Question 1. (TCOs A and B) An EVM analysis employs which factors to
evaluate risks? (Points : 5)
Question 2. (TCO G) You have completed all design drawings and have
a complete scope for your project. You need to hire a contractor to build
the product to your designs. Which type of contract would be best in this
situation? (Points : 5)
Question 3. (TCO D) In which risk response strategy is the
responsibility for the risk moved to a third party? (Points : 5)
4. (TCOs A and B) You have been appointed as a project manager for a
high-dollar project for a government agency, and you have been asked
by your boss to identify the stakeholder groups and the individuals who
make up those groups in order to start the stakeholder analysis. Identify
at least six groups of stakeholders and the individuals who comprise
those groups, and explain when the stakeholder identification process
should take place during the planning of the project. (Points: 20)
(TCO B) Due to globalization within your industry, you have been
appointed as the project manager for an R & D project. Your task is to
create a new technologically advanced solar cell. You want to employ
the PMBOK® Guide risk management process. Senior management
would like you to briefly describe the process and all its steps. Please
create a short briefing for senior management below. (Points : 40)
(TCO I) You are the project manager on a critical project for your
corporation. You have decided to employ fault-tree analysis on your
project. What is fault-tree analysis, and how can it be applied to your
project? (Points : 25)
(TCO H) Senior management is concerned about risk owners on your
project. What is the role of a risk owner in the risk management
process? (Points: 20)
(TCO F) You are a project manager for a large healthcare R & D
project. Senior management has asked you to utilize a sensitivity
analysis and a tornado diagram to quantify risks on your project. Senior
management’s major concern is the price of raw materials in the
development of the new drug. Describe how to perform a sensitivity
analysis and use a tornado diagram to quantify risks to your project.
(Points : 25)
TCO G) Describe and discuss when one should use an FPEPA contract.
Compare and contrast this to a typical FP contract. (Points: 20)
(TCO E) Senior management has just returned from a risk management
workshop. One of the topics was reserve analysis. Management does not
completely understand the concept and asks you what the purpose is of
performing reserve analysis during the risk management process.
(Points : 20)
TCO D) You are the project manager for an important healthcare
project. You are performing qualitative risk analysis. Below are the
values of probability and impact for the top six risks that were given to
you by project team. Assuming a neutral stakeholder tolerance, which
risks must be addressed proactively if possible?(Points : 25)
TCO C) You are the project manager for a large health information
technology project. You are confronted with an important decision on
your project: How much scenario testing is appropriate for this project?
Employ decision tree analysis to provide senior management with the
best course of action for this decision.
************************
PROJ 595 Final Exam Set 2
For more classes visit
www.snaptutorial.com
1. (TCOs A and B) Quantitative risk analysis does all of the
following, except (Points : 5)
Question 2. 2. (TCO G) You need to ensure your project is completed
by July 1 of next year. You do not have time to do all the design work
yourself, so you decide to contract out that work. Which type of contract
would likely be best in this situation? (Points : 5)
Question 3. 3. (TCO D) Which risk response strategy is most
appropriate for risks on the watch list? (Points : 5)
Question 4. 4. (TCOs A and B) You have been appointed as a project
manager for a high-dollar project for the public sector, and you have
been asked by your boss to identify the stakeholder groups and the
individuals who make up those groups in order to start the stakeholder
analysis. Identify at least six groups of stakeholders and the individuals
who comprise those groups, and explain when the stakeholder
identification process should take place during the planning of the
project. (Points : 20)
Question 5. 5. (TCO B) Due to globalization within your industry, you
have been appointed as the project manager for an R & D project. Your
task is to create a new technologically advanced solar cell. You want to
employ the PMBOK® Guide risk management process. Senior
management would like you to briefly describe the process and all its
steps. Please create a short briefing for senior management below.
(Points : 40)
Question 6. 6. (TCO C) You are the project manager for a large health
information technology project. You are confronted with an important
decision on your project: How much posttesting of the design is
appropriate for this project? Employ decision tree analysis to provide
senior management with the best course of action for this decision.
Question 7. 7. (TCO D) You are the project manager for an important
healthcare project. You are performing qualitative risk analysis. Below
are the values of probability and impact for the top six risks that were
given to you by project team. Assuming a neutral stakeholder tolerance,
which risks must be addressed proactively if possible?
Question 8. 8. (TCO E) Senior management is very interested in
creating an effective risk monitoring and control system that is tied to a
performance monitoring system for your project. Describe what a good
monitoring and control and performance measurement system for your
project would look like. Be sure to include an example to help illustrate
your answer. (Points : 20)
Question 9. 9. (TCO F) You are a project manager for a large
healthcare R & D project. Senior management has asked you to utilize a
sensitivity analysis and a tornado diagram to quantify risks on your
project. Senior management’s major concern is the price of raw
materials in the development of the new drug. Describe how to perform
