More Related Content Similar to Presisi_Daily_Plan for mining area at halteng Similar to Presisi_Daily_Plan for mining area at halteng (20) Presisi_Daily_Plan for mining area at halteng1. PT PP Presisi - Daily Plan
28 March 2024 (Shift I & II) – W11
Daily Digging Plan
2. PT PP Presisi - Daily Plan
28 March 2024 (Shift I & II) – W11
Daily Digging Plan
Update Remain Reserve Grizzly. Data topo update 26032024
Material Volume Tonnes Ni Fe Sio2 Mgo Co H2o Dry Density Wet Density
VHGS 15295 27350 1.95 13.99 40.65 21.4 0.03 0.3 1.31 1.86
HGS 15470 28451 1.54 9.45 40.68 28.43 0.02 0.23 1.49 1.92
LGS 1 12260 24320 1.26 8.27 40.99 30.7 0.02 0.21 1.63 2.06
LGS 2 4210 7019 1.28 15.55 38.4 14.72 0.04 0.3 1.18 1.69
VLGS 27345 52015 1.1 9.88 39.4 27.02 0.02 0.23 1.56 2
Total SAP 74580 139155 1.43 11.43 40.02 24.45 0.03 0.25 1.43 1.91
LIM 57868 94525 1.19 38.85 14.11 1.92 0.12 0.4 0.98 1.64
WST 258332 501353 0.25 4.79 24.63 23.04 0.01 0.24 1.65 2.14
Grand Total 390781 735034 0.58 10.27 26.21 20.93 0.02 0.26 1.53 2.04
FSAP RSAP LIM WST Topsoil TMM SAP TMM SAP TMM
W-11 Plan 704,233 418,400 306,085 45,913 1,474,631
20-Mar-24 15,930 - 8,820 9,570 2,700 37,020 493,470 1,105,485 70.1% 75.0%
21-Mar-24 17,340 - 13,740 5,760 3,390 42,180 510,810 1,147,665 72.5% 77.8%
22-Mar-24 15,870 - 15,810 9,480 1,380 42,540 526,680 1,190,205 74.8% 80.7%
23-Mar-24 16,440 - 9,510 10,080 2,820 38,850 543,120 1,229,055 77.1% 83.3%
24-Mar-24 14,220 - 16,020 11,010 3,420 44,670 557,340 1,273,725 79.1% 86.4%
25-Mar-24 15,120 - 16,230 12,840 3,120 47,310 572,460 1,321,035 81.3% 89.6%
26-Mar-24 17,700 - 13,830 10,200 4,980 46,710 590,160 1,367,745 83.8% 92.8%
27-Mar-24 - 590,160 1,367,745 83.8% 92.8%
Period
Mining Production (WMT) WTD W-11 Ach.
ADT
Type ID 40T MP 01 MP 02 FSAP RSAP LIM WST FSAP RSAP LIM WST FSAP RSAP LIM WST FSAP RSAP LIM WST Est. WMT
Date Contractor Exca Type Exca ID ADT40T P1/Peralihan Sub Pit Block ID MP 01 MP 02 BMFSAP prop.
BMRSAP prop.BMLIMprop. BMWSTprop. BM Ni FSAP BMNi RSAP BMNi LIM BMNi WST BM Fe FSAP BMFe RSAP BMFe LIM BMFe WST WMTFSAP WMTRSAP WMTLIM WMTWSTWMTProduction
Tofu-3 410_B18_S125 SAP SAP 0.02 0.06 0.28 0.83 ORE 1.26 1.59 1.41 10.34 6.57 35.18 5.51 50 150 700 2075 2975
Tofu-3 410_B18_S124 SAP SAP 0.02 0.06 0.31 0.72 ORE 1.13 1.83 1.59 12.09 6.68 35.56 5.36 50 150 775 1800 2775
Tofu-3 402_B24_S122 SAP HGS 0.07 0.99 0.27 0.59 ORE 1.01 1.66 1.51 14.74 6.87 32.2 5.62 175 2475 675 1475 4800
Tofu-3 402_B25_S122 LIM LIM2 0.07 0.62 0.15 0.23 ORE 0.84 1.67 1.74 18.03 6.94 31.32 5.15 175 1550 375 575 2675
Tofu-3 446_B31_S116 LIM LIM2 0.30 0.41 0.20 0.25 ORE 0.91 1.83 1.87 14.19 6.98 32.3 5.47 750 1025 500 625 2900
Tofu-3 450_B31_S117 LIM LIM2 0.30 0.41 0.07 0.10 ORE 0.87 1.36 1.34 13.15 7.41 30.63 0 750 1025 175 250 2200
Tofu-3 434_B18_S134 SAP HGS 0.30 0.41 0.08 0.90 ORE 1.09 1.32 1.63 8.46 6.68 29.26 5.24 750 1025 200 2250 4225
Tofu-3 442_B18_S135 SAP HGS 0.30 0.41 0.33 0.79 ORE 1.29 2.06 1.71 12.96 6.81 37.15 5.33 750 1025 825 1975 4575
Tofu-3 454_B35_S124 LIM LIM1 0.01 0.00 0.12 0.14 ORE 1.05 2.33 2.28 16.52 6.8 31.94 0 25 0 300 350 675
Tofu-3 458_B35_S125 LIM LIM1 0.04 0.01 0.02 0.02 ORE 1.04 2.09 2.09 18.89 0 39.2 0 110 25 50 50 235
Tofu-3 434_B18_S132 WST WST 0.25 0.08 0.00 0.00 WST 0 0 0 0 0 0 0 625 200 0 0 825
