Preventive Maintenance
and Breakdown Activity
Introduction
Plant maintenance is an important service function of an effecient
production system.
It helps in maintaing and increasing the operational efficiency of
plant facilities.
Maintenance is the procedure of finding faults in any
Equipment/Machine and also removal of faults.
It may be before or after the Breakdown.
Introduction
Plant maintenance ususlly refers to the methods, strategies, and
practices used to keep an industrial factory running effeciently.
This can include anything from regular checks of equipment o
make sure they are functioning properly.
The general aim of Plant maintenance is to create a productive
working environment that is also safe for workers.
Maintenance Objectives
MAINTENANCE
MAINTAINING PRODUCTION
MINIMIZING ENERGY USAGE
OPTIMIZING USEFUL LIFE
OF EQUIPMENT
PROVIDING BUDGETARY
CONTROL
OPTIMIZING RESOURCES
UTILISATION
REDUCE BREAKDOWN
REDUCE DOWNTIME
IMPROVING EQUIPMENT
EFFICIENCY
IMPROVING INVENTORY
CONTROL
IMPLEMENTING COST
REDUCTION
Importance of Maintenance
It helps to identify the cause of failure e.g whether the failure
is due to design defect or a wear out failure.
Helps in Maintenance Decision like Replace or Repair.
Provides necessary information regarding the life and reliability of
the Equipment.
Types of Maintenance
MAINTENANCE
PLANNED
MAINTENANCE
UNPLANNED
MAINTENANCE
PREVENTIVE
MAINTENANCE
CORRECTIVE
MAINTENANCE
PREDECTIVE
MAINTENANCE
EMERGENCY
MAINTENANCE
RUNNING
MAINTENANCE
SHUTDOWN
MAINTENANCE
SCHEDULE
MAINTENANCE
BREAKDOWN
MAINTENANCE
What should be included in Monthly/Weekly
Maintenance Programming
Reconditioning or Replacing the Lubricating Oil
Repairing or Replacing worn out Parts and Tools,etc.
Checking all the Electrical connections of the system
Checking the Control System
Checking the performance of the each parts
Cleaning of interior parts like Spark plugs, filters
raditors,cylinders,etc.
Critical Equipments in production Area
Laminar Air Flow (LAF)
Steam Sterilization Machine
ETO Sterilization Machine
Air Handling Unit (AHU)
Purposes of the Critical Equipments
LAF: To maintain class 100 Working zone on work bench
STEAM STERILIZER:To Sterile product after primary packing ( Free
from Bioburdon )
ETO STERILIZER:To Sterile product after primary packing ( Free
from Bioburdon )
AIR HANDLING UNIT:To maintain Environment condition in
Working zone (i.e. to maintain class 10,000)
Preventive Maintenance of LAF
Key point to archive performance of machine
Maintain velocity of air between 90 +/- 20 FPM. ( Laminar Air Flow )
Maintain integrity of Filter
Preventive measure to maintain key point
Maintain blower motor speed and set damper to achieve pressure in
Magnehlic Gauge. Range 7 to 15 mm of WC.
If pressure less than 7 ,means filter is chock so replace it with new one
and found pressure more than 15 than filter is puncture/leak/ fail so replace
it with new one
Perform leak test of filter to check side leakage OR puncture of
Filter.Proper fitting of filter is important to achieve clean air flow.
Preventive Maintenance of Steam Sterilizer
Key point to archive performance of machine
Maintain steam temperature ( 121. cent.) and Pressure (1.1 Kg/cm2) for the
particular time in Chamber of Machine
Preventive measure to maintain key point
Supply saturated steam of 1.5 Kg/cm2 from PSG.
Maintain PRESSURE OF STEAM with no leakage from door gasket, any
lines/valves/Gasket.
Achieve and maintain desired vacuum to perform cycle
Preventive Maintenance of ETO Sterilizer
Key point to archive performance of machine
Maintain Chamber temperature ( 40. cent.) and desire Pressure/vacuum for
the particular time with ex poser of EO Gas
Preventive measure to maintain key point
Supply of EO Gas from EO Cylinder/Cartidge.
Maintain PRESSURE/VACUUM OF EO gas with no leakage from door gasket,
any lines/valves/Gasket.
Achieve and maintain desired vacuum to perform cycle.
Preventive Maintenance of AIR Handling Unit
Key point to archive performance of machine
Maintain velocity of air from supply grill ( As per design )
Maintain Chilled water circulation in coil of AHU.
Maintain filter integrity in Planum of AHU and Housing
Preventive measure to maintain key point
Maintain blower motor speed and set damper to achieve require pressurized air
in each area
Maintain CHW flow, pressure and temperature
Proper fitting of filter is important
Perform leak test of filter to check side leakage OR puncture of Filter
No air leakage from AHU OR any part of ducting
THANK YOU

More Related Content

Similar to Preventive Maintenance.pptx

HVAC validation.pdf
HVAC validation.pdfHVAC validation.pdf
HVAC validation.pdf
Dr.Noor Nabi Lodhi
 
