1. PM 586 Complete Project Plan (1800-FLOWERS.COM)
FOR MORE CLASSES VISIT
www.pm586genius.com
PM 586 Week 1 Assignment Organization and Project Plan Template
Proposal (1800-FLOWERS.COM)
Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process Construction of a new office
building Development of a new software system Roll out of a new
product or service Use the Internet to find a project plan template that is
appropriate for the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
business objectives
Availability of organizational data: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
2. PM 586 Week 2 Individual Assignment Project Plan Part 1 (1800-
FLOWERS.COM)
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
Sequence the primary activities
Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
PM 586 Week 3 Individual Assignment Project Plan Part 2 (1800-
FLOWERS.COM)
Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
Define appropriate budget of contingencies for risks identified.
3. PM 586 Week 4 Individual Assignment Project Plan Part 3 (1800-
FLOWERS.COM)
Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
Budget
Critical path
Resource levels
Change requests
Scope creep
===========================================
===
PM 586 Complete Project Plan (Coral Police Advance Training
Facility)
FOR MORE CLASSES VISIT
4. www.pm586genius.com
This Project is available as a Final Plan, This do not contain weekly
work, we have only the final project plan with complete details as per
the plan template
PM 586 Week 1 Assignment Organization and Project Plan Template
Proposal (Coral Police Advance Training Facility)
Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process Construction of a new office
building Development of a new software system Roll out of a new
product or service Use the Internet to find a project plan template that
is appropriate for the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
5. The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
business objectives
Availability of organizational data: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
PM 586 Week 2 Individual Assignment Project Plan Part 1 (Coral Police
Advance Training Facility)
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
6. Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
Sequence the primary activities
Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
PM 586 Week 3 Individual Assignment Project Plan Part 2 (Coral Police
Advance Training Facility)
Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
7. Define appropriate budget of contingencies for risks identified.
PM 586 Week 4 Individual Assignment Project Plan Part 3 (Coral Police
Advance Training Facility)
Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
8. Budget
Critical path
Resource levels
Change requests
Scope creep
===========================================
===
PM 586 Complete Project Plan (Georgia Head Start)
FOR MORE CLASSES VISIT
www.pm586genius.com
PM 586 Week 1 Assignment Organization and Project Plan Template
Proposal (Georgia Head Start)
Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process Construction of a new office
building Development of a new software system Roll out of a new
9. product or service Use the Internet to find a project plan template that is
appropriate for the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
business objectives
Availability of organizational data: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
PM 586 Week 2 Individual Assignment Project Plan Part 1 (Georgia
Head Start)
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
Sequence the primary activities
Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
10. PM 586 Week 3 Individual Assignment Project Plan Part 2 (Georgia
Head Start)
Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
Define appropriate budget of contingencies for risks identified.
PM 586 Week 4 Individual Assignment Project Plan Part 3 (Georgia
Head Start)
Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
Budget
Critical path
Resource levels
11. Change requests
Scope creep
===========================================
===
PM 586 Entire Course
FOR MORE CLASSES VISIT
www.pm586genius.com
PM 586 Week 1 Assignment Organization and Project Plan Template
Proposal (Georgia Head Start) PM 586 Week 2 Learning Team Weekly
Reflection PM 586 Week 2 Assignment Project Plan Part 1(Georgia Head
Start) PM 586 Week 3 Learning Team Weekly Reflection PM 586 Week 3
Assignment Project Plan Part 2 (Georgia Head Start) PM 586 Week 4
Learning Team Reflection – Failed Projects PM 586 Week 4 Assignment
Project Plan Part 3 (Georgia Head Start) PM 586 Week 5 Learning Team
Weekly Reflection PM 586 Week 5 Learning Team Assignment
Influencing and Controlling the Project PM 586 Week 6 Learning Team
Assignment Internal and External Environmental Evaluation
Presentation PM 586 Week 6 Learning Team Weekly Reflection
==============================================
PM 586 Final Exam Guide
12. FOR MORE CLASSES VISIT
www.pm586genius.com
1. In a strong matrix structure, employees take daily direction from: 2. If
the schedule variance is positive and the cost variance is negative, the
project’s status is: 3. Which category of projects would involve a large
number of functional units where the workers may be assigned either
part-time or full-time? 4. Which type of chart provides the least
“predictive” value? 5. Scope creep is generally the result of: 6. Which of
the following is the role of the PM rather than the role of the functional
manager? 7. The balance between quality and cost is called: 8. The
EVMS term that represents the value of work actually accomplished is:
9. Which of the following would be the first item to be discussed in the
initial kickoff meeting for a project? 10. Quality is defined by the: 11.
