PM 586 Complete Project Plan (1800-
FLOWERS.COM)
For more classes visit
www.snaptutorial.com
PM 586 Week 1 Assignment Organization and Project Plan Template
Proposal (1800-FLOWERS.COM)
Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process Construction of a new office
building Development of a new software system Roll out of a new
product or service Use the Internet to find a project plan template that is
appropriate for the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
business objectives
Availability of organizationaldata: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
PM 586 Week 2 Individual Assignment Project Plan Part 1 (1800-
FLOWERS.COM)
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
Sequence the primary activities
Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
PM 586 Week 3 Individual Assignment Project Plan Part 2 (1800-
FLOWERS.COM)
Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
Define appropriate budget of contingencies for risks identified.
PM 586 Week 4 Individual Assignment Project Plan Part 3 (1800-
FLOWERS.COM)
Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
Budget
Critical path
Resource levels
Change requests
Scope creep
*********************************
PM 586 Complete Project Plan (Coral Police
Advance Training Facility
For more classes visit
www.snaptutorial.com
This Project is available as a Final Plan, This do not contain weekly
work, we have only the final project plan with complete details as per
the plan template
PM 586 Week 1 Assignment Organization and Project Plan Template
Proposal (Coral Police Advance Training Facility)
Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process Construction of a new office
building Development of a new software system Roll out of a new
product or service Use the Internet to find a project plan template that is
appropriate for the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
business objectives
Availability of organizationaldata: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
PM 586 Week 2 Individual Assignment Project Plan Part 1 (Coral
Police Advance Training Facility)
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
Sequence the primary activities
Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
PM 586 Week 3 Individual Assignment Project Plan Part 2 (Coral
Police Advance Training Facility)
Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
Define appropriate budget of contingencies for risks identified.
PM 586 Week 4 Individual Assignment Project Plan Part 3 (Coral
Police Advance Training Facility)
Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
Budget
Critical path
Resource levels
Change requests
Scope creep
*********************************
PM 586 Complete Project Plan (Georgia Head
Start)
For more classes visit
www.snaptutorial.com
PM 586 Week 1 Assignment Organization and Project Plan Template
Proposal (Georgia Head Start)
Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process Construction of a new office
building Development of a new software system Roll out of a new
product or service Use the Internet to find a project plan template that is
appropriate for the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
business objectives
Availability of organizationaldata: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
PM 586 Week 2 Individual Assignment Project Plan Part 1 (Georgia
Head Start)
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
Sequence the primary activities
Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
PM 586 Week 3 Individual Assignment Project Plan Part 2 (Georgia
Head Start)
Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
Define appropriate budget of contingencies for risks identified.
PM 586 Week 4 Individual Assignment Project Plan Part 3 (Georgia
Head Start)
Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
Budget
Critical path
Resource levels
Change requests
Scope creep
*********************************
PM 586 Entire Course
For more classes visit
www.snaptutorial.com
PM 586 Week 1 Assignment Organization and Project Plan Template
Proposal (Georgia Head Start)
PM 586 Week 2 Learning Team Weekly Reflection
PM 586 Week 2 Assignment Project Plan Part 1(Georgia Head Start)
PM 586 Week 3 Learning Team Weekly Reflection
PM 586 Week 3 Assignment Project Plan Part 2 (Georgia Head Start)
PM 586 Week 4 Learning Team Reflection – Failed Projects
PM 586 Week 4 Assignment Project Plan Part 3 (Georgia Head Start)
PM 586 Week 5 Learning Team Weekly Reflection
PM 586 Week 5 Learning Team Assignment Influencing and Controlling
the Project
PM 586 Week 6 Learning Team Assignment Internal and External
Environmental Evaluation Presentation
PM 586 Week 6 Learning Team Weekly Reflection
*********************************
PM 586 Final Exam Guide
For more classes visit
www.snaptutorial.com
1. In a strong matrix structure, employees take daily direction from:
2. If the schedule variance is positive and the cost variance is negative,
the project’s status is:
3. Which category of projects would involve a large number of
functional units where the workers may be assigned either part-time or
full-time?
