PERSONAL PARTICULARS
Ho Lei Chiang (Jayden)
Block 408 Bukit Batok West Avenue 4 #08-138 Singapore 650408
90289428/65650287
Leileii123@gmail.com
Date of Birth: 12/09/1987 (Age: 28)
National Service: Completed in June 2010 (Lieutenant)
Driving License: Class 3 (Manual)
Sex: Male
CAREER OBJECTIVES
Be a part in the safety field environment to utilise my knowledge and skills. To work within a
dynamic, highly motivating and challenging atmosphere. With my good analytical skills, initiative and
pleasant personality, I can cooperate well with colleagues to overcome obstacles and deliver beneficial
safety knowledge to stakeholders. Has the ability to work in a fast-paced and demanding environment.
Enriching myself with broad safety knowledge and share it with the people who are working with me.
PROFILE
• Good technical knowledge (Electrical / Mechanical)
• Excellent communication and interpersonal skills
• Great teamwork spirit
• Ability to think creatively
• Strong computer skills
EDUCATION
Republic Polytechnic, School of Engineering, Singapore. Apr 2005 – Jan 2008
Diploma in Communications and Automation Electronics.
Specialized in Automation Technologies.
Current GPA 3.2/4.0
• Completed the engineering studies in Problem Based Learning (PBL) pedagogy where
industrial problems and projects used for learning process.
• Problem solving in a team of 5 members helped to adapt with team work and helped to develop
leadership skills, communication skills, presentation skills, and qualitative research and
analysis skills.
• Final Year Project to Design and Develop an INTELLIGENT ROBOT using belt mechanism
for Singapore Robotics Games 2008.
SAFETY QUALIFICATIONS
WSQ Certificate in Workplace Safety and Health (Level A) Apr 2012 – Jul 2012
WSQ Advance Certificate in Workplace Safety and Health (Level B) Nov 2012 – Apr 2013
WSQ Specialist Diploma in Workplace Safety and Health (Level C) July 2013 – Dec 2013
Work-At-Height Supervisor Mar 2014
Building Construction Safety Supervisor (BCSS) Mar 2014
Work-At-Height Assessor Apr 2014
Assess Confined Space for Safe Entry and Work Jun 2014
Monitor Noise and Vibration Jun 2014
Fire Safety Manager (FSM) Jan 2015
Bachelor in Environmental Occupational Health & Safety May 2015 - (On-going)
AWARDS/ACHIEVEMENTS
Participant and 4th
placing of Singapore Robotics Games between 8 and 10 January 2008 (Intelligent
Robot Category)
Consolation prize in Institution of Engineers Singapore Workshop (Using drinking straws to build a
bridge and support RC model car of 250g)
TECHNICAL SKILLS
• Skilled in digital and analogue electronic systems, PLC systems (OMRON ladder logic),
testing and troubleshooting.
• Knowledge in controlling industrial devices including PLCs, stepper motors, servo motors,
DC/AC motors and common engineering tools such as oscilloscope, multi-meter
spectrum/audio analyzer, signal generator
• Skilled in various engineering software tools including ORCAD, AUTOCAD, Zuken
CR3000/CR5000 PCB Design Software.
• Basic network configuration using switches/routers, configure CCTV(ReadyNAS NETGEAR)
• Design of Power distribution in data communication racks, knowledge of power, heat load, weight
WORK EXPERIENCE
Job Title: Assistant Engineer (Electrical)
Company: Sony Precision Engineering Centre
Location: 52 Tuas Avenue 9 Singapore 639193
Duration With Company: Approximate 3 months (Feb 2008 - May 2008)
Job Scope: Testing and Troubleshooting PIC board; modifying programming codes and wiring
assembly for prototype machines; prepare D-sub connectors; configure simple pneumatic controls.
Job Title: Assistant Engineer (R&D Product Design Group)
Company: JVC Electronics Singapore Pte Ltd
Location: 79 Ayer Rajah Crescent Singapore 139955
Duration With Company: 1 year 7 months (July 2010 - Feb 2012)
Job Scope: Studying and researching Car Audio models before announcing to the market. Produce
sample sets from blank PCB to actual car audio sets with every process involved before Mass
Production starts in overseas factories. Improve both Electrical hardware design and Mechanical parts
design in every prototype sample stage. Functionality inspection and testing with tuner measurements
to ensure that it have met with the international market standards & demands.