a sensitivity analysis and use a tornado diagram to quantify risks to your
project. (Points : 25)
Question 10. 10. (TCO G) Describe and discuss when one should use an
FPEPA contract. Compare and contrast this to a typical FP contract.
(Points : 20)
Question 11. 11. (TCO H) You are in a status meeting with key project
stakeholders. You are discussing residual and secondary risks in your
project. The stakeholders are becoming concerned about these concepts.
The key stakeholders ask for an explanation and example of each. How
would you describe each? Provide an example of a residual and a
secondary risk. (Points : 20)
Question 12. 12. (TCO I) You are the project manager on a complete
overhaul of your corporation’s IT infrastructure. You have decided to
employ fault-tree analysis on your project. What is fault-tree analysis,
and how can it ************************
be applied to your project? (Points : 25)
*********************
PROJ 595 Final Exam Set 3 (NEW)
For more classes visit
www.snaptutorial.com
Question 1.
(TCO A) Qualitative risk analysis
Question 2.
(TCO A) You are the project manager of a new, innovative project. One
overarching principle you adhere to is
Question 3.
(TCO B) Project assumptions are created in the scope statement. These
assumptions are revisited in which process of risk management?
Question 4.
(TCO D) In which risk response strategies are risks guaranteed to not
occur if they are negative and guaranteed to occur if they are positive
after the response plan is initiated?
Question 5.
(TCO E) One the key functions of risk monitoring and control is to
Question 6.
(TCO H) When using the ATOM process to manage risks, which is the
importance of an initiation meeting?
Question 7.
(TCO A) When is a risk register created? What is its importance of a
risk register to a project?
Question 8.
(TCO B) List and briefly define five specific tools and techniques that
can be used to identify risk associated with projects.
Question 9.
(TCO D) Explain avoidance as a risk response strategy, and provide an
example of its use in a project.
Question 10.
(TCO E) Describe what characteristics a performance measurement
system, to be employed in a risk monitoring and control process for a
project, should have. Include an example to help illustrate your answer.
Question 11.
(TCO H) What is the importance of including stakeholders and risk
owners in the creation and approval of risk response plans?
*********************
PROJ 595 Midterm Exam Set 2
For more classes visit
www.snaptutorial.com
1. (TCO A) A stakeholder analysis in risk management (Points : 5)
Question 2. 2. (TCO A) When using the ATOM process to manage risks,
an initiation meeting should be used for (Points : 5)
Question 3. 3. (TCO B) All of the below are risk identification methods,
except (Points : 5)
Question 4. 4. (TCO D) In risk response planning,which is the
difference between active and passive acceptance? (Points : 5)
Question 5. 5. (TCO E) A common tool for use in risk monitoring and
control is (Points : 5)
Question 6. 6. (TCO H) When using the ATOM process to manage
risks, which is the importance of an initiation meeting? (Points : 5)
Question 7. 7. (TCO A) When is a risk register created? What is its
importance of a risk register to a project? (Points : 10)
Question 8. 8. (TCO B) You are the project manager for a major
technological project. You are concerned about doing qualitative risk
analysis. How do you ensure consistency when doing qualitative risk
analysis across all risk evaluators? (Points : 15)
Question 9. 9. (TCO D) Explain transference as a risk response
strategy, and provide an example of its use in a project. (Points : 15)
Question 10. 10. (TCO E) What is the purpose of performing reserve
analysis during the risk management process? (Points : 15)
Question 11. 11. (TCO H) You are in a status meeting with key project
stakeholders. You are discussing residual and secondary risks in your
project. The key stakeholders ask for an explanation and example of
each. How would you describe each? Provide an example of a residual
and a secondary risk. (Points : 15)
*********************
PROJ 595 Risk Paper 2
For more classes visit
www.snaptutorial.com
PROJ 595 Risk Paper 2rocess.
PROJ 595 Week 3 Risk Paper 1 (2 Papers)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Papers of this Assignment
PROJ 595 Week 3 Risk Paper 1
Write a two- to four-page paper regarding a project, either real or
fictitious, where one is able to discuss how risks were identified, ranked,
and monitored. The student is also welcome to write about a major
purchase or major decision in his or her life, such as buying a new car,
buying a new home, or even the decision to return to school to earn a
degree. All of these are considered projects or procurements that
require some form of formal or informal risk review.
Remember to cite and reference any sources that were used in the
project or in the decision-making process. At a minimum, students
should connect this assignment back to the text and support their
decision-making processes with key concepts from the text. One of the
elements of this assignment is to connect the material from the course to
actual risk decisions. You are also welcome to use any of the checklists
from the text to support the decision-making process.
*********************
PROJ 595 Week 4 Course Project(2 Project)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Project
Course Project Part I
For this project, you may choose a project that is of interest to you.
When selecting a project, avoid picking one that is either too big or too
small. For example, do not decide to build a new stadium for your local
professional sports team (too big) or to plant your summer garden (too
small).You will only be addressing the risk issues in the project so you
will not need to be looking at the detail required for a business plan. The
scope statement and the WBS are required in addition to the risk
management plan. It is important to pick one that you understand so that
you will be able to create the risk management plan that is realistic with
sufficient detail where your contingency plans will be relevant.Since you