4. Which type of chart provides the least “predictive” value?
5. Scope creep is generally the result of:
6. Which of the following is the role of the PM rather than the role of the
functional manager?
7. The balance between quality and cost is called:
8. The EVMS term that represents the value of work actually
accomplished is:
9. Which of the following would be the first item to be discussed in the
initial kickoff meeting for a project?
10. Quality is defined by the:
11. Which of the following people has the greatest influence on how
much authority a project manager will possess on a given project?
12. A project manager desires a work breakdown structure that goes
through 6 levels of detail. Level 3 through level 6 would most likely be
prepared by:
13. In which project life cycle phase does quality begin?
14. Project management restructuring allowed companies to manage
projects that _____.
15. Risk constitutes a lack of knowledge _____.
16. The two primary components of a risk are:
17. Which of the following standard project estimating techniques is
usually accomplished in weeks?
18. The hardest part in creating a best practices library is:
19. A typical project office (not to be confused with a project
management office) responsible for the management of a large project
includes the project manager and the:
20. Industries that have _____ tasks and operate in a _____
environment demonstrated the greatest need for project management.
21. Pricing out the construction cost of a home by a cost per square foot
would be representative of a(n) _____ estimate.
22. The collective term for the formal quality activities and processes is
called:
23. The difference between the cost baseline and the contracted cost is
the:
24. Plans such as the cost plan, schedule plan and quality plan are
referred to as:
25. Companies can become reasonably mature in project management
by designing the right support systems. In general, how much time
usually elapses after maturity before a company becomes excellent in
project management execution?
26. The best source of revenue for a customer-requested scope change
is:
27. During the 1970s and 1980s, formal project management practices
were put in place because the constraints were _____ and _____
boundaries had to be crossed
28. A charting technique designed to illustrate the inductive and
deductive reasoning necessary to achieve some objective is called a
_____ Diagram / network
29. Which of the following is often overlooked when planning and
budgeting a project?
30. What is the project sponsor’s responsibility with regard to the WBS
preparation?
*********************************
PM 586 Week 1 Assignment Organization and
Project Plan Template Proposal (1800-
FLOWERS.COM)
For more classes visit
www.snaptutorial.com
Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process
Construction of a new office building
Development of a new software system
Roll out of a new product or service
Use the Internet to find a project plan template that is appropriate for
the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
business objectives
Availability of organizationaldata: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
*********************************
PM 586 Week 1 Assignment Organization and
Project Plan Template Proposal (Georgia Head
Start)
For more classes visit
www.snaptutorial.com
Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process
Construction of a new office building
Development of a new software system
Roll out of a new product or service
Use the Internet to find a project plan template that is appropriate for
the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
business objectives
Availability of organizationaldata: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
*********************************
PM 586 Week 2 Individual Assignment Project
Plan Part 1 (1800-FLOWERS.COM)
For more classes visit
www.snaptutorial.com
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
Sequence the primary activities
Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
*********************************
PM 586 Week 2 Individual Assignment Project
Plan Part 1 (Georgia Head Start)
For more classes visit
www.snaptutorial.com
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
Sequence the primary activities
Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
*********************************
PM 586 Week 2 LearningTeam Weekly Reflection
For more classes visit
www.snaptutorial.com
Discuss this week’s objectives with your team. Your discussion should
include the topics you feel comfortable with, any topics you struggled
with, and how the weekly topics relate to application in your field.
Prepare a 350- to 700- word paper detailing the findings of your
discussion.
PM 586 Week 3 Individual Assignment Project
Plan Part 2 (1800-FLOWERS.COM)
For more classes visit
www.snaptutorial.com
Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
Define appropriate budget of contingencies for risks identified.
*********************************
PM 586 Week 3 Individual Assignment Project
Plan Part 2 (Georgia Head Start)
For more classes visit
www.snaptutorial.com
Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
Define appropriate budget of contingencies for risks identified.
