SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural Build Environment (FNBE)
CONSTRUCTED LANDSCAPE [ARC30203]
Prerequisite: None
Lecturer: Shazreene Nurjanna Samsudin, Noorul Iffa Mohd Nayan
Project 3 (Final)
Residential Landscape Project
40% Individual
Submission: 31st July 2015, Friday (Week 16)
Introduction
Projects in landscape architecture progress through stages, from the very first contact with the client
and awareness of the site, through to the realization, construction and maturation of the finished design.
It is important to remember that the design process, unlike a timeline, is often completely non-linear.
The phrase “back to the drawing board” refers to the continual process of testing and retesting that is
characteristic of the architectures.
In the planning of a residence, there are not only the space is matters but also to integrate the natural
site component with its landscape environs. Since the area to be developed is small scale, the design
will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and
all other natural or architectural features – and bring them into harmony.
“The earth is our home and the ways of nature our paths to understanding”.
[Simonds, J. O.]
Objectives of Project
The objectives of this project:
 To acquire knowledge about design process, planning and development of project.
 To proffer exposure of small scale landscape project to the students.
 To familiarize students about the design stages and how to visualize their ideas onto
presentation boards.
Learning Outcomes of this Project
On successful completion of this subject, students will be able to demonstrate the following:
1. A design process involved in landscape project development and the representation of ideas
for every stage taken.
2. Understanding on landscape design components and how it works and have been applied into
the field.
2
Tasks - Methodology
This is a continuous assignment of Project 2 and an individual project. From the same site that you
were doing for previous Project 2, you are required to design the landscape for the residence/house.
You have to imagine that you are going to present the landscape proposal to the client (who is the
house owner) by preparing ALL drawings needed for every development stages. The development
stages shall include as following;
A. PROJECT DESCRIPTION
A short paragraph of your design statement which explaining about the ideas, rationale of the
design and the concept of the design. The narration should briefly describe, constructive and
informative.
*note: It is advisable to complete at the end of the process
B. CONCEPTUAL DIAGRAM
From the site synthesis (refer to previous individual component of project 2), develop a bubble
diagram. Bubble diagram is used as a means to show what spaces and activities that you want
to propose at the site. Subsequently, you need to come out with a conceptual diagram.
Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and
bubble diagram which related to the site.
C. SCHEMATIC PLAN
From the conceptual plan, you need to develop a schematic plan. It is also known as
preliminary master plan. In schematic plan, you are to compose all of elements that you intend
to put into the design. It should have form composition, shape and pattern of the design
elements. You may provide sketches/illustrations (sections/elevations) to better represent your
ideas.
D. MASTER PLAN
After the schematic plan has been approved by your tutor, you should produce a master plan
set of drawings. The set of drawings include;
- Master Plan
- Elevation & Section
- Hardscape Palette
- Softscape Palette
E. COST ESTIMATION & MAINTENANCE PLAN
A brief cost estimation or budget allocation of the landscape project that you proposed.. The
cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are
also to include a brief maintenance plan of the project.
(These two topics will be taught by guest lecturer (QS Lecturer) in Week 14).
**Note:
A self-independent study is required on graphic communication particularly on architectural lettering,
sketching,colouring & presentation layout. Do save images from internet or scan from books for ideas
collection and inspirations.
3
Submission Requirement
Each student is required to submit ALL of the following:
1. A3 presentation boards. You can use any type of paper and colour materials as long as it is
pasted on the board. You are advisable to use spray mount to stick your paper onto the board.
2. You need to provide ALL of the following;
- Project Description
- Location Plan & Key Plan
- Bubble Diagram
- Conceptual Plan
- Schematic Plan
- Master Plan
- 1 Section & 1 Elevation Drawings
- Hardscape & Softscape Palette
- Cost Estimation & Maintenance Plan
3. All presentation board must be in landscape/potrait layout (FRONT AND BACK) with title
block in every page. The title block will be provided by the lecturer a week before submission.
The overall layout template will be prepared by the lecturer.
4. You are to show your progress of drawing every week during tutorial sessions to your
respective tutors. The progress drawing must be on butter paper, signed by the tutor with
date, to be compiled in A4 plastic cover and to submit together with presentation
boards.
5. All drawings need to be completed manually (hand drawn & hand written) by using
architectural graphic communication. Images can be printed out.
6. All drawings must be coloured. You may choose any medium of colouring technique that
you are master in. It is not compulsory to colour all, it can be a portion or part of the overall
drawings only.
7. Your A3 boards must be binded.
8. You need to submit the complete binded presentation boards with a set of progression drawing
on 31st July 2015 (Friday). Time and venue of submission will be informed.
9. Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days,
no assessment will be done.
10. You are encouraged to take photo or scan your work for e-portfolio purposes.
4
Assessment Criteria
The assessment criteria for this assignment will be based on:
 Demonstrated understanding of brief
 Relevance, appropriateness and depth of research exhibited in the assignment
 Creative application of graphic communication skills, originality and quality of the work
 Design ideas and constructive representation the ideas.
Marking Criteria
Marks shall be distributed as follows:
Work will be assessed based on:
1. CONTENT:
i. Project Description 2 %
ii. Conceptual Plan 4%
iii. Schematic Plan 4%
iv. Master Plan 10%
v. Cost & Maintenance Plan 5%
TOTAL: 25%
2. Originality, creativity & quality of workmanship 10%
3. Progress Drawings 5%
GRAND TOTAL: 40%