will need to create a risk management plan, your project should be
somewhat risky.
1. Create a risk management plan for your project. To do this, you
must first create a scope and a WBS for your project.
2. Perform risk management planning as defined in the lecture.
3. Identify risks for your project, including any issues that may
impede or impair the completion of the project. You must identify at
least 5 positive and 15 negative risks.
4. Prioritize the risks by performing qualitative risk analysis.
Perform risk response planning for your project by creating detailed
risk response plans for those risks needing responses. This should
include both proactive responses and reactive contingency plans as
appropriate.
*********************
PROJ 595 Week 5 Midterm Set 1
For more classes visit
www.snaptutorial.com
1. (TCO A) Qualitative risk analysis
2. (TCO A) When using the ATOM process to manage risks, an initiation
meeting should be used for
3. (TCO B) A watch list is a
4. (TCO D) In risk response planning,which is the difference between
active and passive acceptance?
5. (TCO E) A common tool for use in risk monitoring and control is
6. (TCO H) When using the ATOM process to manage risks, which is the
importance of an initiation meeting?
7. (TCOA) Explain when risk breakdown structure is created, and
explain the importance of a risk breakdown structure in risk
management
8. (TCO B) Explain the qualitative risk analysis process
9. (TCO D) Explain transference as a risk response strategy, and
provide an example of its use in a project
10. (TCO E) Describe the function and process of performing a risk
audit during a project
11. (TCO H) What is the role of a risk owner in the risk management
process?..
*********************
PROJ 595 Week 6 Course Project Part II (2
Project)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Project
Course Project Part II
For this part, you will be creating two decision trees concerning specific
risks or events from the project you developed in part 1. The first one
will be a decision tree used to make a decision. You will be calculating
an expected value based upon this decision tree. The second will be for a
basic risk or event where you will be creating a fault or event tree
illustrating what makes up the fault or event. With each of these, you will
need to discuss the process and results of your tree.
The risks or events you use will be from the project you used in the part
one. You will need to start the report with a short introduction of that
project so that there is continuity and the reader will understand the
events and risks being discussed. You do not have to include part one in
your part two report.
Details:
Create one decision tree with an expected value and a fault or event tree
that would support the exploration of risk for the project you used for
part one of the course project. (That is two trees in all.) Provide a one
paragraph project description of the part 1 project but you do not have
to repeat all the other information in this part.
·The decision tree must be created to support a major risk-related
decision likely to be faced by the project. The calculation of expected
values is a requirement of this project.
·The fault or event tree should offer at a minimum a listing of potential
risks and impacts in the event of a smaller failure.
For example, a smaller failure could be the loss of water pressure or a
fire in a construction project rather than examining what risk was
involved with the collapse of the construction project.
Write a discussion of the risks that supports the fault tree, event tree, or
decision tree that has been created. Make a separate write up for each
of these smaller risks associated with the fault tree or event trees. Your
paper should have a general introduction that should introduce the
decision tree and fault or event trees that will be discussed, and then the
paper should have a discussion regarding each tree. See the sample
outline below for details.
The part 2 paper regarding the identified risks and decision trees should
be from six to ten pages in length. Note that this page length is a
guideline.
At leastthree authoritative, outside references are required (anonymous
authors or web pages are not acceptable). These should be referenced
where used in the paper and listed on the last page titled, Works Cited.
Risks such as “project is over budget” or “project does not meet
schedule” are too broad. Be specific.
Comments on how to create an acceptable tree and project paper
Each fault or event tree should offer at a minimum a listing of two or
more potential risks and impacts in the event of two smaller failures.
(This means for each tree you will have at a minimum two sub-faults
with multiple causes for each of them.)
Use “and” and “or” gates properly. Understand the difference. When
you use an ‘and’ gate it indicates that it take both of the conditions for
the fault to occur. If either of the conditions could cause a problem this
indicates the use of an ‘or’ gate.
There are examples and templates in doc sharing.
You need to select specific faults to use in the tree. General examples of
faults are too broad for the fault tree to provide a comprehensive
evaluation of the possible causes.
The graphics for the tree do not have to be artist professional quality but
they do need to be student professional. A table is not sufficient. If you
use screen shots be sure you crop them so that only the tree is included
not all the computer menus and etc.
You should have at least two options under each gate. There is no
reason for a gate if there is only one option.
When a template is provided or an example it is not meant to be copied.
If you are not doing a construction project, your headings should not be
“construction project” just because the example says that.
This is a risk management course. The engineering solutions to the
problems on these projects are not the answer that you should be
developing. The development is of the risk management system and
process for your specific project.
*********************