Job Title: Associate Engineer (Integrated Comms Division)
Company: ST Electronics (Info-Comm Systems) Pte Ltd
Location: 100 Jurong East Street 21 Singapore 609602
Duration With Company: 2 year 2 months (Mar 2012 – May 2014)
Job Scope: Overlook of Sub-contractors Safety during work. Conduct Risk Assessment before start of
work activities, Ensure sub-contractors comply with organisation SHMS. Site supervision for
contractors in SAF Project. Site coordinator for SAF project works. Installation, Check, Inspection &
Testing (ICIT) engineer. Maintenance and troubleshooting of communication equipment, power
matters in DC/AC generators. Planning project schedule which include Field Acceptance Test (FAT)
with customers/vendors/contractors. Project materials & equipment purchase requisition. Preparation
of documents (Delivery notes, Installation control document, Network connectivity diagram, Design
of data racks layout & power distribution.
Secondary Role: Department Tools IC, ST Electronics Infocomm - SWC Member
Job Title: WSH Officer (Assistant)
Company: Singapore Technologies Kinetics Ltd (KDM)
Location: 249 Jalan Boon Lay Singapore 619523
Duration With Company: 1 year 4 months (Jul 2014 – Present)
Job Scope: Responsible for developing and monitoring safety programmes and policies. Conduct
safety surveys/inspections and recommend appropriate corrective actions. Assist WSHO in conducting
monthly safety meeting and preparation of minutes. Establish and deliver/communicate Environment,
Heatlh and Safety (EHS) deliverables and training. Plan and facilitate internal EHS audit OHSAS
18001 and follow up with post-audit activities. Support external audits ISO14001, OHSAS 18001 by
certification bodies. Create monitor EHS workplan and objectives. Monitor and ensure compliance of
statutory and legal requirements. Plan, coordinate health checks and compile reports, Review and
update EHS documents. Manage Behavioural Based Safety (BBS) System.
Secondary Role: Staff Welfare Committee (SWC) member, Assistant Fire Safety Manager
LANGUAGE PROFICIENCY
Spoken & Written: English, Mandarin and Basic Korean
COMPUTER SKILLS
• Able to do Microsoft Excel, PowerPoint, Word, Visio
• Fine troubleshooting skills
• Basic hardware and software configurations
ACTIVITIES/INTERESTS
• Listen to all kinds of music
• Active sports such as running
• Watch movies with friends
CAREER INTEREST
Current Salary: -
Expected salary: $4000
Availability: 1 month notice
REFERENCES
Ms Chua Chai Ling
Management Support Officer
Attorney General Chambers
91008205
Mr Willie Kee Meng Hui
Engineer
ST Electronics (Info-Comm Systems) Pte Ltd
97581862

Photo resume 131115

  • 1.
    PERSONAL PARTICULARS Ho LeiChiang (Jayden) Block 408 Bukit Batok West Avenue 4 #08-138 Singapore 650408 90289428/65650287 Leileii123@gmail.com Date of Birth: 12/09/1987 (Age: 28) National Service: Completed in June 2010 (Lieutenant) Driving License: Class 3 (Manual) Sex: Male CAREER OBJECTIVES Be a part in the safety field environment to utilise my knowledge and skills. To work within a dynamic, highly motivating and challenging atmosphere. With my good analytical skills, initiative and pleasant personality, I can cooperate well with colleagues to overcome obstacles and deliver beneficial safety knowledge to stakeholders. Has the ability to work in a fast-paced and demanding environment. Enriching myself with broad safety knowledge and share it with the people who are working with me. PROFILE • Good technical knowledge (Electrical / Mechanical) • Excellent communication and interpersonal skills • Great teamwork spirit • Ability to think creatively • Strong computer skills EDUCATION Republic Polytechnic, School of Engineering, Singapore. Apr 2005 – Jan 2008 Diploma in Communications and Automation Electronics. Specialized in Automation Technologies. Current GPA 3.2/4.0 • Completed the engineering studies in Problem Based Learning (PBL) pedagogy where industrial problems and projects used for learning process. • Problem solving in a team of 5 members helped to adapt with team work and helped to develop leadership skills, communication skills, presentation skills, and qualitative research and analysis skills. • Final Year Project to Design and Develop an INTELLIGENT ROBOT using belt mechanism for Singapore Robotics Games 2008. SAFETY QUALIFICATIONS WSQ Certificate in Workplace Safety and Health (Level A) Apr 2012 – Jul 2012 WSQ Advance Certificate in Workplace Safety and Health (Level B) Nov 2012 – Apr 2013 WSQ Specialist Diploma in Workplace Safety and Health (Level C) July 2013 – Dec 2013 Work-At-Height Supervisor Mar 2014 Building Construction Safety Supervisor (BCSS) Mar 2014 Work-At-Height Assessor Apr 2014 Assess Confined Space for Safe Entry and Work Jun 2014 Monitor Noise and Vibration Jun 2014 Fire Safety Manager (FSM) Jan 2015 Bachelor in Environmental Occupational Health & Safety May 2015 - (On-going)
  • 2.
