Street Lighting PPPs: Need & Rationale
Reduction in Energy
Consumption
Improvement in
Service Level
Mobilization of Private
Sector
Introducing energy efficient street lighting system in Project area
•Reduction in energy
consumption by
implementation of
Energy Conservation
Measures (ECM)
•Maintain environment
friendly street lighting
system
•Improvement of
illumination level
•Reduction in number of
non glowing lamps
•Systematic recording of
inventory, billing and
maintenance data
•Improvement in
operation and
maintenance practice –
single point
accountability
•Utilization of private
sector expertise
•Deployment of latest
technological knowhow –
would enable training of
municipal employees as
well.
Implement a technologically and financially sustainable project which may be
replicated in other cities
IFC Experience in India
3
Description Jaipur Bhubaneswar
Street Lights in city 170,000 28,916
Single Drop points 42,000 9,043
Street lights covered under contract 70,000 19,873
Street lights with functional meters 27,000 Approx. 4,000 (ie 20%)
Annual O&M expenses (staff and R&M) USD 1 million USD 200,000
Electricity charges USD 4 million USD 1.5 million
Expected electricity charges post project
implementation
USD 1 million USD 300,000
Estimated Project Cost USD 8.5 million USD 3.5 million
Winning bidder SMC Infrastructure
(LOA issued)
Shah Investments
Energy savings guaranteed (bids received) 77% 80%
Trust &
Retention A/c
Agreement
Transaction Structure – Shared Savings Model
4
Energy Service
Company (ESCO)
Distribution Utility
Municipal Corporation
(MC)/ Urban Local Body
(ULB)
Street Lighting
Network
Financing
(Equity,
Debt)
Sharing of % of savings +
O&M Payment
Energy
Savings
Metering
Supply, Billing & Payments
Supply
Agreement
Energy
Performance
ContractO&M
• The Shared Savings Model
(BOOT Model) envisages the
capital expenditure and O&M of
the project to be undertaken by
the ESCO.
• The ULB shares the savings
realized from the project with the
ESCO as per the provisions of
the contract.
• The actual sharing of benefits is
as per the actual savings
achieved by the ESCO on month
to month/ billing period basis.
• The metering and billing by the
utility decides the amount of
actual energy saved in the
project after implementation of
the identified energy efficient
measures by the ESCO.
Trust &
Retention A/c
Agreement
Alternative Model: Notional Savings / Annuity Model
5
Lighting manufacturer/
Operator
Distribution Utility
Municipal Corporation
(MC)/ Urban Local Body
(ULB) / State Authority
Street Lighting
Network
Financing
(Equity,
Debt)
Annuity
Energy
Savings
Metering
Supply, Billing & Payments
Supply
Agreement
Supply &
Services
ContractO&M
• The model envisages the capital
expenditure and O&M of the
project to be undertaken by the
operator.
• The ULB pays an annuity to the
operator which is the lowest bid.
• The technological intervention is
determined by authority and
therefore savings are estimated
prior to the bid.
• The operator is only required to
meet 1) equipment performance
and 2) customer service
obligations. Energy savings are
not part of the operators
performance parameters
Roof-top Solar Power
6
• Every building whether home, industry, institution, commercial establishment can
generate some solar power by installing PV panels on the rooftop or on unutilized
premises
• PV roof-top installations at the tail-end of the grid increase grid-stability and
reduce losses
• Savings in land requirement and costs
• Savings in development of new transmission infrastructure
• Creation of value from under-utilized /unutilized rooftops
The Concept
Rationale
Gujarat Roof-top Solar Case Study
7
• Govt. of Gujarat (GOG) envisaged to implement a pilot 5 MW grid connected
distributed rooftop solar project in Gandhinagar on a PPP model
• Demonstrate technical, commercial and regulatory viability and sustainability of
rooftop solar concept
• Potential to reduce ~ 6000 tons of CO2 equivalent annually
• Private sector investment mobilization ~ US$ 10 million
• Potential for large scale replication
The Drivers
Envisaged Impact
Gross Metering – Self Owned
8
Rooftop Solar
PV System
SM
Utility (Grid
Owner)
Rooftop
Owner
Flow of Funds
Flow of Energy
Utility Payments to solar developer based
on pre-determined formula
Key mechanisms:
1. Feed in Tariffs
2. Generation Based Incentives
Solar meter
(Generator
Meter)
PPA – Utility & Solar
System Owner
THANK YOU
9
Roof-top Solar Business Models
10
Parameter Gross Metering Net-metering
Objective • Electricity sale to utility • Self-consumption of electricity
Tariff
Arrangement
• PPA with the utility – utility to pay
as per PPA price (FIT)
• No payment by utility for electricity
injected into the grid, beyond a limit
Financial
burden
• Cost borne by utility & then passed
through to the consumer
• Usually Govt. bears burden for any
incentive/subsidy to bridge viability gap
Energy
Accounting
• Metering arrangement to measure
generation only