*********************************
PM 586 Week 3 LearningTeam Weekly Reflection
For more classes visit
www.snaptutorial.com
Discuss this week’s objectives with your team. Your discussion should
include the topics you feel comfortable with, any topics you struggled
with, and how the weekly topics relate to application in your field.
Prepare a 350- to 700- word paper detailing the findings of your
discussion
*********************************
PM 586 Week 4 Individual Assignment Project
Plan Part 3 (1800-FLOWERS.COM)
For more classes visit
www.snaptutorial.com
Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
Budget
Critical path
Resource levels
Change requests
Scope creep
PM 586 Week 4 Individual Assignment Project
Plan Part 3 (Georgia Head Start)
For more classes visit
www.snaptutrial.com
Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
Budget
Critical path
Resource levels
Change requests
Scope creep
PM 586 Week 4 Learning Team Reflection Failed
Projects
For more classes visit
www.snaptutorial.com
Choose an organization that is introducing a product or service that has
failed.
Evaluate the project that failed in the organization, including cost of the
failure (actual and unrealized), causes, and how monitoring could have
prevented the failure.
Use publicly available information, including Securities and Exchanges
Commission filings.
Discuss strategies that could be implemented to minimize this type of
failure in the future.
Prepare a 350- to 700- word paper detailing the findings of your
discussion.
PM 586 Week 5 Learning Team Assignment
Influencing and Controlling the Project
For more classes visit
www.snaptutorial.com
Review each learning team member’s project.
Choose, as a team, one of the individual project plans reviewed
Write a paper of no more than 2,100 words of strategies that facilitate
influencing power and control for the project proposal chosen.
Determine appropriate informal strategies to influence the success of the
selected project. Consider the following:
Organizational change
Stakeholder communication
Informal communication
Reward systems
Develop a control strategy for the project proposal chosen by the team.
Address the following components in the control strategy:
Project evaluation
Project schedule
Budget control
Input quality
Output quality
Change management strategies
Scope management strategies
Format your paper consistent with APA guidelines.
*********************************
PM 586 Week 5 LearningTeam Weekly Reflection
For more classes visit
www.snaptutorial.com
Discuss this week’s objectives with your team. Your discussion should
include the topics you feel comfortable with, any topics you struggled
with, and how the weekly topics relate to application in your field.
*********************************
PM 586 Week 6 Learning Team Assignment
Internal and External Environmental Evaluation
Presentation
For more classes visit
www.snaptutorial.com
Create a Microsoft® PowerPoint® or Prezi® presentation on the
quality-improvement plan for the organization chosen by the Learning
Team for the Influencing and Controlling the Project assignment.
Identify external and internal environmental factors that the company
must consider to manage projects successfully.
Perform a gap analysis to identify any gaps in relation to the company’s
current business processes and factors identified in the environmental
analysis.
Determine methods to address any gaps identified, including the
following components:
Goals of the improvement plan
Organizational responsibilities for the project
Project management tools
Identify the appropriate organizationalresponsibility and interfaces for
the project while addressing the following:
Which business function is responsible for which process?
Where do hand-offs between business functions occur?
Who is responsible for the project?
Who does mentoring or coaching?
What audit or review processes will be used?
Determine appropriate project management tools that the organization
should use to manage its projects.
Format your paper consistent with APA guidelines.
*********************************
PM 586 Week 6 LearningTeam Weekly Reflection
For more classes visit
www.snaptutorial.com
Discuss this week’s objectives with your team. Your discussion should
include the topics you feel comfortable with, any topics you struggled
with, and how the weekly topics relate to application in your field.
Prepare a 350- to 700- word paper detailing the findings of your
discussion
*********************************

PM 586 Education Specialist / snaptutorial.com

  • 1.