    AWARDS/ACHIEVEMENTS Participant and 4th placingof Singapore Robotics Games between 8 and 10 January 2008 (Intelligent Robot Category) Consolation prize in Institution of Engineers Singapore Workshop (Using drinking straws to build a bridge and support RC model car of 250g) TECHNICAL SKILLS • Skilled in digital and analogue electronic systems, PLC systems (OMRON ladder logic), testing and troubleshooting. • Knowledge in controlling industrial devices including PLCs, stepper motors, servo motors, DC/AC motors and common engineering tools such as oscilloscope, multi-meter spectrum/audio analyzer, signal generator • Skilled in various engineering software tools including ORCAD, AUTOCAD, Zuken CR3000/CR5000 PCB Design Software. • Basic network configuration using switches/routers, configure CCTV(ReadyNAS NETGEAR) • Design of Power distribution in data communication racks, knowledge of power, heat load, weight WORK EXPERIENCE Job Title: Assistant Engineer (Electrical) Company: Sony Precision Engineering Centre Location: 52 Tuas Avenue 9 Singapore 639193 Duration With Company: Approximate 3 months (Feb 2008 - May 2008) Job Scope: Testing and Troubleshooting PIC board; modifying programming codes and wiring assembly for prototype machines; prepare D-sub connectors; configure simple pneumatic controls. Job Title: Assistant Engineer (R&D Product Design Group) Company: JVC Electronics Singapore Pte Ltd Location: 79 Ayer Rajah Crescent Singapore 139955 Duration With Company: 1 year 7 months (July 2010 - Feb 2012) Job Scope: Studying and researching Car Audio models before announcing to the market. Produce sample sets from blank PCB to actual car audio sets with every process involved before Mass Production starts in overseas factories. Improve both Electrical hardware design and Mechanical parts design in every prototype sample stage. Functionality inspection and testing with tuner measurements to ensure that it have met with the international market standards & demands. Job Title: Associate Engineer (Integrated Comms Division) Company: ST Electronics (Info-Comm Systems) Pte Ltd Location: 100 Jurong East Street 21 Singapore 609602 Duration With Company: 2 year 2 months (Mar 2012 – May 2014) Job Scope: Overlook of Sub-contractors Safety during work. Conduct Risk Assessment before start of work activities, Ensure sub-contractors comply with organisation SHMS. Site supervision for contractors in SAF Project. Site coordinator for SAF project works. Installation, Check, Inspection & Testing (ICIT) engineer. Maintenance and troubleshooting of communication equipment, power matters in DC/AC generators. Planning project schedule which include Field Acceptance Test (FAT) with customers/vendors/contractors. Project materials & equipment purchase requisition. Preparation of documents (Delivery notes, Installation control document, Network connectivity diagram, Design of data racks layout & power distribution. Secondary Role: Department Tools IC, ST Electronics Infocomm - SWC Member
  • 3.
    Job Title: WSHOfficer (Assistant) Company: Singapore Technologies Kinetics Ltd (KDM) Location: 249 Jalan Boon Lay Singapore 619523 Duration With Company: 1 year 4 months (Jul 2014 – Present) Job Scope: Responsible for developing and monitoring safety programmes and policies. Conduct safety surveys/inspections and recommend appropriate corrective actions. Assist WSHO in conducting monthly safety meeting and preparation of minutes. Establish and deliver/communicate Environment, Heatlh and Safety (EHS) deliverables and training. Plan and facilitate internal EHS audit OHSAS 18001 and follow up with post-audit activities. Support external audits ISO14001, OHSAS 18001 by certification bodies. Create monitor EHS workplan and objectives. Monitor and ensure compliance of statutory and legal requirements. Plan, coordinate health checks and compile reports, Review and update EHS documents. Manage Behavioural Based Safety (BBS) System. Secondary Role: Staff Welfare Committee (SWC) member, Assistant Fire Safety Manager LANGUAGE PROFICIENCY Spoken & Written: English, Mandarin and Basic Korean COMPUTER SKILLS • Able to do Microsoft Excel, PowerPoint, Word, Visio • Fine troubleshooting skills • Basic hardware and software configurations ACTIVITIES/INTERESTS • Listen to all kinds of music • Active sports such as running • Watch movies with friends CAREER INTEREST Current Salary: - Expected salary: $4000 Availability: 1 month notice REFERENCES Ms Chua Chai Ling Management Support Officer Attorney General Chambers 91008205 Mr Willie Kee Meng Hui Engineer ST Electronics (Info-Comm Systems) Pte Ltd 97581862