institutional framework
ii. Financial framework
iii. Phasing
V. Implementation
Project Management Page 8
i. Monitoring
ii. Evaluation
Financial appraisal techniques
 Payback period
 Marginal payback on must-do investments
 Interactive: full payback vs marginal payback
 Return on investment (RoI)
 Net present value (NPV)
 Interactive: NPV vs Payback
 Internal rates of return (IRR)
 Life cycle costing
Components of financial appraisal of a project
1) Return on investment (ROI): for the investment to be financially viable, the RoI
should be greater than the cost of investment
2) Debt service coverage ratio (DSCR): Running an enterprise with financial support
from banks/financial institutions requires their loans to be repaid with interest.
Therefore, an entrepreneur must generate surplus, adequate to meet repayment
obligations
Net profit + interest (on long term loans) + depreciation/interest (on long term loans) +
principal loan
A project is considered financially viable if the cumulative DSCR during repayment period
is at least 2:1
3) Break-even point (BEP): the break-even point is the point of activity where all costs
(variable as well as fixed) are recovered from the sales values. The thumb rule is
lowering the break-even betters the proposition
4) Debt-equity ratio: this ratio indicates the extent to which the promoter’s funds are
leveraged to procure loans. The formula of der is:
DER= total long-term debt/Total promoter’s funds (includes subsidy)
A higher debt equity ratio indicates more risk due to a higher fixed cost of interest. The
BEP of such enterprises will go up
Project Management Page 9
MONTHLY INCOME
INCOME/EXPENSE STATEMENT PERSONAL
NAME: Krish A MONTH January
Instructions: List all income and/or monies that you and/or your spouse or significantother received
during the month. This personal financial statement is to be submitted by the 5th
day of each month with
the monthly supervision report and required payment(if applicable), or as directed by your probation
officer.
YOURS
SPOUSE OR
SIGNIFICANT
OTHER
TOTAL
Gross Salary 200000 200000
Net Salary 130000 130000
Commissions
Pensions
Social Security
Interest
Dividends
Alimony/Child Support
A.D.C. (Aid for Dependent Children)
Income of Other Dependents
Net Profit from Business
Net Rental Income 11000 11000
Gifts
Loans 100000 100000
Other Cash Assistance, etc.
Project Management Page
10
Other Income (i.e., expense
reimbursement, car allowances, etc.)
TOTAL INCOME (DO NOT INCLUDE SHADED BLOCK ABOVE) 241000
TOTAL MONTHLY EXPENSES (from Page 2) 157400
CASH FLOW (Income Less Expenses) 83600
Instructions: List all expenses that you and/or your spouse or significantother or dependent (I, J,
S, or D*) paid out during the month. If you share expenses with someone else, identify the portion
that you paid (i.e., 50%, 100%, etc.). This financial report is to be submitted by the 5th
day of
each month with the monthly supervision report and required payment, or as directed by your
probation officer.
*NOTE: I = INDIVIDUAL J = JOINT S = SPOUSE/SIGNIFICANT OTHER D = DEPENDENT
I,J
,
S,
D
FIXED EXPENSES I,J,
S,D
NECESSARY FLEXIBLE EXPENSES
Mortgage/Rent J Grocery/Household
Supplies
15000
J Utilities 1000 Clothing
Home Telephone Laundry/Cleaning
D Mobile Telephone 2000 Maintenance/Repairs
J Water/Sewer 1200 J 1) Home and Equipment 1000
Garbage 2) Automobile $
Child Care 3) Other $
Alimony/Child Support J Transportation 10000
Special Assessments J Medical Costs
(medical/dental/drug)
4000
Restitution D Education 41000
Fines
J Cable 200 INCIDENTAL PERSONAL
EXPENSES
J 500 1) $
2) $
AUTOMOBILE LOANS 3) $
J 1)CAR LOAN 6500 4) $
2)HOME LOAN 55000 5) $
MONTHLY
EXPENSES
Project Management Page
11
3) $ 6) $
INSTALLMENT/CREDIT CARDS
OTHER (Include all new purchases or
liabilities notidentified
elsewhere on this form.)
CURR. BAL. PAYMENTS
1) $ $ 1) $
2) $ $ 2) $
3) $ $ 3) $
4) $ $ 4) $
INSURANCE 5) $
1) Automobile $ 6) $
2) Home $
J 3) Medical 10000 TOTAL FLEXIBLE EXPENSES 71000
J 4) Life 10000
TOTAL FIXED EXPENSES 86400 TOTAL MONTHLY EXPENSES 157400
Project Management Page
12
INCOME/EXPENSE STATEMENT of a highway project
Project Management Page
13
Project Management Page
14
Project Management Page
15
Project Management Page
16