Tofu-3 430_B19_S130 WST WST 0.04 0.01 0.00 0.00 WST 0 0 0 0 0 0 0 110 25 0 0 135
Tofu-3 394_B23_S119 LIM LIM2 0.47 0.38 0.11 0.23 ORE 0.98 1.43 1.36 16.13 6.75 34.77 4.89 1175 950 275 575 2975
Tofu-3 398_B23_S120 LIM LIM2 0.41 0.16 0.13 0.29 ORE 0.97 1.36 1.28 14.65 6.35 34.4 4.98 1025 400 325 725 2475
Tofu-3 454_B33_S122 WST WST 0.22 0.06 0.32 0.79 WST 1.03 1.39 1.32 9.85 6.79 25.49 5.49 550 150 800 1975 3475
Tofu-3 454_B34_S122 WST WST 0.21 1.00 0.19 0.62 WST 1.15 1.41 1.38 9.6 6.59 29.99 5.34 525 2500 475 1550 5050
Tofu-3 430_B28_S120 LIM LIM2 0.47 0.38 0.06 0.11 ORE 0.78 1.48 1.73 13.98 6.71 34.91 5.46 1175 950 150 275 2550
Tofu-3 438_B29_S120 LIM LIM2 0.41 0.16 0.05 0.07 ORE 0.92 1.74 1.75 13.04 6.26 37.84 0 1025 400 125 175 1725
Tofu-3 394_B17_S118 LIM LIM1 0.47 0.38 0.08 0.10 ORE 1.07 1.68 1.74 29.04 7.78 36.11 4.84 1175 950 200 250 2575
Tofu-3 398_B17_S117 WST WST 0.41 0.16 0.02 0.03 WST 0.79 1.86 1.7 29.56 6.57 30.66 0 1025 400 50 75 1550
Tofu-3 414_B14_S126 SAP HGS 0.47 0.38 0.23 0.67 ORE 1.14 1.45 1.46 17.69 7.25 34.37 5.67 1175 950 575 1675 4375
Tofu-3 414_B15_S126 SAP VLGS 0.41 0.16 0.25 0.80 ORE 1.08 1.61 1.41 14.93 7.02 33.48 5.31 1025 400 625 2000 4050
7595 12675 6725 16700 47245
Total Daily Production Plan
30T 305 2 Peralihan Prepare TOS
40T 465 3 P1
40T 466 3 P1
40T 463 2 P1
40T 464 3 P1
50T 502 3 P1 Prepare Blasting RL 430
50T 505 3 P1
504 3 P1
50T 503 4 P1
Ni Grade (%) Fe Grade (%) Material Production
26-Mar-24 PP PRESISI
50T 501 3 P1
Production
Date
Mining
Contractor
Fleet Position BlockModel
Excavator
50T
Status Subpit BlockID
Class Material Proportion
3. Daily Plan
Block Plan & Activity
EX-505
4ADT
DZ-29
EX-504
3ADT
EX-466
3 ADT
EX-501
3 ADT
EX-503
4ADT
EX-502
3ADT
EX-464
3ADT
EX-203
EX-463
2ADT
EX-465
3 ADT
EX-304
2ADT
TYPE NO UNIT STATUS ACTIVITY
EX 463 RFU PIT
EX 464 RFU PIT
EX 465 RFU PIT
EX 466 RFU PIT
EX 342 RFU SB
EX 344 RFU
EX 305 RFU
EX 347 RFU
EX 301 RFU
EX 302 RFU
EX 304 RFU
40T
STATUS UNIT
30T
EX 40 RFU
EX 203 RFU SB
EX 204 RFU SB
EX 201 RFU
EX 202 BD
EX 205 RFU SB
EX 203 RFU SB
EX 105 RFU
EX 096 RFU SB
EX 505 RFU PIT
EX 501 RFU PIT
EX 502 RFU PIT
EX 503 RFU PIT
EX 504 RFU PIT
50T
20T
UNIT TOTAL RFU B/D SB
ADT 36 31 3 2
MGD 1 1
COMPACT 2 2
FT 4 4
WT 2 1 1
DT MDO 3 2
DZ 8 4 1 3
EXCA 20 T 8 4 4
EXCA 30 T 7 7
EXCA 40 T 4 3 1
EXCA 50 T 5 5
UNIT POPULATION
PIT SERVICE STATUS ACTIVITY
DZ 17 RFU
DZ 19 RFU
DZ 26 RFU
DZ 27 RFU
DZ 28 RFU
DZ 29 RFU
DZ 30 BD
DZ 31 RFU
MG 08 RFU
VR 26 RFU
VR 21 RFU
STATUS UNIT
4. Daily Plan MDO
Progress Land Clearing
Continue progressed clearing WD_TF_PPP_01, LD_TF_PPP_02 using EX-201, EX-304
and clean up biomass using EX-105 log grapple, dozer 27
Continue progressed rockwall / counter weight using EX-305
Compacting access LD_TF_PPP_02 using V21
Continue progressed benching TSD_TF_PPP_02 bench 2 RL 392 ACT 394 Cutting 2M, bench 3
RL 398 ACT 401 Cutting 3M
Item Luas (Ha) Luas Progress (Ha) Remain (Ha) Progress
Pit Tofu 3 East 10.8 9.58 1.2 89%
Temporary Soil Dump 2 1.84 1.19 0.65 65%
Waste Dump 10.6 4.12 6.48 39%
Temporary Limonite Dump 2 8.17 5.16 3.01 63%
5. Daily Plan MDO
Progress Benching LD_TF_001
Continue progressed benching and progressed rockwall LD_TF_PPP_01
Bench 3 RL 460 Act 461 Cut 1m
Bench 4 RL 468 Act 471 Cut 4m
Update situasi 21/03/24