 A completely elevated MRT project in Hyderabad, Southern India
 3 Corridors/Lines (72 km) taken up in Phase I
 UMT sector - World’s largest Metro Rail project in PPP mode
 Main project cost : USD 2.66 b + Property Devpt. ph.I (USD 0.41b)
+ Land + other costs (USD 0.37 b) = USD 3.44 b
 Implementing Entity:
● Concessioning Authority: Hyderabad Metro Rail Limited (Govt. of AP)
● Concessionaire (Pvt. Sector): L&T Metro Rail (Hyderabad) Limited, an
SPV of USD 12 b L&T
Hyderabad Metro Rail Project
1
w w w . h m r . g o v . i n
India
India
Hyderabad
Hyderabad city – geographical location
2
w w w . h m r . g o v . i n
 Hyderabad, a city of 8m pop
 Capital of the Southern State of Telangana
 Historical City – now hub of pharma industry, research institutes,
IT/ITES Service Sector Economy
 Severe traffic congestion & increasing pollution levels
 Lack of efficient, reliable & comfortable PTS  increase in personal
vehicles: 3.0 million vehs + addition of 0.3 m p.a
 Total motorized trips: 7 m per day – Bus + local rail: 44%; Two
wheelers: 30%; Autos: 16%; cars: 10%
Traffic & Transportation Scenario in Hyderabad
3
w w w . h m r . g o v . i n
 Phase I: 3 corridors; 72 km; 66 stations & 3 Depots
 Integration/Interchange with Main rail terminals & Bus Depots
 ‘Transit +’ concept: Last mile connectivity with Feeder Buses, NMT,
Pedestrian Facilities & Street Furniture
 Not a simple Metro, but an urban redesign & rejuvenation effort to
transform Hyderabad into a people friendly green city
 Eco-friendly stations with natural ventilation, skywalks, bicycle
stations & tracks and other commuter friendly facilities
 Expected to generate about INR 500 b (USD 8.06 b) investments in
Hyderabad & it’s surroundings
Hyderabad Metro Rail as “ Transit + ”
4
w w w . h m r . g o v . i n
 35 yr concession, extendable by another 25 yrs
 World’s largest Metro in ppp mode
 Main project cost : USD 2.28 b (INR 14,132 Cr.) + Property Devpt. ph.I
USD 0.36b (INR 2,243 Cr.) + Land & other costs USD 0.32 b (INR 1,980
Cr.) = USD 2.96 b (INR 18,355 Cr.)
 Commercial risk by Concessionaire & no traffic guarantees
 Well balanced & bankable Concession Agreement; transparent global
bid process
 Technology–neutral & performance based ‘output’ oriented MSS
(tech specs)
 RfQ & RfP stages – DCA; MSS & SHA
PPP Format
5
w w w . h m r . g o v . i n
 Scope for design innovation & reduction in life cycle costs
 269 acres (109 Ha) land; commercial exploitation of air space to
create 18.5 m SFT – lease rentals
 Prefixed tariff & fare escalation formula; differential tariff (peak
vs off peak hours)
 Stations as hubs of activity – shopping malls, multiplexes &
leisure; hotels & eateries; hospitals, clinics, office space etc
 Ridership & property development boosting each other 
financial viability
PPP Format
6
w w w . h m r . g o v . i n
 Project cost : USD 2.73 b (INR 16,375 Cr.)
(MRT : 2.36 b (INR 14,132 Cr.) + Property Devpt : 0.37 b (INR 2,243 Cr.))
 Senior Debt : USD 1.91 b (INR 11,478 Cr.)
 Subordinate Debt : USD 0.17 b (INR 1,000 Cr. )
 Equity : USD 0.41 b (INR 2,439 Cr.)
 Other Sources (VGF) : USD 0.24 b (INR 1,458 Cr.)
Total : USD 2.73 b (INR 16,375 Cr.)
 Financial Closure achieved in March 2011
 Revenue Model: 50% from Fare box; 45% from Property devpt; 5%
Misc (Ads + Parking fee)
 IRR
 Project IRR : 13.89%
 Equity IRR : 17.50%
Funding Pattern & Financial model
w w w . h m r . g o v . i n
Lenders’ Engineer
Consultants for Carbon Credits
• Independent Engineer : Louis Berger, USA
• Safety Consultant : Eptisa, Spain
Programme Manager
Concessionaire’s Engineer(CE)
Independent Safety and RAM Assessor
Lenders Insurance Consultant-Marsh India Pvt. Ltd.
Operation & Maintenance Contractor
The Team (Authority, Concessionaire, Consultants etc.,)
Concessionaire : L&TMRHL
Authority : Hyderabad Metro Rail Limited (GoT)
8
w w w . h m r . g o v . i n
Engineering, Procurement & Construction contractors
Packages Vendors
Viaduct, Stations & Depots L&T Construction
Rolling Stock Hyundai Rotem, South Korea
Power supply + SCADA L&T Construction
Traction L&T Construction
Signaling & Train Control Thales, Canada (French company)
Communication Thales, Portugal (French company)
Track works
(Turnouts / Rails / Fastening system)
L&T Construction along with
(Voest Alpine, Austria + Tata Corus,
France + Vossloh, Germany)
O&M Operator Keolis France
Automatic Fare Collection (AFC) Samsung, South Korea
9
w w w . h m r . g o v . i n
Contact Information
Name : Mr N.V.S.Reddy
Company : Hyderabad Metro Rail Ltd.
Role in Project : Managing Director
Phone : +91 40 2338 8580 / 81 (Fax 82)
Email : nvsreddyiras@gmail.com
Website : www.hmr.gov. in
Name : Mr V.B.Gadgil
Company : L&T Metro Rail (Hyderabad) Ltd.
Role in Project : Managing Director
Phone : +91 40 67295500 | Fax: +91 40 23123015
Email : vbg@ltmetro.com
Website : www.ltmetro.in
10
w w w . h m r . g o v . i n 11
w w w . h m r . g o v . i n 12
w w w . h m r . g o v . i n
N.V.S.Reddy

