(RUMAH BANDAR) TOWN HOUSES
KEPADATAN MAKSIMUM                 25 UNIT / EKAR
( MAXIMUM DENSITY )                ( 25 UNITS / ACRE)
SAIZ TAPAK MINIMUM                 3 EKAR (O.8 HEKTAR)
( MINIMUM SAIZ SITE )              ( 3 ACRE / 0.8 HECTARE )
LUAS RUANG LANTAI MINIMUM          83.5mp (900kp)
( MINIMUM FLOOR AREA SPACE )       ( 83.5mp / 900 kp )
BILANGAN TINGKAT MINIMUM           18.3m (60’) atau 3 tingkat.
( MINIMUM LEVEL )                  ( 18.3m / 60’ or 3 level )
PANJANG BLOK TERES                 Maksimum 97.5m (320’)
( LONG BLOCK TERRACE )             ( Maximum 97.5m / 320’ )
Jalan Perkhidmatan :
 Jalan Perkhidmatan                Minimum 15.2m (50’)
  ( Road Service )                   ( Minimum 15.2m / 50’ )
 Jalan Perkhidmatan di             Minimum 12.2m (40’)
  Kawasan Berbukit                   ( Minimum 12.2m / 40’ )
  ( Road Service at Hilly Area )
Jalan Buntu                                 Maksimum 97.5m (320’)
( cul-de-sac )                              ( Maximum 97.5m / 320’ )
Lorong Belakang                             6.1m (20’)
( Back Lane )                               ( 6,1m / 20’ )
Lorong Pemisah (fire break)/ Lorong Tepi 6.1 m (20’) – jarak antara dinding ke
( Lane separators (fire break) / side lane ) dinding bangunan.
                                             Nota: ‘Property break’ tidak dibenarkan
                                             ( 6.1m / 20’ – Distance between wall - to
                                             -wall buildings )
                                             Note: ‘Property break’ not allowed
Anjakan Bangunan :
( building setback)
 Anjakan Hadapan                           6.1m (20’)
   ( Front Setback )                          ( 6.1m / 20’ )
 Anjakan Hadapan Anjung Kereta              3.1m (10’)
   ( Car Porch’s Front Setback )              ( 3.1m / 10’ )
 Anjakan Tepi                               6.1m (20’)
   ( Side Setback )                           ( 6.1m / 20’ )

Tempat Letak Kereta (TLK)                   1 unit : 2 petak
( Parking Space )                            Tambahan 10% bagi pelawat
                                            1 units : 2 lots
                                             Additional 10% for visitors
Rajah (i)
 Rajah (i)
Anjakan Bangunan dan Lorong Belakang Bagi Rumah Bandar.
 Anjakan Bangunan dan Lorong Belakang Bagi Rumah Bandar.
((Building setback and back lane for town house ))
  Building setback and back lane for town house



          Jalan Perkhidmatan 15.2m (50’)
          Road Service 15.2m / 50’ )
                                            Anjakan Hadapan 6.1m (20’)
                                            ( Front Setback 6.1m / 20’ )



                                            Lorong Belakang 6.1m (20’)
                                            ( Back Lane 6.1m / 20’ )



                                            Anjakan Hadapan 6.1m (20’)
                                            ( Front Setback 6.1m / 20’ )
           Jalan Perkhidmatan 15.2m (50’)
           Road Service 15.2m / 50’ )
RAJAH (II)
KERATAN RENTAS JALAN DI KAWASAN BERBUKIT.
( CROSS-SECTION OF THE ROAD AT THE HILLS )

              Jalan Perkhidmatan
               Jalan Perkhidmatan
              12.1m (40’)
               12.1m (40’)
              ((Service Road
                 Service Road
              12.1m //40’ ))
               12.1m 40’




             Anjakan Bangunan 6.1m (20’)
              Anjakan Bangunan 6.1m (20’)
             ((Setback Building 6.1m //20’)
                Setback Building 6.1m 20’)
CONTOH REKABENTUK RUMAH BANDAR
( EXAMPLE OF TOWN HOUSE DESIGN )
PERUMAHAN STRATA
BERTANAH / SKIM STRATA
STRATA LANDED HOUSING / STRATA SCHEME