More Related Content

What's hot

PROJ 595  Focus Dreams/newtonhelp.com
PROJ 595  Focus Dreams/newtonhelp.comPROJ 595  Focus Dreams/newtonhelp.com
PROJ 595  Focus Dreams/newtonhelp.commyblue72
 
Devry proj 595 final exam set 2 new
Devry proj 595 final exam set 2 newDevry proj 595 final exam set 2 new
Devry proj 595 final exam set 2 newuopassignment
 
Risk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansRisk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansMohamed Saeed
 
Risk 8- pm study question risk management
Risk 8- pm study question risk managementRisk 8- pm study question risk management
Risk 8- pm study question risk managementMohamed Saeed
 
Risk 6 questions - 170
Risk 6 questions - 170Risk 6 questions - 170
Risk 6 questions - 170Mohamed Saeed
 
Risk 9-pm study project risk management-test
Risk 9-pm study project risk management-testRisk 9-pm study project risk management-test
Risk 9-pm study project risk management-testMohamed Saeed
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazMohamed Saeed
 
Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...Suma Kamadod
 
Project Management - Pmi’s opm3 is an example of a __________________ model...
Project Management - Pmi’s opm3 is an example of a   __________________ model...Project Management - Pmi’s opm3 is an example of a   __________________ model...
Project Management - Pmi’s opm3 is an example of a __________________ model...Suma Kamadod
 
Six Sigma Green Belt - To determine the average number of nonconforming parts...
Six Sigma Green Belt - To determine the average number of nonconforming parts...Six Sigma Green Belt - To determine the average number of nonconforming parts...
Six Sigma Green Belt - To determine the average number of nonconforming parts...Suma Kamadod
 
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...Suma Kamadod
 

What's hot (20)

PROJ 595  Focus Dreams/newtonhelp.com
PROJ 595  Focus Dreams/newtonhelp.comPROJ 595  Focus Dreams/newtonhelp.com
PROJ 595  Focus Dreams/newtonhelp.com
 
Devry proj 595 final exam set 2 new
Devry proj 595 final exam set 2 newDevry proj 595 final exam set 2 new
Devry proj 595 final exam set 2 new
 
Pmp test 05
Pmp test 05Pmp test 05
Pmp test 05
 
Risk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ansRisk 3 simplelearn-exam2-ans
Risk 3 simplelearn-exam2-ans
 
Risk 8- pm study question risk management
Risk 8- pm study question risk managementRisk 8- pm study question risk management
Risk 8- pm study question risk management
 
Risk 6 questions - 170
Risk 6 questions - 170Risk 6 questions - 170
Risk 6 questions - 170
 
Risk 9-pm study project risk management-test
Risk 9-pm study project risk management-testRisk 9-pm study project risk management-test
Risk 9-pm study project risk management-test
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
Pmp test 01
Pmp test 01Pmp test 01
Pmp test 01
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbaz
 
Pmstudy exam 3
Pmstudy exam 3Pmstudy exam 3
Pmstudy exam 3
 
Pmstudy exam_1
Pmstudy exam_1Pmstudy exam_1
Pmstudy exam_1
 
Pmp test 02
Pmp test 02Pmp test 02
Pmp test 02
 
Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...
 
Project Management - Pmi’s opm3 is an example of a __________________ model...
Project Management - Pmi’s opm3 is an example of a   __________________ model...Project Management - Pmi’s opm3 is an example of a   __________________ model...
Project Management - Pmi’s opm3 is an example of a __________________ model...
 
Pmstudy exam 4
Pmstudy exam 4Pmstudy exam 4
Pmstudy exam 4
 
Session 6 gdas pmp study group presentation
Session 6   gdas pmp study group presentationSession 6   gdas pmp study group presentation
Session 6 gdas pmp study group presentation
 
Six Sigma Green Belt - To determine the average number of nonconforming parts...
Six Sigma Green Belt - To determine the average number of nonconforming parts...Six Sigma Green Belt - To determine the average number of nonconforming parts...
Six Sigma Green Belt - To determine the average number of nonconforming parts...
 
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
Six Sigma Green Belt - Poka yake is best defined as a. improving machine effi...
 
