Institutional Presentation


           2011
Organizational Structure



                                                 Free Float



                     78.8%                                  21.2%



                                             Integrated offshore E&P equipment
                                             and services provider


                                   Holding




    10%   90%                      100%                                          100%




  OSX Shipbuilding
                             OSX Leasing                               OSX Services
        Unit




                                                                                        2
OSX Highlights

                        Priority Rights between OSX and OGX
Strong Demand
                        Order book of 48 offshore E&P units, equivalent to a US$ 30bn investment
from OGX
                        Upside potential with expansion of OGX’s exploratory campaign


                        Expected oil and gas resources to increase to 100 Bboe, with announced investments of
Attractive Market
                         US$ 140bn plus
Conditions in Brazil
                        Underserved domestic equipment & services market


Local Content           Approximately 70% of E&P industry capex supplied locally
Requirement             Key for Brazil’s long-term social and economic development (285,000 jobs in 5 years)


Strategic               Partnership with the largest shipbuilder in the world
Partnership with        State-of-the-art technology and transfer of know-how
Hyundai                 Large, scalable shipyard at Açu


                        ITN – Naval Technology Institutes, partnerships with technical institutions and universities
Training (ITN)          Absorption and application of Korean technology
                        Qualification of 7,800 technical personnel until the end of 2013


Incentivized and
                        More than 30 years experience, on average, in the E&P sector
Experienced
                        US$ 30bn in projects and more than 50,000 people under management
Management Team




                                                                                                                        3
OGX: Anchor Client
                                                       57 oil & gas discoveries to date

   OGX Highlights                                                                   Exploratory Success in the Drilling Campaign
                                                                                                                                                                                                   LINGUADO




                                                                                                                          Campos Basin                                                                            T              Aracaju Prospect
       Largest Brazilian private E&P player in terms of                                  Pipeline Prospect                                                                                                                      Netpay of 40 meters
                                                                                                                                                                            BM-C-39



                                                                                C                                                                                                          POLVO




                                                                                          Netpay of 165 meters
        offshore exploratory acreage
                                                                                                                                                                                 BM-C-40



                                                                                          Discovery between 1,000 – 2,000 M boe                                                                                       R            Belém Prospect
                                                                                                                                                                                                                                   Netpay of 43 meters
       10,8 billion boe of risked prospective resources,
                                                                                                                                                              PEREGRINO




                                                                                D
        with over 80% located offshore in Brazil
                                                                                                                      BM-C-37


                                                                                     Waimea Prospect                                  G
                                                                                                                                C
                                                                                                                                                                                                              B
                                                                                                                                                             MAROMBA




                                                                                     Netpay of 130 meters             BM-C-38      D
                                                                                                                                      I
                                                                                                                                     BM-C-41
                                                                                                                                                                             PAPA-TERRA

                                                                                                                                                                                                                          Vesuvio Prospect
                                                                                                                                                                                                                          Netpay of 57 meters
        22 offshore blocks and 8 onshore blocks in 5                                 Discovery between 500 – 900 M boeH           J N

                                                                                                                     K
                                                                                                                          BM-C-42

                                                                                                                             E
                                                                                                                                 B
                                                                                                                                     F
                                                                                                                                    BM-C-43
                                                                                                                                                                                                                          Discovery between 500 -
                                                                                                                                                                                                                          1,500 M boe
        different sedimentary basins in Brazil and 5 blocks                                                                         Santos Basin
                                                                                          Etna Prospect
        onshore in 3 sedimentary basins in Colombia                             G         Netpay of 91
                                                                                                                                                                            BM-S-56



                                                                                                                                                                                                                          S      Ingá Prospect
                                                                                          meters                                               M                            BM-S-58                                               Netpay of 12 meters
                                                                                          Discovery between
                                                                                                                                               BM-S-57




                                                                                          500 – 1.000 M boe                                                   BM-S-59
                                                                                                                                                                        L