More Related Content

Similar to Presentation-to-the-6th-Global-Infrastructure-Leadership-Forum-New-York.ppt

Hyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sHyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-s
Abi Abagun
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
Akshay Gaikwad
 
Converting of Hubli Dharwad BRTS-LRT.pdf
Converting of Hubli Dharwad BRTS-LRT.pdfConverting of Hubli Dharwad BRTS-LRT.pdf
Converting of Hubli Dharwad BRTS-LRT.pdf
KRISHNAKANTH MALLIKARJUN
 
Cleveland Peer Exchange - Euclid Corridor Transformation
Cleveland Peer Exchange - Euclid Corridor TransformationCleveland Peer Exchange - Euclid Corridor Transformation
Cleveland Peer Exchange - Euclid Corridor Transformation
Miami-Dade Transportation Planning Organization
 
Urban Planning Related Issues.pdf
Urban Planning Related Issues.pdfUrban Planning Related Issues.pdf
Urban Planning Related Issues.pdf
KRISHNAKANTH MALLIKARJUN
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
Shreyanand Patel
 
Alternative for BRTS.pdf
Alternative for BRTS.pdfAlternative for BRTS.pdf
Alternative for BRTS.pdf
KRISHNAKANTH MALLIKARJUN
 
BRTS Impact.pdf
BRTS Impact.pdfBRTS Impact.pdf
BRTS Impact.pdf
krishnakanth648816
 
BRTS Alternative.pdf
BRTS Alternative.pdfBRTS Alternative.pdf
BRTS Alternative.pdf
krishnakanth648816
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluation
gouravranjan27
 
Integrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike MarsdenIntegrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike Marsden
Cape Town Partnership
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
Rajesh Prasad
 
GreenCAB - Dial-a-Rickshaw Service
GreenCAB - Dial-a-Rickshaw ServiceGreenCAB - Dial-a-Rickshaw Service
GreenCAB - Dial-a-Rickshaw Service
Jaspal Singh
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
Kunal Bhadane
 
Post globe john farrow
Post globe john farrowPost globe john farrow
Post globe john farrow
ONEIA
 
Sarwant estonia new business models
Sarwant estonia   new business modelsSarwant estonia   new business models
Sarwant estonia new business models
Marjola BRUCI
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of Delhi
Jaspal Singh
 
PEV autonomy 2017
PEV autonomy 2017 PEV autonomy 2017
PEV autonomy 2017
FabMob
 
Global Challenge Porjct Report -Coursework of University of Bristol
Global Challenge Porjct Report -Coursework of University of Bristol Global Challenge Porjct Report -Coursework of University of Bristol
Global Challenge Porjct Report -Coursework of University of Bristol
ssusera0a3b6
 