Which of the following people has the greatest influence on how much
authority a project manager will possess on a given project? 12. A
project manager desires a work breakdown structure that goes through
6 levels of detail. Level 3 through level 6 would most likely be prepared
by: 13. In which project life cycle phase does quality begin? 14. Project
management restructuring allowed companies to manage projects that
_____. 15. Risk constitutes a lack of knowledge _____. 16. The two
primary components of a risk are: 17. Which of the following standard
project estimating techniques is usually accomplished in weeks? 18. The
hardest part in creating a best practices library is: 19. A typical project
office (not to be confused with a project management office)
responsible for the management of a large project includes the project
manager and the: 20. Industries that have _____ tasks and operate in a
13. _____ environment demonstrated the greatest need for project
management. 21. Pricing out the construction cost of a home by a cost
per square foot would be representative of a(n) _____ estimate. 22. The
collective term for the formal quality activities and processes is called:
23. The difference between the cost baseline and the contracted cost is
the: 24. Plans such as the cost plan, schedule plan and quality plan are
referred to as: 25. Companies can become reasonably mature in project
management by designing the right support systems. In general, how
much time usually elapses after maturity before a company becomes
excellent in project management execution? 26. The best source of
revenue for a customer-requested scope change is: 27. During the 1970s
and 1980s, formal project management practices were put in place
because the constraints were _____ and _____ boundaries had to be
crossed 28. A charting technique designed to illustrate the inductive and
deductive reasoning necessary to achieve some objective is called a
_____ Diagram / network 29. Which of the following is often overlooked
when planning and budgeting a project? 30. What is the project
sponsor’s responsibility with regard to the WBS preparation?
==============================================
PM 586 Week 1 Assignment Organization and Project Plan
Template Proposal (1800-FLOWERS.COM)
FOR MORE CLASSES VISIT
www.pm586genius.com
14. Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process
Construction of a new office building
Development of a new software system
Roll out of a new product or service
Use the Internet to find a project plan template that is appropriate for
the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
business objectives
Availability of organizational data: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
==============================================
15. PM 586 Week 1 Assignment Organization and Project Plan
Template Proposal (Georgia Head Start)
FOR MORE CLASSES VISIT
www.pm586genius.com
Choose an organization as the focus for a Project Proposal. The
organization can be an existing company, nonprofit organization,
religious organization, or governmental agency. Avoid an organization
that is so large that historical data would be difficult to apply. Firms in
the Russell 2000® index may fit well, whereas firms in the Dow 30
Industrial index probably do not.
Select a project that you would expect to occur within this organization
for which you will be writing a proposal. Project proposal examples
include but are not limited to the following:
Implementation of a new hiring process
Construction of a new office building
Development of a new software system
Roll out of a new product or service
Use the Internet to find a project plan template that is appropriate for
the project plan you wish to propose.
Write a few brief paragraphs to justify selecting this organization.
Include the following:
The organization’s name
The purpose for this organization’s existence
Why this organization is of interest to you
A description of the project and its relationship to the organization’s
16. business objectives
Availability of organizational data: Avoid selecting an existing
organization for which there is no publicly available historical data.
Submit your paper and the project plan template to your instructor for
approval.
==============================================
PM 586 Week 2 Individual Assignment Project Plan Part 1
(1800-FLOWERS.COM)
FOR MORE CLASSES VISIT
www.pm586genius.com
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
17. Sequence the primary activities
Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
==============================================
PM 586 Week 2 Individual Assignment Project Plan Part 1
(Georgia Head Start)
FOR MORE CLASSES VISIT
www.pm586genius.com
Resource: Approved project plan proposal
Describe your approach to managing this project, including
methodology used.
Identify sources available to understand the scope of the project
proposal.
Describe the phases the project will contain.
Develop the project scope for your project.
Address the following:
Define the project requirements
Define activities for the project
Develop the schedule for your project proposal.
Address the following:
Estimate primary activity duration
Sequence the primary activities
18. Develop a work breakdown structure and define the tasks
Determine the labor requirement
Determine necessary resources for the project
==============================================
PM 586 Week 2 Learning Team Weekly Reflection (UOP)
FOR MORE CLASSES VISIT
www.pm586genius.com
Discuss this week’s objectives with your team. Your discussion should
include the topics you feel comfortable with, any topics you struggled
with, and how the weekly topics relate to application in your field.
Prepare a 350- to 700- word paper detailing the findings of your
discussion.
==============================================
PM 586 Week 3 Individual Assignment Project Plan Part 2
(1800-FLOWERS.COM)
FOR MORE CLASSES VISIT
www.pm586genius.com
19. Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
Define appropriate budget of contingencies for risks identified.
==============================================
PM 586 Week 3 Individual Assignment Project Plan Part 2
(Georgia Head Start)
FOR MORE CLASSES VISIT
www.pm586genius.com
Continue developing the comprehensive project proposal outline.
