INTRODUCTION 
 
ProService is a qualified and 
competent electromechanical 
contracting company, with head 
offices located in Nasr city, Cairo‐Egypt 
and Qatar branch in Doha. We are 
pleased to enclose herewith, our 
update of ProService prequalification 
and registration documents January, 
2013 edition. 
 
We are keen to establish a good start 
for our intended long‐term business 
relationship. We cordially invite you to 
visit our website 
www.proservice.com.eg , our sister 
company www.tab.com.eg , and our 
Qatar electromechincal contracting 
branch www.mechatronics.com.qa 
 
Please don't hesitate to contact us for 
any necessary clarifications. 
 
 
Best Regards 
 
Eng. Yousef Ahmed Borhan 
Managing Director 
Egypt +20‐12‐ 32‐ 455 ‐89 
Qatar +974‐6661‐7241 
y.borhan@proservice.com.eg 
 
MISSION 
 
To perform for our customers the 
highest level of quality construction 
services at fair and market competitive 
prices. To ensure the longevity of our 
company through repeat and referral 
business achieved by customer 
satisfaction in all areas including 
timeliness, attention to detail and 
service‐minded attitudes. To maintain 
the highest levels of professionalism, 
integrity, honesty and fairness in our 
relationships with our suppliers, 
subcontractors, professional associates 
and customers. 
 
VISION 
 
Expand our services and build a team 
of highly motivated professionals to 
compete with international companies 
in the Middle East and North Africa 
region.  
 
 
 
 
 
` 
 
Eng. 
ProS
y.bo
 
Befor
Youse
electr
organ
and 
landm
Iraq a
 
His fie
Supp
facilit
a  la
electr
petro
proje
Egypt
 
Speci
Venti
MEP 
Plum
Mech
(Facil
BMS 
 
Yousef  A
Service, M
rhan@pro
re  starting 
ef  has  wor
ro‐mechani
nizations (o
has  exp
mark  projec
and Egypt. 
elds of expe
ly,  installat
ty  maintena
arge  num
ro‐mechani
ochemical, 
ects  in  Kuw
t . 
alties: HVA
ilation and A
(Mechanica
bing) / BSEM
hanical Build
ity Mainten
(Building M
Ahmed Bo
anaging D
oservice.c
his  own 
rked  extens
ical  int
n the contr
perience 
cts  in  Kuw
eriences cov
tion,  opera
ance  mana
ber  of  p
ical  and 
and  c
wait,  Qatar,
C (Heating, 
Air‐Conditio
al, Electrica
M (Electrica
ding Service
nance Mana
Management
FO
 
orhan 
Director 
om.eg 
company, 
sively  with 
ternational 
ractor side) 
in  major 
wait,  Qatar, 
ver: 
ation,  and 
gement  of 
prestigious 
industrial, 
commercial 
,  Iraq  and 
oning )/ 
l and 
al & 
es) / FMM 
agement / 
t Systems)
UND
 
DER
En
TA
s.n
 
Sh
arm
wh
Al‐
ran
ma
 
Th
an
ma
co
for
Pro
me
ma
& 
als
of 
  
Sp
Ele
Fin
an
S 
ng. Sherif 
AB, Manag
nowier@p
erif  starte
my  and  lat
here  he  spe
‐Ghanim gr
nks  and  w
aintenance 
hroughout  h
  interest 
anagerial po
ntinuing ed
r  the  finan
oService. To
ember  in 
anaging  dir
Balancing),
so manages
ProService
ecialties:  
ectromecha
nancial man
d Sales / M
 
Ahmed N
ging Direct
proservice
d  his  care
ter  moved 
ent  about  1
oup, he mo
was  in  char
operations
his  career  S
in  fina
ositions tog
ducation pre
ncial  mana
oday, Sherif
ProService
rector  at  TA
 a sister co
s the Tradin
. 
anical servic
nagement / 
anagement
 
owier 
tor 
e.com.eg
eer  in  the
to  Kuwait
17  years  in
oved up the
rge  of  the
.  
Sherif  grew
ance.  The
gether with
epared him
gement  of
f is a board
,  and  the
AB  (Testing
ompany, he
ng activities
ce‐trading / 
Marketing 
t 
e 
t 
n 
e 
e 
w 
e 
h 
m 
f 
d 
e 
g 
e 
s 
 
 
 
