Moula Ali.R.Agarkhed
Mob:7718077715, 07022171660
Subanalla101@gmail.com
P R O J E C T H E A D - E L E C T R I C A L A N D I N S T R U M E N T A T I O N
Senior Project Manager Electrical with 18 year of experience in Electrical Turnkey Projects,
executed various Industrial Projects: Petrochemical, Chemical, Power, Cement, FMCG, Mining,
Automobile, Steels, Edible oil refinery, Bulk Material handling,
Electrical Substation: Indoor/Out Door :SF6 HT Panel, VCB Panel with CT, PT, Digital meters, protection
system consisting of EF & OC relays, Aux relays, master trip relay, antipumping relay trip circuit supervision
relay, Transformers with accessories like Conservator tank, Bucholz's relay, PRV, OSR, Oil temp Indicator
with ON LOAD TAP CHANGER with RTCC panel with AVR complete, Bus duct, PCC panel with Breakers auto
changeover system controlled by PLCs , PDBs, LDBs, APFC,DCDB,UPS, Earthing system ,Lightning
Protection Early streamer, Cables: HT/LT/control/Instrumentation/communication, Cable trays, Internal and
External Lighting, Power, Network
Industrial Electrification and Instrumentation : Providing Power to Equipments, interior and external,
street lighting , Cabling, cable trays, Cable management, Grounding system, Installation of various kinds
Equipments , Various kinds of Panels Power, Instrumentation, automation, Panel Integration, retrofit of
Panels instruments, materials , Control power supply, PLCs (Siemens, allenbadly, Schinder, Beckoff,
ABB),VFDs, Contactors, Relays, OLRs MCBs, Connectors, Timers,
Field Electrification and Instrumentation : Power Provision to Process Panel, Control Panel,
Automation/Instrumentation- Flow ,level, Temperature, Pressure, Controllers, Sensors/Detectors –
Photocells, Proximity, limit switches, solenoids, Control Valves, Motorized Valves, weighing Scales and
Controller,
Project Engineering:
Preparation of Project Plan, Project Schedule, Drawings, Quality Plan, Quality audits, Implementation and
Monitoring, Reporting - Daily, Weekly and Monthly, Manpower deployment, Procurement of Materials,
Purchase, Inventory Management, installation Testing and commissioning reports, Improving quality of work
with high standard Procedures, as build drawings, reconciliation systems, Measurements ,Billings, Handover
Report Technical and Commercial
Developing Business activities: Tendering, Preparation BOM, BOQ, Drawings, terms and condition of
contract, technical Procedures, floating enquiries, Rate analyzing and comparison, maintaining good relation
and positive attitude with clients
Project Highlights
Industries: Petrochemical, Chemical, Mining, Food Processing, Automobiles, Steel ,Cement, Infrastructures
Building Projects: Commercial Complexes, IT Parks ,Hotels, Residential
Executed Projects:
Electrical and Instrumentation
1. Honda two wheeler plant narsapur Kolar India
2. Cardolite Chemicals –Mangalore
3. Indian strategic Petroleum Corporation – Mangalore
4. Ultra mega Power Plant 6x660 Reliance Sasan – MP
5. Al Ghurair group – GIECO – Jabel Ali Dubai
Edible oil refinery,Filling,Packing,Tanjfarm
6. Oman Abrasives LLC – Sohar OMAN
Process plant, Bulk material Handling, Packing, filling,
7. Qatar Gas Petroleum Corporation – Doha Qatar
8. Wirgen India Pvt Ltd – Pune
9. Reliance Corporation IT park- Mumbai
10. Tata Motors Ltd Pimpri – Pune
11. Mutual Industries ( automobile ) – Pune
12. Volkswagen India Pvt Ltd - Pune
