SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural Build Environment (FNBE)
CONSTRUCTED LANDSCAPE [ARC30203]
Prerequisite: None
Lecturer: Noorul Iffa Mohd Nayan & Shazrene Nurjanna Samsudin
Final Project (2B)
Residential Landscape Project
40% Individual
Submission: 1st June 2015 (Week 16)
Introduction
Projects in landscape architecture progress through stages, from the very first contact with the client
and awareness of the site, through to the realization, construction and maturation of the finished design.
It is important to remember that the design process, unlike a timeline, is often completely non-linear.
The phrase “back to the drawing board” refers to the continual process of testing and retesting that is
characteristic of the architectures.
In the planning of a residence, there are not only the space is matters but also to integrate the natural
site component with its landscape environs. Since the area to be developed is small scale, the design
will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and
all other natural or architectural features – and bring them into harmony.
“The earth is our home and the ways of nature our paths to understanding”.
[Simonds, J. O.]
Objectives of Project
The objectives of this project:
 To acquire knowledge about design process, planning and development of project.
 To proffer exposure of small scale landscape project to the students.
 To familiarize students about the design stages and how to visualize their ideas onto
presentation boards.
Learning Outcomes of this Project
On successful completion of this subject, students will be able to demonstrate the following:
1. A design process involved in landscape project development and the representation of ideas
for every stage taken.
2. Understanding on landscape design components and how it works and have been applied into
the field.
Tasks - Methodology
This is a continuous assignment of Project 2A and an individual project. From the same site that you
were doing for previous Project 2A, you are required to propose a landscape design for the
residence/house. You have to imagine that you are going to present the landscape proposal to the
client (who is the house owner) by preparing ALL drawings needed for every development stages.
The development stages shall include as following;
A. PROJECT DESCRIPTION
A short paragraph of your design statement which explaining about the ideas, rationale of the
design and the concept of the design. The narration should briefly describe, constructive and
informative.
*note: It is advisable to complete at the end of the process
B. CONCEPTUAL DIAGRAM
From the site synthesis (refer to your previous project 2A), develop a bubble diagram. Bubble
diagram is used as a means to show what spaces and activities that you want to propose.
Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a
breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which is
more related to the site.
C. SCHEMATIC PLAN
From the conceptual plan, you need to develop a schematic plan. It is also known as
preliminary master plan. In schematic plan, you are to compose all of elements that you intend
to put into the design. It should have form composition, shape and pattern of the design
elements. You may provide sketches/illustrations (sections/elevations) to better represent your
ideas.
D. MASTER PLAN
After the schematic plan has been approved by your tutor only you can then proceed to master
plan set of drawings. The set of drawings include;
- Master Plan
- Elevation & Section
- Hardscape Palette
- Softscape Palette
E. COST ESTIMATION & MAINTENANCE PLAN
A brief cost estimation or budget allocation of the landscape project that you proposed. The
cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are
also to include a brief maintenance plan of the project.
**Note:
A self-independent study is required for presentation layout. Do save images from internet or scan from
books for ideas collection and inspirations. As supportive references, do follow Instagram account;
if_nay13 for info sharing and interactive online consultation.
Submission Requirement
Each student is required to submit ALL of the following:
1. It must be on 2 A2 presentation boards. You can use any type of paper and colour materials
as long as it is pasted on the board. You are advisable to use spray mount to stick your paper
onto the board.
2. You need to provide ALL of the following;
- Project Description
- Bubble Diagram
- Conceptual Plan
- Schematic Plan
- Location Plan & Key Plan
- Master Plan
- 1 Section & 1 Elevation Drawings
- Hardscape & Softscape Palette
- Cost Estimation & Maintenance Plan
3. The presentation boards must have title block at the bottom which contains; tittle of the project,
“Proposed Landscape For [the name of residence or owner’s name], complete address”,
student name, student ID, FNBE (write in full), Semester 1, January 2015.
*Example:
PROPOSED LANDSCAPE FOR MICASA RESIDENCE NOORUL IFFA MOHD NAYAN, LOT 10,
JALAN TAYLOR’S, 47500 BANDAR SUNWAY, SELANGOR DARUL EHSAN
PREPARED BY TAYLOR SWIFT (STUDENT ID),
FOUNDATION IN NATURAL AND BUILT ENVIRONMENT (FNBE), SEMESTER 1 JANUARY 2015
4. You are to show your progression drawing in every tutorial session to your respective tutors.
The progression drawing must be on butter paper, signed by the tutor with date, to be
compiled in A4/A3 plastic cover and to submit together with presentation boards. It is
compulsory to ensure that you are going through the process before completing the final work.
Without that, it could be proclaimed as plagiarism.
5. All drawings need to be completed manually (hand drawn & hand written) by using a proper
architectural (landscape) graphic communication. However, images for softscape and
hardscape can be printed.
6. Drawings must be coloured. You may choose any medium of colouring techniques that you
are master in. You are given a freedom to choose whether to colour it all or a portion of the
drawing (make sure the portion coloured explains something) and have to be proper and
presentable.
7. You need to submit the completed presentation boards with a set of progression drawing on
1 JUNE 2015 (MONDAY), between 3.00 - 3.30 PM at DISCUSSION ROOM C5 (academic
suites, block C, level 5). Late submission after that time will be held outside of the venue.
8. You are encouraged to take photo or scan your work for e-portfolio purposes.
*Gentle reminder;
Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no
assessment will be done.
If you are sick on the submission day, you have to provide MC with an official letter signed by
parents/guardian explaining about your health condition. A formal email should be written to the module
coordinator a day before/or before submission time.
Assessment Criteria
The assessment criteria for this assignment will be based on:
 Demonstrated understanding of brief
 Relevance, appropriateness and depth of research exhibited in the assignment
 Creative application of graphic communication skills, originality and quality of the work
 Design ideas and constructive representation the ideas.
Marking Criteria
Marks shall be distributed as follows:
Work will be assessed based on:
1. CONTENT:
i. Project Description 2 %
ii. Conceptual Plan 4%
iii. Schematic Plan 4%
iv. Master Plan 10%
v. Cost & Maintenance Plan 5%
TOTAL: 25%
2. Originality, creativity & quality of workmanship 10%
3. Progression Drawings 5%
GRAND TOTAL: 40%
Suggested References
Lin, M. W., 1993, Drawing and Designing with Confidence, John Wiley & Sons.
J. Hopper, L.2007, Landscape Architectural Graphic Standards, John Wiley & Sons.
Treib, M., 2008, Representing Landscape Architecture, Taylor & Francis, USA and Canada.
http://land8.com/photo/portfolio-page-3-worsley/prev?context=user