Session 5 gdas pmp study group presentation
Session 5   gdas pmp study group presentationSession 5   gdas pmp study group presentation
Session 5 gdas pmp study group presentation
 

Similar to PROJ 595 Education Specialist / snaptutorial.com

Devry proj 595 midterm exam set 2 new
Devry proj 595 midterm exam set 2 newDevry proj 595 midterm exam set 2 new
Devry proj 595 midterm exam set 2 newuopassignment
 
Proj 420 final exam solution
Proj 420 final exam solutionProj 420 final exam solution
Proj 420 final exam solutionPhilipMendelson
 
Risk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ansRisk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ansMohamed Saeed
 
Devry proj 595 final exam set 3
Devry proj 595 final exam set 3Devry proj 595 final exam set 3
Devry proj 595 final exam set 3uopassignment
 
Individual Risk Management
Individual Risk ManagementIndividual Risk Management
Individual Risk ManagementLaura Torres
 
D.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docxD.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docxtheodorelove43763
 
Managing projects
Managing projectsManaging projects
Managing projectsNovoraj Roy
 
Project ch 3.ppt
Project ch 3.pptProject ch 3.ppt
Project ch 3.pptHabtaBela
 
CRISC Exam Questions
CRISC Exam QuestionsCRISC Exam Questions
CRISC Exam QuestionsDumpsbook
 
Importance Of Iterative Process Groups On Healthcare...
Importance Of Iterative Process Groups On Healthcare...Importance Of Iterative Process Groups On Healthcare...
Importance Of Iterative Process Groups On Healthcare...Joanna Paulsen
 
Risk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansRisk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansMohamed Saeed
 
Profittme pmp framweork questions
Profittme pmp framweork questionsProfittme pmp framweork questions
Profittme pmp framweork questionsThabet Ali
 
Pmp sample questions
Pmp sample questionsPmp sample questions
Pmp sample questionsnewway85
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Risk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansRisk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansMohamed Saeed
 
121220012 incentives in the chinese construction industry
121220012 incentives in the chinese construction industry121220012 incentives in the chinese construction industry
121220012 incentives in the chinese construction industryAshutosh Patekar
 

Similar to PROJ 595 Education Specialist / snaptutorial.com (20)

Devry proj 595 midterm exam set 2 new
Devry proj 595 midterm exam set 2 newDevry proj 595 midterm exam set 2 new
Devry proj 595 midterm exam set 2 new
 
Proj 420 final exam solution
Proj 420 final exam solutionProj 420 final exam solution
Proj 420 final exam solution
 
Risk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ansRisk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ans
 
Pmstudy exam 2
Pmstudy exam 2Pmstudy exam 2
Pmstudy exam 2
 
Devry proj 595 final exam set 3
Devry proj 595 final exam set 3Devry proj 595 final exam set 3
Devry proj 595 final exam set 3
 
Individual Risk Management
Individual Risk ManagementIndividual Risk Management
Individual Risk Management
 
D.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docxD.Q1Information System and Enterprise Systems· Identify.docx
D.Q1Information System and Enterprise Systems· Identify.docx
 
Cpmgt 302 cpmgt302
Cpmgt 302 cpmgt302Cpmgt 302 cpmgt302
Cpmgt 302 cpmgt302
 
Managing projects
Managing projectsManaging projects
Managing projects
 
Project ch 3.ppt
Project ch 3.pptProject ch 3.ppt
Project ch 3.ppt
 
CRISC Exam Questions
CRISC Exam QuestionsCRISC Exam Questions
CRISC Exam Questions
 
Importance Of Iterative Process Groups On Healthcare...
Importance Of Iterative Process Groups On Healthcare...Importance Of Iterative Process Groups On Healthcare...
Importance Of Iterative Process Groups On Healthcare...
 
Risk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ansRisk 4 simplelearn-exam3-ans
Risk 4 simplelearn-exam3-ans
 
Profittme pmp framweork questions
Profittme pmp framweork questionsProfittme pmp framweork questions
Profittme pmp framweork questions
 
Chapter 5
Chapter 5Chapter 5
Chapter 5
 
final (2)
final (2)final (2)
final (2)
 
Pmp sample questions
Pmp sample questionsPmp sample questions
Pmp sample questions
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Risk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ansRisk 5 simplelearn-exam4-ans
Risk 5 simplelearn-exam4-ans
 
121220012 incentives in the chinese construction industry
121220012 incentives in the chinese construction industry121220012 incentives in the chinese construction industry
121220012 incentives in the chinese construction industry
 

Recently uploaded

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 

Recently uploaded (20)

Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 

PROJ 595 Education Specialist / snaptutorial.com

  • 1. PROJ 595 Final Exam Set 1 For more classes visit www.snaptutorial.com Question 1. (TCOs A and B) An EVM analysis employs which factors to evaluate risks? (Points : 5) Question 2. (TCO G) You have completed all design drawings and have a complete scope for your project. You need to hire a contractor to build the product to your designs. Which type of contract would be best in this situation? (Points : 5) Question 3. (TCO D) In which risk response strategy is the responsibility for the risk moved to a third party? (Points : 5) 4. (TCOs A and B) You have been appointed as a project manager for a high-dollar project for a government agency, and you have been asked by your boss to identify the stakeholder groups and the individuals who make up those groups in order to start the stakeholder analysis. Identify at least six groups of stakeholders and the individuals who comprise those groups, and explain when the stakeholder identification process should take place during the planning of the project. (Points: 20)
  • 2. (TCO B) Due to globalization within your industry, you have been appointed as the project manager for an R & D project. Your task is to create a new technologically advanced solar cell. You want to employ the PMBOK® Guide risk management process. Senior management would like you to briefly describe the process and all its steps. Please create a short briefing for senior management below. (Points : 40) (TCO I) You are the project manager on a critical project for your corporation. You have decided to employ fault-tree analysis on your project. What is fault-tree analysis, and how can it be applied to your project? (Points : 25) (TCO H) Senior management is concerned about risk owners on your project. What is the role of a risk owner in the risk management process? (Points: 20) (TCO F) You are a project manager for a large healthcare R & D project. Senior management has asked you to utilize a sensitivity analysis and a tornado diagram to quantify risks on your project. Senior management’s major concern is the price of raw materials in the development of the new drug. Describe how to perform a sensitivity analysis and use a tornado diagram to quantify risks to your project. (Points : 25)
  • 3. TCO G) Describe and discuss when one should use an FPEPA contract. Compare and contrast this to a typical FP contract. (Points: 20) (TCO E) Senior management has just returned from a risk management workshop. One of the topics was reserve analysis. Management does not completely understand the concept and asks you what the purpose is of performing reserve analysis during the risk management process. (Points : 20) TCO D) You are the project manager for an important healthcare project. You are performing qualitative risk analysis. Below are the values of probability and impact for the top six risks that were given to you by project team. Assuming a neutral stakeholder tolerance, which risks must be addressed proactively if possible?(Points : 25) TCO C) You are the project manager for a large health information technology project. You are confronted with an important decision on your project: How much scenario testing is appropriate for this project? Employ decision tree analysis to provide senior management with the best course of action for this decision. ************************ PROJ 595 Final Exam Set 2
  • 4. For more classes visit www.snaptutorial.com 1. (TCOs A and B) Quantitative risk analysis does all of the following, except (Points : 5) Question 2. 2. (TCO G) You need to ensure your project is completed by July 1 of next year. You do not have time to do all the design work yourself, so you decide to contract out that work. Which type of contract would likely be best in this situation? (Points : 5) Question 3. 3. (TCO D) Which risk response strategy is most appropriate for risks on the watch list? (Points : 5) Question 4. 4. (TCOs A and B) You have been appointed as a project manager for a high-dollar project for the public sector, and you have been asked by your boss to identify the stakeholder groups and the individuals who make up those groups in order to start the stakeholder analysis. Identify at least six groups of stakeholders and the individuals who comprise those groups, and explain when the stakeholder
  • 5. identification process should take place during the planning of the project. (Points : 20) Question 5. 5. (TCO B) Due to globalization within your industry, you have been appointed as the project manager for an R & D project. Your task is to create a new technologically advanced solar cell. You want to employ the PMBOK® Guide risk management process. Senior management would like you to briefly describe the process and all its steps. Please create a short briefing for senior management below. (Points : 40) Question 6. 6. (TCO C) You are the project manager for a large health information technology project. You are confronted with an important decision on your project: How much posttesting of the design is appropriate for this project? Employ decision tree analysis to provide senior management with the best course of action for this decision. Question 7. 7. (TCO D) You are the project manager for an important healthcare project. You are performing qualitative risk analysis. Below are the values of probability and impact for the top six risks that were given to you by project team. Assuming a neutral stakeholder tolerance, which risks must be addressed proactively if possible?
  • 6. Question 8. 8. (TCO E) Senior management is very interested in creating an effective risk monitoring and control system that is tied to a performance monitoring system for your project. Describe what a good monitoring and control and performance measurement system for your project would look like. Be sure to include an example to help illustrate your answer. (Points : 20) Question 9. 9. (TCO F) You are a project manager for a large healthcare R & D project. Senior management has asked you to utilize a sensitivity analysis and a tornado diagram to quantify risks on your project. Senior management’s major concern is the price of raw materials in the development of the new drug. Describe how to perform a sensitivity analysis and use a tornado diagram to quantify risks to your project. (Points : 25) Question 10. 10. (TCO G) Describe and discuss when one should use an FPEPA contract. Compare and contrast this to a typical FP contract. (Points : 20) Question 11. 11. (TCO H) You are in a status meeting with key project stakeholders. You are discussing residual and secondary risks in your project. The stakeholders are becoming concerned about these concepts. The key stakeholders ask for an explanation and example of each. How