PDA COURSE - Facility Design
PDA COURSE - Facility DesignPDA COURSE - Facility Design
PDA COURSE - Facility Design
madhmad
 
Techfest
TechfestTechfest
Techfest
guest68681f3
 
Preventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptxPreventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptx
MohsinRaza177052
 
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
HemlataMore3
 
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
AmitMasand5
 
One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...
Palash Das
 
Air Compressor.pptx
Air Compressor.pptxAir Compressor.pptx
Air Compressor.pptx
UsmanBayuWinarji1
 
CHILLER MAINTENANCE & TROUBLE SHOOTING.ppt IKM jb.ppt
CHILLER MAINTENANCE & TROUBLE SHOOTING.ppt IKM jb.pptCHILLER MAINTENANCE & TROUBLE SHOOTING.ppt IKM jb.ppt
CHILLER MAINTENANCE & TROUBLE SHOOTING.ppt IKM jb.ppt
CyrilDason
 
Ahu(ayon dutta)
Ahu(ayon dutta)Ahu(ayon dutta)
Ahu(ayon dutta)
Ayon Dutta
 
ppt on compressed air system and air trimming
 ppt on compressed air system and air trimming ppt on compressed air system and air trimming
ppt on compressed air system and air trimming
SurajWalanju1
 
HVAC training 2020
HVAC  training 2020HVAC  training 2020
HVAC training 2020
Time Pharmaceutical P.Ltd
 
boilers maintenance .pdf
boilers maintenance .pdfboilers maintenance .pdf
boilers maintenance .pdf
ssuser9a3adc
 
ELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air Solutions
VijayEngineeringandM1
 
Pneumatic1day
Pneumatic1dayPneumatic1day
Pneumatic1day
Legaspi66
 
Tipe ataupun jenis ventilasi dalam industri
Tipe ataupun jenis ventilasi dalam industriTipe ataupun jenis ventilasi dalam industri
Tipe ataupun jenis ventilasi dalam industri
danielkrispakpahan
 
Air circulation maintenance industry for sterile and non sterile area
Air circulation maintenance  industry for sterile and non sterile areaAir circulation maintenance  industry for sterile and non sterile area
Air circulation maintenance industry for sterile and non sterile area
GNIPST
 
Presentation of blower industri dan peng
Presentation of blower industri dan pengPresentation of blower industri dan peng
Presentation of blower industri dan peng
MukhammadNaufal1
 
Bio-safety Cabinet
Bio-safety CabinetBio-safety Cabinet
Bio-safety Cabinet
munjo jonah
 
Oil free-screw-air-compressor
Oil free-screw-air-compressorOil free-screw-air-compressor
Oil free-screw-air-compressor
ELGiBrazil
 

Similar to Preventive Maintenance.pptx (20)

HVAC validation.pdf
HVAC validation.pdfHVAC validation.pdf
HVAC validation.pdf
 
PDA COURSE - Facility Design
PDA COURSE - Facility DesignPDA COURSE - Facility Design
PDA COURSE - Facility Design
 
Techfest
TechfestTechfest
Techfest
 
Preventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptxPreventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptx
 
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
 
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
 
One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...One slider for qualification and validation of depyrogenation and sterilizati...
One slider for qualification and validation of depyrogenation and sterilizati...
 
Air Compressor.pptx
Air Compressor.pptxAir Compressor.pptx
Air Compressor.pptx
 
CHILLER MAINTENANCE & TROUBLE SHOOTING.ppt IKM jb.ppt
CHILLER MAINTENANCE & TROUBLE SHOOTING.ppt IKM jb.pptCHILLER MAINTENANCE & TROUBLE SHOOTING.ppt IKM jb.ppt
CHILLER MAINTENANCE & TROUBLE SHOOTING.ppt IKM jb.ppt
 
Ahu(ayon dutta)
Ahu(ayon dutta)Ahu(ayon dutta)
Ahu(ayon dutta)
 
ppt on compressed air system and air trimming
 ppt on compressed air system and air trimming ppt on compressed air system and air trimming
ppt on compressed air system and air trimming
 
HVAC training 2020
HVAC  training 2020HVAC  training 2020
HVAC training 2020
 
boilers maintenance .pdf
boilers maintenance .pdfboilers maintenance .pdf
boilers maintenance .pdf
 
ELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air SolutionsELGI Airmate Air Accessories Total Compressed Air Solutions
ELGI Airmate Air Accessories Total Compressed Air Solutions
 
Pneumatic1day
Pneumatic1dayPneumatic1day
Pneumatic1day
 
Tipe ataupun jenis ventilasi dalam industri
Tipe ataupun jenis ventilasi dalam industriTipe ataupun jenis ventilasi dalam industri
Tipe ataupun jenis ventilasi dalam industri
 
