This document provides information about Jurutera Perunding Tekadmaju Sdn Bhd (JPT), a civil engineering consulting firm, and one of its senior civil engineers, Mr. Paldip. It outlines that JPT was established in 2009 and specializes in various civil engineering services. It then provides details about Mr. Paldip's background, responsibilities at JPT over his 7 years there, and examples of projects he has worked on, including a shopping mall and current high-rise development. The document aims to share insights into the career and experiences of a professional civil engineer.
Electrical Engineer
Registered as an electrical engineer at QCC & ADDC
Certificate of conformity valid until 25th April 2020
Approved from ADNOC as a senior electrical engineer
Electrical Engineer
Registered as an electrical engineer at QCC & ADDC
Certificate of conformity valid until 25th April 2020
Approved from ADNOC as a senior electrical engineer
The report “Global Infusion Pumps & Accessories Market Assessment & Forecast: 2015-2019”, estimates that the global infusion pumps and accessories market was valued at US$ 5,874.3 million in 2014 and expected to grow to US$ 7,539.0 million by 2019 at a CAGR of 5.0% from 2015 to 2019.
Hadj Ounis's most notable work is his sculpture titled "Metamorphosis." This piece showcases Ounis's mastery of form and texture, as he seamlessly combines metal and wood to create a dynamic and visually striking composition. The juxtaposition of the two materials creates a sense of tension and harmony, inviting viewers to contemplate the relationship between nature and industry.
2137ad - Characters that live in Merindol and are at the center of main storiesluforfor
Kurgan is a russian expatriate that is secretly in love with Sonia Contado. Henry is a british soldier that took refuge in Merindol Colony in 2137ad. He is the lover of Sonia Contado.
Explore the multifaceted world of Muntadher Saleh, an Iraqi polymath renowned for his expertise in visual art, writing, design, and pharmacy. This SlideShare delves into his innovative contributions across various disciplines, showcasing his unique ability to blend traditional themes with modern aesthetics. Learn about his impactful artworks, thought-provoking literary pieces, and his vision as a Neo-Pop artist dedicated to raising awareness about Iraq's cultural heritage. Discover why Muntadher Saleh is celebrated as "The Last Polymath" and how his multidisciplinary talents continue to inspire and influence.
2137ad Merindol Colony Interiors where refugee try to build a seemengly norm...luforfor
This are the interiors of the Merindol Colony in 2137ad after the Climate Change Collapse and the Apocalipse Wars. Merindol is a small Colony in the Italian Alps where there are around 4000 humans. The Colony values mainly around meritocracy and selection by effort.
2. COMPANY PROFILE
LOCATION1.Jurutera Perunding Tekadmaju
Sdn Bhd (JPT) was established in
the year 2009 .
2.The company has traced its
success when the firm and the key
personnel have been productively
servicing its client efficiently.
3.JPT is an organization
specializing in a broad
comprehensive range of Civil,
Structure and Geotechnical
independent engineering
consulting services.
4.JPT is make up of well
experience and they specialties in
Highways & Roads, Railways, Civil
Infrastructure for Mixed
Developments, Large Commercial
Structure - Residential, Public
Amenities, Institution & etc,
Industrial Buildings, Bridges &
Ramps, Pavement Design, Flood
Mitigation Works
WWW.JPTM.COM.MY
Head Office
E-5-27, 101 Boulevard,
Jalan Kenari 5, Bandar Puchong Jaya,
47170 Puchong, Selangor Dahrul Ehsan,
Malaysia.
ADDRESS
3. ALL ABOUT MR.PALDIP
Mr.Paldip works as a civil
engineer in Jurutera
Perunding Tekadmaju Sdn.
Bhd since 2008. He has 7
years of working
experience. He was offered
to study as a civil engineer
by the government. He
does not want to accept
this offer at first , but after
he was given some time to
think , he realizes that this
job would be the best for
his future. Soon, he begins
his study in a government
university.
Mr.Paldip gets his first job
without an interview due to
his good academic results.
