This drawing provides details for modifications to the JLR paint shop, including notes on safety risks. It was drawn by G.H. and checked by P.M. and P.R. in February 2015 for the JLR paint shop modifications project. The drawing was issued for approval on March 3, 2015 and for construction on March 12, 2015.