CV: G. Mihiedine May 28, 2016
Page 1 of 7
Mobile: 00961 3171020; Email: ghami1@hotmail.com / gmihiedin@yahoo.com
ghazi.mihie@gmail.com
Structural Civil Engineer
Proposed role in the project:
Category:
1. Family name: Mihiedine
2. First names: Ghazi
3. Date of birth: 7th Oct.1961
4. Nationality: Lebanese
5. Civil status: Married
6. Education:
Institution
[Date from – Date to]
Degree(s) or Diploma(s) obtained:
1984 – 1987 Ecole les soeurs des saints coeurs Baccalaureate Diploma-part two
Lebanese (Philosophy Branch)
Diploma in Employment Skills
1996 to 2008 Freyssinet International CIE a professional certificate
7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic)
Language Reading Speaking Writing
Arabic 5 5 5
English 3 3 3
French 3 3 3
8. Membership of professional bodies: N/A
9. Other skills: (e.g. Computer literacy, etc.) Normal user of software (word, Exel),
compiling reports
10. Present position: Post tension concrete structure (Bridges Consultant technician )
11. Years within the firm: Over 20 years
12. Key qualifications: (Relevant to the assignment)
 Structural civil engineering ,Construction and Consultant of several bridges Systems
(camel crossing, UR, OR bridges, and OW Bridges); Preparation and submission of
technical reports; Managerial abilities, Develop & lead work teams; Study and evaluate
project requirements and scope; Review and interpret comments and approval of shop
drawings; Inspect overall design; Monitor projects progress timely completion;
Supervise and monitor post-tensioning activities of pre- tension ,post tension ,precast
girders box girders ,viaducts ,the all design and AASHTO manual.
CV: G. Mihiedine May 28, 2016
Page 2 of 7
 Qualities control for all post tensioning materials and equipment control
 Fixing all Bearing types ,pot ,and pads Bearings , Neoprene
 Fixing and Controlled all expansion joint types
 PT Building floor ,profiling ducts , anchorage life and dead end
- Employer Companies the present Date
1 – Freyssinet international company From 1996 To 2007
2 - Freyssinet Menard From 2007 To 2008
3 - Freyssinet international company From 2008 To 2009
4 – Khatib & Alami Consultant . C. From 2009 To 2015
Currently : Stand by
13. Specific experience in the region:
Country Date from – Date to
Saudi Arabia June 2009/ March 2015
Qatar Apr 2007 To Sep 2008
Lebanon Jan 1996 to June 2009
Total Experience From Jan 1996 To Mar 2015
CV: G. Mihiedine May 28, 2016
Page 3 of 7
14. Professional experience:
Date from –
Date to
Location Company Position Description
Presen
June 2009 To
March 2015
Saudi Arabia Saudi Arabian
Railway(SAR)/Mi
nistry Of
Finance/(PIF)
Bridges
Technician
Implement
Supervision
Consutant
I S C
 Supervise of all type bridges, e.g. camel crossing, UR, OR bridges, and OW Bridges.
 Supervising all Project ;CT100 Hafer elbaten-CTW200 Hail –CTW300 Quourayat –CTW400 Riyad
 Preparation and submission of technical progress reports
 Develop & lead teams.
 Study and evaluate project requirements and scope.
 Review comments and approval of shop drawings.
 Inspection of overall design in Co-ordination between multiple disciplines.
 Monitoring the progress of the project and timely completion.
 Supervision and monitoring post-tensioning activities of pre- stressed girders as per SFF design
and AASHTO manual.
Apr 2007 To
Sep2008
Freyssinet
Menard
Qatar A
New Doha
international
airport
Bechtel
company
Contractor:
Uksel Turkish
company
Site Engineer
12 box girders
 Supervision of pre-stress silos.
 Supervision of site works such as, Sleep form, foundation, retaining walls, columns, buildings.
 Supervision of steel reinforcement of structural RCC structural elements.
 Supervision and monitoring of concrete pouring, and management of concreting program.