    PM 586 CompleteProject Plan (1800- FLOWERS.COM) For more classes visit www.snaptutorial.com PM 586 Week 1 Assignment Organization and Project Plan Template Proposal (1800-FLOWERS.COM) Choose an organization as the focus for a Project Proposal. The organization can be an existing company, nonprofit organization, religious organization, or governmental agency. Avoid an organization that is so large that historical data would be difficult to apply. Firms in the Russell 2000® index may fit well, whereas firms in the Dow 30 Industrial index probably do not. Select a project that you would expect to occur within this organization for which you will be writing a proposal. Project proposal examples include but are not limited to the following: Implementation of a new hiring process Construction of a new office building Development of a new software system Roll out of a new product or service Use the Internet to find a project plan template that is appropriate for the project plan you wish to propose. Write a few brief paragraphs to justify selecting this organization. Include the following:
  • 2.
    The organization’s name Thepurpose for this organization’s existence Why this organization is of interest to you A description of the project and its relationship to the organization’s business objectives Availability of organizationaldata: Avoid selecting an existing organization for which there is no publicly available historical data. Submit your paper and the project plan template to your instructor for approval. PM 586 Week 2 Individual Assignment Project Plan Part 1 (1800- FLOWERS.COM) Resource: Approved project plan proposal Describe your approach to managing this project, including methodology used. Identify sources available to understand the scope of the project proposal. Describe the phases the project will contain. Develop the project scope for your project. Address the following: Define the project requirements Define activities for the project
  • 3.
    Develop the schedulefor your project proposal. Address the following: Estimate primary activity duration Sequence the primary activities Develop a work breakdown structure and define the tasks Determine the labor requirement Determine necessary resources for the project PM 586 Week 3 Individual Assignment Project Plan Part 2 (1800- FLOWERS.COM) Continue developing the comprehensive project proposal outline. Develop the project budget for your project proposal. Include the following: Identify available resources (consider subcontractors) Create a labor budget Create a capital budget Align the schedule and scope to the labor and capital budget Develop the risk management plan for your project proposal. Address the following: Identify internal and external risks
  • 4.
    Define appropriate budgetof contingencies for risks identified. PM 586 Week 4 Individual Assignment Project Plan Part 3 (1800- FLOWERS.COM) Continue developing the comprehensive project proposal outline. Develop the strategies used to execute the project. Include the following: Strategies for management of human, physical, and financial resources, including the following: Temporary resources Permanent resources Work plan management (deliverables management) Quality assurance strategies Communication strategies Documentation management strategies Change request management strategies Contingency plans Develop the strategies used to monitor the project. Address the following when developing your monitoring strategy: Schedule Budget
  • 5.
    Critical path Resource levels Changerequests Scope creep ********************************* PM 586 Complete Project Plan (Coral Police Advance Training Facility For more classes visit www.snaptutorial.com This Project is available as a Final Plan, This do not contain weekly work, we have only the final project plan with complete details as per the plan template PM 586 Week 1 Assignment Organization and Project Plan Template Proposal (Coral Police Advance Training Facility) Choose an organization as the focus for a Project Proposal. The organization can be an existing company, nonprofit organization, religious organization, or governmental agency. Avoid an organization
  • 6.
    that is solarge that historical data would be difficult to apply. Firms in the Russell 2000® index may fit well, whereas firms in the Dow 30 Industrial index probably do not. Select a project that you would expect to occur within this organization for which you will be writing a proposal. Project proposal examples include but are not limited to the following: Implementation of a new hiring process Construction of a new office building Development of a new software system Roll out of a new product or service Use the Internet to find a project plan template that is appropriate for the project plan you wish to propose. Write a few brief paragraphs to justify selecting this organization. Include the following: The organization’s name The purpose for this organization’s existence Why this organization is of interest to you A description of the project and its relationship to the organization’s business objectives Availability of organizationaldata: Avoid selecting an existing organization for which there is no publicly available historical data. Submit your paper and the project plan template to your instructor for approval. PM 586 Week 2 Individual Assignment Project Plan Part 1 (Coral Police Advance Training Facility)
  • 7.
    Resource: Approved projectplan proposal Describe your approach to managing this project, including methodology used. Identify sources available to understand the scope of the project proposal. Describe the phases the project will contain. Develop the project scope for your project. Address the following: Define the project requirements Define activities for the project Develop the schedule for your project proposal. Address the following: Estimate primary activity duration Sequence the primary activities Develop a work breakdown structure and define the tasks Determine the labor requirement Determine necessary resources for the project PM 586 Week 3 Individual Assignment Project Plan Part 2 (Coral Police Advance Training Facility) Continue developing the comprehensive project proposal outline.