  • 7. would you describe each? Provide an example of a residual and a secondary risk. (Points : 20) Question 12. 12. (TCO I) You are the project manager on a complete overhaul of your corporation’s IT infrastructure. You have decided to employ fault-tree analysis on your project. What is fault-tree analysis, and how can it ************************ be applied to your project? (Points : 25) ********************* PROJ 595 Final Exam Set 3 (NEW) For more classes visit www.snaptutorial.com Question 1. (TCO A) Qualitative risk analysis Question 2.
  • 8. (TCO A) You are the project manager of a new, innovative project. One overarching principle you adhere to is Question 3. (TCO B) Project assumptions are created in the scope statement. These assumptions are revisited in which process of risk management? Question 4. (TCO D) In which risk response strategies are risks guaranteed to not occur if they are negative and guaranteed to occur if they are positive after the response plan is initiated? Question 5. (TCO E) One the key functions of risk monitoring and control is to Question 6. (TCO H) When using the ATOM process to manage risks, which is the importance of an initiation meeting? Question 7. (TCO A) When is a risk register created? What is its importance of a risk register to a project? Question 8.
  • 9. (TCO B) List and briefly define five specific tools and techniques that can be used to identify risk associated with projects. Question 9. (TCO D) Explain avoidance as a risk response strategy, and provide an example of its use in a project. Question 10. (TCO E) Describe what characteristics a performance measurement system, to be employed in a risk monitoring and control process for a project, should have. Include an example to help illustrate your answer. Question 11. (TCO H) What is the importance of including stakeholders and risk owners in the creation and approval of risk response plans? ********************* PROJ 595 Midterm Exam Set 2 For more classes visit
  • 10. www.snaptutorial.com 1. (TCO A) A stakeholder analysis in risk management (Points : 5) Question 2. 2. (TCO A) When using the ATOM process to manage risks, an initiation meeting should be used for (Points : 5) Question 3. 3. (TCO B) All of the below are risk identification methods, except (Points : 5) Question 4. 4. (TCO D) In risk response planning,which is the difference between active and passive acceptance? (Points : 5) Question 5. 5. (TCO E) A common tool for use in risk monitoring and control is (Points : 5) Question 6. 6. (TCO H) When using the ATOM process to manage risks, which is the importance of an initiation meeting? (Points : 5) Question 7. 7. (TCO A) When is a risk register created? What is its importance of a risk register to a project? (Points : 10) Question 8. 8. (TCO B) You are the project manager for a major technological project. You are concerned about doing qualitative risk analysis. How do you ensure consistency when doing qualitative risk analysis across all risk evaluators? (Points : 15) Question 9. 9. (TCO D) Explain transference as a risk response strategy, and provide an example of its use in a project. (Points : 15) Question 10. 10. (TCO E) What is the purpose of performing reserve analysis during the risk management process? (Points : 15) Question 11. 11. (TCO H) You are in a status meeting with key project stakeholders. You are discussing residual and secondary risks in your
  • 11. project. The key stakeholders ask for an explanation and example of each. How would you describe each? Provide an example of a residual and a secondary risk. (Points : 15) ********************* PROJ 595 Risk Paper 2 For more classes visit www.snaptutorial.com PROJ 595 Risk Paper 2rocess. PROJ 595 Week 3 Risk Paper 1 (2 Papers) For more classes visit www.snaptutorial.com This Tutorial contains 2 Papers of this Assignment
  • 12. PROJ 595 Week 3 Risk Paper 1 Write a two- to four-page paper regarding a project, either real or fictitious, where one is able to discuss how risks were identified, ranked, and monitored. The student is also welcome to write about a major purchase or major decision in his or her life, such as buying a new car, buying a new home, or even the decision to return to school to earn a degree. All of these are considered projects or procurements that require some form of formal or informal risk review. Remember to cite and reference any sources that were used in the project or in the decision-making process. At a minimum, students should connect this assignment back to the text and support their decision-making processes with key concepts from the text. One of the elements of this assignment is to connect the material from the course to actual risk decisions. You are also welcome to use any of the checklists from the text to support the decision-making process. ********************* PROJ 595 Week 4 Course Project(2 Project) For more classes visit www.snaptutorial.com This Tutorial contains 2 Project