Contents 
1. Introduction letter / Mission / Vision 
2. Founders 
3. ProService Departments: 
a) Contracting Department 
b) Facility management Department 
c) Indoor Air Quality Management Department 
d) Automatic Control Department 
e) TAB, ProService Sister Company 
f) MechaTronics Company, Qatar Branch. 
 g) Trading Department 
4. Partners in success 
5. Earlier awarded projects 
    a) Contracting projects in Qatar 
    b) Contracting projects in Egypt 
6.  Registration documents. 
    a) Chamber of commerce 
    b) General taxes authorities 
    c) Sales taxes authorities 
   
 
 
ProService Departments 
 
      a. Contracting Department. 
      b. Facility management Department. 
      c. Indoor Air Quality Management Department. 
      d. Automatic Control Department. 
      e. TAB, ProService Sister Company. 
      f. MechaTronics Company , Qatar Branch. 
      g. Trading Department. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
a)Contracting Department 
Electromechanical contracting of 
building services, our expertise 
includes: 
1. HVAC (Hea ng, Ven la ng, and Air 
Conditioning Systems). 
2. Industrial ventilation. 
3. Fire protection and safety. 
4. Indoor and outdoor lighting. 
5. Electrical. 
6. Safety & security. 
7. Audiovisual. 
8. Plumbing. 
9. Central building controls and BMS 
(Building Management Systems). 
10. Opera on & maintenance. 
 
b)Facility Management 
Department 
1. Preventive maintenance . 
2. Corrective maintenance. 
3. Operation. 
4. System development. 
5. Implementation and management 
of CMMS (Computerized 
Maintenance Management 
Software). 
6. Proteus Software for computerized 
maintenance management. 
c) Indoor Air Quality 
Management Department 
Our IAQ department is recognized 
nationwide and complies with NADCA 
standards. 
 
The IAQ services include: 
1. Air duct cleaning and disinfection. 
2. Air coils cleaning and disinfection. 
3. Air handling systems cleaning and 
disinfection. 
 
d)Automatic Control 
Department 
We are an international dealer in 
Egypt , Saudi Arabia,  Qatar, and 
Lebanon of building management 
systems (HVAC controls , MCC , 
BMS) and industrial automation 
control and measuring 
instruments for industrial 
applications 
1. Telecontrol solutions.                                
2. Transducers and converters.    
3. Data acquisi on and gateways. 
4. Water treatment. 
 
 
g)  Tra
 ProServ
sophisti
compan
ading D
vice repr
icated hi
ny intere
Departm
resents a
gh‐qualit
st; this in
 
ment 
 few rep
ty produ
ncludes:
KMC 
TSI  
EAGLE  
Sun Pipe 
Flexible  
SENECA 
CAREL 
DST 
STUDOR 
RICKARD  
FRESE 
utable m
cts that s
K
TSI envi
Eagle
S
Technip
SENECA
CAREL
DST Se
Studor Sw
RICKARD 
Frese; d
manufact
serve the
KMC; building
CO
ronmental air
temp
e technology ;
M
un Pipe; new 
p ‐ Coflexip Fra
A Italy; Industr
instrument
L Italy; humidi
eibu Giken Jap
ind
weden; draina
Air South Afr
dynamic wat
urers, wh
e main lin
g managemen
NTROL , MCC 
r measuring in
perature and h
CMMS‐Comp
anagement sy
lighting syste
ance; flexible 
industries
rial automatio
ts for industri
ifiers units for
pan/ Sweden;
dustrial applic
age venting so
products 
rica; VAV (Var
ter balancing 
ho suppl
ne of the
nt systems ( HV
, BMS) 
nstrumentatio
humidity) 
puterized Main
ystem 
ems using sun 
steel pipe for
s 
on control and
al application
r industrial ap
; dehumidifier
cations 
olutions throug
iable Air Volu
valves for HV
y 
e 
VAC 
on (airflow , 
ntenance 
light 
r petroleum 
d measuring 
s 
plications 
rs units for 
gh innovative
me) diffusers
AC system. 
e 
 
 
 
 
e) TAB
Compa
ProServ
compan
Compan
Services
500 diff
HVAC; M
Clean Sp
Commis
Projects
scope o
1. Tes n
2. Total 
Systems
3. Clean
Certifica
4. Electr
Commis
 
 
     
 
 
 
 
 
 
 
 
B, ProSe
any 
vice work
ny TAB (T
ny for Te
s) .TAB e
fferent typ
Mechanic
paces Te
ssioning 
s in Egyp
of service
ng Adjus
Commis
s 
n Room 
ation/Va
rical Tes
ssioning 
    
ervice 
ks with a 
The Engin
sting and
xecuted 
pes and s
cal, Elect
esting, Ba
and Valid
t and Qa
e include:
ng and 
ssioning o
lidation 
ng and 
Sister 
sister 
neering 
d Balanci
more th
sizes of 
trical and
alancing, 
dation 
atar. TAB 
: 
Balancin
of HVAC 
ing 
an 
d 
ng.                          
f) Mec
Qatar 
1. HVAC
Conditio
2. Indust
3. Fire p
4. Indoo
5. Electr
6. Safety
7. Audio
8. Plumb
9. Centr
(Building
10. Oper
11. Facil
 