More Related Content

Viewers also liked

Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
LY97
 
Social Psychology presentation slides
Social Psychology presentation slidesSocial Psychology presentation slides
Social Psychology presentation slides
LY97
 
Social psychology
Social psychologySocial psychology
Social psychology
LY97
 
Compare & Contrast Essay
Compare & Contrast EssayCompare & Contrast Essay
Compare & Contrast Essay
LY97
 
E portfolio assignment brief
E portfolio assignment briefE portfolio assignment brief
E portfolio assignment brief
LY97
 
Math module outline
Math module outline Math module outline
Math module outline
LY97
 
Social psychology assessment
Social psychology assessmentSocial psychology assessment
Social psychology assessment
LY97
 
Psychology
Psychology Psychology
Psychology
LY97
 
Math Assignment
Math AssignmentMath Assignment
Math Assignment
LY97
 
EPC Brief
EPC BriefEPC Brief
EPC Brief
LY97
 
O Amigo de Deus
O Amigo de DeusO Amigo de Deus
Maths project brief
Maths project brief Maths project brief
Maths project brief
LY97
 
Estudo sobre noé
Estudo sobre noéEstudo sobre noé
Estudo sobre noé
Rodrigo Araujo de Oliveira
 
桜木町意見書~市長への手紙~震災と住民不在の須磨多聞線 141 151 第3部 私たちの桜木町
桜木町意見書~市長への手紙~震災と住民不在の須磨多聞線 141 151 第3部 私たちの桜木町桜木町意見書~市長への手紙~震災と住民不在の須磨多聞線 141 151 第3部 私たちの桜木町
桜木町意見書~市長への手紙~震災と住民不在の須磨多聞線 141 151 第3部 私たちの桜木町
hinger35
 

Viewers also liked (14)

Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Social Psychology presentation slides
Social Psychology presentation slidesSocial Psychology presentation slides
Social Psychology presentation slides
 
Social psychology
Social psychologySocial psychology
Social psychology
 
Compare & Contrast Essay
Compare & Contrast EssayCompare & Contrast Essay
Compare & Contrast Essay
 
E portfolio assignment brief
E portfolio assignment briefE portfolio assignment brief
E portfolio assignment brief
 
Math module outline
Math module outline Math module outline
Math module outline
 
Social psychology assessment
Social psychology assessmentSocial psychology assessment
Social psychology assessment
 
Psychology
Psychology Psychology
Psychology
 
Math Assignment
Math AssignmentMath Assignment
Math Assignment
 
EPC Brief
EPC BriefEPC Brief
EPC Brief
 
O Amigo de Deus
O Amigo de DeusO Amigo de Deus
O Amigo de Deus
 
Maths project brief
Maths project brief Maths project brief
Maths project brief
 
Estudo sobre noé
Estudo sobre noéEstudo sobre noé
Estudo sobre noé
 
桜木町意見書~市長への手紙~震災と住民不在の須磨多聞線 141 151 第3部 私たちの桜木町
桜木町意見書~市長への手紙~震災と住民不在の須磨多聞線 141 151 第3部 私たちの桜木町桜木町意見書~市長への手紙~震災と住民不在の須磨多聞線 141 151 第3部 私たちの桜木町
桜木町意見書~市長への手紙~震災と住民不在の須磨多聞線 141 151 第3部 私たちの桜木町
 

Similar to Project 3 residential landscape project march 2015

CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
christinelee1996
 
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)KY Quah
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectstactixzz97
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891
yongzsoh
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectchuenmin
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Quo Ming
 
FNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEFFNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEF
barbaraxchang
 
Cl project2B residential landscape project
Cl project2B residential landscape projectCl project2B residential landscape project
Cl project2B residential landscape project
SongKit96
 
CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
ashleyyeap
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Amelisa Collins
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectDameerster
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Alexis Wei
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Leon Lim
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
Gynie
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892KY Quah
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Zheng Chee Cham
 

Similar to Project 3 residential landscape project march 2015 (17)

CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
 
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
FNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEFFNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEF
 
