NOTE:  
•	 Close all the drawers and doors, and do not leave any personal belongings behind.
•	 The electricity will be shut down during the drill.
•	 Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over.
•	 Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor
5 minutes before the drill begins for safety.
WHEN THE DRILL STARTS:
1. Stop all activities and leave your workstation immediately.
2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase.
3. Do NOT use the elevators.
4. Report to the emergency assembly point.
5. Do not leave the designated assembly point until the emergency state is lifted.
Conducted by: RAK FTZ Engineering Department
TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM
DATE LOCATION TIME
1 21 OCTOBER ADMIN BUILDING - BP 09:30 AM
2 21 OCTOBER BC-1 10:00 AM
3 21 OCTOBER BC-2 10:30 AM
4 21 OCTOBER BC-3 11:00 AM
5 21 OCTOBER BC-4 11:30 AM
6 21 OCTOBER BC-5 01:00 PM
7 21 OCTOBER BC-6 02:00 PM
MOCK
DRILL
FIRE
Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will
conduct an Emergency Evacuation Exercise at all the buildings.
WHEN THE DRILL STARTS:
1. Stop all activities and leave your workstation immediately.
2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase.
3. Do NOT use the elevators.
4. Report to the emergency assembly point.
5. Do not leave the designated assembly point until the emergency state is lifted.
DATE LOCATION TIME
1 19 OCTOBER ADMIN BUILDING - TP 12:00 PM
2 19 OCTOBER LA 01 - TP 01:15 PM
3 19 OCTOBER LA 02 - TP 01:15 PM
4 19 OCTOBER LA 03 - TP 01:15 PM
5 19 OCTOBER LA 04 - TP 01:15 PM
6 19 OCTOBER SA - TP 01:15 PM
Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will
conduct an Emergency Evacuation Exercise at all the buildings.
NOTE:  
•	 Close all the drawers and doors, and do not leave any personal belongings behind.
•	 The electricity will be shut down during the drill.
•	 Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over.
•	 Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor
5 minutes before the drill begins for safety.
Conducted by: RAK FTZ Engineering Department
TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM
MOCK
DRILL
FIRE
WHEN THE DRILL STARTS:
1. Stop all activities and leave your workstation immediately.
2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase.
3. Do NOT use the elevators.
4. Report to the emergency assembly point.
5. Do not leave the designated assembly point until the emergency state is lifted.
Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will
conduct an Emergency Evacuation Exercise at all the buildings.
DATE LOCATION TIME
1 20 OCTOBER ADMIN BUILDING - IP 12:00 PM
2 20 OCTOBER LA 02 - IP 01:15 PM
3 20 OCTOBER LA 03 - IP 01:15 PM
4 20 OCTOBER LA 04 - IP 01:15 PM
5 20 OCTOBER LA 05 - IP 01:15 PM
NOTE:  
•	 Close all the drawers and doors, and do not leave any personal belongings behind.
•	 The electricity will be shut down during the drill.
•	 Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over.
•	 Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor
5 minutes before the drill begins for safety.
Conducted by: RAK FTZ Engineering Department
TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM
MOCK
DRILL
FIRE

More Related Content

What's hot

Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
Gaurav Singh Rajput
 
HSE Engineer Resume
HSE Engineer ResumeHSE Engineer Resume
HSE Engineer Resume
Mohammadali Hussain
 
Safety File Index
Safety File IndexSafety File Index
Safety File Index
Viviene E Strydom
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
ChinaHarbour
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklist
imaduddin91
 
Confined space entry ppt slide
Confined space entry ppt slideConfined space entry ppt slide
Confined space entry ppt slide
Personal Secret
 
CLASS Regulation 2013
CLASS Regulation 2013CLASS Regulation 2013
CLASS Regulation 2013
Jau Robert
 
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
muhammad shoaib sadiq
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Ahmad Nazib
 
Emergency Evacuation Training by UMES
Emergency Evacuation Training by UMESEmergency Evacuation Training by UMES
Emergency Evacuation Training by UMES
Atlantic Training, LLC.
 
Arnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerArnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE Manager
ARNEL GUPIT
 
Permit to work
Permit to workPermit to work
Permit to work
Nikhil Barshettiwar
 
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...Olivean Anthony
 
HSE Manager (C.V)
HSE Manager (C.V)HSE Manager (C.V)
HSE Manager (C.V)
Khaled Shabaan
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
SUDHEER KUMAR KALYANAM
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
Lucy Reimer
 
Safety training observation programme (STOP)
Safety training observation programme (STOP)Safety training observation programme (STOP)
Safety training observation programme (STOP)
Salim Solanki
 
safety certificate of appreciation engr. moath 60260
safety certificate of appreciation engr. moath 60260safety certificate of appreciation engr. moath 60260
safety certificate of appreciation engr. moath 60260
Moath Alhorainy
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
Dwarika Bhushan Sharma
 
Fire safety training presentation.ppt
Fire safety training presentation.pptFire safety training presentation.ppt
Fire safety training presentation.ppt
Zhacky Zacarias
 

What's hot (20)

Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
HSE Engineer Resume
HSE Engineer ResumeHSE Engineer Resume
HSE Engineer Resume
 
Safety File Index
Safety File IndexSafety File Index
Safety File Index
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklist
 
Confined space entry ppt slide
Confined space entry ppt slideConfined space entry ppt slide
Confined space entry ppt slide
 
CLASS Regulation 2013
CLASS Regulation 2013CLASS Regulation 2013
CLASS Regulation 2013
 
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...
 
Emergency Evacuation Training by UMES
Emergency Evacuation Training by UMESEmergency Evacuation Training by UMES
Emergency Evacuation Training by UMES
 
Arnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerArnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE Manager
 
Permit to work
Permit to workPermit to work
Permit to work
 
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
[Letter of Appointment] Chemsain Konsultant Sdn. Bhd. - Member of the Health,...
 
HSE Manager (C.V)
HSE Manager (C.V)HSE Manager (C.V)
HSE Manager (C.V)
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
Safety training observation programme (STOP)
Safety training observation programme (STOP)Safety training observation programme (STOP)
Safety training observation programme (STOP)
 
safety certificate of appreciation engr. moath 60260
safety certificate of appreciation engr. moath 60260safety certificate of appreciation engr. moath 60260
safety certificate of appreciation engr. moath 60260
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
 
Fire safety training presentation.ppt
Fire safety training presentation.pptFire safety training presentation.ppt
Fire safety training presentation.ppt
 

Viewers also liked

Tu primera conquiesta internacional (Emprendedores)
Tu primera conquiesta internacional (Emprendedores)Tu primera conquiesta internacional (Emprendedores)
Tu primera conquiesta internacional (Emprendedores)EAE Business School
 
CIAT in Ethiopia
CIAT in Ethiopia  CIAT in Ethiopia
CIAT in Ethiopia
ILRI
 
CV-mohammad 2016
CV-mohammad 2016CV-mohammad 2016
CV-mohammad 2016
Mohammed Abu-Aitah
 
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ LevelNadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ LevelNadiia Ivarova
 
áGua propriedade
áGua propriedadeáGua propriedade
áGua propriedade
Simone Maia
 
Projects and programmes, a sure fire way to creating business value
Projects and programmes, a sure fire way to creating business valueProjects and programmes, a sure fire way to creating business value
Projects and programmes, a sure fire way to creating business value
Association for Project Management
 
Master Your Emergency Response Mock Drills
Master Your Emergency Response Mock DrillsMaster Your Emergency Response Mock Drills
Master Your Emergency Response Mock Drills
Triumvirate Environmental
 
Non-Ferrous Alloy
Non-Ferrous AlloyNon-Ferrous Alloy
Non-Ferrous Alloy
Akash Patel
 