   OGX Offshore Blocks (Sept. 2009)                                             H
                                                                                          Huna Prospect
                                                                                          Netpay of 52                                                   MEXILHÃO
                                                                                                                                                                                                              J           Vesúvio Direcional
                                                                                                                                                                                                                          Prospect
                                                                                          meters                                                                                                                          Netpay of 60
                                                                                                                                                                                                                          meters

                                                                                      OGX blocks                                                                                                              L               Hawaii Prospect
                           Unrisked   Probability of     Risked      Risked                                                                                                                                                   Netpay of 64 meter
                                                                                      Oil Field
    Basin      Blocks     Resources    Geological       Resources   Resources
                            Total        Success          Total       OGX

  Campos          7         9.350          44,10%        4.124       3.693
                                                                                             Basin               D&M Report 2011
   Santos         5         6.659          27,00%        1.796       1.688
                                                                                           Campos                               5.700*
   Espírito
                  5         5.017          32,60%        1.634        817                   Santos                                  1.688
    Santo


                                                                                                                                                                                              + 30%
   Pará                                                                                Espírito Santo                                  817
                  5         2.104          21,30%         447         447
 Maranhão                                                                             Pará Maranhão                                    447
    Total        22        23.130          34,59%        8.001       6.645                   Total                                  8.652
(1) Gross Prospective Resources                                                     * 3C + Delineation + Prospective

Source: D&M Report and OGX presentations

                                                                                                                                                                                                                                                         4
OGX: Significant Demand Expected

                   Base case order book of 48 offshore E&P units equivalent to US$ 30bn

                                                          Expected Demand for Offshore Equipment
    OGX Production Targets - kboepd
                                                          (2011-2019) - Number of units


                                      1,380               FPSO                                    19
                   CAGR:
                   70%                                    TLWP                                     5
                                                          WHP                                     24
                         730
                                                          Total                                   48*
                                                          Source: OGX                 * Considering 2009 D&M Report
            20
                                                           Delivery Timeline
           2011E         2015E        2019E
                                                                                                  13
                                                      •    OSX2: to be delivered in        12
• Initial production expected to begin 2011                mid 2013 (IPO: Dec
                                                           2012)
                                                                                                   6
                                                      •    OSX5: to be delivered in         6
•    1stFPSO already contracted for a period of 20         1Q 2015 (IPO: Dec 2014) 6
                                                                                                          6
     years, at an average day rate of US$ 263,000                            5                     2
                                                                                            1             2      4
                                                                                            1
                                                                             3        5                   1
• Expected CAGR of 70% between 2011 and 2019                 1                              5      5   2
                                                                                                             1
                                                                                            4
                                                                                                 3     1
                                                             1     1     2                             1     1
                                                                               1
                                                           2011E 2012E 2013E 2014E 2015E 2016E 2017E 2018E 2019E




                                                                                                                      5
Pre-Salt Resources
      Pre-salt discoveries strongly contribute to increase in Brazilian resources of up to 100Bboe

   Local Content Requirement                                                         Pre-salt Resources Area


                                                                                             Exploratory Blocks
  Total Area             • 149,000 km2
                                                                                             OGX Blocks
                                                                                             Oil and Gas Fields
  Estimated
                         • Additional ~ 70 billion boe (only in pre-salt)
  Resources                                                                                  Pre-salt Reservoir
                                                                                             (Petrobras/CNPE/ANP)
  Production
                         • FPSO units, deepwater environment
  Development

  Required               • US$ 111bn 2009-2020E
  Capex                  • US$ 33bn 2010-2014E
Source: Petrobras (updated in June 2011)                                                                                                     Espírito
                                                                                                                                             Santo
                                                                                                                            Super            Basin
                                                                                                                     Porto do Açu
   Petrobras Local Production Forecast ( thousad bpd )

                                                    3.950
      Ex-Pre Salt                                                                                                                         Cmpos
                                                                                                                                          Basin
                                                    1.078
      Pre Salt                    2.980
                                   241