 Preparation of weekly and monthly progress reports for onward submission to the Structural
Engineer and Construction Manager.
Apr 2007 –
Sep 2008
Freyssinet
Menard
Qatar B
Ummbab Ciment
factory
F.C.B Cement
Contractor :
SIAC Egypt
Site engineer-
post tension
5 Silos
May 2008 To
June 2009
Lebanon-
Mdayrijj Sowfar
Bridge
Freyssinet
International
Butec joint
venture
Civil post tension
Supervisor
 Supervision of pre-stressed box girders
 Increment launching Box girders
CV: G. Mihiedine May 28, 2016
Page 4 of 7
May1999 To
Feb 2006
Lebanon
Rmayleh
PROJECT
Freyssinet
International
Lebanese
villages project
Freyssinet
Owner
Site Manager  Supervision of overall project.
 Excavation for the preparation of a Genie Civil lots, Embankment a Degradation terrassment for
agricultural land.
 Wings wall in natural stone building, Lebanese garden design, Plantation of old landscaping trees
 Sanitary sewer line and construction of manholes.
 Hydro-pressure, chlorination, bacteriological tests for potable water.
 Ex-filtration test for new sanitary sewer manhole.
 Concrete pads for electric transformers, metering switchgear. Electric & telephone duct bank.
Mandrill test for all types of duct bank.
 Installation and interlocking of curb stones on walkway & side walk paving
 Carrying out asphalt wearing course of rigid pavement (Stone roads) and road marking in primary
& secondary roadways.
 Streamlining of Storm drainage system vide installation of reinforced concrete pipes & UPVC pipe
as per Royal Commission specification, including catch basins.
 Fire water system: Installation of UPVC class-V pipes, post indicator valve, fire hydrant, butterfly
valves and concrete chambers.
JUN1997 –
Apr 1999
Lebanon
Hazmieh Adlieh
Bridges
B.E.T.H.E
contractor
ACE Consultant
Freyssinet
International
Civil supervisor  Supervision of pre-stress box girders
 Supervision of site works such as, foundation, retaining walls, columns, buildings
 Supervision of steel reinforcement of structural RCC structural elements
 Supervision and monitoring of pouring of concrete, and management of concreting program
 Preparation of weekly and monthly progress reports for onward submission to the Structural
Engineer and Construction Manager.
 Preparation of safety schemes at work site and coordinating with safety manager for ensuring
safety procedure to avoid fatal accidents.
CV: G. Mihiedine May 28, 2016
Page 5 of 7
Jan 1996 to
May 1996
-JUN 2015
TOJun 2016
-Aug 2016 to
Till now
present
Lebanon
Sibbline Ciment
factory
-Lebanon –
Zahleh City
Saudi Arabia
Diplomatic
Quarter Marriott
Hotel
Freyssinet
International
CCC Contractor
Dar Al Handasa
Consultant
=M A C
Construction
contractor
engineering
-Shapporji
Pallonjji
Company(Hill
international)
Freyssinet –
Menard sub
contractor
Khatib&Alami
Civil supervisor
Site engineer
-PT Slab
Technical
Supervisor
 Supervision of pre-stress silos
 Sleep Form concrete structure
 Preparation of safety schemes at work site and coordinating with safety manager for
ensuring safety procedure to avoid fatal accidents.
 Preparation of preliminary documentation regarding work execution and progress
monitoring in conformity to the project schedule.
 Preparation of Quality Control documents and coordinating with Quality Control Manager
for ensuring the works to be carried as per designed drawings and contractual
specifications.
 PT Slab building,7 floors Mall Gate ,structure Supervision post tension slab and Hollow
Core
 PT Slab building Technical Supervision Consultant Khatib&Alami specification and
procedure implementation supervision, and leadership the Sub Contractor Engineering
(Freyssinet - Menard Gulf )
15. Other relevant information :
- Freyssinet international Certificate (( Paris – French issue ))
- S A R , Saudi Arabia railway ,North-South project – Recommendation
CV: G. Mihiedine May 28, 2016
Page 6 of 7
Proof documents are available on request and professional certificates from corresponding companies are also available on request.