Hand hygiene pgr
Hand hygiene pgrHand hygiene pgr
Hand hygiene pgr
Ahmad Uzair Qureshi
 
Swwe presentation 100516
Swwe presentation 100516Swwe presentation 100516
Swwe presentation 100516
Association for Project Management
 

Viewers also liked (10)

Tu primera conquiesta internacional (Emprendedores)
Tu primera conquiesta internacional (Emprendedores)Tu primera conquiesta internacional (Emprendedores)
Tu primera conquiesta internacional (Emprendedores)
 
CIAT in Ethiopia
CIAT in Ethiopia  CIAT in Ethiopia
CIAT in Ethiopia
 
CV-mohammad 2016
CV-mohammad 2016CV-mohammad 2016
CV-mohammad 2016
 
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ LevelNadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
Nadiia_Stupak_ISTQB_Certified_Tester_ Foundation_ Level
 
áGua propriedade
áGua propriedadeáGua propriedade
áGua propriedade
 
Projects and programmes, a sure fire way to creating business value
Projects and programmes, a sure fire way to creating business valueProjects and programmes, a sure fire way to creating business value
Projects and programmes, a sure fire way to creating business value
 
Master Your Emergency Response Mock Drills
Master Your Emergency Response Mock DrillsMaster Your Emergency Response Mock Drills
Master Your Emergency Response Mock Drills
 
Non-Ferrous Alloy
Non-Ferrous AlloyNon-Ferrous Alloy
Non-Ferrous Alloy
 
Hand hygiene pgr
Hand hygiene pgrHand hygiene pgr
Hand hygiene pgr
 
Swwe presentation 100516
Swwe presentation 100516Swwe presentation 100516
Swwe presentation 100516
 

More from Hazem Shehada

How to handle chemical products
How to handle chemical productsHow to handle chemical products
How to handle chemical products
Hazem Shehada
 
Fire & Safety Awareness
Fire & Safety AwarenessFire & Safety Awareness
Fire & Safety Awareness
Hazem Shehada
 
Poster - Clean & Green Revolution (210x297)
Poster - Clean & Green Revolution (210x297)Poster - Clean & Green Revolution (210x297)
Poster - Clean & Green Revolution (210x297)
Hazem Shehada
 
Safe & Efficient Fuel Driving
Safe & Efficient Fuel DrivingSafe & Efficient Fuel Driving
Safe & Efficient Fuel Driving
Hazem Shehada
 
Low Fat Zone
Low Fat ZoneLow Fat Zone
Low Fat Zone
Hazem Shehada
 
Green Family - Trees Planting
Green Family - Trees PlantingGreen Family - Trees Planting
Green Family - Trees Planting
Hazem Shehada
 
Paperless Office
Paperless OfficePaperless Office
Paperless Office
Hazem Shehada
 
Fire Drill Poster - 2013
Fire Drill Poster - 2013Fire Drill Poster - 2013
Fire Drill Poster - 2013
Hazem Shehada
 
Beat the Heat - Banner (288x180cm)
Beat the Heat - Banner (288x180cm)Beat the Heat - Banner (288x180cm)
Beat the Heat - Banner (288x180cm)Hazem Shehada
 

More from Hazem Shehada (9)

How to handle chemical products
How to handle chemical productsHow to handle chemical products
How to handle chemical products
 
Fire & Safety Awareness
Fire & Safety AwarenessFire & Safety Awareness
Fire & Safety Awareness
 
Poster - Clean & Green Revolution (210x297)
Poster - Clean & Green Revolution (210x297)Poster - Clean & Green Revolution (210x297)
Poster - Clean & Green Revolution (210x297)
 
Safe & Efficient Fuel Driving
Safe & Efficient Fuel DrivingSafe & Efficient Fuel Driving
Safe & Efficient Fuel Driving
 
Low Fat Zone
Low Fat ZoneLow Fat Zone
Low Fat Zone
 
Green Family - Trees Planting
Green Family - Trees PlantingGreen Family - Trees Planting
Green Family - Trees Planting
 