More Related Content

Viewers also liked (8)

Resume_Devendran_3.7 Years Exp
Resume_Devendran_3.7 Years ExpResume_Devendran_3.7 Years Exp
Resume_Devendran_3.7 Years Exp
 
Enbe project 1 jan 2015
Enbe project 1 jan 2015Enbe project 1 jan 2015
Enbe project 1 jan 2015
 
นาย นิธิโชติ ชาเทพ ประวิติส่วนตัว
นาย นิธิโชติ ชาเทพ ประวิติส่วนตัวนาย นิธิโชติ ชาเทพ ประวิติส่วนตัว
นาย นิธิโชติ ชาเทพ ประวิติส่วนตัว
 
Drawing project 2 january 2015-1
Drawing project 2 january 2015-1Drawing project 2 january 2015-1
Drawing project 2 january 2015-1
 
ACTL_Journal_80_Spring_2016
ACTL_Journal_80_Spring_2016ACTL_Journal_80_Spring_2016
ACTL_Journal_80_Spring_2016
 
Enbe project 2 brief
Enbe project 2 briefEnbe project 2 brief
Enbe project 2 brief
 
APRIL PHC TRAINING REPORT
APRIL PHC TRAINING REPORTAPRIL PHC TRAINING REPORT
APRIL PHC TRAINING REPORT
 
ACTL_Journal_79_Final
ACTL_Journal_79_FinalACTL_Journal_79_Final
ACTL_Journal_79_Final
 

Similar to Cl project2B residential landscape project

Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
LY97
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
joshualimlbn
 
Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)
pigxd123
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
gjj97
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Kenneth Tan
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
温 庄壁
 

Similar to Cl project2B residential landscape project (9)

Resubmission (1)
Resubmission (1)Resubmission (1)
Resubmission (1)
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
CL PROJECT 3 BRIEF
CL PROJECT 3 BRIEFCL PROJECT 3 BRIEF
CL PROJECT 3 BRIEF
 
Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 

More from SongKit96

Ici project 1 b
Ici project 1 bIci project 1 b
Ici project 1 b
SongKit96
 
269053911 fnbe0115-cl-architecture-pro
269053911 fnbe0115-cl-architecture-pro269053911 fnbe0115-cl-architecture-pro
269053911 fnbe0115-cl-architecture-pro
SongKit96
 

