• Here is an explanation of Pickup and Delivery dates and date emphasis and some parameters in use when figuring out shipment/pickup dates
Here is what each option does:
Note: I will abbreviate all the date fields, as follows:
EPD: Early Pickup Date
LPD: Late Pickup Date
EDD: Early Delivery Date
LDD: Late Delivery Date
DATE EMPHASIS:
BOTH: This will make sure that the ALL the Order Release times are adhered do (i.e. EPD, LPD, EDD, LDD). In other words, the shipment will be built where the times on the shipment
will ensure that all those data time requirements are met. In addition to the adherence of these four datetime fields, OTM must ALSO adhere to CURRENT time (i.e. we can not create
a shipment that starts anytime earlier than “now”)
SHIP: We will adhere to ONLY the EPD and LPD (i.e. only the pickup times). We will pretend that the EDD and LDD (i.e. delivery times) are non-existent. This also must adhere to
CURRENT time (i.e. no shipments in the past)
DELV: We will adhere to ONLY the EDD and LDD (i.e. only the delivery time). We will pretend that the EPD and LPD (i.e. pickup times) are non-existent. This also must adhere to
CURRENT time (i.e. no shipments in the past)
PAST: This is the same exact thing as BOTH (i.e. must adhere to ALL the times)…however lift the CURRENT time restriction, meaning we can create a shipment that starts in the past.
For example, if the EPD is last year, we can create a shipment that starts last year.
NONE: This ignores ALL the times on the Order Release (i.e. ignores EPD, LPD, EDD, LDD). Only restriction is that we must adhere to CURRENT time (i.e. we can not create a
shipment that starts in the past)
OTM Date Emphasis
• The control on if we want to start a shipment as “early as possible” or “as late as
possible” is controlled by a Parameter called:
HOLD AS LATE AS POSSIBLE - which you have set to TRUE
When FALSE (the default), we will plan the shipment using the times on the order
(the times that are adhered to based on the Date Emphasis) starting as the
earliest time possible that is feasible.
When TRUE, we will plan a shipment that leaves at the latest time possible
(within the pickup constraints, if adhered to based on the Date Emphasis
selection) that is feasible.
Also the date is effected by:
ORDER WINDOW TIME SPAN - which you have set to 30
OTM Date Emphasis
•
---> So in your TEST case there is no LPD (field is null on your order) - so since that field is null
and the parameter ORDER WINDOW TIME SPAN = 30, it adds 30 days to the EPD and uses that
since HOLD AS LATE AS POSSIBLE PARAM is = TRUE.
So you have 2 alternatives here to get the earliest date or the EPD:
1. Enter a date/time in the LPD - so this would be used instead of going out 30 days.
2. Change the HOLD AS LATE AS POSSIBLE to = FALSE - then it should pick the earliest date which
would be the 7/21 date in this case.
Let me know if you have questions on the above.
I just tested out same dates/date emphasis in our 22.2 internal instance with above parameters
TRUE/FALSE and 5/30 and I am getting the expected results as I mentioned above.
Thanks,

More Related Content

What's hot

Megabox Write UP_James Quayson
Megabox Write UP_James QuaysonMegabox Write UP_James Quayson
Megabox Write UP_James Quayson
James Quayson
 

What's hot (20)

OTM Value for International Logistics including Ocean Vessel Transport
OTM Value for International Logistics including Ocean Vessel TransportOTM Value for International Logistics including Ocean Vessel Transport
OTM Value for International Logistics including Ocean Vessel Transport
 
OTM(Oracle Transport Management)
OTM(Oracle Transport Management)OTM(Oracle Transport Management)
OTM(Oracle Transport Management)
 
Transportation management system by Bala
Transportation management system by BalaTransportation management system by Bala
Transportation management system by Bala
 
Transportation Control Tower
Transportation Control TowerTransportation Control Tower
Transportation Control Tower
 
Logistics control tower
Logistics control towerLogistics control tower
Logistics control tower
 
VRP.pptx
VRP.pptxVRP.pptx
VRP.pptx
 
Logistica internacional
Logistica internacionalLogistica internacional
Logistica internacional
 
Supply Chain Control Tower
Supply Chain Control TowerSupply Chain Control Tower
Supply Chain Control Tower
 
Transportation management system PPT
Transportation management system PPTTransportation management system PPT
Transportation management system PPT
 
Oracle Warehouse Management System(Oracle WMS)@ERP OCEAN
Oracle Warehouse Management System(Oracle WMS)@ERP OCEANOracle Warehouse Management System(Oracle WMS)@ERP OCEAN
Oracle Warehouse Management System(Oracle WMS)@ERP OCEAN
 
Rock Your Logistics with Advanced Operations
Rock Your Logistics with Advanced OperationsRock Your Logistics with Advanced Operations
Rock Your Logistics with Advanced Operations
 