                  PERUMAHAN BERTANAH
                       (LANDED STRATA)
PIAWAIAN PERUMAHAN STRATA BERTANAH
( STRATA LANDED HOUSING STANDARDS )

Keluasan Tapak                        1.2 – 8.1 hektar (3 – 20ekar)
( Site Area )                         ( 1.2-8.1 hectare / 3 – 20acre )
Bilangan Unit (no. of units ) :       Bilangan Unit :      Keluasan :
 Sesebuah / Berkembar / Kluster       24-160 unit        Minimum 1.2 hek.
  ( Detached / cluster )
 Teres ( Terrace )                    48-240 unit        Maksimum 8.1
 Perumahan Bercampur                 hek.
  ( mixed housing )                    48-240 unit        ( 3 – 20 ekar )
 Rumah Bandar ( Town House )
                                       48-240 unit
Ketinggian Bangunan                   Bagi perumahan jenis banglo, berkembar,
( Building Height )                   kluster, ‘zero lot boundary’ dan rumah
                                      bandar, had ketinggian maksimum ialah
                                      4 tingkat dari basement atau 18.5m
                                      (tanpa lif).
Jalan Perkhidmatan :
 Jalan Perkhidmatan                   Minimum 15.2m (50’)
 Jalan Perkhidmatan di kawasan        Minimum 12.2m (40’)
  Berbukit.
Jalan Persendirian :
 Sehala                             9.1m (30’) termasuk rezab jalan
  ( one – way )                       9.1m (30’) including the road
 Dua Hala                            reserve.
  ( two – way )                      12.1m (40’) termasuk rezab jalan
                                      12.1m(40’) including the road
                                       reserve.
Anjakan Bangunan ( Setback
Buildings ) :
a)Perumahan Bertingkat :-            6.1m (20’)
Anjakan dari jalan perkhidmatan.     ( 6.1m / 20’ )
   ( Setback from road services )    6.1m (20’)
Anjakan sempadan bersama.            ( 6.1m / 20’ )
   ( Boundaries Setback )            dinding ke dinding (sisi) 6.1m
Anjakan sisi bangunan.               ( wall-to-wall / side 6.1m )
                                     dinding ke dinding (blkg) 4.6m
   ( Setback side buildings )
                                      ( wall-to-wall / back 4.6m )
b) Perumahan Bertanah
  ( Landed houses ) :             6.1m (20’)
 Anjakan dari jalan
  perkhidmatan.                   3.1m (10’)
  (Setback from service road )    6.1m (20’)
 Anjakan sempadan utama.
  ( Main border’s setback )
 Anjakan mengadap jalan
  utama.
  ( Setback facing the main
  road )
Akses Laluan Keluar – masuk       Rezab jalan minimum 15.2m (50’).
( Access accessibility )           ( Minimum’s road reserve is 15.2m
                                    / 50’ )
                                  Perlu disediakan dua pintu akses
                                   laluan keluar – masuk.
                                   ( Be provided two exit access doors-
                                   out )
                                  Jalan penyambungan tidak
                                   dibenarkan.
                                   ( The road connection is not
                                   justified )
Tempat Letak Kenderaan           2 TLK / 1 unit kediaman + tambahan
( parking space ) :               10% TLK untuk pelawat.
 Tempat letak kereta (TLK)       (2 TLK / 1 residential unit +
   ( Parking space / TLK )      extra 10%
 TLK orang kurang upaya          TLK for visitors. )
   ( Parking space for OKU )     2% daripada jumlah TLK, disediakan
                                  bersama ramp.
                                  ( 2 % of the total TLK, provided
                                with
                                  ramp.