13. Foseco India( Chemical Plant) – Pune
14. L& T Jhon Dhere LTD – Pune
15. Konkan Synthetic Fibre Ltd – Mahad
16. Centuryenka Ltd – Pune
17. Building Projects : NRI Complexes,Residential Township, Hotels,Hospitals
Key Skills
1) Turnkey Project execution-(Electrical/Instrumentation/automation) with proper
site supervision and co ordination, preparing required documentation Technical,
commercial, Drawings, Testing and Commissioning
2) Project Engineering, Planning, scheduling, Implementing,
Monitoring
3) Procurement of material with proper client approval, Procurement Plan,
Procurement Quality plan, Inventory Management ,Reconciliation
4) Project - QA/QC, Quality Plan, Quality Inspection Reports
5) Project Budgeting and cost Control
6) Site safety, safety tool box, ensuring project execution with employees and
equipments safety
7) Quality Management system ISO 9000 - 2008
8) co ordination with Clients/Consultants/other agencies
9) Project Handover with all Technical Reports and commercial Billing, Final
settlement
10) Biding /Estimating/Proposals/Negotiation with Clients
and Suppliers
FABTECHCONSULTANT -L&T ELECTRICAL &AUTOMATION (2010-PRESENT)
Manager Electrical & Instrumentation : responsible forproject and Maintenance
Electrical & Instrumentation
 Thermal Power Plant : Reliance Sasan Ultra Megha Power plant 3960MW 6x660, singrauli MP
 Dalmia cement Belgaum Karnataka 4500TPD
 India Strategic Petroleum Corporation Mangalore
 CARDOLITE SPECIAL CHEMICALS PVT LTD – MANGALORE
 HONDA TWO WHEELER PLANT KOLAR KARNATAKA
OMAN ABRASIVES LLC (SOHAR OMAN) — senior Project Manager Electrical and
Instrumentation, 2002 – 2010
Oman abrasives Largest abrasive Producer in GCC, Producing various products supply in Oman, Dubai, Saudi,
Bahrain, Srilanka … Heavy consumers are Dry docks, Off shores, Oil and Gas, we have five plants 3000TPD
Production, plant consisting Crushing, size segregation process, Filling, Packing, Group of MHD, Zubair
Responsible for new project Installation, testing and commissioning
1) Equipment Installations-Hopers, Conveyors, vibrators, bucket elevators, crushers, filling plants, weighing
scales, Palletizer, shrink wrappers, Air compressors ,dust extraction systems, and Electrical Substation
2) Project Planning, Scheduling, Quality plan, Procurement, Closely monitoring in micro level completing all
activities as per Time mentioned in Schedule Inventory management, cost control
3) QA/QC, ISO 9000-2008,Procurements,Purchasing and cost control, Reconciliation’s
4) Awarded as BEST PERFORMANCE
ALGHURAIR GROUP OF COMPANIES
GULF IMPORTS AND EXPORTS LLC DUBAI - Sr. ENGINEER ELECTRICAL and INSTRUMENTATION, 1999-
2002 ( 2 Years)
Al Ghurair is one of the largest diversified industrial enterprises in the Middle East, with global reach and business
roots,Al Ghurair: State-of-the-Art refinery is strategically located in the Jebel Ali Port and has an annual re fining
capacity of 96,000 MT. Refine and pack Canola, Corn, Sunflower oils. In addition to own brands, supply edible oils
to retailers, HORECA, wholesalers and private labels.
Al Ghurair Group is a main business group contributing to the economy of Dubai and the UAE. The Group Founder,
Mr. Saif Al Ghurair, is a pioneer of the business society and a pillar in the community. The Group is family owned
and managed. Al Ghurair Group has been in business for over 40 years with expertise in retail, industry and
manufacturing.