More Related Content

Similar to Project Management Life cycle

Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Projectimrohan1
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisalAmandaBvera
 
Capital Improvement Program
Capital Improvement ProgramCapital Improvement Program
Capital Improvement ProgramJames May
 
Bank project appraisal,
Bank  project appraisal, Bank  project appraisal,
Bank project appraisal, sksbatish
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Deanna’s Input for Question 3As Chief Financial Management Of.docx
Deanna’s Input for Question 3As Chief Financial Management Of.docxDeanna’s Input for Question 3As Chief Financial Management Of.docx
Deanna’s Input for Question 3As Chief Financial Management Of.docxedwardmarivel
 
Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation tobiassommer2013
 
Financial Analysis of an Infrastructure Project
Financial Analysis of an Infrastructure ProjectFinancial Analysis of an Infrastructure Project
Financial Analysis of an Infrastructure ProjectRavikant Joshi
 
8.06 Project Risk Management_Project Life Cycle.pptx
8.06 Project Risk Management_Project Life Cycle.pptx8.06 Project Risk Management_Project Life Cycle.pptx
8.06 Project Risk Management_Project Life Cycle.pptxIftekarHasnine
 
Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)hayat alishah
 
Item # 5 - Water and Wastewater Rate Study
Item # 5 - Water and Wastewater Rate StudyItem # 5 - Water and Wastewater Rate Study
Item # 5 - Water and Wastewater Rate Studyahcitycouncil
 
conditions-of-engagement-of-professional-services-and-scale-of-professional-f...
conditions-of-engagement-of-professional-services-and-scale-of-professional-f...conditions-of-engagement-of-professional-services-and-scale-of-professional-f...
conditions-of-engagement-of-professional-services-and-scale-of-professional-f...Harshalsingh17
 
C8 financing affordable rental projects p pt - obie baker
C8 financing affordable rental projects   p pt - obie bakerC8 financing affordable rental projects   p pt - obie baker
C8 financing affordable rental projects p pt - obie bakerHousing Assistance Council
 
Day 1 topic 5.2. designing a grant part two
Day 1 topic 5.2. designing a grant   part twoDay 1 topic 5.2. designing a grant   part two
Day 1 topic 5.2. designing a grant part twoIFAD_Grants
 
2.1-Financial_Overview.ppt
2.1-Financial_Overview.ppt2.1-Financial_Overview.ppt
2.1-Financial_Overview.pptsabetali
 

Similar to Project Management Life cycle (20)

Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Project
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
 
Capital Improvement Program
Capital Improvement ProgramCapital Improvement Program
Capital Improvement Program
 
BIZ Zone Plan April 2014
BIZ Zone Plan April 2014BIZ Zone Plan April 2014
BIZ Zone Plan April 2014
 
Bank project appraisal,
Bank  project appraisal, Bank  project appraisal,
Bank project appraisal,
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Deanna’s Input for Question 3As Chief Financial Management Of.docx
Deanna’s Input for Question 3As Chief Financial Management Of.docxDeanna’s Input for Question 3As Chief Financial Management Of.docx
Deanna’s Input for Question 3As Chief Financial Management Of.docx
 
Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation
 
Financial Analysis of an Infrastructure Project
Financial Analysis of an Infrastructure ProjectFinancial Analysis of an Infrastructure Project
Financial Analysis of an Infrastructure Project
 
8.06 Project Risk Management_Project Life Cycle.pptx
8.06 Project Risk Management_Project Life Cycle.pptx8.06 Project Risk Management_Project Life Cycle.pptx
8.06 Project Risk Management_Project Life Cycle.pptx
 
Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)
 
Pc i social sector
Pc i social sectorPc i social sector
Pc i social sector
 
Item # 5 - Water and Wastewater Rate Study
Item # 5 - Water and Wastewater Rate StudyItem # 5 - Water and Wastewater Rate Study
Item # 5 - Water and Wastewater Rate Study
 
Pm assignment
Pm assignmentPm assignment
Pm assignment
 
conditions-of-engagement-of-professional-services-and-scale-of-professional-f...
conditions-of-engagement-of-professional-services-and-scale-of-professional-f...conditions-of-engagement-of-professional-services-and-scale-of-professional-f...
conditions-of-engagement-of-professional-services-and-scale-of-professional-f...
 