Paperless Office
Paperless OfficePaperless Office
Paperless Office
 
Fire Drill Poster - 2013
Fire Drill Poster - 2013Fire Drill Poster - 2013
Fire Drill Poster - 2013
 
Beat the Heat - Banner (288x180cm)
Beat the Heat - Banner (288x180cm)Beat the Heat - Banner (288x180cm)
Beat the Heat - Banner (288x180cm)
 

Poster - Fire Drill 2014 (841x1189)

  • 1. NOTE:   • Close all the drawers and doors, and do not leave any personal belongings behind. • The electricity will be shut down during the drill. • Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over. • Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor 5 minutes before the drill begins for safety. WHEN THE DRILL STARTS: 1. Stop all activities and leave your workstation immediately. 2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase. 3. Do NOT use the elevators. 4. Report to the emergency assembly point. 5. Do not leave the designated assembly point until the emergency state is lifted. Conducted by: RAK FTZ Engineering Department TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM DATE LOCATION TIME 1 21 OCTOBER ADMIN BUILDING - BP 09:30 AM 2 21 OCTOBER BC-1 10:00 AM 3 21 OCTOBER BC-2 10:30 AM 4 21 OCTOBER BC-3 11:00 AM 5 21 OCTOBER BC-4 11:30 AM 6 21 OCTOBER BC-5 01:00 PM 7 21 OCTOBER BC-6 02:00 PM MOCK DRILL FIRE Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will conduct an Emergency Evacuation Exercise at all the buildings.
  • 2. WHEN THE DRILL STARTS: 1. Stop all activities and leave your workstation immediately. 2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase. 3. Do NOT use the elevators. 4. Report to the emergency assembly point. 5. Do not leave the designated assembly point until the emergency state is lifted. DATE LOCATION TIME 1 19 OCTOBER ADMIN BUILDING - TP 12:00 PM 2 19 OCTOBER LA 01 - TP 01:15 PM 3 19 OCTOBER LA 02 - TP 01:15 PM 4 19 OCTOBER LA 03 - TP 01:15 PM 5 19 OCTOBER LA 04 - TP 01:15 PM 6 19 OCTOBER SA - TP 01:15 PM Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will conduct an Emergency Evacuation Exercise at all the buildings. NOTE:   • Close all the drawers and doors, and do not leave any personal belongings behind. • The electricity will be shut down during the drill. • Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over. • Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor 5 minutes before the drill begins for safety. Conducted by: RAK FTZ Engineering Department TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM MOCK DRILL FIRE
  • 3. WHEN THE DRILL STARTS: 1. Stop all activities and leave your workstation immediately. 2. Do NOT panic, evacuate the building quickly and orderly through the nearest staircase. 3. Do NOT use the elevators. 4. Report to the emergency assembly point. 5. Do not leave the designated assembly point until the emergency state is lifted. Further to our vision of strengthening the safety standards at the free zone, RAK FTZ will conduct an Emergency Evacuation Exercise at all the buildings. DATE LOCATION TIME 1 20 OCTOBER ADMIN BUILDING - IP 12:00 PM 2 20 OCTOBER LA 02 - IP 01:15 PM 3 20 OCTOBER LA 03 - IP 01:15 PM 4 20 OCTOBER LA 04 - IP 01:15 PM 5 20 OCTOBER LA 05 - IP 01:15 PM NOTE:   • Close all the drawers and doors, and do not leave any personal belongings behind. • The electricity will be shut down during the drill. • Entry to the building will be prohibited 5 minutes before the drill begins until the drill is over. • Employees, clients and visitors with health problems and expectant mothers are requested to be on the ground floor 5 minutes before the drill begins for safety. Conducted by: RAK FTZ Engineering Department TEL: 07 2447350 MOB: 050 4879948 FAX: 07 2447360 EMAIL: H.SHEHADA@RAKFTZ.COM MOCK DRILL FIRE