 
 
 
               
chaTron
Branch
 (Heating
oning) sys
trial vent
rotection
or and ou
rical. 
y & secur
ovisual. 
bing. 
al buildin
g Manag
ra on & 
ity mana
 
nics Co
h            
g, Ventila
stems. 
tilation. 
n and saf
utdoor lig
rity. 
ng contro
ement Sy
mainten
agement
mpany
    
ating, an
fety. 
gh ng. 
ols and B
ystems).
nance. 
. 
y, 
d Air 
BMS 
 
 
 
 
 
Earlier Awarded Projects 
 
 
1. Contrac ng projects in Qatar 
  2. Contrac ng projects in Egypt 
 
   
 
 
 
 
 
 
Registration documents 
 
1. Chamber of Commerce. 
2. General Taxes Authori es. 
3. Sales Taxes Authori e
PARRTNER
 
 
RS IN 
 
SUCC
 
  
 
CESS
  
 
 
 
 
 
 
 
 
Contra
i. M
1‐ MEP W
Client 
Start Date 
End Date 
 
FC & FD typ
Logistic Vil
Scope of w
 Fire
 Plu
 Ele
 
acting p
echaTron
Work for 
: 
: 
: 
pe Warehou
lage Qatar, o
work is includ
e Fighting Sy
umbing Syste
ectrical Syste
projects
nics electr
Gulf Ware
Gulf War
May 20
May 20
uses are (G+M
our scope of
ding: 
ystem. 
em. 
ems. 
s in Qat
romechan
ehousing 
rehousing Co
11 
12 
M) warehou
f work is EPC
tar :
nical work
Phase II –
ompany 
ses buildings
C Engineering
k projects
– Part 1 (3 
s of total bu
g, Procurem
s :
FC + 2 FD) 
ilt up area 2
ment & Const
Warehou
22,000 m2
truction of M
ses. 
2 located at 
MEP Systemss.  
 
 
 
2- MEP Work for Gulf Warehousing Phase II – Part 1 (3 GA + 1 H2E) Warehouses.
Client : Gulf Warehousing Company
Start Date : June 2011
End Date : June 2012
GA & H2E type Warehouses are one story warehouses buildings of total built up area 23,000 m
2
 located at 
Logistic Village Qatar, our scope of work is EPC Engineering, Procurement & Construction of MEP Systems.  
 Fire Fighting System. 
 Plumbing System. 
 Electrical Systems. 
 
 
 
 
 
 
 
3‐ Mechanical & Electrical Work for MARKHEYA Administration Building. 
Client  :  EID Charity 
Start Date  :  January 2011 
End Date  :  August 2011 
MERQAB tower is a (B+G+1) administra on building located at Markheya district Doha, Qatar, our scope of 
work is EPC Engineering, Procurement & Construction of Mechanical & Electrical Systems for EID Charity.   
Scope of work is including: 
 HVAC System which is a ducted split DX system. 
 Fire Fighting System. 
 Electrical Systems 
 
 
 
 
 
4‐ MEP Work for Mr. Mohamed Abdelkarim Al‐Emadi Palace. 
Client  :  Mr. Mohamed Abdelkarim Al‐Emadi; Chairman – Emadi Enterprises 
Consultant  :  Qatari Home. 
Start Date  :  December 2009 
End Date  :  September 2010 
Mr. Mohamed Abdelkarim Al‐Emadi Luxuries Palace is a (B+G+1+P) building located at Nauija district in Doha, 
Qatar, with a total Built‐Up Area 8,000 m2 with a high quality specifications for the MEP work and 
Finishing,. 
Scope of work is including: 
 HVAC System which is DX Package Unit system. 
 Plumbing & Drainage system. 
 External Swimming Pool & its equipment. 
 Electrical systems which are including substation, power network, light current network. 
 Home Automation System.  
 
 
 
 
 
 
 
            El –EMADI PALACE  
 
 
 
 
5‐ Mechanical & Electrical Work for IBA Mosque. 
 
