QUANTITY SURVEYOR
ARCHIMAG
Company History & Profile
HISTORY
Awangsa Bina Sdn Bhd, incorporated in the
year 1993 started from humble beginnings
of small to medium sized construction trade
works.
Awangsa Bina Sdn Bhd is a construction com-
pany specializing in commercial, residential,
and industrial building, as well as civil engi-
neering projects.
From 2004 onwards, they ventured into Main
Builder’s Work through the awarding of main
contracts for various construction work by
their esteemed clients.
At the meantime, they pursued in the imple-
mentation of Quality Management System
and that was successfully attained in 2007.
1
PROFILE
Over the years, they have broad-
ened their management focus into
a green business model for the sus-
tainability of the built environment
and consistently maintaining the
health and safety of their business
operations.
In 2010, they started pursued
in the implementation of Envi-
ronment Management System
and Occupational Safety and
Health Management System. They
achieved the accreditation in 2011.
The integrated management system,
QESH (Quality, Environment, Safety
& Health) Management System is in
place to propel Awangsa to greater
heights.
Basically, Awangsa Bina Sdn Bhd are
the main contractor, they undertake
the whole main building, the M&Es,
infrastructure works for the whole
completion of the building. Then for
their pay master means the devel-
oper, the cover this project, they un-
dertake the contract to construct the
building.
2
Interviewee Profile
PROFILE
Age: 30 years old
Qualification:
• Master in Project Management
• Registered member of Board of
Quantity Surveyors Malaysia Working
experience: 6 years
Previous company: Geopancar Sdn
Bhd (1 year)
Current company: Awangsa Bina Sdn
Bhd (5 year) as Senior Contract Execu-
tive Contractor or Consultancy
Contracted Project involved: 3 project;
1 completed, 2 in-progress
Thought on future:
• Intention to formulate a cost,
time, quality effective and ef-
ficient construction method/
management.
• From design stage to con-
struction stage.
MR.VOO
CHUNG JUN
3
OUR INTERVIEW PROCESS
Mr Voo explain to us very in
detail about the responsibili-
ties of quantity surveyor and
the company he is working at.
He also show us the projects
he handled and explain to us
what are the challenges he
faced through the projects.
We have learnt a
lot through out the
interview. Not just
knowledge about
QS but a way to
fight for survive in
the ‘Real World’.
4
PROJECTS
INVOLVED
BY
THE
INTERVIEWEE
5
PROJECT A- SUNWAY GEO
Single storey to 3 storey.
Retail for sale at Sunway
Geo, within an integrated
development.In Bandar
Sunway next to Malaysia’s
FIRST Elevated BRT (Bus
Rapid Transit)
PROJECT B- CONCERTO NK
Strategically located on
a 5 acre plot in Dutamas,
on the north side of Mont’
Kiara. Concerto North
Kiara is linked to Kuala
Lumpur, Petaling Jaya and
the rest of Klang Valley by
an excellent network of
roads. Overview of Con-
certo North Kiara
6
PROJECT SELECTED
CONCERTO NORTH KIARA
Information of Project
CONCERTO NORTH KIARA
Client: BCB Berhad
Appointed by: BCB Berhad (Devel-
oper)
Location: North Kiara
Type: Condominium
Area of project: 5 Arce
Contract value: RM 250,582,711.80
Time taken of project: 2 year 9
month (expected finish in July 2015)
Proposed Construction of 3
Condominium Blocks, Comprising
of Block 1 30-Storey Condomini-
um (162 Units) Residences; Block 2
32-Storey Condominium (116 units)
Residences; Block 3 30-Storey Con-
dominium (162 Units) Residence;
Podium 4-Storey Car Park and 1
M&E on the Ground Floor; 1 Unit of
Clubhouse; 1 Unit of Guardhouse;
1 Unit of Waste Collection House;
1 Unit L.P.G; Public Amenities For
Residents and Retaining Wall on
Lot PT 25954 (Lot Asal 1844 and
Lot 1845), Segambut, Mukim Batu,
Dalam Bandaraya Kuala Lumpur,
Wilayah Persekutuan.
7
Roles and Responsibility
- Main contractor must undertake the ten-
der
- They need to participate in the tender to
do the pricing and go for tending interview.
- They will get the job after the tender is
confirm by client
- After they get the job, QS is responsible
to procure with the site contractor, engi-
neer and workers who carry out the work.
- Main contractor do not do most of the
works, they will sub their work to the spe-
cialist or sub-contractor to do the work as
well.
Q&A Throughout the Interview
How he deal with cost management?“We tender have
our own budget. We will take quotation from different
contractors, sub-contractors and compare the price but
most probably we are choosing the lowest one. We also
need to check on their specification, their scope of work
which give a cheaper price to prevent unfair competition”
How he deal with cost planning and reporting?“For cost-
ing out in our site, we certify the payment to sub-contrac-
tor, we certify how much we need to pay every month
and our account will quote that payment into a system.
Therefore, inside the system we can capture the catch in
and the catch out”
8
What is the difference compare with Sunway Geo Residences
?
“Bungalow is landed property. This is high rise. Even the ma-
chinery involve like the tower and concrete bum is different. In
the landed, we don’t have this kind of machinery while the high
rise building has a more complicated machinery. The scope of
work of sub-contractor is also different.”
What is the biggest challenge you face through this 2 proj-
ects?
“Sunway is a big company and they are quite strict on quality
issue, whereas Cencerto has a longer time frame and very chill
with project due date, but they also have strict quality require-
ments. Another thing is the time issue. There is a time frame, so
everything is quite tight in submitting the tender.”
(This is just a small part of the Q&A session throughout the
Interview to let us have a surface idea that what is his task
throughout the projects)
Official website ( www.concerto.com.my)
9
GROUP MEMBERS
JANSON CHEN KEN SENG
0323047
LOH MUN TONG
0323680
KIEW CHEE YUAN
0323297
LOW HUI MING
0323827
JUN ZHE
0322076
JIJI NG
0904Y72861
10
QS TEAM
Project 1B Profession in Construction Industry – Building Teams Identifying Their Specific Roles.pdf