Tanah Lapang dan Rekreasi        1000 penduduk : 2 hektar tanah
( Open space and recreation )      lapang.
                                    (1000 population: 2 hectares of land
                                    leisure. )
                                 Kemudahan yang di sediakan
                                  termasuk :
                                    (The facilities to be provided
                                    including )
                                • Padang permainan kanak-kanak.
                                  (Children playground )
                                • Gelanggang sepak takraw/
                                  badminton/tenis dan lain-lain.
                                  (Tennis sepak takraw /
                                  badminton / tennis and others. )
• Taman atas bumbung dibenarkan
                         tetapi tidak melebihi 30% keperluan
                         penyediaan kawasan lapang.
                          (The rooftop garden is allowed
                         but not more than 30% of the
                         total provision of open space. )

Perimeter Planting       Minimum 3m (10’) di sekeliling kawasan
( Perimeter Planting )   pembangunan ( tdk termasuk jarak dari
                         anjakan bangunan ).
                         (Minimum 3m (10 ') around the
                         development (including distance from
                         inconspicuous building setback).


Pagar / Tembok           Ketinggian maksimum 2.7m (9’).
( Fence / Wall )         ( Maximum height 2.7m /9’ )
Kemudahan Awam           Kemudahan awam bersepadu
( Public Facilities )    (masjid,sekolah dll)perlu disediakan di
                         luar kawasan perumahan.
                         (Integrated public facilities (mosques,
                         schools, etc.) should be provided
                         outside the housing.)
RAJAH (I)
ANJAKAN BANGUNAN DAN LORONG BELAKANG BAGI PERUMAHAN STRATA
BERTANAH/ SKIM STRATA
(DISPLACEMENT OF BUILDING AND HOUSING REAR LANE FOR STRATA LANDED /
STRATA SCHEMES )
                             ( Fraction of land )   (Exit access 15.2m / 50’ )




                           (Private Road 12.1m / 40’ )




                         Jalan Persendirian 12.1m (40’)




  Rumah ke rumah 24.4m
  (80’)
CONTOH ILUSTRASI STRATA BERTANAH TERDIRI DARIPADA
PEMBANGUNAN BERTINGKAT TIDAK MELEBIHI 4 TINGKAT DENGAN
PEMBERIAN HAKMILIK STRATA INDIVIDU KEPADA PECAHAN TANAH
(LAND PARCEL).




Rumah Sesebuah 2 Tingkat ( 1pecahan tanah/
                 land parcel)
   ( 2-storey detached house / land parcel )



                                               Rumah Berkembar (1pecahan tanah/
                                                          land parcel)
                                                 ( Detached House / land parcel )

More Related Content

What's hot

PIHAK BERKUASA TEMPATAN
PIHAK BERKUASA TEMPATANPIHAK BERKUASA TEMPATAN
PIHAK BERKUASA TEMPATANSiti Mastura
 
Garis Panduan Perancangan Bangunan
Garis Panduan Perancangan BangunanGaris Panduan Perancangan Bangunan
Garis Panduan Perancangan BangunanFadzliaton Zainudin
 
Sistem bekalan air
Sistem bekalan air Sistem bekalan air
Sistem bekalan air UTHM
 
Pembinaan
PembinaanPembinaan
Pembinaananis
 
Prinsip, Objektif dan Dasar Perolehan
Prinsip, Objektif dan Dasar PerolehanPrinsip, Objektif dan Dasar Perolehan
Prinsip, Objektif dan Dasar PerolehanIszwan Shah
 
bumbung teknologi binaan bangunan 1
 bumbung teknologi binaan bangunan 1 bumbung teknologi binaan bangunan 1
bumbung teknologi binaan bangunan 1uthm
 
Projek Tahun Akhir (PTA) PPN KVKK
Projek Tahun Akhir (PTA) PPN KVKKProjek Tahun Akhir (PTA) PPN KVKK
Projek Tahun Akhir (PTA) PPN KVKKMohd Shukri Suib
 
Laporan Awalan Kajian Perancangan Wilayah Rompin-Mersing
Laporan Awalan Kajian Perancangan Wilayah Rompin-MersingLaporan Awalan Kajian Perancangan Wilayah Rompin-Mersing
Laporan Awalan Kajian Perancangan Wilayah Rompin-MersingAtiqah Arfa
 