  • 8.
    Develop the projectbudget for your project proposal. Include the following: Identify available resources (consider subcontractors) Create a labor budget Create a capital budget Align the schedule and scope to the labor and capital budget Develop the risk management plan for your project proposal. Address the following: Identify internal and external risks Define appropriate budget of contingencies for risks identified. PM 586 Week 4 Individual Assignment Project Plan Part 3 (Coral Police Advance Training Facility) Continue developing the comprehensive project proposal outline. Develop the strategies used to execute the project. Include the following: Strategies for management of human, physical, and financial resources, including the following: Temporary resources Permanent resources Work plan management (deliverables management)
  • 9.
    Quality assurance strategies Communicationstrategies Documentation management strategies Change request management strategies Contingency plans Develop the strategies used to monitor the project. Address the following when developing your monitoring strategy: Schedule Budget Critical path Resource levels Change requests Scope creep ********************************* PM 586 Complete Project Plan (Georgia Head Start) For more classes visit
  • 10.
    www.snaptutorial.com PM 586 Week1 Assignment Organization and Project Plan Template Proposal (Georgia Head Start) Choose an organization as the focus for a Project Proposal. The organization can be an existing company, nonprofit organization, religious organization, or governmental agency. Avoid an organization that is so large that historical data would be difficult to apply. Firms in the Russell 2000® index may fit well, whereas firms in the Dow 30 Industrial index probably do not. Select a project that you would expect to occur within this organization for which you will be writing a proposal. Project proposal examples include but are not limited to the following: Implementation of a new hiring process Construction of a new office building Development of a new software system Roll out of a new product or service Use the Internet to find a project plan template that is appropriate for the project plan you wish to propose. Write a few brief paragraphs to justify selecting this organization. Include the following: The organization’s name The purpose for this organization’s existence Why this organization is of interest to you A description of the project and its relationship to the organization’s business objectives
  • 11.
    Availability of organizationaldata:Avoid selecting an existing organization for which there is no publicly available historical data. Submit your paper and the project plan template to your instructor for approval. PM 586 Week 2 Individual Assignment Project Plan Part 1 (Georgia Head Start) Resource: Approved project plan proposal Describe your approach to managing this project, including methodology used. Identify sources available to understand the scope of the project proposal. Describe the phases the project will contain. Develop the project scope for your project. Address the following: Define the project requirements Define activities for the project Develop the schedule for your project proposal. Address the following: Estimate primary activity duration Sequence the primary activities
  • 12.
    Develop a workbreakdown structure and define the tasks Determine the labor requirement Determine necessary resources for the project PM 586 Week 3 Individual Assignment Project Plan Part 2 (Georgia Head Start) Continue developing the comprehensive project proposal outline. Develop the project budget for your project proposal. Include the following: Identify available resources (consider subcontractors) Create a labor budget Create a capital budget Align the schedule and scope to the labor and capital budget Develop the risk management plan for your project proposal. Address the following: Identify internal and external risks Define appropriate budget of contingencies for risks identified. PM 586 Week 4 Individual Assignment Project Plan Part 3 (Georgia Head Start) Continue developing the comprehensive project proposal outline.
  • 13.
    Develop the strategiesused to execute the project. Include the following: Strategies for management of human, physical, and financial resources, including the following: Temporary resources Permanent resources Work plan management (deliverables management) Quality assurance strategies Communication strategies Documentation management strategies Change request management strategies Contingency plans Develop the strategies used to monitor the project. Address the following when developing your monitoring strategy: Schedule Budget Critical path Resource levels Change requests Scope creep
  • 14.