More Related Content

What's hot

New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
kmnalam
 
The Everkleen promise
The Everkleen promiseThe Everkleen promise
The Everkleen promise
ScottDWiele
 
larry - resume (3)
larry - resume (3)larry - resume (3)
larry - resume (3)Larry Gill
 
Magazine 02
Magazine 02Magazine 02
Magazine 02
pigxd123
 
ICI PROJECT 2 Magazine
ICI PROJECT 2 MagazineICI PROJECT 2 Magazine
ICI PROJECT 2 Magazine
Sheng Zhe
 
Robin Mark Hicks 2015 resume 2
Robin Mark Hicks 2015 resume 2Robin Mark Hicks 2015 resume 2
Robin Mark Hicks 2015 resume 2Robin Hicks
 

What's hot (11)

New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
 
Tnt Job Photos
Tnt Job PhotosTnt Job Photos
Tnt Job Photos
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
The Everkleen promise
The Everkleen promiseThe Everkleen promise
The Everkleen promise
 
larry - resume (3)
larry - resume (3)larry - resume (3)
larry - resume (3)
 
CV HBP-12.07.15
CV HBP-12.07.15CV HBP-12.07.15
CV HBP-12.07.15
 
Magazine 02
Magazine 02Magazine 02
Magazine 02
 
COE Scan
COE ScanCOE Scan
COE Scan
 
ICI PROJECT 2 Magazine
ICI PROJECT 2 MagazineICI PROJECT 2 Magazine
ICI PROJECT 2 Magazine
 
Jonjo updated CV
Jonjo updated CVJonjo updated CV
Jonjo updated CV
 
Robin Mark Hicks 2015 resume 2
Robin Mark Hicks 2015 resume 2Robin Mark Hicks 2015 resume 2
Robin Mark Hicks 2015 resume 2
 

Similar to Project 1B Profession in Construction Industry – Building Teams Identifying Their Specific Roles.pdf