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALAPEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALAPuteri Zaharah
 
Membina Model Landskap
Membina Model LandskapMembina Model Landskap
Membina Model Landskapcasia biflora
 
Pentadbiran Kontrak
Pentadbiran KontrakPentadbiran Kontrak
Pentadbiran KontrakIszwan Shah
 
Kepentingan penubuhan badan pengurusan (JMB/MC)
Kepentingan penubuhan badan pengurusan (JMB/MC)Kepentingan penubuhan badan pengurusan (JMB/MC)
Kepentingan penubuhan badan pengurusan (JMB/MC)Sr Ezwan Bustamin
 
Tempoh tanggungan kecacatan (Defects Liability Period (DLP))
Tempoh tanggungan kecacatan (Defects Liability Period (DLP))Tempoh tanggungan kecacatan (Defects Liability Period (DLP))
Tempoh tanggungan kecacatan (Defects Liability Period (DLP))sofyan fatimi
 
Sistem rawatan kumbahan sanitari
Sistem rawatan kumbahan   sanitariSistem rawatan kumbahan   sanitari
Sistem rawatan kumbahan sanitariElmi Hamid
 

What's hot (20)

PIHAK BERKUASA TEMPATAN
PIHAK BERKUASA TEMPATANPIHAK BERKUASA TEMPATAN
PIHAK BERKUASA TEMPATAN
 
Pengurusan Nilai Strategik (VMS)
Pengurusan Nilai Strategik (VMS)Pengurusan Nilai Strategik (VMS)
Pengurusan Nilai Strategik (VMS)
 
Garis Panduan Perancangan Bangunan
Garis Panduan Perancangan BangunanGaris Panduan Perancangan Bangunan
Garis Panduan Perancangan Bangunan
 
Sistem bekalan air
Sistem bekalan air Sistem bekalan air
Sistem bekalan air
 
cerucuk piling
cerucuk pilingcerucuk piling
cerucuk piling
 
Pembinaan
PembinaanPembinaan
Pembinaan
 
Prinsip, Objektif dan Dasar Perolehan
Prinsip, Objektif dan Dasar PerolehanPrinsip, Objektif dan Dasar Perolehan
Prinsip, Objektif dan Dasar Perolehan
 
Kejuruteraan struktur
Kejuruteraan strukturKejuruteraan struktur
Kejuruteraan struktur
 
bumbung teknologi binaan bangunan 1
 bumbung teknologi binaan bangunan 1 bumbung teknologi binaan bangunan 1
bumbung teknologi binaan bangunan 1
 
Projek Tahun Akhir (PTA) PPN KVKK
Projek Tahun Akhir (PTA) PPN KVKKProjek Tahun Akhir (PTA) PPN KVKK
Projek Tahun Akhir (PTA) PPN KVKK
 
Laporan Awalan Kajian Perancangan Wilayah Rompin-Mersing
Laporan Awalan Kajian Perancangan Wilayah Rompin-MersingLaporan Awalan Kajian Perancangan Wilayah Rompin-Mersing
Laporan Awalan Kajian Perancangan Wilayah Rompin-Mersing
 
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALAPEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
 
Bab 4
Bab 4Bab 4
Bab 4
 
Membina Model Landskap
Membina Model LandskapMembina Model Landskap
Membina Model Landskap
 
Pentadbiran Kontrak
Pentadbiran KontrakPentadbiran Kontrak
Pentadbiran Kontrak
 
Kepentingan penubuhan badan pengurusan (JMB/MC)
Kepentingan penubuhan badan pengurusan (JMB/MC)Kepentingan penubuhan badan pengurusan (JMB/MC)
Kepentingan penubuhan badan pengurusan (JMB/MC)
 
UBBL 2021.pdf
UBBL 2021.pdfUBBL 2021.pdf
UBBL 2021.pdf
 
Lukisan bangunan
Lukisan bangunanLukisan bangunan
Lukisan bangunan
 
Tempoh tanggungan kecacatan (Defects Liability Period (DLP))
Tempoh tanggungan kecacatan (Defects Liability Period (DLP))Tempoh tanggungan kecacatan (Defects Liability Period (DLP))
Tempoh tanggungan kecacatan (Defects Liability Period (DLP))
 