C8 financing affordable rental projects p pt - obie baker
C8 financing affordable rental projects   p pt - obie bakerC8 financing affordable rental projects   p pt - obie baker
C8 financing affordable rental projects p pt - obie baker
 
UNIT- 4.pptx
UNIT- 4.pptxUNIT- 4.pptx
UNIT- 4.pptx
 
Day 1 topic 5.2. designing a grant part two
Day 1 topic 5.2. designing a grant   part twoDay 1 topic 5.2. designing a grant   part two
Day 1 topic 5.2. designing a grant part two
 
2.1-Financial_Overview.ppt
2.1-Financial_Overview.ppt2.1-Financial_Overview.ppt
2.1-Financial_Overview.ppt
 
HTown Day 2012 - The Honorable Ronald C. Green
HTown Day 2012 - The Honorable Ronald C. GreenHTown Day 2012 - The Honorable Ronald C. Green
HTown Day 2012 - The Honorable Ronald C. Green
 

More from AdithyaA16

Various Methods of Redevelopment
Various Methods of RedevelopmentVarious Methods of Redevelopment
Various Methods of RedevelopmentAdithyaA16
 
Bhalswa Jahangirpur slum in New Delhi
Bhalswa Jahangirpur slum in New DelhiBhalswa Jahangirpur slum in New Delhi
Bhalswa Jahangirpur slum in New DelhiAdithyaA16
 
District and City Plan of Varanasi UP
District and City Plan of Varanasi UPDistrict and City Plan of Varanasi UP
District and City Plan of Varanasi UPAdithyaA16
 
Information on logistic hubs
Information on logistic hubsInformation on logistic hubs
Information on logistic hubsAdithyaA16
 
Best practices in infrastructure
Best practices in infrastructureBest practices in infrastructure
Best practices in infrastructureAdithyaA16
 
City Development Plan Solapur 2041
City Development Plan Solapur 2041City Development Plan Solapur 2041
City Development Plan Solapur 2041AdithyaA16
 

More from AdithyaA16 (7)

Various Methods of Redevelopment
Various Methods of RedevelopmentVarious Methods of Redevelopment
Various Methods of Redevelopment
 
Bhalswa Jahangirpur slum in New Delhi
Bhalswa Jahangirpur slum in New DelhiBhalswa Jahangirpur slum in New Delhi
Bhalswa Jahangirpur slum in New Delhi
 
District and City Plan of Varanasi UP
District and City Plan of Varanasi UPDistrict and City Plan of Varanasi UP
District and City Plan of Varanasi UP
 
Information on logistic hubs
Information on logistic hubsInformation on logistic hubs
Information on logistic hubs
 
Logistics hub
Logistics hubLogistics hub
Logistics hub
 
Best practices in infrastructure
Best practices in infrastructureBest practices in infrastructure
Best practices in infrastructure
 
City Development Plan Solapur 2041
City Development Plan Solapur 2041City Development Plan Solapur 2041
City Development Plan Solapur 2041
 

Recently uploaded

VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...Suhani Kapoor
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...Suhani Kapoor
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改atducpo
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSAishani27
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998YohFuh
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsappssapnasaifi408
 
Data Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptxData Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptxFurkanTasci3
 
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfMarket Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfRachmat Ramadhan H
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfLars Albertsson
 
Data Warehouse , Data Cube Computation
Data Warehouse   , Data Cube ComputationData Warehouse   , Data Cube Computation
Data Warehouse , Data Cube Computationsit20ad004
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxStephen266013
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts ServiceSapana Sha
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Sapana Sha
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
Data Science Project: Advancements in Fetal Health Classification
Data Science Project: Advancements in Fetal Health ClassificationData Science Project: Advancements in Fetal Health Classification
Data Science Project: Advancements in Fetal Health ClassificationBoston Institute of Analytics
 

Recently uploaded (20)

VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
 
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
 
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in  KishangarhDelhi 99530 vip 56974 Genuine Escort Service Call Girls in  Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
 
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICS
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
 
Data Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptxData Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptx
 
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfMarket Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdf
 
Data Warehouse , Data Cube Computation
Data Warehouse   , Data Cube ComputationData Warehouse   , Data Cube Computation
Data Warehouse , Data Cube Computation
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docx
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts Service
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
 
Data Science Project: Advancements in Fetal Health Classification
Data Science Project: Advancements in Fetal Health ClassificationData Science Project: Advancements in Fetal Health Classification
Data Science Project: Advancements in Fetal Health Classification
 