                 2.100                              2.872
                                  2.739
                 2.100
                                                                                                                           Santos Basin
                 2010             2014              2020
                                                              Source: Petrobras
                     Petrobras’ capex: US$ 111 billion                                    Source: Petrobras – (Company Presentation)
                                                            (updated in June 2011)

                                                                                                                                                        6
Strong Demand: Offshore E&P Equipment in Brazil

            182 units to be delivered within the next 10 years
            OGX’s projected demand: 48 units (19 FPSOs, 24 WHPs, 5 TLWPs)


     Consolidated Potential Demand (number of E&P equipment units)


            OGX (FPSOs Only)                                    32
            Petrobras (FPSOs + 28 Rigs)
                                                                                27

                                                                        18
                                                22                                              16
                                                                                        13
                                                                                                        11
                                                        8


Existing
Capacity    3                 3


           2011E           2012E               2013E   2014E   2015E   2016E   2017E   2018E   2019E   2020E
   Note: Including already ordered equipment
   Source: Verax
   Capacity Estimates: Source OSX




                                                                                                               7
Local Content: Rationale and Evolution
      The local content requirement represents a social and economic development strategy
                   and has significantly increased in recent ANP bidding rounds


 Local Content Requirement                                   Local Content Evolution

                                                                                                    89%
                                                                                              86%                                      84%
 Definition: minimum percentage of equipment  and                 Exploration Phase                         81%
                                                                                                                                 77%
  services contracted by the operator that must be                 Development Phase
                                                                                                    86%
  supplied by local companies                                                                 79%                                      79%
                                                                                       54%                   74%
 Average 70% in the production development phase                                                                                69%
                                                                      48%
 Component of the bid for acquisition of E&P Blocks                         40%
 Certification of each item by inspection companies         27%      42%                                 Source: ANP
  (guidelines set forth by Federal Government – MME)                                   39%
                                                                                                          Note (1) 8th ANP bidding round
                                                             25%             28%                          auction is still under discussion
 Subject to severe penalties
                                                             1st      2nd     3rd       4th   5th   6th       7th    8th   (1)   9th   10th




 Local Content Rationale                                     Notable Companies Committed to Local Content


    Boost local oil & gas equipment and services industry
    Incentivize local technology development
    Substantially increase employment and income




                                                                                                                                              8
Brazilian Shipyards
     Local shipyards are not prepared to serve expected offshore E&P equipment demand


   Main Shipbuilders in Brazil                                   Current Brazilian Shipyard Condition


                                                                Mac Laren
                         EAS     ERG Brasfels   Mauá MacLaren


Committed Slots
                                                                                                        Mauá
Site Area   (km2)        1.6     0.5    0.5     0.4   0.1


Technology Partner

Steel Processing Capacity
(Kton / year)
                          160    60     50      36     6        Brasfels

Focus on Offshore
Equipment

Logistics


Labor Force

Source: Verax




                “A construction slot in OSX’s shipyard is worth more than gold”

                                                                                                               9
Strategic Partner: Hyundai Heavy Industries
                       OSX Shipbuilding Unit under development in partnership
                                with the largest shipbuilder in the world


Rationale and Overview              Why Hyundai?                         Efficiency Comparison


  10% equity investment in OSX       Proven track record: founded in     Significant upside potential
   Shipbuilding Unit                   1972                                 for OSX
                                      Largest shipbuilder in the             HHI Offshore division processes
  State-of-the-art technology                                            —
                                       world: 10% market share (2010)         550,000 tons of steel/year in
  Transfer of know-how and           Delivered more than 1,600              2,500,000 m²
   training                            vessels to more than 250 ship      —   OSX should process in its initial
  Accelerate learning curve:          owners in 47 countries to date         stage 180,000 tons of steel/year
   distill 38 years of experience     One of the leaders in offshore         and integrate 220,000 tons/year
                                       equipment fabrication in the           in 2,000,000 m²
   into 2 years
                                       world, handling over 100            Efficiency gains could drive
  Technology and services             turnkey EPIC projects for more       potential processing capacity
   contract for shipyard design        than 30 oil and gas majors
                                                                            expansion
   and transfer of know-how for       Delivered FPSO’s and fixed
                                       platforms to clients such as        OSX’s goal is to reach Asian
   at least 10 years                                                        productivity levels after two
                                       ExxonMobil, Petrobras, Shell,
                                       Chevron and BP                       years of operation