    ********************************* PM 586 EntireCourse For more classes visit www.snaptutorial.com PM 586 Week 1 Assignment Organization and Project Plan Template Proposal (Georgia Head Start) PM 586 Week 2 Learning Team Weekly Reflection PM 586 Week 2 Assignment Project Plan Part 1(Georgia Head Start) PM 586 Week 3 Learning Team Weekly Reflection PM 586 Week 3 Assignment Project Plan Part 2 (Georgia Head Start) PM 586 Week 4 Learning Team Reflection – Failed Projects PM 586 Week 4 Assignment Project Plan Part 3 (Georgia Head Start) PM 586 Week 5 Learning Team Weekly Reflection PM 586 Week 5 Learning Team Assignment Influencing and Controlling the Project PM 586 Week 6 Learning Team Assignment Internal and External Environmental Evaluation Presentation
  • 15.
    PM 586 Week6 Learning Team Weekly Reflection ********************************* PM 586 Final Exam Guide For more classes visit www.snaptutorial.com 1. In a strong matrix structure, employees take daily direction from: 2. If the schedule variance is positive and the cost variance is negative, the project’s status is: 3. Which category of projects would involve a large number of functional units where the workers may be assigned either part-time or full-time? 4. Which type of chart provides the least “predictive” value? 5. Scope creep is generally the result of: 6. Which of the following is the role of the PM rather than the role of the functional manager? 7. The balance between quality and cost is called: 8. The EVMS term that represents the value of work actually accomplished is:
  • 16.
    9. Which ofthe following would be the first item to be discussed in the initial kickoff meeting for a project? 10. Quality is defined by the: 11. Which of the following people has the greatest influence on how much authority a project manager will possess on a given project? 12. A project manager desires a work breakdown structure that goes through 6 levels of detail. Level 3 through level 6 would most likely be prepared by: 13. In which project life cycle phase does quality begin? 14. Project management restructuring allowed companies to manage projects that _____. 15. Risk constitutes a lack of knowledge _____. 16. The two primary components of a risk are: 17. Which of the following standard project estimating techniques is usually accomplished in weeks? 18. The hardest part in creating a best practices library is: 19. A typical project office (not to be confused with a project management office) responsible for the management of a large project includes the project manager and the: 20. Industries that have _____ tasks and operate in a _____ environment demonstrated the greatest need for project management. 21. Pricing out the construction cost of a home by a cost per square foot would be representative of a(n) _____ estimate. 22. The collective term for the formal quality activities and processes is called:
  • 17.
    23. The differencebetween the cost baseline and the contracted cost is the: 24. Plans such as the cost plan, schedule plan and quality plan are referred to as: 25. Companies can become reasonably mature in project management by designing the right support systems. In general, how much time usually elapses after maturity before a company becomes excellent in project management execution? 26. The best source of revenue for a customer-requested scope change is: 27. During the 1970s and 1980s, formal project management practices were put in place because the constraints were _____ and _____ boundaries had to be crossed 28. A charting technique designed to illustrate the inductive and deductive reasoning necessary to achieve some objective is called a _____ Diagram / network 29. Which of the following is often overlooked when planning and budgeting a project? 30. What is the project sponsor’s responsibility with regard to the WBS preparation? ********************************* PM 586 Week 1 Assignment Organization and Project Plan Template Proposal (1800- FLOWERS.COM)
  • 18.
    For more classesvisit www.snaptutorial.com Choose an organization as the focus for a Project Proposal. The organization can be an existing company, nonprofit organization, religious organization, or governmental agency. Avoid an organization that is so large that historical data would be difficult to apply. Firms in the Russell 2000® index may fit well, whereas firms in the Dow 30 Industrial index probably do not. Select a project that you would expect to occur within this organization for which you will be writing a proposal. Project proposal examples include but are not limited to the following: Implementation of a new hiring process Construction of a new office building Development of a new software system Roll out of a new product or service Use the Internet to find a project plan template that is appropriate for the project plan you wish to propose. Write a few brief paragraphs to justify selecting this organization. Include the following: The organization’s name The purpose for this organization’s existence
  • 19.