• Metering arrangement to measure
generation as well as respective
consumption
Beneficiary
• Assist utility in meeting Solar RPO
compliance
• Assist consumer directly to reduce its
electricity billing
Project
Selection
• Tariff based competitive bidding
• First-come-first serve basis (to start
with)
Utility’s
Concern
• Not keen on signing PPA with small
rooftop projects – higher FIT &
administrative burden.
• Loss of revenue for utility – reduced
grid consumption by consumers
Developer’s
Concern
• Grid unavailability to impact
revenue
• Low level of incentives may impact
viability of project for certain consumer
segments
Key Features of Shared Savings Model
11
Baseline Needs complete functional data on number of lights, performance quality,
glowing / non glowing hours, voltage fluctuations, etc
Working meters and robust underlying infrastructure required to ensure
proper base lining
If not available, authority needs to incur upfront expenditure to ensure
proper baseline either prior to technical due diligence or post bid
Engagement with utility to ensure working meters are available at all points
Technology
Neutral
Bidding is usually done on the basis of energy savings so choice of technology
is left to operator as long as highest savings are achieved
While energy share offered to authority, if base line increases after
correction of deficiencies and operational improvement then it results in a
net cash outflow
Operational & Maintenance expenditure currently being incurred by the
authority also transferred to operator to make project viable
Challenges
• Need for robust Baseline and Monitoring and Verification (M&V) :
 Performance and the payment to the ESCO depend on improvements made over
the baseline
• Difficulties in establishing baseline:
 In the absence of meters, difficult to arrive at the energy cost of the ULB based
on actual energy consumed.
 Not possible to establish baseline consumption for points not connected to the
street-lighting feeder (single drop points)
 Baseline needs to assume that all lamps in the city are glowing
 Need for adequate system infrastructure: poles, cables, and feeder pillars
• Places significant demand on the ULB to undertake robust M&V and make
performance based payments.
• Single drop points are not covered – need for a separate contract
• Investors not very keen on ESCO model given the payback depends upon quality of
the infrastructure and accuracy of metering/ billing systems
• Difficult to raise project finance under ESCO model owing to above
12
Key Features of Annuity Model
Project
design
determined
upfront
Authority can decide technology, systems required based on objectives,
city needs and payment capacity.
Bid will incorporate specific design and input requirements
If underlying infrastructure is poor, then the project scope can be
expanded to include upgradation of entire network
No reduction
in energy
bills – net
cash outflow
Technical demonstrations will determine energy savings at the due
diligence stage (prior to bid).
Engagement with the utility will be up to the municipal authority – in
the interest of the ULB to push for installation of meters
Authorities will need to get budget approvals upfront based on bid
amount
13
Challenges
• The notional savings/ annuity model assumes that the 1) data available with respect
to number and types of lamps and 2) energy consumption of the street lighting
network is up to date and robust and does not require fresh surveys
• The Notional Savings / Annuity model ignores underlying issues that may exist in the
network which can only be determined through a survey/detailed assessment
• The operator is not required to demonstrate energy savings so in the absence of
adequate data monitoring, the city authority may not realize cost savings under
such projects
• The city authority finalizes the technology prior to the bid and they may not
necessarily be aware of the latest options in the market
• If sample surveys undertaken prior to the bid are not robust or the estimated
number of points is lower than estimated then the authority may end up paying a lot
more under such projects
14
Key Differences in Models
Point of difference Shared Savings Notional savings
Technology / Interventions Selected by bidder Prescribed by ULB
Energy savings Based on bid (minimum
threshold provided by ULB)
Prescribed by ULB by way of design
(but not measured)
Bid variable Guaranteed energy savings Annuity payable by ULB
Savings share with government Can be structured in project
design
Not applicable as actual savings accrue
to the ULB
Energy Baseline Robust baseline required Not required (sample surveys to
demonstrate savings)
M&V Detailed M&V protocol
prescribed in bid documents
Minimal M&V required provided
technology interventions are as
prescribed
Metering Required to establish
baseline and for M&V
Not required, though is in the interest
of the ULB and preferable for long
term sector development
15
THANK YOU
16