                                                                                                                  10
Açu Industrial Complex
A new cluster for the offshore and heavy industry




                                                    11
Açu Site

 US$ 1.7 bn investment
 Steel processing capacity of 180,000 ton/year and assembly capacity of
  220,000 ton/year
 Up to 3,525 m water front (2,400 m in first phase)
 Conceptual design approved by Hyundai Heavy Industries




                                                                           12
Açu Site: Competitive Advantages

 Welding economies: 18m steel plate, 56% less welding, savings of US$
  3.5 MM/FPSO

 Energy savings: 30% estimated reduction (US$ 4.0 MM/year)

 Weather conditions: Less than 30% of rainy days per year

 Soil advantages: less foundation required

 Integration slots: Up to 3,525m of quay allowing simultaneous
  integration of 9 FPSOs and the construction of 8 WHPs. (6 FPSOs and
  2,400m at 1st phase)

 Proximity to Campos Basin: approximately 150 km




                                                                         13
Product Portfolio

                                Description                 Main Systems for Standardization Target

                    • Floating Production Storage and     OSX Flex Engineering
                      Offloading                          • Conceived to process oils of different
       FPSO
                    • Hull: conversion of oil tanker or     characteristics (different API grade, gas/oil
                      new-build                             ratio, water/oil ratio

                                                          Sister Vessels
                    • Tension-Leg Wellhead Platform
                                                          • Reduction in project time and conversion costs
       TLWP         • Suited for deepwater
                      environments                        • Accelerates the learning curve in the operation
                                                            and maintenance

                    • Wellhead Platform or fixed          WHP’s Standardization
                      production platforms in general
       WHP                                                •Optimization of assembly and fabrication
                    • Suited for shallow-water
                      environments                        •Designed to operate in a range of water depths


                    • Drilling units for exploration      Equipment Standardization
       Drillships   • Heavily demanded in ultra-          • Key systems
                      deepwater
                                                          • Supplied with increased security and speed
                                                            systems in the long run
                    • Navigation transportation unit      • Pre negotiated contracts with minimum demand
       Tankers      • Demand for long course                guaranteed
                      navigation units, cabotage,         • Inventory and maintenance optimization
                      relievers and production
                      platforms



                                                                                                              14
ITN –Naval Technology Institute


The ITN is designed to have 4 areas of activity.
Phase I began during the 3rd quarter 2011



 Phase I- Qualification and Training




   —   on 1st July 2011, OSX entered into an agreement with FIRJAN for the training of up to
       3.100 pepole in 23 job functions (welders, mechanics, among others)

   —   in this first phase, SENAI’s facilities and faculty in the city of Campos shall be utilized as
       well as mobile units in São João da Barra

   —   classes shall commence in 2012

   —   estimated investment for this phase is approx. R$ 12.7 million




                                                                                                        15
ITN –Naval Technology Institute

   Phase II- Training at UCN Açu:
    —   contemplates several training activities, technical assistance and supervision of operations in
        partnership with Hyundai (40 specialists based in Brazil for 5 years)
    —   50 employees from UCN Açu to be trained at Hyundai’s shipyard in Ulsan, South Korea
    —   construction of ITN at UCN Açu, with an area of approximately 1,800 m2
    —   facilities for workshops, labs, classrooms, auditorium and library
    —   implementation of systems for simulation of operations of offshore units




                                   Phase 1 – Employee Training



                                                                                ➜ Shipbuilding

                                                                                ➜ Operation &
                                                                                  Maintenance of naval
                                                                                  units
                                                Phase 2 – Knowledge,
           Dedication




                                              Technology & Inovation


                        Timeline
                                                                                                          16
ITN –Naval Technology Institute



 Phase III- Supply Chain Strengthening
  —   Identification of suppliers that have the potential to develop new materials,
      equipment and innovative work methodologies, focused on OSX’s potential demand




 Phase IV- Technological Innovation
  —   The ITN will establish partnerships with Brazilian and international academic
      institutions, focused on the development and assimilation of new technologies.