Client  :  IBA Group 
Start Date  :  March 2011
End Date  :  September 2011 
 
IBA Mosque is a 2 stories mosque located at Thumama, Doha, Qatar, our scope of work is EPC Engineering, 
Procurement & Construction of Mechanical & Electrical Systems for the mosque.   
Scope of work is including: 
 HVAC System which is a Package Unit system. 
 Plumbing System. 
 Electrical Systems 
 
 
 
 
 
 
2) MechaTronics had executed & handed over the following projects:
1‐ Mechanical "HVAC & Fire Fighting" Work for MERQAB Tower; Ministry of 
Foreign Affairs and Annex Building. 
Client  :  Qatari Ministry of Foreign Affairs
Consultant  :  AEB; Arab Engineering Bureau 
Start Date  :  December 2009 
End Date  :  August 2010 
MERQAB tower is a (B+G+M+23) exis ng building located at Dafna district Doha‐Qatar, our scope of work is 
EPC Engineering, Procurement & Construction of Mechanical Systems for the building new inhabitant; Qatari 
Ministry of Foreign Affairs,  and generate the mechanical systems design and engineering to adequate the 
new architectural design.   
Scope of work is including: 
 HVAC System which is a district chilled water system using AHU’s and VAV air distribution terminals. 
 Fire Fighting System. 
 
 
 
 
 
2‐ MEP Work for CONCORDE Hotel. 
Client  :  IBA Real Estate
Consultant  :  Qatari Home. 
Designed by  :  Arab Consulting Engineers; Mouhram Bakhoum. 
Start Date  :  December 2008 
End Date  :  September 2010 
VANDOM Hotel is a (B+G+7) building consis ng of 210 rooms with a total built‐up area of 12,000 m2. 
Scope of work is including: 
 HVAC System which is chilled water system operated by 4 x 284 TR air cooled chillers. 
 Fire Fighting System. 
 Electrical Power System of 3 x 1,600 KVA Transformers. 
 Light Current System including IPTV, Telephone & Data & Security systems. 
 Plumbing & Drainage system. 
 External Swimming Pool & its equipment. 
 
 
 
 
 
                      CONCORDE HOTEL DOHA‐QATAR. 
 
 
1) A
 
Client          
Consultant
                    
Start Date  
End Date    
 
AUG Phar
Scope of w
 Wa
T.R
 Ele
 150
 Lig
Co
 Plu
 Fir
 Cle
 Ph
 
                   
 
            
 
 
 
 
 
 
 
B)
AUG Ph
  :         AUG 
ts  :          Egy
            ECC; 
  :        May
  :        June 
ma is consi
work is incl
ater Cooled
R. to cool a
ectrical Pow
00 rpm, 38
ght Curren
ntrol & CCT
umbing & D
e Fighting S
ean Areas V
armaceutic
                   
Contra
harma
Pharma ; Al
ptrol ( Electr
Engineering 
2011 
2013 
ists of 4 Bu
luding:
d Absorptio
a water flow
wer System
0/220 V, 50
nt System in
TV  systems
Drainage sys
System. 
Validation. 
cal producti
            
acting p
llied United 
rical, Plumbi
Company fo
ildings with
on Chillers
w rate of 72
m of 1 x 1,60
0 Hz. 3 pha
ncluding, T
s. 
stem. 
ion process
rojects
Group 
ing, Fire Figh
or Compleme
h total buil
s operated b
20 GPM fro
00 KVA Tr
ase, 4 wires
Telephone ,
s cooling an
 
 
in Egyp
hting Works 
entary work
lt-up area 1
by natural
om 54.00F
ransformer
and 1.5 M
,Data, Fire A
nd heating 
pt,
) 
k (HVAC wor
12,500 m2
.
gas and ha
to 44.0°F .
rs.
MVA (Diesel
Alarm, Pub
k ) 
aving a cap
l Generatin
blic Address
pcity of 2*3
nq unit).
s , Access 
00
 
 
 
 
                   
 
 
 
 
 
 
 
 
    AUG Phharma Co. PPharmaceuuticals pro
   
oduction faacility 6 Th.
October CCity Egypt 
 
 
 
 
a2) Q
Renov
Rd, No.10,
Qatar Emb
Scope of w
 HV
 Ele
 Lig
 Plu
atar Em
vation Work
, Al – Moha
bassy  Build
work is inclu
VAC System
ectrical wor
ght Current 
umbing & D
mbassy
ks For The Q
andeseen‐C
ding ( Basem
uding: 
 Including  
rks Includin
System in c
Drainage sys
in Cair
Qatar Emba
Cairo 
ment + Gr+8
Exhaust & V
g Lighting , 
cluding Fire
stem. 
ro, Egyp
assy And Am
8 floors + R
Ventilation
Lighting Sw
e Alarm syst
pt
mbassador’
Roof). 
n Componen
witches and
tem. 
s Multi‐Sto
nts  and  Fa
d Sockets. 
ory building
an Coil Units
 At Al Tham
s. 
 