Sistem rawatan kumbahan sanitari
Sistem rawatan kumbahan   sanitariSistem rawatan kumbahan   sanitari
Sistem rawatan kumbahan sanitari
 

More from El Moro

Utility panel
Utility panelUtility panel
Utility panelEl Moro
 
Process & procedure presentation
Process & procedure presentationProcess & procedure presentation
Process & procedure presentationEl Moro
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)El Moro
 
Contoh pelan konsep
Contoh pelan konsepContoh pelan konsep
Contoh pelan konsepEl Moro
 
Commercial presentation group b
Commercial presentation group bCommercial presentation group b
Commercial presentation group bEl Moro
 
Mbas piawaian copy
Mbas piawaian   copyMbas piawaian   copy
Mbas piawaian copyEl Moro
 
Presentation1 adi
Presentation1 adiPresentation1 adi
Presentation1 adiEl Moro
 
Piawaian industri
Piawaian industriPiawaian industri
Piawaian industriEl Moro
 

More from El Moro (8)

Utility panel
Utility panelUtility panel
Utility panel
 
Process & procedure presentation
Process & procedure presentationProcess & procedure presentation
Process & procedure presentation
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
Contoh pelan konsep
Contoh pelan konsepContoh pelan konsep
Contoh pelan konsep
 
Commercial presentation group b
Commercial presentation group bCommercial presentation group b
Commercial presentation group b
 
Mbas piawaian copy
Mbas piawaian   copyMbas piawaian   copy
Mbas piawaian copy
 
Presentation1 adi
Presentation1 adiPresentation1 adi
Presentation1 adi
 
Piawaian industri
Piawaian industriPiawaian industri
Piawaian industri
 

Recently uploaded

Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXMIRIAMSALINAS13
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345beazzy04
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxbennyroshan06
 
Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfYibeltalNibretu
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfjoachimlavalley1
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationDelapenabediema
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptxJosvitaDsouza2
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPCeline George
 
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptxSolid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptxDenish Jangid
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsCol Mukteshwar Prasad
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxJisc
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersPedroFerreira53928
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxakshayaramakrishnan21
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfTamralipta Mahavidyalaya
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxEduSkills OECD
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasGeoBlogs
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...Jisc
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfbu07226
 

Recently uploaded (20)

Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptxSolid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptx
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 

Perumahan edit (2)