CV: G. Mihiedine May 28, 2016
Page 7 of 7

Post tension CV 07/Jan/2017

  • 1.
    CV: G. MihiedineMay 28, 2016 Page 1 of 7 Mobile: 00961 3171020; Email: ghami1@hotmail.com / gmihiedin@yahoo.com ghazi.mihie@gmail.com Structural Civil Engineer Proposed role in the project: Category: 1. Family name: Mihiedine 2. First names: Ghazi 3. Date of birth: 7th Oct.1961 4. Nationality: Lebanese 5. Civil status: Married 6. Education: Institution [Date from – Date to] Degree(s) or Diploma(s) obtained: 1984 – 1987 Ecole les soeurs des saints coeurs Baccalaureate Diploma-part two Lebanese (Philosophy Branch) Diploma in Employment Skills 1996 to 2008 Freyssinet International CIE a professional certificate 7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic) Language Reading Speaking Writing Arabic 5 5 5 English 3 3 3 French 3 3 3 8. Membership of professional bodies: N/A 9. Other skills: (e.g. Computer literacy, etc.) Normal user of software (word, Exel), compiling reports 10. Present position: Post tension concrete structure (Bridges Consultant technician ) 11. Years within the firm: Over 20 years 12. Key qualifications: (Relevant to the assignment)  Structural civil engineering ,Construction and Consultant of several bridges Systems (camel crossing, UR, OR bridges, and OW Bridges); Preparation and submission of technical reports; Managerial abilities, Develop & lead work teams; Study and evaluate project requirements and scope; Review and interpret comments and approval of shop drawings; Inspect overall design; Monitor projects progress timely completion; Supervise and monitor post-tensioning activities of pre- tension ,post tension ,precast girders box girders ,viaducts ,the all design and AASHTO manual.
  • 2.
    CV: G. MihiedineMay 28, 2016 Page 2 of 7  Qualities control for all post tensioning materials and equipment control  Fixing all Bearing types ,pot ,and pads Bearings , Neoprene  Fixing and Controlled all expansion joint types  PT Building floor ,profiling ducts , anchorage life and dead end - Employer Companies the present Date 1 – Freyssinet international company From 1996 To 2007 2 - Freyssinet Menard From 2007 To 2008 3 - Freyssinet international company From 2008 To 2009 4 – Khatib & Alami Consultant . C. From 2009 To 2015 Currently : Stand by 13. Specific experience in the region: Country Date from – Date to Saudi Arabia June 2009/ March 2015 Qatar Apr 2007 To Sep 2008 Lebanon Jan 1996 to June 2009 Total Experience From Jan 1996 To Mar 2015
  • 3.
    CV: G. MihiedineMay 28, 2016 Page 3 of 7 14. Professional experience: Date from – Date to Location Company Position Description Presen June 2009 To March 2015 Saudi Arabia Saudi Arabian Railway(SAR)/Mi nistry Of Finance/(PIF) Bridges Technician Implement Supervision Consutant I S C  Supervise of all type bridges, e.g. camel crossing, UR, OR bridges, and OW Bridges.  Supervising all Project ;CT100 Hafer elbaten-CTW200 Hail –CTW300 Quourayat –CTW400 Riyad  Preparation and submission of technical progress reports  Develop & lead teams.  Study and evaluate project requirements and scope.  Review comments and approval of shop drawings.  Inspection of overall design in Co-ordination between multiple disciplines.  Monitoring the progress of the project and timely completion.  Supervision and monitoring post-tensioning activities of pre- stressed girders as per SFF design and AASHTO manual. Apr 2007 To Sep2008 Freyssinet Menard Qatar A New Doha international airport Bechtel company Contractor: Uksel Turkish company Site Engineer 12 box girders  Supervision of pre-stress silos.  Supervision of site works such as, Sleep form, foundation, retaining walls, columns, buildings.  Supervision of steel reinforcement of structural RCC structural elements.  Supervision and monitoring of concrete pouring, and management of concreting program.  Preparation of weekly and monthly progress reports for onward submission to the Structural Engineer and Construction Manager. Apr 2007 – Sep 2008 Freyssinet Menard Qatar B Ummbab Ciment factory F.C.B Cement Contractor : SIAC Egypt Site engineer- post tension 5 Silos May 2008 To June 2009 Lebanon- Mdayrijj Sowfar Bridge Freyssinet International Butec joint venture Civil post tension Supervisor  Supervision of pre-stressed box girders  Increment launching Box girders
  • 4.