mar
 
 
 
 
3)Ur
Electrical, H
Main Consu
Sabbour 
Main Contr
MEP Design
MEP Execu
 
Urban Pla
total Built
Scope of w
 HV
 Ele
 500
 Lig
and
 Plu
 Fire
rban P
HVAC, Fire F
ultant           
ractor            
n Consultant
ution Consult
za Building
t‐Up Area o
work is includ
VAC System i
ectrical Powe
0 KVA. (at 5
ght Current
d  Garage Ga
umbing & Dr
e Fighting Sy
laza
ighting, Plum
              : Dr.
             : Gin
t            : EHA
tant      : Dr. 
 is consists 
f 5,000 m
ding: 
ncluding Fan
er System of
50°C ambien
System incl
ate systems.
ainage syste
ystem. 
mbing, 
 Hussein 
nza 
AF 
Hussein Sab
of ( Basem
m2. 
n Coil Units ,
f  1 x 1,600 K
nt) 0.8 p.f., 3
luding, Tele
 
em. 
bbour 
ent 3 + Bas
, Exhaust Fan
KVA Transf
380 V Diese
ephone ,Data
sement 2+ B
ns , Smoke F
formers.
l Generator
a, Fire Alarm
Basement 1
Fans & Press
r.
m, CCTV  , Fir
1+ Gr. + 1st
 )
surization Fa
re Telephone
) Floors wit
ns. 
e , Evacuatio
 
h 
on 
 
 
 
4)
Electrical, 
(Middle Sc
 Ma
 ME
Cairo Ame
total Built
Scope of w
 HV
 Ele
Pow
 Dim
 Lig
Sys
 Plu
 Fire
 
 
) Cairo
HVAC, Fire
chool Build
ain Contrac
EP Design C
erican Colle
t‐Up Area o
work is includ
VAC System i
ectrical Powe
wer Sockets
mming Syste
ht Current S
stems. 
umbing & Dr
e Fighting Sy
o Amer
e Fighting, P
ing and Lib
ctor : Rowad
Consultant :
ege Building
f 3,500 m
ding: 
ncluding Fan
er System inc
. 
em. 
System includ
ainage syste
ystem. 
rican C
Plumbing, fo
arary) – “Ca
d Modern E
: Wassef De
g is consists
m
2
. 
n Coil Units ,
cluding  Low
ding Tele. , D
em. 
College
or Cairo Am
airo‐ Maad
Engineering
esign Office
s of ( Basem
, AHU’s & Ex
w Voltage Ma
Data , Fire Al
, Phase
merican Coll
i” 
g 
e 
ment + Gr. +
xhaust Fans .
ain & Sub Di
larm, Public 
e II.
lege Projec
+ 1st
 + 2nd
 + 3
. 
stribution B
Address , CC
t 
3rd 
+ Roof) F
oards, Light
CTV  , and Au
Floors with
ing  Fixtures
udio Visual 
h 
s and  
 
 
 
5)C
Electrical, 
College “C
 Ma
 ME
 
airo A
HVAC, Plum
C.A.C” ‐ (Al M
ain Consulta
EP Consulta
merica
mbing, Irrig
Maadi) 
ant : RMC "
ant  : ECO “E
an Coll
gation and F
" RAAFAT M
Engineering
lege, P
Fire Fightin
MILLER CON
g Consultan
hase I.
g Work For
NSULTANT"
nt Office” 
.
r Cairo Ameerican 
 
Electrical, 
 
 ME
Scope of W
 HV
 Co
 Chi
 Fire
 Boo
 Cab
 Pow
 Mo
 Var
 BM
Le M6)
HVAC, Fire
EP Design C
Work :  
VAC Machine
ondenser Wa
illed Water R
e Fighting Pu
oster & Subm
ble Trays. 
wer Cables. 
otor Control 
riable Speed
MS 
eridian H
e Fighting, P
Consultant :
e Room inclu
ater Pumps. 
Risers / Cond
umps & Rise
mersible pum
Centers for 
d Devices. 
H–Hotel
Plumbing, fo
: EHAF 
uding Cooling
denser Wate
ers Connectio
mps & conne
(Cooling tow
Heliopoli
or Le Merid
g Towers, Ch
er Risers. 
on. 
ection. 
wers, conden
is
dian Hotel –
hilled & 
nsing & chill
– “Cairo ‐ He
ed water pu
eliopolis” 
umps) . 
 