Executed Gulf Import and Export group Edible Oil Refinery, Filling and Packing Project
Main Role
1) Project Engineering activities,
2) Installation testing and Commissioning
A) Electrical Substation
B) Process Plant Equipments : Degumming, Deodorization, Bleaching, Filter Plant, Tank farms,
C) Packing Plant: various kinds of Oil filling can to drum, capping, labeling, printing ,Palletizing, Shrink
wrapping, washing, bulk Oil Filling
D) Air Compressors, steam boilers, water softeners, waste water Treatment Plants, cooling towers,
chillers
E) Related to above plants Instruments and electrical equipments and panels; Cabling, Motors, starters,
VFDs, Flow Meters, radar level, pressure, temperature, Detectors, Proximity sensors, photocells,
Motorized Valves, Pneumatic Control valves, Control Power supply, Logos PLCs,
F) Brands Siemens Schinder, ABB, allenbradly, Donfoss, Mitsubishi,Omron, Beckoff, Bosch
PRATIBHA ELECTRICALS (PUNE) — PROJECT Engineer, 1996 – 1999 ( 3 Years)
Pratibha Electricals is reputed well-known in Electrical Turnkey Contracting in Industrial and Building Projects
Wirtgen India, Tata Motors Ltd, Century Enka Ltd. Foseco India Ltd.KSB Pumps,Volkswagen, L & T John
Deere, Mercedes Benz, Fiat India Automobile, Bharat Forge Ltd, Kalyani Breakes, Wika Instruments,
Kirloskar Oil Engines, Cipla Pharma Ltd., DLF Akruti Info Parks (Pune) Ltd., Hinjawadi, Marriott Hotel-S.B
Road, DLF Akruti Info Parks (Pune) Ltd.,
1) Turnkey Project Execution complete activities Installation Testing and
Commissioning
2) Business Development activities
3) Completed various prestigious projects: Centuryenka, Tata Motors, Volkswagen,
Foseco,
MANNAI ENGINEERING CORPORATION (KSA)-Electrical Engineer, 1996 – 1997 ( 1
Year)
Businesses the oil and gas sector, automotive distribution, information and communication technology, consumer
products, Mannai Corporation lies in the interactive co-operation between different operating companies. Every
division and subsidiary works to the same high standards, totally committed to the provision of outstanding levels
of service to clients
Main Role
Project Engineering and site supervision
Project Executed
QASSM CEMENT PROJECT
1) Substation
2) MCC Panel for Kiln
3) Lighting and Power system
QATAR GENERAL PETROLEUM CORPORATION (Doha Qatar) — Electrical Engineer 1995-
1996 (1Year)
Electrical Substation: HT Panel, Transformers, Bus duct, LT Panels, MCC, Field devices, Motors, Starters, Motorized
Valves, cabling and cable management
ZODIAC POWER CONTROLS LTD (MUMBAI) — Site In charge, 1992 to 1995 (3 Years)
Reputed Electrical Contracting Organization having various Projects all over India , having good work force
management Team, executing projects with high Quality standard
Main Role
Project Engineering and site supervision
Project Executed
NRI Residential Complex Belapur, UTI Commercial Complex Belapur, Radio station substation Panjim Goa
1) Electrical Substation, Internal and External Electrical works, Lighting, Power, Telephone,
ACC BOBCOCK LTD SHAHABAD(SHAHABAD- GULBARGA) — ELECTRICAL ENGINEER,1990
-1991( 1 year)
ACC Babcock (Alstom) Shahabad manufacturing facility is located in Gulbarga district of the Southern state of
Karnataka. It has two Main Product Lines – Boiler Products & Foundry Products. The Boiler Products lines includes
Coal Pulverisers & Milling System, High Pressure Piping, Soot Blowers, Heavy Fabrication parts, Hydro Mechanical
Equipment, Heat Exchangers, Condensers, Deaerators and Cement Machinery Equipment Foundry Products include
Grey Iron Castings, Spherical Graphite Iron Castings, Corrosion Resistant Iron Castings and Wear Resistant iron
Castings
Mai Role
Project Engineering and Operation and Maintenance
Project Executed
1) Substation /Machine shop/Tube shop/Melt and Foundry/Fabrication and welding
EDUCATION
1. BACHELOR OF ELECTRICAL ENGINEERING AIEM, MUMBAI Maharashtra
2001-2003
2. DIPLOMA IN ELECTRICAL ENGINEERING, - GOVT OF KARANATAKA
1987-1990 TECHNICAL BOARD
3. PLC S7-300 ( 2004) - SIEMENS MUMBAI
4. ISO 9000-2000/2008 ( 2003 & 2009) - TUV DUBAI
5. Supervisory Development Program (1991) - ABL Shahabad Gulbarga
6. Safety Standards /First Aid / Fire fighting - Al Ghurair DUBAI
(2000)
7. Kaizen / S5(S6) / TPM /Six Sigam/
TS1629 by Consultancy (2010) - SADGURU Consultant Pune
PERSONAL
Passport : J1167660, Issued at Muscat Oman, date of Issue 24.04.2010, Expire
23.04.2020
Date of Birth : 14.11.1969
Health : Good Health No any health issues,
Languages : English, Hindi, Kannada, Marathi,

Project head Electrical

  • 1.