Cl project2B residential landscape project
Cl project2B residential landscape projectCl project2B residential landscape project
Cl project2B residential landscape project
 
CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
2B
2B2B
2B
 

More from LY97

Exercise 1 area and volume
Exercise 1  area and volumeExercise 1  area and volume
Exercise 1 area and volume
LY97
 
Pyramid and Frustum
Pyramid and FrustumPyramid and Frustum
Pyramid and Frustum
LY97
 
Accounting report
Accounting reportAccounting report
Accounting report
LY97
 
Acc new course outline
Acc new course outline Acc new course outline
Acc new course outline
LY97
 
Fnbe journal assignment brief
Fnbe journal assignment briefFnbe journal assignment brief
Fnbe journal assignment brief
LY97
 
epc course outline
epc course outline epc course outline
epc course outline
LY97
 
Ecn course outline september 2015 semester
Ecn course outline september 2015 semesterEcn course outline september 2015 semester
Ecn course outline september 2015 semester
LY97
 
Psychology report
Psychology reportPsychology report
Psychology report
LY97
 
Social psychology course outline
Social psychology course outlineSocial psychology course outline
Social psychology course outline
LY97
 
Social psychology project brief
Social psychology project briefSocial psychology project brief
Social psychology project brief
LY97
 
basic accounting assignment brief
basic accounting assignment briefbasic accounting assignment brief
basic accounting assignment brief
LY97
 
Economics
EconomicsEconomics
Economics
LY97
 
economics assignment brief
economics assignment briefeconomics assignment brief
economics assignment brief
LY97
 
English (report)
English (report)English (report)
English (report)
LY97
 
English presentation slide
English presentation slideEnglish presentation slide
English presentation slide
LY97
 
English assignment 2 brief
English assignment 2 briefEnglish assignment 2 brief
English assignment 2 brief
LY97
 
English assignment 1 brief
English assignment 1 briefEnglish assignment 1 brief
English assignment 1 brief
LY97
 
blogging assignment brief
blogging assignment briefblogging assignment brief
blogging assignment brief
LY97
 
Religious building around the world
Religious building around the worldReligious building around the world
Religious building around the world
LY97
 
Drawing studio unit living
Drawing studio unit livingDrawing studio unit living
Drawing studio unit living
LY97
 

More from LY97 (20)

Exercise 1 area and volume
Exercise 1  area and volumeExercise 1  area and volume
Exercise 1 area and volume
 
Pyramid and Frustum
Pyramid and FrustumPyramid and Frustum
Pyramid and Frustum
 
Accounting report
Accounting reportAccounting report
Accounting report
 
Acc new course outline
Acc new course outline Acc new course outline
Acc new course outline
 
Fnbe journal assignment brief
Fnbe journal assignment briefFnbe journal assignment brief
Fnbe journal assignment brief
 
epc course outline
epc course outline epc course outline
epc course outline
 
Ecn course outline september 2015 semester
Ecn course outline september 2015 semesterEcn course outline september 2015 semester
Ecn course outline september 2015 semester
 
Psychology report
Psychology reportPsychology report
Psychology report
 
Social psychology course outline
Social psychology course outlineSocial psychology course outline
Social psychology course outline
 
Social psychology project brief
Social psychology project briefSocial psychology project brief
Social psychology project brief
 
basic accounting assignment brief
basic accounting assignment briefbasic accounting assignment brief
basic accounting assignment brief
 
Economics
EconomicsEconomics
Economics
 
economics assignment brief
economics assignment briefeconomics assignment brief
economics assignment brief
 
English (report)
English (report)English (report)
English (report)
 
English presentation slide
English presentation slideEnglish presentation slide
English presentation slide
 
English assignment 2 brief
English assignment 2 briefEnglish assignment 2 brief
English assignment 2 brief
 
English assignment 1 brief
English assignment 1 briefEnglish assignment 1 brief
English assignment 1 brief
 
blogging assignment brief
blogging assignment briefblogging assignment brief
blogging assignment brief
 
Religious building around the world
Religious building around the worldReligious building around the world
Religious building around the world
 
Drawing studio unit living
Drawing studio unit livingDrawing studio unit living
Drawing studio unit living
 

Recently uploaded

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 

Recently uploaded (20)