When he first joins the
company , he works as a
junior civil engineer for a
senior civil engineer. He
works mainly in infrastructure
sector. His responsibilities is
problem solving, road
designing & utilizing, bridge
designing & building
construction. He is now a
senior civil engineer, leading
2 junior civil engineers.
4. Civil engineers often have
to plan projects with
architect. They have to
involve themselves in good,
sewage, water declaration
and etc. They also have to
do site visit ,site survey and
client meeting. Besides,
they have to design road
and sewage. They need
approvement from the
authorities before starting
the construction. Civil
engineers have to prepare
tender and reports for their
projects. They seldom work
with geotechnical engineer.
Civil engineers will do the
counting for the cost of the
small projects themselves
as they only need quantity
surveyors on big projects.
RESPONSIBILITY
TAYLOR'SMAGAZINE
Interviewing Mr. Paldip
5. Responsibilities of
Civil Engineer
JUNIOR
- Follow instructions and
complete the task given by the
senior engineer/boss
- Needs to ask questions more
as they still need to learn
- Can be dependable to the
senior
- Follow the senior
engineers/boss to meetings.
SENIOR
- Plan and delicate works to
junior engineers
- Provide training to the juniors
- Role model to the junior
( independent and pro-active )
- Able to create, articulate,
passionately own and
relentlessly drive a vision to
completion
6. Project : SHOPPINGMALL IN TEMERLOH,
PAHANGDARUL MAKMUR
- The shopping mall is a 2 storey building having foot
print of 137 meter by 57 meter.
- The ground floor is utilized for retail and car park
- The first floor is used for supermarket area.
COMPLETED PROJECT
Cost of the Project : RM 8 million
Scope of work
BIGPROJECT
The proposed development consists of a shopping mall
and a block of shop office.
7. Special Features
- Flat slab system for first floor slab at the shopping mall to
provide higher headroom at ground floor.
- Large span steel roof truss over the mall area:ie.24 meter
span of steel truss
Construction Work in Progress
8. Preliminary
Design
They would work out on
the concept for the
infrastructure and the
design/drawing will be
presented to the project
team.
- Proceeded upon confirmation
from client/project team.
- Carry out submission to local
and external authority.
- Compile the authority
requirements and their
comments
- Obtain approval then
proceed to prepare and
tender documents
- Invite tenderers to join the
tender exercise and give
them date line to submit
their quotations
- Prepare tender evaluation
report and submit to client
- Invite a minimum of 3
tenderers to interview
TAYLOR'S
MAGAZINE
Detail Drawing
- Letter of Award given to the
selected tenderer
( contractor )
- Construction drawings
issued to contractor
- Submit report and arising
issues during site meeting
- Consultants ensure the
progress of the work
digitally
- Engineers resolve any
problem arise
- Issue Certificate of Practical
Completion ( CPC) to
contractors once the work is
completed
9. ON-GOINGPROJECT
Currently has no specific name yet
Client : Eco Sky Developement Sdn. Bhd.
Estimated cost of project : RM 550 million
Scope of Work
JPT was appointed by Eco Sy as the civil and structural
consultant for the proposed high rise residential
development :
- Foundation and Structural design of the high-rise
condominium
- Internal cold water and sanitary piping design
- Contract management and site coordination for
piling and main building works
10. Special Features
- Shear wall with Transfer
Beam
- Spun piles and bored
piles foundation
Construction Work in Progress
11. We would like to thank Mr. Paldip Singh for
sharing to us about his personal career and
experience as a civil engineer. As we are
coming to an end of this magazine, we
would like to conclude that after going
through an interview with a professional
senior civil engineer, we acquired more
knowledge on one of the professions in
the construction industry. We hope to
continue exploring the construction.
Conclusion
Done by :
- Muhammad Mirza Qayyum
- Pui Chun Shian
- Ng Sheng Zhe
- Su Bang Zheng
- Sii Siaw Hua
- Ryan Bunsu
- Mashruk Asad