This document discusses reactivating an idle well, XXX Well, in the Dulang X oil field through additional perforation. It will study the well history and logs to show profitable reservoirs exist. Production from offset wells will be used to assess reservoir capability after perforation and predict future production rates and recoverable reserves. A perforation strategy and design will be devised. The net present value will be calculated from predicted production rates and costs to show this project will be profitable.