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 

Project 3 residential landscape project march 2015

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural Build Environment (FNBE) CONSTRUCTED LANDSCAPE [ARC30203] Prerequisite: None Lecturer: Shazreene Nurjanna Samsudin, Noorul Iffa Mohd Nayan Project 3 (Final) Residential Landscape Project 40% Individual Submission: 31st July 2015, Friday (Week 16) Introduction Projects in landscape architecture progress through stages, from the very first contact with the client and awareness of the site, through to the realization, construction and maturation of the finished design. It is important to remember that the design process, unlike a timeline, is often completely non-linear. The phrase “back to the drawing board” refers to the continual process of testing and retesting that is characteristic of the architectures. In the planning of a residence, there are not only the space is matters but also to integrate the natural site component with its landscape environs. Since the area to be developed is small scale, the design will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and all other natural or architectural features – and bring them into harmony. “The earth is our home and the ways of nature our paths to understanding”. [Simonds, J. O.] Objectives of Project The objectives of this project:  To acquire knowledge about design process, planning and development of project.  To proffer exposure of small scale landscape project to the students.  To familiarize students about the design stages and how to visualize their ideas onto presentation boards. Learning Outcomes of this Project On successful completion of this subject, students will be able to demonstrate the following: 1. A design process involved in landscape project development and the representation of ideas for every stage taken. 2. Understanding on landscape design components and how it works and have been applied into the field.
  • 2. 2 Tasks - Methodology This is a continuous assignment of Project 2 and an individual project. From the same site that you were doing for previous Project 2, you are required to design the landscape for the residence/house. You have to imagine that you are going to present the landscape proposal to the client (who is the house owner) by preparing ALL drawings needed for every development stages. The development stages shall include as following; A. PROJECT DESCRIPTION A short paragraph of your design statement which explaining about the ideas, rationale of the design and the concept of the design. The narration should briefly describe, constructive and informative. *note: It is advisable to complete at the end of the process B. CONCEPTUAL DIAGRAM From the site synthesis (refer to previous individual component of project 2), develop a bubble diagram. Bubble diagram is used as a means to show what spaces and activities that you want to propose at the site. Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which related to the site. C. SCHEMATIC PLAN From the conceptual plan, you need to develop a schematic plan. It is also known as preliminary master plan. In schematic plan, you are to compose all of elements that you intend to put into the design. It should have form composition, shape and pattern of the design elements. You may provide sketches/illustrations (sections/elevations) to better represent your ideas. D. MASTER PLAN After the schematic plan has been approved by your tutor, you should produce a master plan set of drawings. The set of drawings include; - Master Plan - Elevation & Section - Hardscape Palette - Softscape Palette E. COST ESTIMATION & MAINTENANCE PLAN A brief cost estimation or budget allocation of the landscape project that you proposed.. The cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are also to include a brief maintenance plan of the project. (These two topics will be taught by guest lecturer (QS Lecturer) in Week 14). **Note: A self-independent study is required on graphic communication particularly on architectural lettering, sketching,colouring & presentation layout. Do save images from internet or scan from books for ideas collection and inspirations.
  • 3. 3 Submission Requirement Each student is required to submit ALL of the following: 1. A3 presentation boards. You can use any type of paper and colour materials as long as it is pasted on the board. You are advisable to use spray mount to stick your paper onto the board. 2. You need to provide ALL of the following; - Project Description - Location Plan & Key Plan - Bubble Diagram - Conceptual Plan - Schematic Plan - Master Plan - 1 Section & 1 Elevation Drawings - Hardscape & Softscape Palette - Cost Estimation & Maintenance Plan 3. All presentation board must be in landscape/potrait layout (FRONT AND BACK) with title block in every page. The title block will be provided by the lecturer a week before submission. The overall layout template will be prepared by the lecturer. 4. You are to show your progress of drawing every week during tutorial sessions to your respective tutors. The progress drawing must be on butter paper, signed by the tutor with date, to be compiled in A4 plastic cover and to submit together with presentation boards. 5. All drawings need to be completed manually (hand drawn & hand written) by using architectural graphic communication. Images can be printed out. 6. All drawings must be coloured. You may choose any medium of colouring technique that you are master in. It is not compulsory to colour all, it can be a portion or part of the overall drawings only. 7. Your A3 boards must be binded. 8. You need to submit the complete binded presentation boards with a set of progression drawing on 31st July 2015 (Friday). Time and venue of submission will be informed. 9. Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no assessment will be done. 10. You are encouraged to take photo or scan your work for e-portfolio purposes.
  • 4. 4 Assessment Criteria The assessment criteria for this assignment will be based on:  Demonstrated understanding of brief  Relevance, appropriateness and depth of research exhibited in the assignment  Creative application of graphic communication skills, originality and quality of the work  Design ideas and constructive representation the ideas. Marking Criteria Marks shall be distributed as follows: Work will be assessed based on: 1. CONTENT: i. Project Description 2 % ii. Conceptual Plan 4% iii. Schematic Plan 4% iv. Master Plan 10% v. Cost & Maintenance Plan 5% TOTAL: 25% 2. Originality, creativity & quality of workmanship 10% 3. Progress Drawings 5% GRAND TOTAL: 40%