                                      Fase 2 – Conhecimento,
                                       Tecnologia e Inovação


                                                                                       17
RI@OSX.COM.BR

+55 21 2555 6914

Osx institutional eng_november

  • 1.
  • 2.
    Organizational Structure Free Float 78.8% 21.2% Integrated offshore E&P equipment and services provider Holding 10% 90% 100% 100% OSX Shipbuilding OSX Leasing OSX Services Unit 2
  • 3.
    OSX Highlights  Priority Rights between OSX and OGX Strong Demand  Order book of 48 offshore E&P units, equivalent to a US$ 30bn investment from OGX  Upside potential with expansion of OGX’s exploratory campaign  Expected oil and gas resources to increase to 100 Bboe, with announced investments of Attractive Market US$ 140bn plus Conditions in Brazil  Underserved domestic equipment & services market Local Content  Approximately 70% of E&P industry capex supplied locally Requirement  Key for Brazil’s long-term social and economic development (285,000 jobs in 5 years) Strategic  Partnership with the largest shipbuilder in the world Partnership with  State-of-the-art technology and transfer of know-how Hyundai  Large, scalable shipyard at Açu  ITN – Naval Technology Institutes, partnerships with technical institutions and universities Training (ITN)  Absorption and application of Korean technology  Qualification of 7,800 technical personnel until the end of 2013 Incentivized and  More than 30 years experience, on average, in the E&P sector Experienced  US$ 30bn in projects and more than 50,000 people under management Management Team 3
  • 4.
    OGX: Anchor Client 57 oil & gas discoveries to date OGX Highlights Exploratory Success in the Drilling Campaign LINGUADO Campos Basin T Aracaju Prospect  Largest Brazilian private E&P player in terms of Pipeline Prospect Netpay of 40 meters BM-C-39 C POLVO Netpay of 165 meters offshore exploratory acreage BM-C-40 Discovery between 1,000 – 2,000 M boe R Belém Prospect Netpay of 43 meters  10,8 billion boe of risked prospective resources, PEREGRINO D with over 80% located offshore in Brazil BM-C-37 Waimea Prospect G C B MAROMBA Netpay of 130 meters BM-C-38 D I BM-C-41 PAPA-TERRA Vesuvio Prospect Netpay of 57 meters 22 offshore blocks and 8 onshore blocks in 5 Discovery between 500 – 900 M boeH J N  K BM-C-42 E B F BM-C-43 Discovery between 500 - 1,500 M boe different sedimentary basins in Brazil and 5 blocks Santos Basin Etna Prospect onshore in 3 sedimentary basins in Colombia G Netpay of 91 BM-S-56 S Ingá Prospect meters M BM-S-58 Netpay of 12 meters Discovery between BM-S-57 500 – 1.000 M boe BM-S-59 L OGX Offshore Blocks (Sept. 2009) H Huna Prospect Netpay of 52 MEXILHÃO J Vesúvio Direcional Prospect meters Netpay of 60 meters OGX blocks L Hawaii Prospect Unrisked Probability of Risked Risked Netpay of 64 meter Oil Field Basin Blocks Resources Geological Resources Resources Total Success Total OGX Campos 7 9.350 44,10% 4.124 3.693 Basin D&M Report 2011 Santos 5 6.659 27,00% 1.796 1.688 Campos 5.700* Espírito 5 5.017 32,60% 1.634 817 Santos 1.688 Santo + 30% Pará Espírito Santo 817 5 2.104 21,30% 447 447 Maranhão Pará Maranhão 447 Total 22 23.130 34,59% 8.001 6.645 Total 8.652 (1) Gross Prospective Resources * 3C + Delineation + Prospective Source: D&M Report and OGX presentations 4
  • 5.