    Moula Ali.R.Agarkhed Mob:7718077715, 07022171660 Subanalla101@gmail.com PR O J E C T H E A D - E L E C T R I C A L A N D I N S T R U M E N T A T I O N Senior Project Manager Electrical with 18 year of experience in Electrical Turnkey Projects, executed various Industrial Projects: Petrochemical, Chemical, Power, Cement, FMCG, Mining, Automobile, Steels, Edible oil refinery, Bulk Material handling, Electrical Substation: Indoor/Out Door :SF6 HT Panel, VCB Panel with CT, PT, Digital meters, protection system consisting of EF & OC relays, Aux relays, master trip relay, antipumping relay trip circuit supervision relay, Transformers with accessories like Conservator tank, Bucholz's relay, PRV, OSR, Oil temp Indicator with ON LOAD TAP CHANGER with RTCC panel with AVR complete, Bus duct, PCC panel with Breakers auto changeover system controlled by PLCs , PDBs, LDBs, APFC,DCDB,UPS, Earthing system ,Lightning Protection Early streamer, Cables: HT/LT/control/Instrumentation/communication, Cable trays, Internal and External Lighting, Power, Network Industrial Electrification and Instrumentation : Providing Power to Equipments, interior and external, street lighting , Cabling, cable trays, Cable management, Grounding system, Installation of various kinds Equipments , Various kinds of Panels Power, Instrumentation, automation, Panel Integration, retrofit of Panels instruments, materials , Control power supply, PLCs (Siemens, allenbadly, Schinder, Beckoff, ABB),VFDs, Contactors, Relays, OLRs MCBs, Connectors, Timers, Field Electrification and Instrumentation : Power Provision to Process Panel, Control Panel, Automation/Instrumentation- Flow ,level, Temperature, Pressure, Controllers, Sensors/Detectors – Photocells, Proximity, limit switches, solenoids, Control Valves, Motorized Valves, weighing Scales and Controller, Project Engineering: Preparation of Project Plan, Project Schedule, Drawings, Quality Plan, Quality audits, Implementation and Monitoring, Reporting - Daily, Weekly and Monthly, Manpower deployment, Procurement of Materials, Purchase, Inventory Management, installation Testing and commissioning reports, Improving quality of work with high standard Procedures, as build drawings, reconciliation systems, Measurements ,Billings, Handover Report Technical and Commercial Developing Business activities: Tendering, Preparation BOM, BOQ, Drawings, terms and condition of contract, technical Procedures, floating enquiries, Rate analyzing and comparison, maintaining good relation and positive attitude with clients Project Highlights Industries: Petrochemical, Chemical, Mining, Food Processing, Automobiles, Steel ,Cement, Infrastructures Building Projects: Commercial Complexes, IT Parks ,Hotels, Residential Executed Projects:
  • 2.
    Electrical and Instrumentation 1.Honda two wheeler plant narsapur Kolar India 2. Cardolite Chemicals –Mangalore 3. Indian strategic Petroleum Corporation – Mangalore 4. Ultra mega Power Plant 6x660 Reliance Sasan – MP 5. Al Ghurair group – GIECO – Jabel Ali Dubai Edible oil refinery,Filling,Packing,Tanjfarm 6. Oman Abrasives LLC – Sohar OMAN Process plant, Bulk material Handling, Packing, filling, 7. Qatar Gas Petroleum Corporation – Doha Qatar 8. Wirgen India Pvt Ltd – Pune 9. Reliance Corporation IT park- Mumbai 10. Tata Motors Ltd Pimpri – Pune 11. Mutual Industries ( automobile ) – Pune 12. Volkswagen India Pvt Ltd - Pune 13. Foseco India( Chemical Plant) – Pune 14. L& T Jhon Dhere LTD – Pune 15. Konkan Synthetic Fibre Ltd – Mahad 16. Centuryenka Ltd – Pune 17. Building Projects : NRI Complexes,Residential Township, Hotels,Hospitals Key Skills 1) Turnkey Project execution-(Electrical/Instrumentation/automation) with proper site supervision and co ordination, preparing required documentation Technical, commercial, Drawings, Testing and Commissioning 2) Project Engineering, Planning, scheduling, Implementing, Monitoring 3) Procurement of material with proper client approval, Procurement Plan, Procurement Quality plan, Inventory Management ,Reconciliation 4) Project - QA/QC, Quality Plan, Quality Inspection Reports 5) Project Budgeting and cost Control 6) Site safety, safety tool box, ensuring project execution with employees and equipments safety 7) Quality Management system ISO 9000 - 2008 8) co ordination with Clients/Consultants/other agencies
  • 3.