Fusion Transport Intelligence in OTM
Fusion Transport Intelligence in OTMFusion Transport Intelligence in OTM
Fusion Transport Intelligence in OTM
 
Introduction 2 Logistics
Introduction 2 LogisticsIntroduction 2 Logistics
Introduction 2 Logistics
 
TRANSPORTATION MANAGEMENT
TRANSPORTATION MANAGEMENTTRANSPORTATION MANAGEMENT
TRANSPORTATION MANAGEMENT
 
Transportation management
Transportation  managementTransportation  management
Transportation management
 
Megabox Write UP_James Quayson
Megabox Write UP_James QuaysonMegabox Write UP_James Quayson
Megabox Write UP_James Quayson
 
Unit-3 LOGISTICS IN SUPPLY CHAIN.pdf
Unit-3 LOGISTICS IN SUPPLY CHAIN.pdfUnit-3 LOGISTICS IN SUPPLY CHAIN.pdf
Unit-3 LOGISTICS IN SUPPLY CHAIN.pdf
 
Historia de la logística 1
Historia de la logística 1Historia de la logística 1
Historia de la logística 1
 
Operaciones comercio exterior
Operaciones comercio exteriorOperaciones comercio exterior
Operaciones comercio exterior
 
Las Plataformas Logísticas
Las Plataformas Logísticas Las Plataformas Logísticas
Las Plataformas Logísticas
 

Recently uploaded

Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo DiehlFuture Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Peter Udo Diehl
 

Recently uploaded (20)

"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
ODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User GroupODC, Data Fabric and Architecture User Group
ODC, Data Fabric and Architecture User Group
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
In-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsIn-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT Professionals
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
 
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo DiehlFuture Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
 
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxUnpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
 

OTM Date Emphasis.pptx

  • 2. OTM Date Emphasis • Here is an explanation of Pickup and Delivery dates and date emphasis and some parameters in use when figuring out shipment/pickup dates Here is what each option does: Note: I will abbreviate all the date fields, as follows: EPD: Early Pickup Date LPD: Late Pickup Date EDD: Early Delivery Date LDD: Late Delivery Date DATE EMPHASIS: BOTH: This will make sure that the ALL the Order Release times are adhered do (i.e. EPD, LPD, EDD, LDD). In other words, the shipment will be built where the times on the shipment will ensure that all those data time requirements are met. In addition to the adherence of these four datetime fields, OTM must ALSO adhere to CURRENT time (i.e. we can not create a shipment that starts anytime earlier than “now”) SHIP: We will adhere to ONLY the EPD and LPD (i.e. only the pickup times). We will pretend that the EDD and LDD (i.e. delivery times) are non-existent. This also must adhere to CURRENT time (i.e. no shipments in the past) DELV: We will adhere to ONLY the EDD and LDD (i.e. only the delivery time). We will pretend that the EPD and LPD (i.e. pickup times) are non-existent. This also must adhere to CURRENT time (i.e. no shipments in the past) PAST: This is the same exact thing as BOTH (i.e. must adhere to ALL the times)…however lift the CURRENT time restriction, meaning we can create a shipment that starts in the past. For example, if the EPD is last year, we can create a shipment that starts last year. NONE: This ignores ALL the times on the Order Release (i.e. ignores EPD, LPD, EDD, LDD). Only restriction is that we must adhere to CURRENT time (i.e. we can not create a shipment that starts in the past)
  • 3. OTM Date Emphasis • The control on if we want to start a shipment as “early as possible” or “as late as possible” is controlled by a Parameter called: HOLD AS LATE AS POSSIBLE - which you have set to TRUE When FALSE (the default), we will plan the shipment using the times on the order (the times that are adhered to based on the Date Emphasis) starting as the earliest time possible that is feasible. When TRUE, we will plan a shipment that leaves at the latest time possible (within the pickup constraints, if adhered to based on the Date Emphasis selection) that is feasible. Also the date is effected by: ORDER WINDOW TIME SPAN - which you have set to 30
  • 4. OTM Date Emphasis • ---> So in your TEST case there is no LPD (field is null on your order) - so since that field is null and the parameter ORDER WINDOW TIME SPAN = 30, it adds 30 days to the EPD and uses that since HOLD AS LATE AS POSSIBLE PARAM is = TRUE. So you have 2 alternatives here to get the earliest date or the EPD: 1. Enter a date/time in the LPD - so this would be used instead of going out 30 days. 2. Change the HOLD AS LATE AS POSSIBLE to = FALSE - then it should pick the earliest date which would be the 7/21 date in this case. Let me know if you have questions on the above. I just tested out same dates/date emphasis in our 22.2 internal instance with above parameters TRUE/FALSE and 5/30 and I am getting the expected results as I mentioned above. Thanks,