More Related Content

What's hot

Grace Solar Corporate
Grace Solar CorporateGrace Solar Corporate
Grace Solar Corporate
gracesolarpk
 
Mini grid and Solar home system
Mini grid and Solar home systemMini grid and Solar home system
Mini grid and Solar home system
Tuong Do
 
solar street light project report.
solar street light project report.solar street light project report.
solar street light project report.
Hagi Sahib
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
Rajesh Pindoriya
 
2017 listen catalogue of solar light
2017 listen catalogue of solar light2017 listen catalogue of solar light
2017 listen catalogue of solar light
LISTEN lighting Julie
 
PPT OF SOLAR NAVEEN' `11
PPT OF SOLAR NAVEEN' `11PPT OF SOLAR NAVEEN' `11
PPT OF SOLAR NAVEEN' `11naveen bhati
 
Solar street light technical specification solar lighting & street lamp man...
Solar street light technical specification   solar lighting & street lamp man...Solar street light technical specification   solar lighting & street lamp man...
Solar street light technical specification solar lighting & street lamp man...
Eric Cao Solar
 
Importance of Solar Energy in India | Solar Energy PDF
Importance of Solar Energy in India | Solar Energy PDFImportance of Solar Energy in India | Solar Energy PDF
Importance of Solar Energy in India | Solar Energy PDF
urjarathi
 
Solar street light
Solar street lightSolar street light
Solar street light
Jitendra Solanki
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Headway Solar
 
Solar photovoltaic powerpoint
Solar photovoltaic powerpointSolar photovoltaic powerpoint
Solar photovoltaic powerpoint
William Wallace
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system works
Hardik Parmar
 
PPT ON SOLAR STREET LIGHTING SYSTEM
PPT ON SOLAR STREET LIGHTING SYSTEMPPT ON SOLAR STREET LIGHTING SYSTEM
PPT ON SOLAR STREET LIGHTING SYSTEM
subhankar Dash
 
SOLAR LIGHT PRESENTATION 080716
SOLAR LIGHT PRESENTATION 080716SOLAR LIGHT PRESENTATION 080716
SOLAR LIGHT PRESENTATION 080716Amzat Folashade
 
SOLAR LED STREET LIGHT
SOLAR LED STREET LIGHT SOLAR LED STREET LIGHT
SOLAR LED STREET LIGHT
shiv kapil
 
Final project report on Solar street light
Final project report on Solar street light Final project report on Solar street light
Final project report on Solar street light
Darshil Shah
 
Hitechled integrated solar led street light vs other street lights
Hitechled integrated solar led street light vs other street lightsHitechled integrated solar led street light vs other street lights
Hitechled integrated solar led street light vs other street lights
James Chen
 
Hybrid pamphlet
Hybrid pamphletHybrid pamphlet
Hybrid pamphlet
guest85c4571e
 
How to select solar street light
How to select solar street lightHow to select solar street light
How to select solar street light
Sky Resources Solar Technology Co.,Ltd
 

What's hot (20)

Grace Solar Corporate
Grace Solar CorporateGrace Solar Corporate
Grace Solar Corporate
 
Mini grid and Solar home system
Mini grid and Solar home systemMini grid and Solar home system
Mini grid and Solar home system
 
solar street light project report.
solar street light project report.solar street light project report.
solar street light project report.
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
 
2017 listen catalogue of solar light
2017 listen catalogue of solar light2017 listen catalogue of solar light
2017 listen catalogue of solar light
 
Solar street light
Solar  street  lightSolar  street  light
Solar street light
 
PPT OF SOLAR NAVEEN' `11
PPT OF SOLAR NAVEEN' `11PPT OF SOLAR NAVEEN' `11
PPT OF SOLAR NAVEEN' `11
 
Solar street light technical specification solar lighting & street lamp man...
Solar street light technical specification   solar lighting & street lamp man...Solar street light technical specification   solar lighting & street lamp man...
Solar street light technical specification solar lighting & street lamp man...
 