  • 13. Course Project Part I For this project, you may choose a project that is of interest to you. When selecting a project, avoid picking one that is either too big or too small. For example, do not decide to build a new stadium for your local professional sports team (too big) or to plant your summer garden (too small).You will only be addressing the risk issues in the project so you will not need to be looking at the detail required for a business plan. The scope statement and the WBS are required in addition to the risk management plan. It is important to pick one that you understand so that you will be able to create the risk management plan that is realistic with sufficient detail where your contingency plans will be relevant.Since you will need to create a risk management plan, your project should be somewhat risky. 1. Create a risk management plan for your project. To do this, you must first create a scope and a WBS for your project. 2. Perform risk management planning as defined in the lecture. 3. Identify risks for your project, including any issues that may impede or impair the completion of the project. You must identify at least 5 positive and 15 negative risks. 4. Prioritize the risks by performing qualitative risk analysis. Perform risk response planning for your project by creating detailed risk response plans for those risks needing responses. This should include both proactive responses and reactive contingency plans as appropriate. *********************
  • 14. PROJ 595 Week 5 Midterm Set 1 For more classes visit www.snaptutorial.com 1. (TCO A) Qualitative risk analysis 2. (TCO A) When using the ATOM process to manage risks, an initiation meeting should be used for 3. (TCO B) A watch list is a 4. (TCO D) In risk response planning,which is the difference between active and passive acceptance? 5. (TCO E) A common tool for use in risk monitoring and control is 6. (TCO H) When using the ATOM process to manage risks, which is the importance of an initiation meeting? 7. (TCOA) Explain when risk breakdown structure is created, and explain the importance of a risk breakdown structure in risk management 8. (TCO B) Explain the qualitative risk analysis process 9. (TCO D) Explain transference as a risk response strategy, and provide an example of its use in a project 10. (TCO E) Describe the function and process of performing a risk audit during a project
  • 15. 11. (TCO H) What is the role of a risk owner in the risk management process?.. ********************* PROJ 595 Week 6 Course Project Part II (2 Project) For more classes visit www.snaptutorial.com This Tutorial contains 2 Project Course Project Part II For this part, you will be creating two decision trees concerning specific risks or events from the project you developed in part 1. The first one will be a decision tree used to make a decision. You will be calculating an expected value based upon this decision tree. The second will be for a basic risk or event where you will be creating a fault or event tree illustrating what makes up the fault or event. With each of these, you will need to discuss the process and results of your tree. The risks or events you use will be from the project you used in the part one. You will need to start the report with a short introduction of that project so that there is continuity and the reader will understand the events and risks being discussed. You do not have to include part one in your part two report.
  • 16. Details: Create one decision tree with an expected value and a fault or event tree that would support the exploration of risk for the project you used for part one of the course project. (That is two trees in all.) Provide a one paragraph project description of the part 1 project but you do not have to repeat all the other information in this part. ·The decision tree must be created to support a major risk-related decision likely to be faced by the project. The calculation of expected values is a requirement of this project. ·The fault or event tree should offer at a minimum a listing of potential risks and impacts in the event of a smaller failure. For example, a smaller failure could be the loss of water pressure or a fire in a construction project rather than examining what risk was involved with the collapse of the construction project. Write a discussion of the risks that supports the fault tree, event tree, or decision tree that has been created. Make a separate write up for each of these smaller risks associated with the fault tree or event trees. Your paper should have a general introduction that should introduce the decision tree and fault or event trees that will be discussed, and then the paper should have a discussion regarding each tree. See the sample outline below for details. The part 2 paper regarding the identified risks and decision trees should be from six to ten pages in length. Note that this page length is a guideline. At leastthree authoritative, outside references are required (anonymous authors or web pages are not acceptable). These should be referenced where used in the paper and listed on the last page titled, Works Cited. Risks such as “project is over budget” or “project does not meet schedule” are too broad. Be specific.
  • 17. Comments on how to create an acceptable tree and project paper Each fault or event tree should offer at a minimum a listing of two or more potential risks and impacts in the event of two smaller failures. (This means for each tree you will have at a minimum two sub-faults with multiple causes for each of them.) Use “and” and “or” gates properly. Understand the difference. When you use an ‘and’ gate it indicates that it take both of the conditions for the fault to occur. If either of the conditions could cause a problem this indicates the use of an ‘or’ gate. There are examples and templates in doc sharing. You need to select specific faults to use in the tree. General examples of faults are too broad for the fault tree to provide a comprehensive evaluation of the possible causes. The graphics for the tree do not have to be artist professional quality but they do need to be student professional. A table is not sufficient. If you use screen shots be sure you crop them so that only the tree is included not all the computer menus and etc. You should have at least two options under each gate. There is no reason for a gate if there is only one option. When a template is provided or an example it is not meant to be copied. If you are not doing a construction project, your headings should not be “construction project” just because the example says that. This is a risk management course. The engineering solutions to the problems on these projects are not the answer that you should be developing. The development is of the risk management system and process for your specific project.