7) Da
A
Electrical, H
Petroleum)
 
Corporatio
 Ma
 ME
 ME
Technica
Total Area
No. of Floor
Total Servi
Total Coolin
Transforme
Generators
 
 
 
 
 
 
 
 
ana Gas
A High –
HVAC, Fire F
)      
n – “New Ca
ain Consultan
EP Design Co
EP Execution
al Aspect
r
iced Area
ng Load
er
–End Off
ighting, Plum
airo”  
nt                   
onsultant      
n Consultant 
s:
2000m2
7 Floors + G
7200m2
500 T.R.
1 MVA
500 KVA +
ffice Faci
mbing, Liftin
 : SAMA Con
  : R&A Cons
: MAK “Mar
Ground + Ba
+ 350 KVA
ility
ng     Station 
nsultants 
sultants 
rawan Karaw
asement
and Water T
wya” 
Tanks for Dana Gas  (Cennturion 
 
 
 
 
Dana Gas Egypt Head Quarter Office Facility  
 
 
Dana Gas Egypt Head Quarter Office Facility  
 
 
 
 
8) AR
Electrical, 
Headquar
(Arab Adm
Consultan
 A high en
9) Me
Electrical, 
Mentor Gr
Office (El‐
Consultan
A high end
Total Area
No. of Floo
Total Serv
Total Cool
Transform
Generator
RADO.
HVAC, Plum
ter Building
ministrative
nt : Saudi Co
d Office Fa
entor Gr
HVAC, Plum
raphics New
Nozha Stre
nt : EL‐Nour 
d Office Fac
a
or
viced Area
ling Load
mer
s
mbing and 
g of ARADO
e Developm
onsult, Egyp
cility  
raphics.
mbing and 
w Regional 
et) 
Consulting
cility  
500m2
11Floors+G
Mezzanine
8000 m2
350T.R.+
800 KVA
250 KVA
Fire Fightin
O 
ment Organi
pt 
Fire Fightin
g Group, Egy
Ground+2B
e
+Cooling Tow
A.
A + 350 KVA
ng Works, 
zation) 
ng Work For
ypt 
Basement+
wer.
A
r 
 
10)EL-N
HVAC, BM
Securities 
Consultan
Total Area
No. of Floo
Total Serv
Total Cool
11)HV
Start
       Consu
Engineerin
12)SM
HVAC S
Start Date
Consultan
Nour Secu
MS, Fire Figh
Headquart
nt : Shaker C
a
or
viced Area
ling Load
VAC for
Date : 11/1
ltant : Prof
ng Faculty 
MASH Cl
System for
e : 15/12/20
nt : Dr. Hu
urities Hea
hting, and P
ter –Smart V
Consultant 
1755 m2
5Floors+
8500 m2
500T
Faculty o
11/2000 To
f. Dr. El Said
lub.
r ( SMASH
06 ended 1
ssein Sabb
adquarte
Plumbing W
Village (Giz
Group, Egy
+Ground+2B
T.R.
of Pharma
: 15/7/2001
d Khalil – En
H Club; T
15/09/2007
our Associ
r
Works For EL
za) 
ypt 
Basement.
acy -Tant
1
ngineering C
The Smart
ates (Prof. 
L‐Nour  
ta Univers
Consultatio
Village Sp
Dr. Moham
sity
on Unit; Tan
ports and
med Mahmo
nta Univers
Social Clu
oud) 
ity‐ 
ub )
 
13)Duty
HVAC Syst
Start Date
Consultan
14)Mari
HVAC – M
Start Date
Execution
Consultan
D
Electric
Service
Consult
              
Plot lan
No. of F
Total Se
Transfo
Generat
Daihats
Daihatsu i
both small
sophisticat
air cooled
tank capac
ProService
workshops
y-free Sho
tem & Fire 
e : 8/12/200
nt : EHAF Co
na Gabal
Marina Gaba
e                  :
n Period
nt                : 
AIHATS
cal, HVAC, C
 Center – Se
tant : Mode
          “Eng.
nd Area
Floor
erviced Area
ormer
tor
su Servic
s the second
l and heavy
ted project s
oil-injected
city and a dr
e scope cov
s and stores
ops.
Fighting for
04 To: 01/05
onsulting     
l El-Rossa
al El‐Rossas 
 April 2008
: 45 days. 
Eng. Hussie
U Misr
Compressed
ervice Cent
ern Enginee
. Mustafa Ib
25,2
2
a 28,0
500
150
ce Cente
d vehicle se
vehicles (H
services. Th
d rotary scre
ryer capacit
vers all the M
s as well as t
r: Egypt Air
5/2005 
    