Importance of Solar Energy in India | Solar Energy PDF
Importance of Solar Energy in India | Solar Energy PDFImportance of Solar Energy in India | Solar Energy PDF
Importance of Solar Energy in India | Solar Energy PDF
 
Solar street light
Solar street lightSolar street light
Solar street light
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
 
Solar photovoltaic powerpoint
Solar photovoltaic powerpointSolar photovoltaic powerpoint
Solar photovoltaic powerpoint
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system works
 
PPT ON SOLAR STREET LIGHTING SYSTEM
PPT ON SOLAR STREET LIGHTING SYSTEMPPT ON SOLAR STREET LIGHTING SYSTEM
PPT ON SOLAR STREET LIGHTING SYSTEM
 
SOLAR LIGHT PRESENTATION 080716
SOLAR LIGHT PRESENTATION 080716SOLAR LIGHT PRESENTATION 080716
SOLAR LIGHT PRESENTATION 080716
 
SOLAR LED STREET LIGHT
SOLAR LED STREET LIGHT SOLAR LED STREET LIGHT
SOLAR LED STREET LIGHT
 
Final project report on Solar street light
Final project report on Solar street light Final project report on Solar street light
Final project report on Solar street light
 
Hitechled integrated solar led street light vs other street lights
Hitechled integrated solar led street light vs other street lightsHitechled integrated solar led street light vs other street lights
Hitechled integrated solar led street light vs other street lights
 
Hybrid pamphlet
Hybrid pamphletHybrid pamphlet
Hybrid pamphlet
 
How to select solar street light
How to select solar street lightHow to select solar street light
How to select solar street light
 

Viewers also liked

Technical guide-smart-technology-and-solar-street-lights
Technical guide-smart-technology-and-solar-street-lightsTechnical guide-smart-technology-and-solar-street-lights
Technical guide-smart-technology-and-solar-street-lights
Lightinus Inc
 
Mains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switchMains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switch
Edgefxkits & Solutions
 
Solar powered led street light with auto intensity control
Solar powered led street light with auto intensity controlSolar powered led street light with auto intensity control
Solar powered led street light with auto intensity control
kanhaiya lal
 
ForesightPower Solar Street Lighting
ForesightPower Solar Street LightingForesightPower Solar Street Lighting
ForesightPower Solar Street Lighting
Michael French
 
Smart Traffic Light Controller
Smart Traffic Light ControllerSmart Traffic Light Controller
Smart Traffic Light Controller
Himanshi_Sharma
 
Fence presentation
Fence  presentationFence  presentation
Fence presentation
prknaidu
 

Viewers also liked (6)

Technical guide-smart-technology-and-solar-street-lights
Technical guide-smart-technology-and-solar-street-lightsTechnical guide-smart-technology-and-solar-street-lights
Technical guide-smart-technology-and-solar-street-lights
 
Mains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switchMains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switch
 
Solar powered led street light with auto intensity control
Solar powered led street light with auto intensity controlSolar powered led street light with auto intensity control
Solar powered led street light with auto intensity control
 
ForesightPower Solar Street Lighting
ForesightPower Solar Street LightingForesightPower Solar Street Lighting
ForesightPower Solar Street Lighting
 
Smart Traffic Light Controller
Smart Traffic Light ControllerSmart Traffic Light Controller
Smart Traffic Light Controller
 
Fence presentation
Fence  presentationFence  presentation
Fence presentation
 

Similar to PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Generation

Panel 2: Utility Presentation
Panel 2: Utility PresentationPanel 2: Utility Presentation
Panel 2: Utility Presentation
Metropolitan Area Planning Council
 
federal reserve.
federal reserve.federal reserve.
federal reserve.
Sandro Suzart
 
Flexible energy: the value of demand response
Flexible energy: the value of demand responseFlexible energy: the value of demand response
Flexible energy: the value of demand response
CGI Nederland
 
coned-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfconed-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdf
Jose Morales
 
"Next Gen Grid Tech Commercialization" for Duke University Energy Initiative ...
"Next Gen Grid Tech Commercialization" for Duke University Energy Initiative ..."Next Gen Grid Tech Commercialization" for Duke University Energy Initiative ...
"Next Gen Grid Tech Commercialization" for Duke University Energy Initiative ...
Josh Gould
 
Street Lights - A New Metering Frontier
Street Lights -  A New Metering FrontierStreet Lights -  A New Metering Frontier
Street Lights - A New Metering Frontier
TESCO - The Eastern Specialty Company
 
Webinar HORIZON 2020 - STORY How microgrids help optimize local energy storage
Webinar HORIZON 2020 - STORY How microgrids help optimize local energy storageWebinar HORIZON 2020 - STORY How microgrids help optimize local energy storage
Webinar HORIZON 2020 - STORY How microgrids help optimize local energy storage
Actility
 
13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE FundingTim Rushenberg
 
Final IUWG symposium SGSC Customer Applications
Final IUWG symposium SGSC Customer ApplicationsFinal IUWG symposium SGSC Customer Applications
Final IUWG symposium SGSC Customer ApplicationsTerry Daly
 