  • 2. KEPADATAN MAKSIMUM 25 UNIT / EKAR ( MAXIMUM DENSITY ) ( 25 UNITS / ACRE) SAIZ TAPAK MINIMUM 3 EKAR (O.8 HEKTAR) ( MINIMUM SAIZ SITE ) ( 3 ACRE / 0.8 HECTARE ) LUAS RUANG LANTAI MINIMUM 83.5mp (900kp) ( MINIMUM FLOOR AREA SPACE ) ( 83.5mp / 900 kp ) BILANGAN TINGKAT MINIMUM 18.3m (60’) atau 3 tingkat. ( MINIMUM LEVEL ) ( 18.3m / 60’ or 3 level ) PANJANG BLOK TERES Maksimum 97.5m (320’) ( LONG BLOCK TERRACE ) ( Maximum 97.5m / 320’ ) Jalan Perkhidmatan :  Jalan Perkhidmatan  Minimum 15.2m (50’) ( Road Service ) ( Minimum 15.2m / 50’ )  Jalan Perkhidmatan di  Minimum 12.2m (40’) Kawasan Berbukit ( Minimum 12.2m / 40’ ) ( Road Service at Hilly Area )
  • 3. Jalan Buntu Maksimum 97.5m (320’) ( cul-de-sac ) ( Maximum 97.5m / 320’ ) Lorong Belakang 6.1m (20’) ( Back Lane ) ( 6,1m / 20’ ) Lorong Pemisah (fire break)/ Lorong Tepi 6.1 m (20’) – jarak antara dinding ke ( Lane separators (fire break) / side lane ) dinding bangunan. Nota: ‘Property break’ tidak dibenarkan ( 6.1m / 20’ – Distance between wall - to -wall buildings ) Note: ‘Property break’ not allowed Anjakan Bangunan : ( building setback)  Anjakan Hadapan 6.1m (20’) ( Front Setback ) ( 6.1m / 20’ )  Anjakan Hadapan Anjung Kereta  3.1m (10’) ( Car Porch’s Front Setback ) ( 3.1m / 10’ )  Anjakan Tepi  6.1m (20’) ( Side Setback ) ( 6.1m / 20’ ) Tempat Letak Kereta (TLK) 1 unit : 2 petak ( Parking Space )  Tambahan 10% bagi pelawat 1 units : 2 lots  Additional 10% for visitors
  • 4. Rajah (i) Rajah (i) Anjakan Bangunan dan Lorong Belakang Bagi Rumah Bandar. Anjakan Bangunan dan Lorong Belakang Bagi Rumah Bandar. ((Building setback and back lane for town house )) Building setback and back lane for town house Jalan Perkhidmatan 15.2m (50’) Road Service 15.2m / 50’ ) Anjakan Hadapan 6.1m (20’) ( Front Setback 6.1m / 20’ ) Lorong Belakang 6.1m (20’) ( Back Lane 6.1m / 20’ ) Anjakan Hadapan 6.1m (20’) ( Front Setback 6.1m / 20’ ) Jalan Perkhidmatan 15.2m (50’) Road Service 15.2m / 50’ )
  • 5. RAJAH (II) KERATAN RENTAS JALAN DI KAWASAN BERBUKIT. ( CROSS-SECTION OF THE ROAD AT THE HILLS ) Jalan Perkhidmatan Jalan Perkhidmatan 12.1m (40’) 12.1m (40’) ((Service Road Service Road 12.1m //40’ )) 12.1m 40’ Anjakan Bangunan 6.1m (20’) Anjakan Bangunan 6.1m (20’) ((Setback Building 6.1m //20’) Setback Building 6.1m 20’)
  • 6. CONTOH REKABENTUK RUMAH BANDAR ( EXAMPLE OF TOWN HOUSE DESIGN )
  • 7. PERUMAHAN STRATA BERTANAH / SKIM STRATA STRATA LANDED HOUSING / STRATA SCHEME PERUMAHAN BERTANAH (LANDED STRATA)
  • 8. PIAWAIAN PERUMAHAN STRATA BERTANAH ( STRATA LANDED HOUSING STANDARDS ) Keluasan Tapak 1.2 – 8.1 hektar (3 – 20ekar) ( Site Area ) ( 1.2-8.1 hectare / 3 – 20acre ) Bilangan Unit (no. of units ) : Bilangan Unit : Keluasan :  Sesebuah / Berkembar / Kluster  24-160 unit Minimum 1.2 hek. ( Detached / cluster )  Teres ( Terrace )  48-240 unit Maksimum 8.1  Perumahan Bercampur hek. ( mixed housing )  48-240 unit ( 3 – 20 ekar )  Rumah Bandar ( Town House )  48-240 unit Ketinggian Bangunan Bagi perumahan jenis banglo, berkembar, ( Building Height ) kluster, ‘zero lot boundary’ dan rumah bandar, had ketinggian maksimum ialah 4 tingkat dari basement atau 18.5m (tanpa lif). Jalan Perkhidmatan :  Jalan Perkhidmatan  Minimum 15.2m (50’)  Jalan Perkhidmatan di kawasan  Minimum 12.2m (40’) Berbukit.