    Why this organizationis of interest to you A description of the project and its relationship to the organization’s business objectives Availability of organizationaldata: Avoid selecting an existing organization for which there is no publicly available historical data. Submit your paper and the project plan template to your instructor for approval. ********************************* PM 586 Week 1 Assignment Organization and Project Plan Template Proposal (Georgia Head Start) For more classes visit www.snaptutorial.com Choose an organization as the focus for a Project Proposal. The organization can be an existing company, nonprofit organization, religious organization, or governmental agency. Avoid an organization that is so large that historical data would be difficult to apply. Firms in the Russell 2000® index may fit well, whereas firms in the Dow 30 Industrial index probably do not.
  • 20.
    Select a projectthat you would expect to occur within this organization for which you will be writing a proposal. Project proposal examples include but are not limited to the following: Implementation of a new hiring process Construction of a new office building Development of a new software system Roll out of a new product or service Use the Internet to find a project plan template that is appropriate for the project plan you wish to propose. Write a few brief paragraphs to justify selecting this organization. Include the following: The organization’s name The purpose for this organization’s existence Why this organization is of interest to you A description of the project and its relationship to the organization’s business objectives Availability of organizationaldata: Avoid selecting an existing organization for which there is no publicly available historical data. Submit your paper and the project plan template to your instructor for approval. *********************************
  • 21.
    PM 586 Week2 Individual Assignment Project Plan Part 1 (1800-FLOWERS.COM) For more classes visit www.snaptutorial.com Resource: Approved project plan proposal Describe your approach to managing this project, including methodology used. Identify sources available to understand the scope of the project proposal. Describe the phases the project will contain. Develop the project scope for your project. Address the following: Define the project requirements Define activities for the project Develop the schedule for your project proposal. Address the following: Estimate primary activity duration Sequence the primary activities
  • 22.
    Develop a workbreakdown structure and define the tasks Determine the labor requirement Determine necessary resources for the project ********************************* PM 586 Week 2 Individual Assignment Project Plan Part 1 (Georgia Head Start) For more classes visit www.snaptutorial.com Resource: Approved project plan proposal Describe your approach to managing this project, including methodology used. Identify sources available to understand the scope of the project proposal. Describe the phases the project will contain. Develop the project scope for your project. Address the following: Define the project requirements
  • 23.
    Define activities forthe project Develop the schedule for your project proposal. Address the following: Estimate primary activity duration Sequence the primary activities Develop a work breakdown structure and define the tasks Determine the labor requirement Determine necessary resources for the project ********************************* PM 586 Week 2 LearningTeam Weekly Reflection For more classes visit www.snaptutorial.com Discuss this week’s objectives with your team. Your discussion should include the topics you feel comfortable with, any topics you struggled with, and how the weekly topics relate to application in your field. Prepare a 350- to 700- word paper detailing the findings of your discussion.
  • 24.
    PM 586 Week3 Individual Assignment Project Plan Part 2 (1800-FLOWERS.COM) For more classes visit www.snaptutorial.com Continue developing the comprehensive project proposal outline. Develop the project budget for your project proposal. Include the following: Identify available resources (consider subcontractors) Create a labor budget Create a capital budget Align the schedule and scope to the labor and capital budget Develop the risk management plan for your project proposal. Address the following: Identify internal and external risks Define appropriate budget of contingencies for risks identified. *********************************
  • 25.
    PM 586 Week3 Individual Assignment Project Plan Part 2 (Georgia Head Start) For more classes visit www.snaptutorial.com Continue developing the comprehensive project proposal outline. Develop the project budget for your project proposal. Include the following: Identify available resources (consider subcontractors) Create a labor budget Create a capital budget Align the schedule and scope to the labor and capital budget Develop the risk management plan for your project proposal. Address the following: Identify internal and external risks Define appropriate budget of contingencies for risks identified. *********************************
  • 26.
    PM 586 Week3 LearningTeam Weekly Reflection For more classes visit www.snaptutorial.com Discuss this week’s objectives with your team. Your discussion should include the topics you feel comfortable with, any topics you struggled with, and how the weekly topics relate to application in your field. Prepare a 350- to 700- word paper detailing the findings of your discussion ********************************* PM 586 Week 4 Individual Assignment Project Plan Part 3 (1800-FLOWERS.COM) For more classes visit www.snaptutorial.com Continue developing the comprehensive project proposal outline.