as Resort
Resort – M
8 To: May
en Sabbour
d air system
ter Abou Ra
ering Group
brahim”. 
261 m2
000 m2
0 KVA
0 KVA
er
ervice centre
HINO) got i
he project al
ew air comp
ty of 9 m3 /
MEP service
the adminis
r  “Duty‐free
.
Marsa Alam
2008.
r Consultant
m, Fire Fight
awash. 
p   
e for ProSer
ts technical
lso contains
pressor with
min.
es for all the
stration and
e Shops” @
ts.    
ting, Plumb
rvice to exe
l challenges
s a compres
h working p
e project lan
customers’
@ “City Stars
bing for DAI
ecute. This s
in being a
ssed air equi
pressure of 1
ndscape, ser
welfare fac
s Center” 
HATSU Mis
service cent
fast track an
ipment inclu
10 Bars and
rvice facilit
cilities.
sr – 
tre serving
nd
uding the
d 1000 liters
ties and
s
 
HVAC, 
 ‐ Abu‐Raw
 Consultan
17)LEON
HVAC Syst
New Facto
Start Date
Consultan
Mahmoud
18)L
HVAC Syst
Factory No
Start Date
Consultan
(Prof. Dr. 
16) V
and Fire Fi
wash (Giza)
nt : MA Con
NI New F
tem for LEO
ory No.6 Ex
e : 07/11/2
nt : Dr. Huss
d)  
LEONI Ne
tem for LEO
o. 5 Extensi
e : 15/07/2
nt : Dr.Husse
Mohamed 
Volks Wa
ghting Wor
 
nsultants, P
Factory N
ONI Wiring S
xpansion 
2006 ende
sein Sabbou
ew Factor
ONI Wiring S
ion 
2005 To: 1
ein Sabbou
Mahmoud)
agen
rks For Volk
PhD –Moham
No.6
Systems ‐ E
ed 12/06/2
ur associate
ry No.5
Systems‐Eg
15/10/200
r associate
) 
ks Wagen S
med  Moem
Egypt Comp
2007 
es (Prof. Dr.
gypt Compa
06 
s 
howroom
men Afify, E
pany;  
. Mohamed
any; New 
Egypt 
d 
 
HVAC Syst
Factory No
Start Date
Consultan
(Prof. Dr.
20
HVAC Sy
Company
Start Date
Consultan
21)M
Electrical, 
& Distribu
Center – A
Start Date
Consultan
22)PA
HVAC for 
Start Date
Consultan
 
23)PA
HVAC Syst
City 
Start Date
Consultan
 
 
 
 
19)
tem for LEO
o. 4 Extensi
e : 15/07/20
nt : Dr.Hus
. Mohamed
0)LEONI
ystem and F
y; Existing &
e : 28/08/20
nt : Hamza a
Mobinil
HVAC, and
ution 
Abu‐Rawash
e : 26/01/20
nt : MA Con
ACHIN.
Pachin Fact
e : 10/03/20
nt : Design &
ACHIN.
tem for Pac
e : 3/07/200
nt : Design a
)LEONI N
ONI Wiring S
ion 
005 To: 15/
ssein Sabbo
d Mahmoud
I New Fac
Fire Fightin
& New Fac
003 To: 25
associates (
d Fire Fightin
h (Giza) 
007 To: 26/0
sultants, Ph
tory Extens
008 To: 10/0
& Built 
chin Admini
06 ended 03
and Built 
New Facto
Systems‐Eg
/10/2006
our associa
d)
ctory No.2
ng System
ctory No.2
5/03/2004
Prof. Dr. M
ng Works F
07/2007 
hD ‐ Moham
ion 
07/2008 
istration Bu
3/01/2007 
ory No.4
gypt Compa
tes
2
for LEONI
Extension
Mamdouh Ha
For Mobinil 
med Moem
uilding‐ El‐O
any; New 
I Wiring Sy
amza, Dr. A
Warehouse
en Afify, Eg
Obour 
ystem-Egyp
Ali Omar)
es 
gypt 
pt
 
 
 
 
24) M
Electrical a
 – Abu Sul
Start Date
Consultan
 
 
 
 
25
HVAC, Bui
Start Date
Consultan
                   
26)Al
HVAC for
Start Date
Consultan
27)Ka
Electrical,
Kazzarin
Start Date
Consultan
 