Ici magazine
Ici magazineIci magazine
Ici magazine
Cherilyn Chia
 
Ici magazine
Ici magazineIci magazine
Ici magazine
Chan Yifung
 
Kbcl construction presentation mar 2017
Kbcl construction presentation mar 2017Kbcl construction presentation mar 2017
Kbcl construction presentation mar 2017
Nitesh Kumar C Eng, MRICS, FIE
 
ICI Project 1B Magazine
ICI Project 1B MagazineICI Project 1B Magazine
ICI Project 1B Magazine
ForestedTiger
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
tfkc1212
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
Kailyn Lee
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
Shze Hwa Lee
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering
Eric Teo
 
VISANITY MAGAZINE
VISANITY MAGAZINEVISANITY MAGAZINE
VISANITY MAGAZINE
Theresa Thia
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
zerkai
 
Ici magazine (
Ici magazine (Ici magazine (
Ici magazine (
kiraly93
 
Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck
 
Ms compiled report
Ms compiled reportMs compiled report
Ms compiled report
Hasif Alias
 
ICI Project 1b: Magazine
ICI Project 1b: MagazineICI Project 1b: Magazine
ICI Project 1b: Magazine
Atiqah Ghazali
 
Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI
SANKET SENAPATI
 
ICI MAGAZINE
ICI MAGAZINE  ICI MAGAZINE
ICI MAGAZINE
kimberleyfay
 

Similar to Project 1B Profession in Construction Industry – Building Teams Identifying Their Specific Roles.pdf (20)

Ici magazine
Ici magazineIci magazine
Ici magazine
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Kbcl construction presentation mar 2017
Kbcl construction presentation mar 2017Kbcl construction presentation mar 2017
Kbcl construction presentation mar 2017
 
Ici magazine 1 2
Ici magazine 1 2Ici magazine 1 2
Ici magazine 1 2
 
Ici magazine 1 2
Ici magazine 1 2Ici magazine 1 2
Ici magazine 1 2
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
ICI Project 1B Magazine
ICI Project 1B MagazineICI Project 1B Magazine
ICI Project 1B Magazine
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering
 
VISANITY MAGAZINE
VISANITY MAGAZINEVISANITY MAGAZINE
VISANITY MAGAZINE
 
Resume bkj
Resume bkjResume bkj
Resume bkj
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
Ici magazine (
Ici magazine (Ici magazine (
Ici magazine (
 
Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck CV August 2015
Peter deBoeck CV August 2015
 
Ms compiled report
Ms compiled reportMs compiled report
Ms compiled report
 
ICI Project 1b: Magazine
ICI Project 1b: MagazineICI Project 1b: Magazine
ICI Project 1b: Magazine
 
Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI
 
ICI MAGAZINE
ICI MAGAZINE  ICI MAGAZINE
ICI MAGAZINE
 

More from Eave0222

ITD Resume.pptx
ITD Resume.pptxITD Resume.pptx
ITD Resume.pptxEave0222
 
ITD Resume.pptx
ITD Resume.pptxITD Resume.pptx
ITD Resume.pptxEave0222
 
Presentation slides.pptx
Presentation slides.pptxPresentation slides.pptx
Presentation slides.pptxEave0222
 
Presentation Slides
Presentation SlidesPresentation Slides
Presentation Slides
Eave0222
 
psycho report.docx
psycho report.docxpsycho report.docx
psycho report.docxEave0222
 
Literature Review
Literature ReviewLiterature Review
Literature Review
Eave0222
 
Comic Presentation
Comic PresentationComic Presentation
Comic Presentation
Eave0222
 
Journal 3
Journal 3Journal 3
Journal 3
Eave0222
 
Journal 2
Journal 2Journal 2
Journal 2
Eave0222
 
Journal 4
Journal 4Journal 4
Journal 4
Eave0222
 
Journal 5
Journal 5Journal 5
Journal 5
Eave0222
 
Journal 1
Journal 1Journal 1
Journal 1
Eave0222
 
Charity Drive Report
Charity Drive ReportCharity Drive Report
Charity Drive Report
Eave0222
 