  • 27.
    Develop the strategiesused to execute the project. Include the following: Strategies for management of human, physical, and financial resources, including the following: Temporary resources Permanent resources Work plan management (deliverables management) Quality assurance strategies Communication strategies Documentation management strategies Change request management strategies Contingency plans Develop the strategies used to monitor the project. Address the following when developing your monitoring strategy: Schedule Budget Critical path Resource levels Change requests Scope creep
  • 28.
    PM 586 Week4 Individual Assignment Project Plan Part 3 (Georgia Head Start) For more classes visit www.snaptutrial.com Continue developing the comprehensive project proposal outline. Develop the strategies used to execute the project. Include the following: Strategies for management of human, physical, and financial resources, including the following: Temporary resources Permanent resources Work plan management (deliverables management) Quality assurance strategies Communication strategies Documentation management strategies Change request management strategies Contingency plans
  • 29.
    Develop the strategiesused to monitor the project. Address the following when developing your monitoring strategy: Schedule Budget Critical path Resource levels Change requests Scope creep PM 586 Week 4 Learning Team Reflection Failed Projects For more classes visit www.snaptutorial.com Choose an organization that is introducing a product or service that has failed. Evaluate the project that failed in the organization, including cost of the failure (actual and unrealized), causes, and how monitoring could have prevented the failure.
  • 30.
    Use publicly availableinformation, including Securities and Exchanges Commission filings. Discuss strategies that could be implemented to minimize this type of failure in the future. Prepare a 350- to 700- word paper detailing the findings of your discussion. PM 586 Week 5 Learning Team Assignment Influencing and Controlling the Project For more classes visit www.snaptutorial.com Review each learning team member’s project. Choose, as a team, one of the individual project plans reviewed Write a paper of no more than 2,100 words of strategies that facilitate influencing power and control for the project proposal chosen. Determine appropriate informal strategies to influence the success of the selected project. Consider the following: Organizational change Stakeholder communication Informal communication
  • 31.
    Reward systems Develop acontrol strategy for the project proposal chosen by the team. Address the following components in the control strategy: Project evaluation Project schedule Budget control Input quality Output quality Change management strategies Scope management strategies Format your paper consistent with APA guidelines. ********************************* PM 586 Week 5 LearningTeam Weekly Reflection For more classes visit www.snaptutorial.com
  • 32.
    Discuss this week’sobjectives with your team. Your discussion should include the topics you feel comfortable with, any topics you struggled with, and how the weekly topics relate to application in your field. ********************************* PM 586 Week 6 Learning Team Assignment Internal and External Environmental Evaluation Presentation For more classes visit www.snaptutorial.com Create a Microsoft® PowerPoint® or Prezi® presentation on the quality-improvement plan for the organization chosen by the Learning Team for the Influencing and Controlling the Project assignment. Identify external and internal environmental factors that the company must consider to manage projects successfully. Perform a gap analysis to identify any gaps in relation to the company’s current business processes and factors identified in the environmental analysis. Determine methods to address any gaps identified, including the following components:
  • 33.
    Goals of theimprovement plan Organizational responsibilities for the project Project management tools Identify the appropriate organizationalresponsibility and interfaces for the project while addressing the following: Which business function is responsible for which process? Where do hand-offs between business functions occur? Who is responsible for the project? Who does mentoring or coaching? What audit or review processes will be used? Determine appropriate project management tools that the organization should use to manage its projects. Format your paper consistent with APA guidelines. ********************************* PM 586 Week 6 LearningTeam Weekly Reflection For more classes visit www.snaptutorial.com
  • 34.
    Discuss this week’sobjectives with your team. Your discussion should include the topics you feel comfortable with, any topics you struggled with, and how the weekly topics relate to application in your field. Prepare a 350- to 700- word paper detailing the findings of your discussion *********************************