More Related Content Similar to PP-QM with Subcontractor Similar to PP-QM with Subcontractor (8) PP-QM with Subcontractor1. Production order with external processing and Quality Checks
Hexagon Bolt (finished Goods manufacturing)
BOM - Hexagon Bolt
8. Auto goods receipt setup at last operation 0060 – PP03
Quality Management – inspection setup in the material master:
17. In the assignment tab we see the inspection lot generated for the created production order.
18. Production order – operation overview.
Let’s confirm the order operation wise. Transaction: Co11n
Enter the order & operation 0010
21. Save the order. Operation 0010 confirmed now.
Lets check the operation overview display of production order – co03
34. Inbound delivery created against – Vendor & PO.
3160002598 - Indound delivery.
MIGO – Goods receipt against the Inbound delivery
38. GR done for the external operation. Now lets see the Production order.
43. Operation 0030 confirmed.
Now We got the external operation done. So we can go ahead with the next operations. Let’s confirm
0040 painting here.
47. When I try to confirm I get a pop message - QM Characteristics.
So let perform the QM operations on the Inspection lot for the order.
72. Operation 0050 status.
Last operation 0060. PP03 control key for auto goods receipt.
Also we have Inspection setup – 04 for this, hence stock would be visible in Quality – Final goods receipt
for inspection (PP QM)
Current stock :
78. See Final goods - stock in Quality.
We will have to the Result recording and UD.
91. I see 3 have been moved to unrestricted.