    9) Project Handoverwith all Technical Reports and commercial Billing, Final settlement 10) Biding /Estimating/Proposals/Negotiation with Clients and Suppliers FABTECHCONSULTANT -L&T ELECTRICAL &AUTOMATION (2010-PRESENT) Manager Electrical & Instrumentation : responsible forproject and Maintenance Electrical & Instrumentation  Thermal Power Plant : Reliance Sasan Ultra Megha Power plant 3960MW 6x660, singrauli MP  Dalmia cement Belgaum Karnataka 4500TPD  India Strategic Petroleum Corporation Mangalore  CARDOLITE SPECIAL CHEMICALS PVT LTD – MANGALORE  HONDA TWO WHEELER PLANT KOLAR KARNATAKA OMAN ABRASIVES LLC (SOHAR OMAN) — senior Project Manager Electrical and Instrumentation, 2002 – 2010 Oman abrasives Largest abrasive Producer in GCC, Producing various products supply in Oman, Dubai, Saudi, Bahrain, Srilanka … Heavy consumers are Dry docks, Off shores, Oil and Gas, we have five plants 3000TPD Production, plant consisting Crushing, size segregation process, Filling, Packing, Group of MHD, Zubair Responsible for new project Installation, testing and commissioning 1) Equipment Installations-Hopers, Conveyors, vibrators, bucket elevators, crushers, filling plants, weighing scales, Palletizer, shrink wrappers, Air compressors ,dust extraction systems, and Electrical Substation 2) Project Planning, Scheduling, Quality plan, Procurement, Closely monitoring in micro level completing all activities as per Time mentioned in Schedule Inventory management, cost control 3) QA/QC, ISO 9000-2008,Procurements,Purchasing and cost control, Reconciliation’s 4) Awarded as BEST PERFORMANCE ALGHURAIR GROUP OF COMPANIES GULF IMPORTS AND EXPORTS LLC DUBAI - Sr. ENGINEER ELECTRICAL and INSTRUMENTATION, 1999- 2002 ( 2 Years) Al Ghurair is one of the largest diversified industrial enterprises in the Middle East, with global reach and business roots,Al Ghurair: State-of-the-Art refinery is strategically located in the Jebel Ali Port and has an annual re fining capacity of 96,000 MT. Refine and pack Canola, Corn, Sunflower oils. In addition to own brands, supply edible oils to retailers, HORECA, wholesalers and private labels. Al Ghurair Group is a main business group contributing to the economy of Dubai and the UAE. The Group Founder, Mr. Saif Al Ghurair, is a pioneer of the business society and a pillar in the community. The Group is family owned and managed. Al Ghurair Group has been in business for over 40 years with expertise in retail, industry and manufacturing. Executed Gulf Import and Export group Edible Oil Refinery, Filling and Packing Project Main Role 1) Project Engineering activities, 2) Installation testing and Commissioning A) Electrical Substation
  • 4.