 
MUP, Med
and Plumbi
tan 
e : 15/11/20
nt : ECG, Egy
5 )Glaxo S
ilding Mana
e : July 200
nt : Howeed
    Consulta
lkan Phar
Alkan Pha
e : 09/07/20
nt : Howeed
azzarin F
HVAC, Pl
Factory – 6
e : 10/07/20
nt : Dar Al-
dical Unio
ing Works F
07 till 02/0
ypt 
Smith Klin
agement Sy
07 To: May 
dy Consulta
ant Group, 
rma Facto
arma Facto
002 ended 0
dy Consult
Factory .
lumbing an
6 October
007 To: 10/
-Handasa, 
on Pharm
For Medica
6/2008
ne
ystem and R
2008 
nt & Shake
Egypt 
ory
ry
01/03/2003
tant
nd Fire Figh
/4/2008
Egypt 
maceutical
l Union Pha
Related Elec
r 
hting Work
ls.
armaceutica
ctrical Wor
ks For
als 
k for Glaxo Smith Kline Factory 
 
 
 
28)Ca
HVAC, Pro
Cadbury F
Start Date
Main Con
HVAC fo
22°C and
special si
Chilled W
Glycol in
Controls
supplied
29)Ni
Electrical, 
Nile Hilton
Start Date
Consultan
 
adbury F
ocess Coolin
Factory (For
e : April 20
nsultant: H
for product
d 24% Rel
ilica gel sp
Water indu
ndustrial p
and build
by us.
ile Hilton
HVAC, Plum
n Hotel Mo
e : 1/08/20
nt : ECG / DP
Factory
ng, Dehumi
rsa Project
009. To: Ju
Howeedy Co
t cooling a
lative Hum
pecial deh
ustrial pro
process co
ding manag
n Hotel.
mbing and 
ck‐UP Room
006 To: 1/
PME, Egypt
dification S
t) 10th
of Ra
uly 2009.
onsultant.
and dry st
midity. Th
humidifier
ocess cooli
oling syst
gement sy
Fire Fightin
ms – Cairo
/11/2006
t 
System & B
amadan.
orage with
his low hum
r air treatm
ing system
tem
ystem (BM
ng Works Fo
MS for 
h controlle
midity con
ment system
m
MS) to con
or 
ed indoor
nditions is
m importe
ntrol and m
room con
s reached t
ed from Sw
monitor all
nditions of
though a
weden.
l the syste
f:
ems
 
30)He
HVAC, Plu
 Four Seas
Stefano Co
Start Date
Consultan
31
HVAC for 
Start Date
Consultan
Mamdouh
This p
project fo
32)Ba
Printed Ci
Start Date
Consultan
33)Ba
HVAC wor
Start Date
Consultan
34)Eg
HVAC syst
Obour City
Start Date
Consultan
 
 
 
ealth Clu
umbing and 
sons Hotel –
omplex Ale
e : 23/05/2
nt : Dar Al‐H
)Alexand
Bibliotheca
e : 5/3/200
nt : Hamza A
h Hamza , D
roject had
for the yea
anha for E
rcuits Boar
e : 17/5/20
nt : Prof. Dr.
anha for E
rk For Rada
e : 01/08/2
nt : Prof. Dr.
gypt Gold
tem for the
y 
e : 15/5/20
nt : NewVisi
b.
Fire Fightin
– San 
exandria 
2006 To: 2
Handasa, Eg
drina Bibl
a Alexandrin
00 To: Apr
Association
Dr. Ali Omar
d the prize
ar of 2000
Electronic
ds & Electro
000 To: 22
. Mokhtar A
Electroni
r Hall Reno
2005 To: 0
. Mokhtar A
d Group .
 main facto
001 To: 15/
ion Consult
ng Redesign
23/10/20
gypt 
liotheca
na: 
ril 2002 
s (Prof. DR.
r) 
e of best w
0
cs Industr
onics Store
2/9/2000
Afifi 
cs Indust
ovations of 
01/08/20
Afifi 
ory of the Eg
/8/2001
ation, Eng. 
n Works Fo
006 
. 
world qual
ries
 ‐ Banha fo
0
tries
Benha Elec
006
gypt Gold G
Hamdi el N
r Health Clu
lity
r Electronic
tronic Indu
Group, for G
Nashar 
ub – 
cs Industrie
stries Co. 
Gold and Je
es 
ewelry Prodducts ‐AL 
 
 
         
 
 
 
Registration documents
1. Chamber of Commerce.
2. General Taxes Authorities.
3. Sales Taxes Authorities.
 
 
 
 
 
 
 
 
 
 
 
 
 

ProService ElectroMechanical contracting profile – بروفايل بروسيرفيس لمقاولات أنظمة الإلكتروميكانيكال