Small Business Plan
Small Business PlanSmall Business Plan
Small Business Plan
Eave0222
 
Oral Presentation 2
Oral Presentation 2Oral Presentation 2
Oral Presentation 2
Eave0222
 
Oral Presentation 1
Oral Presentation 1Oral Presentation 1
Oral Presentation 1
Eave0222
 
Report Writing
Report WritingReport Writing
Report Writing
Eave0222
 
Cafe Businesses
Cafe BusinessesCafe Businesses
Cafe Businesses
Eave0222
 
Assignment 1
Assignment 1Assignment 1
Assignment 1
Eave0222
 
Postcards
PostcardsPostcards
Postcards
Eave0222
 

More from Eave0222 (20)

ITD Resume.pptx
ITD Resume.pptxITD Resume.pptx
ITD Resume.pptx
 
ITD Resume.pptx
ITD Resume.pptxITD Resume.pptx
ITD Resume.pptx
 
Presentation slides.pptx
Presentation slides.pptxPresentation slides.pptx
Presentation slides.pptx
 
Presentation Slides
Presentation SlidesPresentation Slides
Presentation Slides
 
psycho report.docx
psycho report.docxpsycho report.docx
psycho report.docx
 
Literature Review
Literature ReviewLiterature Review
Literature Review
 
Comic Presentation
Comic PresentationComic Presentation
Comic Presentation
 
Journal 3
Journal 3Journal 3
Journal 3
 
Journal 2
Journal 2Journal 2
Journal 2
 
Journal 4
Journal 4Journal 4
Journal 4
 
Journal 5
Journal 5Journal 5
Journal 5
 
Journal 1
Journal 1Journal 1
Journal 1
 
Charity Drive Report
Charity Drive ReportCharity Drive Report
Charity Drive Report
 
Small Business Plan
Small Business PlanSmall Business Plan
Small Business Plan
 
Oral Presentation 2
Oral Presentation 2Oral Presentation 2
Oral Presentation 2
 
Oral Presentation 1
Oral Presentation 1Oral Presentation 1
Oral Presentation 1
 
Report Writing
Report WritingReport Writing
Report Writing
 
Cafe Businesses
Cafe BusinessesCafe Businesses
Cafe Businesses
 
Assignment 1
Assignment 1Assignment 1
Assignment 1
 
Postcards
PostcardsPostcards
Postcards
 

Project 1B Profession in Construction Industry – Building Teams Identifying Their Specific Roles.pdf