Project Management Life cycle

  • 1. Project Management Page 1 Jawaharlal Nehru Architecture and Fine Arts University School of Planning and Architecture Department- Urban and Regional Planning Subject- Project Formulation, Appraisal and Management Topics- Project Management Life cycle Project appraisal important points Income and expenditure statement Name- Adithya A Roll No- 17011BA001
  • 2. Project Management Page 2 Phases of Project Management Life cycle Steps of CSP Preparation (City Sanitation Plan) Initiating CSP •Stakeholder mapping •Constitution of CSTF •CSTF to kick start •the process of CSP preparation Preparation of status report •Baseline data collection Ex- city profile, water suppl, wastewater, solid waste, storm water, access to toilets •Review baseline to identify data gaps Draft CSP •Data analysis and interpretation •Demand supply issue gap analysis •Identification of key issues •Formulation of sanitation vision Final CSP •Sectorial strategies and recommendati ons for identified issue •Action plan: short, medium and long term •Approval of CSP
  • 3. Project Management Page 3 Selection of Infrastructure project by ULB Construction stages for highway project Road Project Estimating total project cost Choosing financing options for project execution • funding • revenue Selecting mode of project implementation Installation of light poles, road signs and signals Construction of pavement structure Contruction of drainage structure Ex- bridges and culverts Earthwork for laying embankment Clearing site Setting up plant at project site
  • 4. Project Management Page 4 Construction stages of New Water Supply Scheme Construction operations for construction of RCC retaining wall Methodology for Project Formulation and Appraisal There are five stages in the preparation of a project and its appraisal of a housing project Construction of water treatment plant Installation of transmission lines and construction of tunnels Installation of pumping house Construction of spillway and controls Construction of suitable dam type Clearing reservoir site Backfilling the earth Pouring of concrete Placing of reinforcement Erection of form work Excavation by manual labour Excavation by machine
  • 5. Project Management Page 5 I. Feasibility studies Form the initial part of project preparation. Their purpose is to establish whether or not a project might be successful before committing substantial funds to it. a) Identify the target population and its housing needs: i. Identify economic characteristics ii. Identify household characteristics iii. Identifying housing demand b) Outline assessment and selection of project site i. Assessing the site availability ii. Initial evaluation of site location iii. Identifying site area and shape iv. Identifying existing land tenure v. Identifying site boundaries vi. Initial assessment of site topography and landscape vii. Initial assessment of ground conditions viii. Identifying pollution problems c) Assessing initial site development options i. Initial assessment of housing layouts and densities ii. Initial assessment of plot development iii. Initial assessment of commerce and industry iv. Initial assessment of requirements for public facilities and recreation v. Identifying other land uses vi. Initial assessment of circulation and transportation vii. Initial assessment of requirements for utilities d) Institutional and financial framework i. Assess the capacity of the institutional framework ii. Identifying the financial framework II. Detailed studies It will provide descriptions and measures or parameters for which and within which the project will be designed. Examples are the likely number of families, the existing means of services, problems involved, likely amounts of money, available, the administrative system available and the nature and cost of the site.
  • 6. Project Management Page 6 a) Survey of the target population and its housing needs i. Economic characteristics of households ii. Household characteristics iii. Household attitudes to their locality iv. Household attitudes to plot characteristics v. Relationship between households and their dwellings vi. Potential for community involvement vii. Nature of housing demand b) Detailed analysis of project site i. Site location ii. Site area and shape iii. Land tenure iv. Site boundaries v. Site topography and vegetation vi. Ground conditions vii. Local climate c) Survey and analysis of existing site development i. Existing housing layouts and densities ii. Existing plot sizes and shapes iii. Existing buildings iv. Public facilities and recreation provision v. Commerce and industry vi. Other existing land uses vii. Circulation and transportation viii. Existing utilities d) Institutional and financial framework i. Institutional framework ii. Financial framework iii. Assessing the ability to pay III. Options for development This stage represents the key part of project planning when all the options are likely to be relevant to the project are identified, their relevant advantages and disadvantages assessed and a preferred group of options selected
