1. MODIFICATION OF A TWO
WHEELER TO OVERCOME
EXISTING PROBLEMS
1
Team Reg. No. : 14259
2. Guided By:
Prof. Chitralekha Nahar
Mechanical Department
Saffrony Institute of Technology
Prepared By:
Parth Solanki (120393119029)
Aniket Patel (110390119030)
Hanee Patel (110390119036)
Raj Soni (110390119025)
7th
Semester
Mechanical Department
Saffrony Institute of Technology
3.
4. • Modification of a two wheeler to overcome the
existing problems by improving the performances,
stability and control.
• The vehicle will be easy to learn for all age group.
• The vehicle will have improved turning regardless of
traction and making it to run on muddy and slippery
road.
• Modified vehicle will eliminate the fear of falling and
will more safe to ride.
14. • This vehicle will have more stability than
two wheeled vehicle.
• This vehicle will be easy to control.
• There will be reduction in skidding of vehicle
on slippery surface.
• It will be less tiresome in traffic condition.
• It will be easy to learn for all age group
including physically challenged people.
• The ride will be more comfortable and
smoother.
• There will be ease in taking sharp turns.
15. • It will have 50% more braking power.
• Modified suspension system will have efficient
damping of shocks and vibration.
• It will be easy to learn for all age group including
physically challenged people.
• The ride will be more comfortable and smoother.
• There will be ease in taking sharp turns.
• It will have 50% more braking power.
• Modified suspension system will have efficient
damping of shocks and vibration.
• It will be less tiresome in traffic condition.
16. • Increases the weight of vehicle.
• Requires more power to propel.
• Increase in maintenance.
• Increase in cost of vehicle.
17. TASKS DURATION START FINISH
IDEA GENERATION AND
RESEARCH
18 Days Jul-02- 2014 Jul-20-2014
MARKET SURVEY 10 Days Jul-05-2014 Jul-15-2014
TITLE FINALIZATION 10 Days Jul-21- 2014 Aug-10-2014
DESIGN 38 Days Sep-3-2014 Oct-10-2014
DOCUMENTATION 3 Days Oct-29-2014 Nov-01-2014
DESIGN MODIFICATION 10 Days Dec-20-2014 Dec-29-2014
MATERIAL PROCUREMENT 8 Days Jan-02-2015 Jan-10-2015
FABRICATION 48 Days Jan-11-2015 Feb-27-2015
VALIDATION 6 Days Mar-01-2015 Mar-06-2015
DOCUMENTATION 13 Days Mar-07-2015 Mar-20-201534