Air circulation maintenance industry for sterile and non sterile area
Air circulation maintenance  industry for sterile and non sterile areaAir circulation maintenance  industry for sterile and non sterile area
Air circulation maintenance industry for sterile and non sterile area
 
Presentation of blower industri dan peng
Presentation of blower industri dan pengPresentation of blower industri dan peng
Presentation of blower industri dan peng
 
Bio-safety Cabinet
Bio-safety CabinetBio-safety Cabinet
Bio-safety Cabinet
 
Oil free-screw-air-compressor
Oil free-screw-air-compressorOil free-screw-air-compressor
Oil free-screw-air-compressor
 

Recently uploaded

Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
OKORIE1
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
Shiny Christobel
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
CE19KaushlendraKumar
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 

Recently uploaded (20)

Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 

Preventive Maintenance.pptx

  • 2. Introduction Plant maintenance is an important service function of an effecient production system. It helps in maintaing and increasing the operational efficiency of plant facilities. Maintenance is the procedure of finding faults in any Equipment/Machine and also removal of faults. It may be before or after the Breakdown.
  • 3. Introduction Plant maintenance ususlly refers to the methods, strategies, and practices used to keep an industrial factory running effeciently. This can include anything from regular checks of equipment o make sure they are functioning properly. The general aim of Plant maintenance is to create a productive working environment that is also safe for workers.
  • 4. Maintenance Objectives MAINTENANCE MAINTAINING PRODUCTION MINIMIZING ENERGY USAGE OPTIMIZING USEFUL LIFE OF EQUIPMENT PROVIDING BUDGETARY CONTROL OPTIMIZING RESOURCES UTILISATION REDUCE BREAKDOWN REDUCE DOWNTIME IMPROVING EQUIPMENT EFFICIENCY IMPROVING INVENTORY CONTROL IMPLEMENTING COST REDUCTION
  • 5. Importance of Maintenance It helps to identify the cause of failure e.g whether the failure is due to design defect or a wear out failure. Helps in Maintenance Decision like Replace or Repair. Provides necessary information regarding the life and reliability of the Equipment.
  • 7. What should be included in Monthly/Weekly Maintenance Programming Reconditioning or Replacing the Lubricating Oil Repairing or Replacing worn out Parts and Tools,etc. Checking all the Electrical connections of the system Checking the Control System Checking the performance of the each parts Cleaning of interior parts like Spark plugs, filters raditors,cylinders,etc.
  • 8. Critical Equipments in production Area Laminar Air Flow (LAF) Steam Sterilization Machine ETO Sterilization Machine Air Handling Unit (AHU)
  • 9. Purposes of the Critical Equipments LAF: To maintain class 100 Working zone on work bench STEAM STERILIZER:To Sterile product after primary packing ( Free from Bioburdon ) ETO STERILIZER:To Sterile product after primary packing ( Free from Bioburdon ) AIR HANDLING UNIT:To maintain Environment condition in Working zone (i.e. to maintain class 10,000)
  • 10. Preventive Maintenance of LAF Key point to archive performance of machine Maintain velocity of air between 90 +/- 20 FPM. ( Laminar Air Flow ) Maintain integrity of Filter Preventive measure to maintain key point Maintain blower motor speed and set damper to achieve pressure in Magnehlic Gauge. Range 7 to 15 mm of WC. If pressure less than 7 ,means filter is chock so replace it with new one and found pressure more than 15 than filter is puncture/leak/ fail so replace it with new one Perform leak test of filter to check side leakage OR puncture of Filter.Proper fitting of filter is important to achieve clean air flow.
  • 11. Preventive Maintenance of Steam Sterilizer Key point to archive performance of machine Maintain steam temperature ( 121. cent.) and Pressure (1.1 Kg/cm2) for the particular time in Chamber of Machine Preventive measure to maintain key point Supply saturated steam of 1.5 Kg/cm2 from PSG. Maintain PRESSURE OF STEAM with no leakage from door gasket, any lines/valves/Gasket. Achieve and maintain desired vacuum to perform cycle
  • 12. Preventive Maintenance of ETO Sterilizer Key point to archive performance of machine Maintain Chamber temperature ( 40. cent.) and desire Pressure/vacuum for the particular time with ex poser of EO Gas Preventive measure to maintain key point Supply of EO Gas from EO Cylinder/Cartidge. Maintain PRESSURE/VACUUM OF EO gas with no leakage from door gasket, any lines/valves/Gasket. Achieve and maintain desired vacuum to perform cycle.
  • 13. Preventive Maintenance of AIR Handling Unit Key point to archive performance of machine Maintain velocity of air from supply grill ( As per design ) Maintain Chilled water circulation in coil of AHU. Maintain filter integrity in Planum of AHU and Housing Preventive measure to maintain key point Maintain blower motor speed and set damper to achieve require pressurized air in each area Maintain CHW flow, pressure and temperature Proper fitting of filter is important Perform leak test of filter to check side leakage OR puncture of Filter No air leakage from AHU OR any part of ducting