    CV: G. MihiedineMay 28, 2016 Page 4 of 7 May1999 To Feb 2006 Lebanon Rmayleh PROJECT Freyssinet International Lebanese villages project Freyssinet Owner Site Manager  Supervision of overall project.  Excavation for the preparation of a Genie Civil lots, Embankment a Degradation terrassment for agricultural land.  Wings wall in natural stone building, Lebanese garden design, Plantation of old landscaping trees  Sanitary sewer line and construction of manholes.  Hydro-pressure, chlorination, bacteriological tests for potable water.  Ex-filtration test for new sanitary sewer manhole.  Concrete pads for electric transformers, metering switchgear. Electric & telephone duct bank. Mandrill test for all types of duct bank.  Installation and interlocking of curb stones on walkway & side walk paving  Carrying out asphalt wearing course of rigid pavement (Stone roads) and road marking in primary & secondary roadways.  Streamlining of Storm drainage system vide installation of reinforced concrete pipes & UPVC pipe as per Royal Commission specification, including catch basins.  Fire water system: Installation of UPVC class-V pipes, post indicator valve, fire hydrant, butterfly valves and concrete chambers. JUN1997 – Apr 1999 Lebanon Hazmieh Adlieh Bridges B.E.T.H.E contractor ACE Consultant Freyssinet International Civil supervisor  Supervision of pre-stress box girders  Supervision of site works such as, foundation, retaining walls, columns, buildings  Supervision of steel reinforcement of structural RCC structural elements  Supervision and monitoring of pouring of concrete, and management of concreting program  Preparation of weekly and monthly progress reports for onward submission to the Structural Engineer and Construction Manager.  Preparation of safety schemes at work site and coordinating with safety manager for ensuring safety procedure to avoid fatal accidents.
  • 5.
    CV: G. MihiedineMay 28, 2016 Page 5 of 7 Jan 1996 to May 1996 -JUN 2015 TOJun 2016 -Aug 2016 to Till now present Lebanon Sibbline Ciment factory -Lebanon – Zahleh City Saudi Arabia Diplomatic Quarter Marriott Hotel Freyssinet International CCC Contractor Dar Al Handasa Consultant =M A C Construction contractor engineering -Shapporji Pallonjji Company(Hill international) Freyssinet – Menard sub contractor Khatib&Alami Civil supervisor Site engineer -PT Slab Technical Supervisor  Supervision of pre-stress silos  Sleep Form concrete structure  Preparation of safety schemes at work site and coordinating with safety manager for ensuring safety procedure to avoid fatal accidents.  Preparation of preliminary documentation regarding work execution and progress monitoring in conformity to the project schedule.  Preparation of Quality Control documents and coordinating with Quality Control Manager for ensuring the works to be carried as per designed drawings and contractual specifications.  PT Slab building,7 floors Mall Gate ,structure Supervision post tension slab and Hollow Core  PT Slab building Technical Supervision Consultant Khatib&Alami specification and procedure implementation supervision, and leadership the Sub Contractor Engineering (Freyssinet - Menard Gulf ) 15. Other relevant information : - Freyssinet international Certificate (( Paris – French issue )) - S A R , Saudi Arabia railway ,North-South project – Recommendation
  • 6.
    CV: G. MihiedineMay 28, 2016 Page 6 of 7 Proof documents are available on request and professional certificates from corresponding companies are also available on request.
  • 7.
    CV: G. MihiedineMay 28, 2016 Page 7 of 7