More from SongKit96 (18)

ICI final project
ICI final project ICI final project
ICI final project
 
Ici project 2
Ici project 2 Ici project 2
Ici project 2
 
Ici project 1 b
Ici project 1 bIci project 1 b
Ici project 1 b
 
ENBE Project 2 process journal compilation
ENBE Project 2 process journal compilationENBE Project 2 process journal compilation
ENBE Project 2 process journal compilation
 
Enbe tjn brief
Enbe tjn briefEnbe tjn brief
Enbe tjn brief
 
ENBE Module outline
ENBE Module outline ENBE Module outline
ENBE Module outline
 
Cts idj brief jan15
Cts idj brief jan15Cts idj brief jan15
Cts idj brief jan15
 
269053911 fnbe0115-cl-architecture-pro
269053911 fnbe0115-cl-architecture-pro269053911 fnbe0115-cl-architecture-pro
269053911 fnbe0115-cl-architecture-pro
 
Cl project 1 experiential landscape
Cl project 1 experiential landscapeCl project 1 experiential landscape
Cl project 1 experiential landscape
 
Cts project 2 rebranding daily object jan 2015
Cts project 2 rebranding daily object jan 2015Cts project 2 rebranding daily object jan 2015
Cts project 2 rebranding daily object jan 2015
 
Cts project 1 musical performance january 2015
Cts project 1 musical performance january 2015Cts project 1 musical performance january 2015
Cts project 1 musical performance january 2015
 
Module outline cts
Module outline ctsModule outline cts
Module outline cts
 
FNBE0115 ITD Module outline
FNBE0115 ITD Module outline FNBE0115 ITD Module outline
FNBE0115 ITD Module outline
 
ENG l Course outline
ENG l Course outlineENG l Course outline
ENG l Course outline
 
English eassy 1
English eassy 1English eassy 1
English eassy 1
 
English 1-january-2015
English 1-january-2015English 1-january-2015
English 1-january-2015
 
FNBE0115-Itd,ici,eng1 presentation 1
FNBE0115-Itd,ici,eng1 presentation 1 FNBE0115-Itd,ici,eng1 presentation 1
FNBE0115-Itd,ici,eng1 presentation 1
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revised
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 

Recently uploaded (20)

Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

Cl project2B residential landscape project

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural Build Environment (FNBE) CONSTRUCTED LANDSCAPE [ARC30203] Prerequisite: None Lecturer: Noorul Iffa Mohd Nayan & Shazrene Nurjanna Samsudin Final Project (2B) Residential Landscape Project 40% Individual Submission: 1st June 2015 (Week 16) Introduction Projects in landscape architecture progress through stages, from the very first contact with the client and awareness of the site, through to the realization, construction and maturation of the finished design. It is important to remember that the design process, unlike a timeline, is often completely non-linear. The phrase “back to the drawing board” refers to the continual process of testing and retesting that is characteristic of the architectures. In the planning of a residence, there are not only the space is matters but also to integrate the natural site component with its landscape environs. Since the area to be developed is small scale, the design will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and all other natural or architectural features – and bring them into harmony. “The earth is our home and the ways of nature our paths to understanding”. [Simonds, J. O.] Objectives of Project The objectives of this project:  To acquire knowledge about design process, planning and development of project.  To proffer exposure of small scale landscape project to the students.  To familiarize students about the design stages and how to visualize their ideas onto presentation boards. Learning Outcomes of this Project On successful completion of this subject, students will be able to demonstrate the following: 1. A design process involved in landscape project development and the representation of ideas for every stage taken. 2. Understanding on landscape design components and how it works and have been applied into the field.
  • 2. Tasks - Methodology This is a continuous assignment of Project 2A and an individual project. From the same site that you were doing for previous Project 2A, you are required to propose a landscape design for the residence/house. You have to imagine that you are going to present the landscape proposal to the client (who is the house owner) by preparing ALL drawings needed for every development stages. The development stages shall include as following; A. PROJECT DESCRIPTION A short paragraph of your design statement which explaining about the ideas, rationale of the design and the concept of the design. The narration should briefly describe, constructive and informative. *note: It is advisable to complete at the end of the process B. CONCEPTUAL DIAGRAM From the site synthesis (refer to your previous project 2A), develop a bubble diagram. Bubble diagram is used as a means to show what spaces and activities that you want to propose. Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which is more related to the site. C. SCHEMATIC PLAN From the conceptual plan, you need to develop a schematic plan. It is also known as preliminary master plan. In schematic plan, you are to compose all of elements that you intend to put into the design. It should have form composition, shape and pattern of the design elements. You may provide sketches/illustrations (sections/elevations) to better represent your ideas. D. MASTER PLAN After the schematic plan has been approved by your tutor only you can then proceed to master plan set of drawings. The set of drawings include; - Master Plan - Elevation & Section - Hardscape Palette - Softscape Palette E. COST ESTIMATION & MAINTENANCE PLAN A brief cost estimation or budget allocation of the landscape project that you proposed. The cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are also to include a brief maintenance plan of the project. **Note: A self-independent study is required for presentation layout. Do save images from internet or scan from books for ideas collection and inspirations. As supportive references, do follow Instagram account; if_nay13 for info sharing and interactive online consultation. Submission Requirement Each student is required to submit ALL of the following: 1. It must be on 2 A2 presentation boards. You can use any type of paper and colour materials as long as it is pasted on the board. You are advisable to use spray mount to stick your paper onto the board.
  • 3. 2. You need to provide ALL of the following; - Project Description - Bubble Diagram - Conceptual Plan - Schematic Plan - Location Plan & Key Plan - Master Plan - 1 Section & 1 Elevation Drawings - Hardscape & Softscape Palette - Cost Estimation & Maintenance Plan 3. The presentation boards must have title block at the bottom which contains; tittle of the project, “Proposed Landscape For [the name of residence or owner’s name], complete address”, student name, student ID, FNBE (write in full), Semester 1, January 2015. *Example: PROPOSED LANDSCAPE FOR MICASA RESIDENCE NOORUL IFFA MOHD NAYAN, LOT 10, JALAN TAYLOR’S, 47500 BANDAR SUNWAY, SELANGOR DARUL EHSAN PREPARED BY TAYLOR SWIFT (STUDENT ID), FOUNDATION IN NATURAL AND BUILT ENVIRONMENT (FNBE), SEMESTER 1 JANUARY 2015 4. You are to show your progression drawing in every tutorial session to your respective tutors. The progression drawing must be on butter paper, signed by the tutor with date, to be compiled in A4/A3 plastic cover and to submit together with presentation boards. It is compulsory to ensure that you are going through the process before completing the final work. Without that, it could be proclaimed as plagiarism. 5. All drawings need to be completed manually (hand drawn & hand written) by using a proper architectural (landscape) graphic communication. However, images for softscape and hardscape can be printed. 6. Drawings must be coloured. You may choose any medium of colouring techniques that you are master in. You are given a freedom to choose whether to colour it all or a portion of the drawing (make sure the portion coloured explains something) and have to be proper and presentable. 7. You need to submit the completed presentation boards with a set of progression drawing on 1 JUNE 2015 (MONDAY), between 3.00 - 3.30 PM at DISCUSSION ROOM C5 (academic suites, block C, level 5). Late submission after that time will be held outside of the venue. 8. You are encouraged to take photo or scan your work for e-portfolio purposes. *Gentle reminder; Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no assessment will be done. If you are sick on the submission day, you have to provide MC with an official letter signed by parents/guardian explaining about your health condition. A formal email should be written to the module coordinator a day before/or before submission time.
  • 4. Assessment Criteria The assessment criteria for this assignment will be based on:  Demonstrated understanding of brief  Relevance, appropriateness and depth of research exhibited in the assignment  Creative application of graphic communication skills, originality and quality of the work  Design ideas and constructive representation the ideas. Marking Criteria Marks shall be distributed as follows: Work will be assessed based on: 1. CONTENT: i. Project Description 2 % ii. Conceptual Plan 4% iii. Schematic Plan 4% iv. Master Plan 10% v. Cost & Maintenance Plan 5% TOTAL: 25% 2. Originality, creativity & quality of workmanship 10% 3. Progression Drawings 5% GRAND TOTAL: 40% Suggested References Lin, M. W., 1993, Drawing and Designing with Confidence, John Wiley & Sons. J. Hopper, L.2007, Landscape Architectural Graphic Standards, John Wiley & Sons. Treib, M., 2008, Representing Landscape Architecture, Taylor & Francis, USA and Canada. http://land8.com/photo/portfolio-page-3-worsley/prev?context=user