Develop the project budget for your project proposal.
Include the following:
Identify available resources (consider subcontractors)
Create a labor budget
Create a capital budget
Align the schedule and scope to the labor and capital budget
20. Develop the risk management plan for your project proposal.
Address the following:
Identify internal and external risks
Define appropriate budget of contingencies for risks identified.
==============================================
PM 586 Week 3 Learning Team Weekly Reflection (UOP)
FOR MORE CLASSES VISIT
www.pm586genius.com
Discuss this week’s objectives with your team. Your discussion should
include the topics you feel comfortable with, any topics you struggled
with, and how the weekly topics relate to application in your field.
Prepare a 350- to 700- word paper detailing the findings of your
discussion
==============================================
PM 586 Week 4 Individual Assignment Project Plan Part 3
(1800-FLOWERS.COM)
FOR MORE CLASSES VISIT
www.pm586genius.com
21. Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
Budget
Critical path
Resource levels
Change requests
Scope creep
==============================================
PM 586 Week 4 Individual Assignment Project Plan Part 3
(Georgia Head Start)
22. FOR MORE CLASSES VISIT
www.pm586genius.com
Continue developing the comprehensive project proposal outline.
Develop the strategies used to execute the project.
Include the following:
Strategies for management of human, physical, and financial resources,
including the following:
Temporary resources
Permanent resources
Work plan management (deliverables management)
Quality assurance strategies
Communication strategies
Documentation management strategies
Change request management strategies
Contingency plans
Develop the strategies used to monitor the project.
Address the following when developing your monitoring strategy:
Schedule
Budget
Critical path
Resource levels
Change requests
Scope creep
==============================================
23. PM 586 Week 4 Learning Team Reflection – Failed Projects
(UOP)
FOR MORE CLASSES VISIT
www.pm586genius.com
Choose an organization that is introducing a product or service that has
failed.
Evaluate the project that failed in the organization, including cost of the
failure (actual and unrealized), causes, and how monitoring could have
prevented the failure.
Use publicly available information, including Securities and Exchanges
Commission filings.
Discuss strategies that could be implemented to minimize this type of
failure in the future.
Prepare a 350- to 700- word paper detailing the findings of your
discussion.
==============================================
PM 586 Week 5 Learning Team Assignment Influencing and
Controlling the Project (UOP)
FOR MORE CLASSES VISIT
www.pm586genius.com
24. Review each learning team member’s project.
Choose, as a team, one of the individual project plans reviewed
Write a paper of no more than 2,100 words of strategies that facilitate
influencing power and control for the project proposal chosen.
Determine appropriate informal strategies to influence the success of
the selected project. Consider the following:
Organizational change
Stakeholder communication
Informal communication
Reward systems
Develop a control strategy for the project proposal chosen by the team.
Address the following components in the control strategy:
Project evaluation
Project schedule
Budget control
Input quality
Output quality
Change management strategies
Scope management strategies
Format your paper consistent with APA guidelines.
==============================================
PM 586 Week 5 Learning Team Weekly Reflection (UOP)
FOR MORE CLASSES VISIT
25. www.pm586genius.com
Discuss this week’s objectives with your team. Your discussion should
include the topics you feel comfortable with, any topics you struggled
with, and how the weekly topics relate to application in your field.
==============================================
PM 586 Week 6 Learning Team Assignment Internal and
External Environmental Evaluation Presentation (UOP)
FOR MORE CLASSES VISIT
www.pm586genius.com
Create a Microsoft® PowerPoint® or Prezi® presentation on the quality-
improvement plan for the organization chosen by the Learning Team for
the Influencing and Controlling the Project assignment.
Identify external and internal environmental factors that the company
must consider to manage projects successfully.
Perform a gap analysis to identify any gaps in relation to the company’s
current business processes and factors identified in the environmental
analysis.
Determine methods to address any gaps identified, including the
following components:
Goals of the improvement plan
Organizational responsibilities for the project
Project management tools
26. Identify the appropriate organizational responsibility and interfaces for
the project while addressing the following:
Which business function is responsible for which process?
Where do hand-offs between business functions occur?
Who is responsible for the project?
Who does mentoring or coaching?
What audit or review processes will be used?
Determine appropriate project management tools that the organization
should use to manage its projects.
Format your paper consistent with APA guidelines.
==============================================
PM 586 Week 6 Learning Team Weekly Reflection (UOP)
FOR MORE CLASSES VISIT
www.pm586genius.com
Discuss this week’s objectives with your team. Your discussion should
include the topics you feel comfortable with, any topics you struggled
with, and how the weekly topics relate to application in your field.
Prepare a 350- to 700- word paper detailing the findings of your
discussion
==============================================