The Commercial Energy Codes Support Program
The Commercial Energy Codes Support ProgramThe Commercial Energy Codes Support Program
The Commercial Energy Codes Support Program
Center for Energy and Environment
 
Solar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónSolar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda Cayón
ASCAME
 
College Station Automated Metering Infrastructure
College Station Automated Metering InfrastructureCollege Station Automated Metering Infrastructure
College Station Automated Metering Infrastructure
City of College Station
 
European research experience and needs on smart metering
European research experience and needs on smart metering European research experience and needs on smart metering
European research experience and needs on smart metering
IEA DSM Implementing Agreement (IA)
 
Brasilia int school_solar_energy_putting_in_place_the_solar_potential_v1
Brasilia int school_solar_energy_putting_in_place_the_solar_potential_v1Brasilia int school_solar_energy_putting_in_place_the_solar_potential_v1
Brasilia int school_solar_energy_putting_in_place_the_solar_potential_v1
Jacinto Estima
 
Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...
Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...
Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...
OECD Directorate for Financial and Enterprise Affairs
 
Retrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy EfficiencyRetrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy Efficiency
Divya Kothari
 
Photovoltaic Grid Parity in the Tertiary Sector
Photovoltaic Grid Parity in the Tertiary SectorPhotovoltaic Grid Parity in the Tertiary Sector
Photovoltaic Grid Parity in the Tertiary Sector
Leonardo ENERGY
 
Issues faced by developer for net metering
Issues faced by developer for net meteringIssues faced by developer for net metering
Issues faced by developer for net metering
Ankur Tyagi
 

Similar to PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Generation (20)

Panel 2: Utility Presentation
Panel 2: Utility PresentationPanel 2: Utility Presentation
Panel 2: Utility Presentation
 
federal reserve.
federal reserve.federal reserve.
federal reserve.
 
Flexible energy: the value of demand response
Flexible energy: the value of demand responseFlexible energy: the value of demand response
Flexible energy: the value of demand response
 
coned-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfconed-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdf
 
"Next Gen Grid Tech Commercialization" for Duke University Energy Initiative ...
"Next Gen Grid Tech Commercialization" for Duke University Energy Initiative ..."Next Gen Grid Tech Commercialization" for Duke University Energy Initiative ...
"Next Gen Grid Tech Commercialization" for Duke University Energy Initiative ...
 
Street Lights - A New Metering Frontier
Street Lights -  A New Metering FrontierStreet Lights -  A New Metering Frontier
Street Lights - A New Metering Frontier
 
Webinar HORIZON 2020 - STORY How microgrids help optimize local energy storage
Webinar HORIZON 2020 - STORY How microgrids help optimize local energy storageWebinar HORIZON 2020 - STORY How microgrids help optimize local energy storage
Webinar HORIZON 2020 - STORY How microgrids help optimize local energy storage
 
13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding
 
Final IUWG symposium SGSC Customer Applications
Final IUWG symposium SGSC Customer ApplicationsFinal IUWG symposium SGSC Customer Applications
Final IUWG symposium SGSC Customer Applications
 
The Commercial Energy Codes Support Program
The Commercial Energy Codes Support ProgramThe Commercial Energy Codes Support Program
The Commercial Energy Codes Support Program
 
Solar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónSolar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda Cayón
 
College Station Automated Metering Infrastructure
College Station Automated Metering InfrastructureCollege Station Automated Metering Infrastructure
College Station Automated Metering Infrastructure
 
European research experience and needs on smart metering
European research experience and needs on smart metering European research experience and needs on smart metering
European research experience and needs on smart metering
 
Brasilia int school_solar_energy_putting_in_place_the_solar_potential_v1
Brasilia int school_solar_energy_putting_in_place_the_solar_potential_v1Brasilia int school_solar_energy_putting_in_place_the_solar_potential_v1
Brasilia int school_solar_energy_putting_in_place_the_solar_potential_v1
 
Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...
Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...
Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...
 
Retrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy EfficiencyRetrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy Efficiency
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
Photovoltaic Grid Parity in the Tertiary Sector
Photovoltaic Grid Parity in the Tertiary SectorPhotovoltaic Grid Parity in the Tertiary Sector
Photovoltaic Grid Parity in the Tertiary Sector
 
Issues faced by developer for net metering
Issues faced by developer for net meteringIssues faced by developer for net metering
Issues faced by developer for net metering
 

More from lacclimatebusinessforum

Carlos Cesar Parrado - Water Resources Management: The Role of the Private Se...
Carlos Cesar Parrado - Water Resources Management: The Role of the Private Se...Carlos Cesar Parrado - Water Resources Management: The Role of the Private Se...
Carlos Cesar Parrado - Water Resources Management: The Role of the Private Se...
lacclimatebusinessforum
 
Sebastian Kind - Energías Renovables en Argentina
Sebastian Kind - Energías Renovables en ArgentinaSebastian Kind - Energías Renovables en Argentina
Sebastian Kind - Energías Renovables en Argentina
lacclimatebusinessforum
 
Rodrigo Suárez - El cambio climático y la competitividad de su empresa
Rodrigo Suárez - El cambio climático y la competitividad de su empresaRodrigo Suárez - El cambio climático y la competitividad de su empresa
Rodrigo Suárez - El cambio climático y la competitividad de su empresa
lacclimatebusinessforum
 
Beneficios económicos y sociales de la implementación de lineamientos de con...
Beneficios económicos y sociales de la implementación de lineamientos de  con...Beneficios económicos y sociales de la implementación de lineamientos de  con...
Beneficios económicos y sociales de la implementación de lineamientos de con...
lacclimatebusinessforum
 
Alonso Cárdenas Spittia - Reglamentación de Construcción Sostenible
Alonso Cárdenas Spittia - Reglamentación de Construcción SostenibleAlonso Cárdenas Spittia - Reglamentación de Construcción Sostenible
Alonso Cárdenas Spittia - Reglamentación de Construcción Sostenible
lacclimatebusinessforum
 
Oscar Díaz - Plan Distrital de Desarrollo Bogotá 2016 - 2020
Oscar Díaz - Plan Distrital de Desarrollo Bogotá 2016 - 2020Oscar Díaz - Plan Distrital de Desarrollo Bogotá 2016 - 2020
Oscar Díaz - Plan Distrital de Desarrollo Bogotá 2016 - 2020
lacclimatebusinessforum
 
Enrique Peñalosa - Bogotá sostenible
Enrique Peñalosa - Bogotá sostenibleEnrique Peñalosa - Bogotá sostenible
Enrique Peñalosa - Bogotá sostenible
lacclimatebusinessforum
 
Simón Gaviria Muñoz - Smart Cities
Simón Gaviria Muñoz - Smart CitiesSimón Gaviria Muñoz - Smart Cities
Simón Gaviria Muñoz - Smart Cities
lacclimatebusinessforum
 

More from lacclimatebusinessforum (8)

Carlos Cesar Parrado - Water Resources Management: The Role of the Private Se...
Carlos Cesar Parrado - Water Resources Management: The Role of the Private Se...Carlos Cesar Parrado - Water Resources Management: The Role of the Private Se...
Carlos Cesar Parrado - Water Resources Management: The Role of the Private Se...
 
Sebastian Kind - Energías Renovables en Argentina
Sebastian Kind - Energías Renovables en ArgentinaSebastian Kind - Energías Renovables en Argentina
Sebastian Kind - Energías Renovables en Argentina
 
Rodrigo Suárez - El cambio climático y la competitividad de su empresa
Rodrigo Suárez - El cambio climático y la competitividad de su empresaRodrigo Suárez - El cambio climático y la competitividad de su empresa
Rodrigo Suárez - El cambio climático y la competitividad de su empresa
 
Beneficios económicos y sociales de la implementación de lineamientos de con...
Beneficios económicos y sociales de la implementación de lineamientos de  con...Beneficios económicos y sociales de la implementación de lineamientos de  con...
Beneficios económicos y sociales de la implementación de lineamientos de con...
 
Alonso Cárdenas Spittia - Reglamentación de Construcción Sostenible
Alonso Cárdenas Spittia - Reglamentación de Construcción SostenibleAlonso Cárdenas Spittia - Reglamentación de Construcción Sostenible
Alonso Cárdenas Spittia - Reglamentación de Construcción Sostenible
 
Oscar Díaz - Plan Distrital de Desarrollo Bogotá 2016 - 2020
Oscar Díaz - Plan Distrital de Desarrollo Bogotá 2016 - 2020Oscar Díaz - Plan Distrital de Desarrollo Bogotá 2016 - 2020
Oscar Díaz - Plan Distrital de Desarrollo Bogotá 2016 - 2020
 
Enrique Peñalosa - Bogotá sostenible
Enrique Peñalosa - Bogotá sostenibleEnrique Peñalosa - Bogotá sostenible
Enrique Peñalosa - Bogotá sostenible
 