  • 2. Company History & Profile HISTORY Awangsa Bina Sdn Bhd, incorporated in the year 1993 started from humble beginnings of small to medium sized construction trade works. Awangsa Bina Sdn Bhd is a construction com- pany specializing in commercial, residential, and industrial building, as well as civil engi- neering projects. From 2004 onwards, they ventured into Main Builder’s Work through the awarding of main contracts for various construction work by their esteemed clients. At the meantime, they pursued in the imple- mentation of Quality Management System and that was successfully attained in 2007. 1
  • 3. PROFILE Over the years, they have broad- ened their management focus into a green business model for the sus- tainability of the built environment and consistently maintaining the health and safety of their business operations. In 2010, they started pursued in the implementation of Envi- ronment Management System and Occupational Safety and Health Management System. They achieved the accreditation in 2011. The integrated management system, QESH (Quality, Environment, Safety & Health) Management System is in place to propel Awangsa to greater heights. Basically, Awangsa Bina Sdn Bhd are the main contractor, they undertake the whole main building, the M&Es, infrastructure works for the whole completion of the building. Then for their pay master means the devel- oper, the cover this project, they un- dertake the contract to construct the building. 2
  • 4. Interviewee Profile PROFILE Age: 30 years old Qualification: • Master in Project Management • Registered member of Board of Quantity Surveyors Malaysia Working experience: 6 years Previous company: Geopancar Sdn Bhd (1 year) Current company: Awangsa Bina Sdn Bhd (5 year) as Senior Contract Execu- tive Contractor or Consultancy Contracted Project involved: 3 project; 1 completed, 2 in-progress Thought on future: • Intention to formulate a cost, time, quality effective and ef- ficient construction method/ management. • From design stage to con- struction stage. MR.VOO CHUNG JUN 3
  • 5. OUR INTERVIEW PROCESS Mr Voo explain to us very in detail about the responsibili- ties of quantity surveyor and the company he is working at. He also show us the projects he handled and explain to us what are the challenges he faced through the projects. We have learnt a lot through out the interview. Not just knowledge about QS but a way to fight for survive in the ‘Real World’. 4
  • 7. PROJECT A- SUNWAY GEO Single storey to 3 storey. Retail for sale at Sunway Geo, within an integrated development.In Bandar Sunway next to Malaysia’s FIRST Elevated BRT (Bus Rapid Transit) PROJECT B- CONCERTO NK Strategically located on a 5 acre plot in Dutamas, on the north side of Mont’ Kiara. Concerto North Kiara is linked to Kuala Lumpur, Petaling Jaya and the rest of Klang Valley by an excellent network of roads. Overview of Con- certo North Kiara 6
  • 8. PROJECT SELECTED CONCERTO NORTH KIARA Information of Project CONCERTO NORTH KIARA Client: BCB Berhad Appointed by: BCB Berhad (Devel- oper) Location: North Kiara Type: Condominium Area of project: 5 Arce Contract value: RM 250,582,711.80 Time taken of project: 2 year 9 month (expected finish in July 2015) Proposed Construction of 3 Condominium Blocks, Comprising of Block 1 30-Storey Condomini- um (162 Units) Residences; Block 2 32-Storey Condominium (116 units) Residences; Block 3 30-Storey Con- dominium (162 Units) Residence; Podium 4-Storey Car Park and 1 M&E on the Ground Floor; 1 Unit of Clubhouse; 1 Unit of Guardhouse; 1 Unit of Waste Collection House; 1 Unit L.P.G; Public Amenities For Residents and Retaining Wall on Lot PT 25954 (Lot Asal 1844 and Lot 1845), Segambut, Mukim Batu, Dalam Bandaraya Kuala Lumpur, Wilayah Persekutuan. 7
  • 9. Roles and Responsibility - Main contractor must undertake the ten- der - They need to participate in the tender to do the pricing and go for tending interview. - They will get the job after the tender is confirm by client - After they get the job, QS is responsible to procure with the site contractor, engi- neer and workers who carry out the work. - Main contractor do not do most of the works, they will sub their work to the spe- cialist or sub-contractor to do the work as well. Q&A Throughout the Interview How he deal with cost management?“We tender have our own budget. We will take quotation from different contractors, sub-contractors and compare the price but most probably we are choosing the lowest one. We also need to check on their specification, their scope of work which give a cheaper price to prevent unfair competition” How he deal with cost planning and reporting?“For cost- ing out in our site, we certify the payment to sub-contrac- tor, we certify how much we need to pay every month and our account will quote that payment into a system. Therefore, inside the system we can capture the catch in and the catch out” 8
  • 10. What is the difference compare with Sunway Geo Residences ? “Bungalow is landed property. This is high rise. Even the ma- chinery involve like the tower and concrete bum is different. In the landed, we don’t have this kind of machinery while the high rise building has a more complicated machinery. The scope of work of sub-contractor is also different.” What is the biggest challenge you face through this 2 proj- ects? “Sunway is a big company and they are quite strict on quality issue, whereas Cencerto has a longer time frame and very chill with project due date, but they also have strict quality require- ments. Another thing is the time issue. There is a time frame, so everything is quite tight in submitting the tender.” (This is just a small part of the Q&A session throughout the Interview to let us have a surface idea that what is his task throughout the projects) Official website ( www.concerto.com.my) 9
  • 11. GROUP MEMBERS JANSON CHEN KEN SENG 0323047 LOH MUN TONG 0323680 KIEW CHEE YUAN 0323297 LOW HUI MING 0323827 JUN ZHE 0322076 JIJI NG 0904Y72861 10 QS TEAM