    B) Process PlantEquipments : Degumming, Deodorization, Bleaching, Filter Plant, Tank farms, C) Packing Plant: various kinds of Oil filling can to drum, capping, labeling, printing ,Palletizing, Shrink wrapping, washing, bulk Oil Filling D) Air Compressors, steam boilers, water softeners, waste water Treatment Plants, cooling towers, chillers E) Related to above plants Instruments and electrical equipments and panels; Cabling, Motors, starters, VFDs, Flow Meters, radar level, pressure, temperature, Detectors, Proximity sensors, photocells, Motorized Valves, Pneumatic Control valves, Control Power supply, Logos PLCs, F) Brands Siemens Schinder, ABB, allenbradly, Donfoss, Mitsubishi,Omron, Beckoff, Bosch PRATIBHA ELECTRICALS (PUNE) — PROJECT Engineer, 1996 – 1999 ( 3 Years) Pratibha Electricals is reputed well-known in Electrical Turnkey Contracting in Industrial and Building Projects Wirtgen India, Tata Motors Ltd, Century Enka Ltd. Foseco India Ltd.KSB Pumps,Volkswagen, L & T John Deere, Mercedes Benz, Fiat India Automobile, Bharat Forge Ltd, Kalyani Breakes, Wika Instruments, Kirloskar Oil Engines, Cipla Pharma Ltd., DLF Akruti Info Parks (Pune) Ltd., Hinjawadi, Marriott Hotel-S.B Road, DLF Akruti Info Parks (Pune) Ltd., 1) Turnkey Project Execution complete activities Installation Testing and Commissioning 2) Business Development activities 3) Completed various prestigious projects: Centuryenka, Tata Motors, Volkswagen, Foseco, MANNAI ENGINEERING CORPORATION (KSA)-Electrical Engineer, 1996 – 1997 ( 1 Year) Businesses the oil and gas sector, automotive distribution, information and communication technology, consumer products, Mannai Corporation lies in the interactive co-operation between different operating companies. Every division and subsidiary works to the same high standards, totally committed to the provision of outstanding levels of service to clients Main Role Project Engineering and site supervision Project Executed QASSM CEMENT PROJECT 1) Substation 2) MCC Panel for Kiln 3) Lighting and Power system QATAR GENERAL PETROLEUM CORPORATION (Doha Qatar) — Electrical Engineer 1995- 1996 (1Year) Electrical Substation: HT Panel, Transformers, Bus duct, LT Panels, MCC, Field devices, Motors, Starters, Motorized Valves, cabling and cable management ZODIAC POWER CONTROLS LTD (MUMBAI) — Site In charge, 1992 to 1995 (3 Years) Reputed Electrical Contracting Organization having various Projects all over India , having good work force management Team, executing projects with high Quality standard Main Role Project Engineering and site supervision Project Executed
  • 5.
    NRI Residential ComplexBelapur, UTI Commercial Complex Belapur, Radio station substation Panjim Goa 1) Electrical Substation, Internal and External Electrical works, Lighting, Power, Telephone, ACC BOBCOCK LTD SHAHABAD(SHAHABAD- GULBARGA) — ELECTRICAL ENGINEER,1990 -1991( 1 year) ACC Babcock (Alstom) Shahabad manufacturing facility is located in Gulbarga district of the Southern state of Karnataka. It has two Main Product Lines – Boiler Products & Foundry Products. The Boiler Products lines includes Coal Pulverisers & Milling System, High Pressure Piping, Soot Blowers, Heavy Fabrication parts, Hydro Mechanical Equipment, Heat Exchangers, Condensers, Deaerators and Cement Machinery Equipment Foundry Products include Grey Iron Castings, Spherical Graphite Iron Castings, Corrosion Resistant Iron Castings and Wear Resistant iron Castings Mai Role Project Engineering and Operation and Maintenance Project Executed 1) Substation /Machine shop/Tube shop/Melt and Foundry/Fabrication and welding EDUCATION 1. BACHELOR OF ELECTRICAL ENGINEERING AIEM, MUMBAI Maharashtra 2001-2003 2. DIPLOMA IN ELECTRICAL ENGINEERING, - GOVT OF KARANATAKA 1987-1990 TECHNICAL BOARD 3. PLC S7-300 ( 2004) - SIEMENS MUMBAI 4. ISO 9000-2000/2008 ( 2003 & 2009) - TUV DUBAI 5. Supervisory Development Program (1991) - ABL Shahabad Gulbarga 6. Safety Standards /First Aid / Fire fighting - Al Ghurair DUBAI (2000) 7. Kaizen / S5(S6) / TPM /Six Sigam/ TS1629 by Consultancy (2010) - SADGURU Consultant Pune PERSONAL Passport : J1167660, Issued at Muscat Oman, date of Issue 24.04.2010, Expire 23.04.2020 Date of Birth : 14.11.1969 Health : Good Health No any health issues, Languages : English, Hindi, Kannada, Marathi,