Simón Gaviria Muñoz - Smart Cities
Simón Gaviria Muñoz - Smart CitiesSimón Gaviria Muñoz - Smart Cities
Simón Gaviria Muñoz - Smart Cities
 

Recently uploaded

What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 

Recently uploaded (20)

What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 

PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Generation

  • 1. PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Generation June 15, 2016
  • 2. 2 Street Lighting PPPs: Need & Rationale Reduction in Energy Consumption Improvement in Service Level Mobilization of Private Sector Introducing energy efficient street lighting system in Project area •Reduction in energy consumption by implementation of Energy Conservation Measures (ECM) •Maintain environment friendly street lighting system •Improvement of illumination level •Reduction in number of non glowing lamps •Systematic recording of inventory, billing and maintenance data •Improvement in operation and maintenance practice – single point accountability •Utilization of private sector expertise •Deployment of latest technological knowhow – would enable training of municipal employees as well. Implement a technologically and financially sustainable project which may be replicated in other cities
  • 3. IFC Experience in India 3 Description Jaipur Bhubaneswar Street Lights in city 170,000 28,916 Single Drop points 42,000 9,043 Street lights covered under contract 70,000 19,873 Street lights with functional meters 27,000 Approx. 4,000 (ie 20%) Annual O&M expenses (staff and R&M) USD 1 million USD 200,000 Electricity charges USD 4 million USD 1.5 million Expected electricity charges post project implementation USD 1 million USD 300,000 Estimated Project Cost USD 8.5 million USD 3.5 million Winning bidder SMC Infrastructure (LOA issued) Shah Investments Energy savings guaranteed (bids received) 77% 80%
  • 4. Trust & Retention A/c Agreement Transaction Structure – Shared Savings Model 4 Energy Service Company (ESCO) Distribution Utility Municipal Corporation (MC)/ Urban Local Body (ULB) Street Lighting Network Financing (Equity, Debt) Sharing of % of savings + O&M Payment Energy Savings Metering Supply, Billing & Payments Supply Agreement Energy Performance ContractO&M • The Shared Savings Model (BOOT Model) envisages the capital expenditure and O&M of the project to be undertaken by the ESCO. • The ULB shares the savings realized from the project with the ESCO as per the provisions of the contract. • The actual sharing of benefits is as per the actual savings achieved by the ESCO on month to month/ billing period basis. • The metering and billing by the utility decides the amount of actual energy saved in the project after implementation of the identified energy efficient measures by the ESCO.
  • 5. Trust & Retention A/c Agreement Alternative Model: Notional Savings / Annuity Model 5 Lighting manufacturer/ Operator Distribution Utility Municipal Corporation (MC)/ Urban Local Body (ULB) / State Authority Street Lighting Network Financing (Equity, Debt) Annuity Energy Savings Metering Supply, Billing & Payments Supply Agreement Supply & Services ContractO&M • The model envisages the capital expenditure and O&M of the project to be undertaken by the operator. • The ULB pays an annuity to the operator which is the lowest bid. • The technological intervention is determined by authority and therefore savings are estimated prior to the bid. • The operator is only required to meet 1) equipment performance and 2) customer service obligations. Energy savings are not part of the operators performance parameters
  • 6. Roof-top Solar Power 6 • Every building whether home, industry, institution, commercial establishment can generate some solar power by installing PV panels on the rooftop or on unutilized premises • PV roof-top installations at the tail-end of the grid increase grid-stability and reduce losses • Savings in land requirement and costs • Savings in development of new transmission infrastructure • Creation of value from under-utilized /unutilized rooftops The Concept Rationale
  • 7. Gujarat Roof-top Solar Case Study 7 • Govt. of Gujarat (GOG) envisaged to implement a pilot 5 MW grid connected distributed rooftop solar project in Gandhinagar on a PPP model • Demonstrate technical, commercial and regulatory viability and sustainability of rooftop solar concept • Potential to reduce ~ 6000 tons of CO2 equivalent annually • Private sector investment mobilization ~ US$ 10 million • Potential for large scale replication The Drivers Envisaged Impact
  • 8. Gross Metering – Self Owned 8 Rooftop Solar PV System SM Utility (Grid Owner) Rooftop Owner Flow of Funds Flow of Energy Utility Payments to solar developer based on pre-determined formula Key mechanisms: 1. Feed in Tariffs 2. Generation Based Incentives Solar meter (Generator Meter) PPA – Utility & Solar System Owner