  • 9. Jalan Persendirian :  Sehala  9.1m (30’) termasuk rezab jalan ( one – way ) 9.1m (30’) including the road  Dua Hala reserve. ( two – way )  12.1m (40’) termasuk rezab jalan 12.1m(40’) including the road reserve. Anjakan Bangunan ( Setback Buildings ) : a)Perumahan Bertingkat :-  6.1m (20’) Anjakan dari jalan perkhidmatan. ( 6.1m / 20’ ) ( Setback from road services )  6.1m (20’) Anjakan sempadan bersama. ( 6.1m / 20’ ) ( Boundaries Setback )  dinding ke dinding (sisi) 6.1m Anjakan sisi bangunan. ( wall-to-wall / side 6.1m )  dinding ke dinding (blkg) 4.6m ( Setback side buildings ) ( wall-to-wall / back 4.6m )
  • 10. b) Perumahan Bertanah ( Landed houses ) :  6.1m (20’)  Anjakan dari jalan perkhidmatan.  3.1m (10’) (Setback from service road )  6.1m (20’)  Anjakan sempadan utama. ( Main border’s setback )  Anjakan mengadap jalan utama. ( Setback facing the main road ) Akses Laluan Keluar – masuk  Rezab jalan minimum 15.2m (50’). ( Access accessibility ) ( Minimum’s road reserve is 15.2m / 50’ )  Perlu disediakan dua pintu akses laluan keluar – masuk. ( Be provided two exit access doors- out )  Jalan penyambungan tidak dibenarkan. ( The road connection is not justified )
  • 11. Tempat Letak Kenderaan  2 TLK / 1 unit kediaman + tambahan ( parking space ) : 10% TLK untuk pelawat.  Tempat letak kereta (TLK) (2 TLK / 1 residential unit + ( Parking space / TLK ) extra 10%  TLK orang kurang upaya TLK for visitors. ) ( Parking space for OKU )  2% daripada jumlah TLK, disediakan bersama ramp. ( 2 % of the total TLK, provided with ramp. Tanah Lapang dan Rekreasi  1000 penduduk : 2 hektar tanah ( Open space and recreation ) lapang. (1000 population: 2 hectares of land     leisure. )  Kemudahan yang di sediakan termasuk : (The facilities to be provided     including ) • Padang permainan kanak-kanak. (Children playground ) • Gelanggang sepak takraw/ badminton/tenis dan lain-lain. (Tennis sepak takraw /   badminton / tennis and others. )
  • 12. • Taman atas bumbung dibenarkan tetapi tidak melebihi 30% keperluan penyediaan kawasan lapang. (The rooftop garden is allowed but not more than 30% of the total provision of open space. ) Perimeter Planting Minimum 3m (10’) di sekeliling kawasan ( Perimeter Planting ) pembangunan ( tdk termasuk jarak dari anjakan bangunan ). (Minimum 3m (10 ') around the development (including distance from inconspicuous building setback). Pagar / Tembok Ketinggian maksimum 2.7m (9’). ( Fence / Wall ) ( Maximum height 2.7m /9’ ) Kemudahan Awam Kemudahan awam bersepadu ( Public Facilities ) (masjid,sekolah dll)perlu disediakan di luar kawasan perumahan. (Integrated public facilities (mosques, schools, etc.) should be provided outside the housing.)
  • 13. RAJAH (I) ANJAKAN BANGUNAN DAN LORONG BELAKANG BAGI PERUMAHAN STRATA BERTANAH/ SKIM STRATA (DISPLACEMENT OF BUILDING AND HOUSING REAR LANE FOR STRATA LANDED / STRATA SCHEMES ) ( Fraction of land ) (Exit access 15.2m / 50’ ) (Private Road 12.1m / 40’ ) Jalan Persendirian 12.1m (40’) Rumah ke rumah 24.4m (80’)
  • 14. CONTOH ILUSTRASI STRATA BERTANAH TERDIRI DARIPADA PEMBANGUNAN BERTINGKAT TIDAK MELEBIHI 4 TINGKAT DENGAN PEMBERIAN HAKMILIK STRATA INDIVIDU KEPADA PECAHAN TANAH (LAND PARCEL). Rumah Sesebuah 2 Tingkat ( 1pecahan tanah/ land parcel) ( 2-storey detached house / land parcel ) Rumah Berkembar (1pecahan tanah/ land parcel) ( Detached House / land parcel )