  • 7. Project Management Page 7 The most important test will be whether the proposals will be appropriate to the people who will live in the project area. Their needs and resources should thus form the basic criteria against which options are measured a) Formulating site development options i. Housing layout and density ii. Plot sizes and shapes iii. Building iv. Commerce and industry v. Public facilities and recreation vi. Incorporation and transportation vii. Utilities b) Institutional and financial framework i. Selecting the institutional framework ii. Land tenure iii. Developing financial options IV. Detailed Development proposals This is the development of both the physical design and the financial and administrative aspects in detail a) Designing site development i. Housing layouts ii. Housing building iii. Commerce and industry iv. Public facilities and recreation v. Road layouts vi. Utilities b) Institutional and financial framework i. Institutional framework ii. Financial framework iii. Phasing V. Implementation
  • 8. Project Management Page 8 i. Monitoring ii. Evaluation Financial appraisal techniques  Payback period  Marginal payback on must-do investments  Interactive: full payback vs marginal payback  Return on investment (RoI)  Net present value (NPV)  Interactive: NPV vs Payback  Internal rates of return (IRR)  Life cycle costing Components of financial appraisal of a project 1) Return on investment (ROI): for the investment to be financially viable, the RoI should be greater than the cost of investment 2) Debt service coverage ratio (DSCR): Running an enterprise with financial support from banks/financial institutions requires their loans to be repaid with interest. Therefore, an entrepreneur must generate surplus, adequate to meet repayment obligations Net profit + interest (on long term loans) + depreciation/interest (on long term loans) + principal loan A project is considered financially viable if the cumulative DSCR during repayment period is at least 2:1 3) Break-even point (BEP): the break-even point is the point of activity where all costs (variable as well as fixed) are recovered from the sales values. The thumb rule is lowering the break-even betters the proposition 4) Debt-equity ratio: this ratio indicates the extent to which the promoter’s funds are leveraged to procure loans. The formula of der is: DER= total long-term debt/Total promoter’s funds (includes subsidy) A higher debt equity ratio indicates more risk due to a higher fixed cost of interest. The BEP of such enterprises will go up
  • 9. Project Management Page 9 MONTHLY INCOME INCOME/EXPENSE STATEMENT PERSONAL NAME: Krish A MONTH January Instructions: List all income and/or monies that you and/or your spouse or significantother received during the month. This personal financial statement is to be submitted by the 5th day of each month with the monthly supervision report and required payment(if applicable), or as directed by your probation officer. YOURS SPOUSE OR SIGNIFICANT OTHER TOTAL Gross Salary 200000 200000 Net Salary 130000 130000 Commissions Pensions Social Security Interest Dividends Alimony/Child Support A.D.C. (Aid for Dependent Children) Income of Other Dependents Net Profit from Business Net Rental Income 11000 11000 Gifts Loans 100000 100000 Other Cash Assistance, etc.
  • 10. Project Management Page 10 Other Income (i.e., expense reimbursement, car allowances, etc.) TOTAL INCOME (DO NOT INCLUDE SHADED BLOCK ABOVE) 241000 TOTAL MONTHLY EXPENSES (from Page 2) 157400 CASH FLOW (Income Less Expenses) 83600 Instructions: List all expenses that you and/or your spouse or significantother or dependent (I, J, S, or D*) paid out during the month. If you share expenses with someone else, identify the portion that you paid (i.e., 50%, 100%, etc.). This financial report is to be submitted by the 5th day of each month with the monthly supervision report and required payment, or as directed by your probation officer. *NOTE: I = INDIVIDUAL J = JOINT S = SPOUSE/SIGNIFICANT OTHER D = DEPENDENT I,J , S, D FIXED EXPENSES I,J, S,D NECESSARY FLEXIBLE EXPENSES Mortgage/Rent J Grocery/Household Supplies 15000 J Utilities 1000 Clothing Home Telephone Laundry/Cleaning D Mobile Telephone 2000 Maintenance/Repairs J Water/Sewer 1200 J 1) Home and Equipment 1000 Garbage 2) Automobile $ Child Care 3) Other $ Alimony/Child Support J Transportation 10000 Special Assessments J Medical Costs (medical/dental/drug) 4000 Restitution D Education 41000 Fines J Cable 200 INCIDENTAL PERSONAL EXPENSES J 500 1) $ 2) $ AUTOMOBILE LOANS 3) $ J 1)CAR LOAN 6500 4) $ 2)HOME LOAN 55000 5) $ MONTHLY EXPENSES
  • 11. Project Management Page 11 3) $ 6) $ INSTALLMENT/CREDIT CARDS OTHER (Include all new purchases or liabilities notidentified elsewhere on this form.) CURR. BAL. PAYMENTS 1) $ $ 1) $ 2) $ $ 2) $ 3) $ $ 3) $ 4) $ $ 4) $ INSURANCE 5) $ 1) Automobile $ 6) $ 2) Home $ J 3) Medical 10000 TOTAL FLEXIBLE EXPENSES 71000 J 4) Life 10000 TOTAL FIXED EXPENSES 86400 TOTAL MONTHLY EXPENSES 157400
  • 12. Project Management Page 12 INCOME/EXPENSE STATEMENT of a highway project