  • 10. Roof-top Solar Business Models 10 Parameter Gross Metering Net-metering Objective • Electricity sale to utility • Self-consumption of electricity Tariff Arrangement • PPA with the utility – utility to pay as per PPA price (FIT) • No payment by utility for electricity injected into the grid, beyond a limit Financial burden • Cost borne by utility & then passed through to the consumer • Usually Govt. bears burden for any incentive/subsidy to bridge viability gap Energy Accounting • Metering arrangement to measure generation only • Metering arrangement to measure generation as well as respective consumption Beneficiary • Assist utility in meeting Solar RPO compliance • Assist consumer directly to reduce its electricity billing Project Selection • Tariff based competitive bidding • First-come-first serve basis (to start with) Utility’s Concern • Not keen on signing PPA with small rooftop projects – higher FIT & administrative burden. • Loss of revenue for utility – reduced grid consumption by consumers Developer’s Concern • Grid unavailability to impact revenue • Low level of incentives may impact viability of project for certain consumer segments
  • 11. Key Features of Shared Savings Model 11 Baseline Needs complete functional data on number of lights, performance quality, glowing / non glowing hours, voltage fluctuations, etc Working meters and robust underlying infrastructure required to ensure proper base lining If not available, authority needs to incur upfront expenditure to ensure proper baseline either prior to technical due diligence or post bid Engagement with utility to ensure working meters are available at all points Technology Neutral Bidding is usually done on the basis of energy savings so choice of technology is left to operator as long as highest savings are achieved While energy share offered to authority, if base line increases after correction of deficiencies and operational improvement then it results in a net cash outflow Operational & Maintenance expenditure currently being incurred by the authority also transferred to operator to make project viable
  • 12. Challenges • Need for robust Baseline and Monitoring and Verification (M&V) :  Performance and the payment to the ESCO depend on improvements made over the baseline • Difficulties in establishing baseline:  In the absence of meters, difficult to arrive at the energy cost of the ULB based on actual energy consumed.  Not possible to establish baseline consumption for points not connected to the street-lighting feeder (single drop points)  Baseline needs to assume that all lamps in the city are glowing  Need for adequate system infrastructure: poles, cables, and feeder pillars • Places significant demand on the ULB to undertake robust M&V and make performance based payments. • Single drop points are not covered – need for a separate contract • Investors not very keen on ESCO model given the payback depends upon quality of the infrastructure and accuracy of metering/ billing systems • Difficult to raise project finance under ESCO model owing to above 12
  • 13. Key Features of Annuity Model Project design determined upfront Authority can decide technology, systems required based on objectives, city needs and payment capacity. Bid will incorporate specific design and input requirements If underlying infrastructure is poor, then the project scope can be expanded to include upgradation of entire network No reduction in energy bills – net cash outflow Technical demonstrations will determine energy savings at the due diligence stage (prior to bid). Engagement with the utility will be up to the municipal authority – in the interest of the ULB to push for installation of meters Authorities will need to get budget approvals upfront based on bid amount 13
  • 14. Challenges • The notional savings/ annuity model assumes that the 1) data available with respect to number and types of lamps and 2) energy consumption of the street lighting network is up to date and robust and does not require fresh surveys • The Notional Savings / Annuity model ignores underlying issues that may exist in the network which can only be determined through a survey/detailed assessment • The operator is not required to demonstrate energy savings so in the absence of adequate data monitoring, the city authority may not realize cost savings under such projects • The city authority finalizes the technology prior to the bid and they may not necessarily be aware of the latest options in the market • If sample surveys undertaken prior to the bid are not robust or the estimated number of points is lower than estimated then the authority may end up paying a lot more under such projects 14
  • 15. Key Differences in Models Point of difference Shared Savings Notional savings Technology / Interventions Selected by bidder Prescribed by ULB Energy savings Based on bid (minimum threshold provided by ULB) Prescribed by ULB by way of design (but not measured) Bid variable Guaranteed energy savings Annuity payable by ULB Savings share with government Can be structured in project design Not applicable as actual savings accrue to the ULB Energy Baseline Robust baseline required Not required (sample surveys to demonstrate savings) M&V Detailed M&V protocol prescribed in bid documents Minimal M&V required provided technology interventions are as prescribed Metering Required to establish baseline and for M&V Not required, though is in the interest of the ULB and preferable for long term sector development 15

Editor's Notes

  1. Delay in baselining by IEA Infra structure issues Staff related issues   Delay in meeting CPs (funding of escrow account) due to lack of understanding by relevant BMC officials   Delay in approval of baseline reports by BMC due to capacity issues   Installation of meters by utility – inability to check for variation between audit meters and utility meters ; sanctity of baseline   Installation of lamps where baselining was not done