M9-EIA-Draft Final Report
M9-EIA-Draft Final ReportM9-EIA-Draft Final Report
M9-EIA-Draft Final Report
giap0083
 

Similar to Presentation-to-the-6th-Global-Infrastructure-Leadership-Forum-New-York.ppt (20)

Hyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sHyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-s
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
 
Converting of Hubli Dharwad BRTS-LRT.pdf
Converting of Hubli Dharwad BRTS-LRT.pdfConverting of Hubli Dharwad BRTS-LRT.pdf
Converting of Hubli Dharwad BRTS-LRT.pdf
 
Cleveland Peer Exchange - Euclid Corridor Transformation
Cleveland Peer Exchange - Euclid Corridor TransformationCleveland Peer Exchange - Euclid Corridor Transformation
Cleveland Peer Exchange - Euclid Corridor Transformation
 
Urban Planning Related Issues.pdf
Urban Planning Related Issues.pdfUrban Planning Related Issues.pdf
Urban Planning Related Issues.pdf
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
Alternative for BRTS.pdf
Alternative for BRTS.pdfAlternative for BRTS.pdf
Alternative for BRTS.pdf
 
BRTS Impact.pdf
BRTS Impact.pdfBRTS Impact.pdf
BRTS Impact.pdf
 
BRTS Alternative.pdf
BRTS Alternative.pdfBRTS Alternative.pdf
BRTS Alternative.pdf
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluation
 
Integrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike MarsdenIntegrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike Marsden
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
GreenCAB - Dial-a-Rickshaw Service
GreenCAB - Dial-a-Rickshaw ServiceGreenCAB - Dial-a-Rickshaw Service
GreenCAB - Dial-a-Rickshaw Service
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 
Post globe john farrow
Post globe john farrowPost globe john farrow
Post globe john farrow
 
Sarwant estonia new business models
Sarwant estonia   new business modelsSarwant estonia   new business models
Sarwant estonia new business models
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of Delhi
 
PEV autonomy 2017
PEV autonomy 2017 PEV autonomy 2017
PEV autonomy 2017
 
Global Challenge Porjct Report -Coursework of University of Bristol
Global Challenge Porjct Report -Coursework of University of Bristol Global Challenge Porjct Report -Coursework of University of Bristol
Global Challenge Porjct Report -Coursework of University of Bristol
 
M9-EIA-Draft Final Report
M9-EIA-Draft Final ReportM9-EIA-Draft Final Report
M9-EIA-Draft Final Report
 

Recently uploaded

Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 

Recently uploaded (20)

Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 

Presentation-to-the-6th-Global-Infrastructure-Leadership-Forum-New-York.ppt

  • 1. w w w . h m r . g o v . i n NVS Reddy Managing Director Hyderabad Metro Rail Ltd. Hyderabad Metro Rail in PPP Mode Presentation to the 6th Global Infrastructure Leadership Forum
  • 2. w w w . h m r . g o v . i n  A completely elevated MRT project in Hyderabad, Southern India  3 Corridors/Lines (72 km) taken up in Phase I  UMT sector - World’s largest Metro Rail project in PPP mode  Main project cost : USD 2.66 b + Property Devpt. ph.I (USD 0.41b) + Land + other costs (USD 0.37 b) = USD 3.44 b  Implementing Entity: ● Concessioning Authority: Hyderabad Metro Rail Limited (Govt. of AP) ● Concessionaire (Pvt. Sector): L&T Metro Rail (Hyderabad) Limited, an SPV of USD 12 b L&T Hyderabad Metro Rail Project 1
  • 3. w w w . h m r . g o v . i n India India Hyderabad Hyderabad city – geographical location 2
  • 4. w w w . h m r . g o v . i n  Hyderabad, a city of 8m pop  Capital of the Southern State of Telangana  Historical City – now hub of pharma industry, research institutes, IT/ITES Service Sector Economy  Severe traffic congestion & increasing pollution levels  Lack of efficient, reliable & comfortable PTS  increase in personal vehicles: 3.0 million vehs + addition of 0.3 m p.a  Total motorized trips: 7 m per day – Bus + local rail: 44%; Two wheelers: 30%; Autos: 16%; cars: 10% Traffic & Transportation Scenario in Hyderabad 3
  • 5. w w w . h m r . g o v . i n  Phase I: 3 corridors; 72 km; 66 stations & 3 Depots  Integration/Interchange with Main rail terminals & Bus Depots  ‘Transit +’ concept: Last mile connectivity with Feeder Buses, NMT, Pedestrian Facilities & Street Furniture  Not a simple Metro, but an urban redesign & rejuvenation effort to transform Hyderabad into a people friendly green city  Eco-friendly stations with natural ventilation, skywalks, bicycle stations & tracks and other commuter friendly facilities  Expected to generate about INR 500 b (USD 8.06 b) investments in Hyderabad & it’s surroundings Hyderabad Metro Rail as “ Transit + ” 4
  • 6. w w w . h m r . g o v . i n  35 yr concession, extendable by another 25 yrs  World’s largest Metro in ppp mode  Main project cost : USD 2.28 b (INR 14,132 Cr.) + Property Devpt. ph.I USD 0.36b (INR 2,243 Cr.) + Land & other costs USD 0.32 b (INR 1,980 Cr.) = USD 2.96 b (INR 18,355 Cr.)  Commercial risk by Concessionaire & no traffic guarantees  Well balanced & bankable Concession Agreement; transparent global bid process  Technology–neutral & performance based ‘output’ oriented MSS (tech specs)  RfQ & RfP stages – DCA; MSS & SHA PPP Format 5
  • 7. w w w . h m r . g o v . i n  Scope for design innovation & reduction in life cycle costs  269 acres (109 Ha) land; commercial exploitation of air space to create 18.5 m SFT – lease rentals  Prefixed tariff & fare escalation formula; differential tariff (peak vs off peak hours)  Stations as hubs of activity – shopping malls, multiplexes & leisure; hotels & eateries; hospitals, clinics, office space etc  Ridership & property development boosting each other  financial viability PPP Format 6
  • 8. w w w . h m r . g o v . i n  Project cost : USD 2.73 b (INR 16,375 Cr.) (MRT : 2.36 b (INR 14,132 Cr.) + Property Devpt : 0.37 b (INR 2,243 Cr.))  Senior Debt : USD 1.91 b (INR 11,478 Cr.)  Subordinate Debt : USD 0.17 b (INR 1,000 Cr. )  Equity : USD 0.41 b (INR 2,439 Cr.)  Other Sources (VGF) : USD 0.24 b (INR 1,458 Cr.) Total : USD 2.73 b (INR 16,375 Cr.)  Financial Closure achieved in March 2011  Revenue Model: 50% from Fare box; 45% from Property devpt; 5% Misc (Ads + Parking fee)  IRR  Project IRR : 13.89%  Equity IRR : 17.50% Funding Pattern & Financial model
  • 9. w w w . h m r . g o v . i n Lenders’ Engineer Consultants for Carbon Credits • Independent Engineer : Louis Berger, USA • Safety Consultant : Eptisa, Spain Programme Manager Concessionaire’s Engineer(CE) Independent Safety and RAM Assessor Lenders Insurance Consultant-Marsh India Pvt. Ltd. Operation & Maintenance Contractor The Team (Authority, Concessionaire, Consultants etc.,) Concessionaire : L&TMRHL Authority : Hyderabad Metro Rail Limited (GoT) 8
  • 10. w w w . h m r . g o v . i n Engineering, Procurement & Construction contractors Packages Vendors Viaduct, Stations & Depots L&T Construction Rolling Stock Hyundai Rotem, South Korea Power supply + SCADA L&T Construction Traction L&T Construction Signaling & Train Control Thales, Canada (French company) Communication Thales, Portugal (French company) Track works (Turnouts / Rails / Fastening system) L&T Construction along with (Voest Alpine, Austria + Tata Corus, France + Vossloh, Germany) O&M Operator Keolis France Automatic Fare Collection (AFC) Samsung, South Korea 9
  • 11. w w w . h m r . g o v . i n Contact Information Name : Mr N.V.S.Reddy Company : Hyderabad Metro Rail Ltd. Role in Project : Managing Director Phone : +91 40 2338 8580 / 81 (Fax 82) Email : nvsreddyiras@gmail.com Website : www.hmr.gov. in Name : Mr V.B.Gadgil Company : L&T Metro Rail (Hyderabad) Ltd. Role in Project : Managing Director Phone : +91 40 67295500 | Fax: +91 40 23123015 Email : vbg@ltmetro.com Website : www.ltmetro.in 10
  • 12. w w w . h m r . g o v . i n 11
  • 13. w w w . h m r . g o v . i n 12
  • 14. w w w . h m r . g o v . i n N.V.S.Reddy