    OGX: Significant DemandExpected Base case order book of 48 offshore E&P units equivalent to US$ 30bn Expected Demand for Offshore Equipment OGX Production Targets - kboepd (2011-2019) - Number of units 1,380 FPSO 19 CAGR: 70% TLWP 5 WHP 24 730 Total 48* Source: OGX * Considering 2009 D&M Report 20 Delivery Timeline 2011E 2015E 2019E 13 • OSX2: to be delivered in 12 • Initial production expected to begin 2011 mid 2013 (IPO: Dec 2012) 6 • OSX5: to be delivered in 6 • 1stFPSO already contracted for a period of 20 1Q 2015 (IPO: Dec 2014) 6 6 years, at an average day rate of US$ 263,000 5 2 1 2 4 1 3 5 1 • Expected CAGR of 70% between 2011 and 2019 1 5 5 2 1 4 3 1 1 1 2 1 1 1 2011E 2012E 2013E 2014E 2015E 2016E 2017E 2018E 2019E 5
  • 6.
    Pre-Salt Resources Pre-salt discoveries strongly contribute to increase in Brazilian resources of up to 100Bboe Local Content Requirement Pre-salt Resources Area Exploratory Blocks Total Area • 149,000 km2 OGX Blocks Oil and Gas Fields Estimated • Additional ~ 70 billion boe (only in pre-salt) Resources Pre-salt Reservoir (Petrobras/CNPE/ANP) Production • FPSO units, deepwater environment Development Required • US$ 111bn 2009-2020E Capex • US$ 33bn 2010-2014E Source: Petrobras (updated in June 2011) Espírito Santo Super Basin Porto do Açu Petrobras Local Production Forecast ( thousad bpd ) 3.950 Ex-Pre Salt Cmpos Basin 1.078 Pre Salt 2.980 241 2.100 2.872 2.739 2.100 Santos Basin 2010 2014 2020 Source: Petrobras Petrobras’ capex: US$ 111 billion Source: Petrobras – (Company Presentation) (updated in June 2011) 6
  • 7.
    Strong Demand: OffshoreE&P Equipment in Brazil  182 units to be delivered within the next 10 years  OGX’s projected demand: 48 units (19 FPSOs, 24 WHPs, 5 TLWPs) Consolidated Potential Demand (number of E&P equipment units) OGX (FPSOs Only) 32 Petrobras (FPSOs + 28 Rigs) 27 18 22 16 13 11 8 Existing Capacity 3 3 2011E 2012E 2013E 2014E 2015E 2016E 2017E 2018E 2019E 2020E Note: Including already ordered equipment Source: Verax Capacity Estimates: Source OSX 7
  • 8.
    Local Content: Rationaleand Evolution The local content requirement represents a social and economic development strategy and has significantly increased in recent ANP bidding rounds Local Content Requirement Local Content Evolution 89% 86% 84%  Definition: minimum percentage of equipment and Exploration Phase 81% 77% services contracted by the operator that must be Development Phase 86% supplied by local companies 79% 79% 54% 74%  Average 70% in the production development phase 69% 48%  Component of the bid for acquisition of E&P Blocks 40%  Certification of each item by inspection companies 27% 42% Source: ANP (guidelines set forth by Federal Government – MME) 39% Note (1) 8th ANP bidding round 25% 28% auction is still under discussion  Subject to severe penalties 1st 2nd 3rd 4th 5th 6th 7th 8th (1) 9th 10th Local Content Rationale Notable Companies Committed to Local Content  Boost local oil & gas equipment and services industry  Incentivize local technology development  Substantially increase employment and income 8
  • 9.
    Brazilian Shipyards Local shipyards are not prepared to serve expected offshore E&P equipment demand Main Shipbuilders in Brazil Current Brazilian Shipyard Condition Mac Laren EAS ERG Brasfels Mauá MacLaren Committed Slots Mauá Site Area (km2) 1.6 0.5 0.5 0.4 0.1 Technology Partner Steel Processing Capacity (Kton / year) 160 60 50 36 6 Brasfels Focus on Offshore Equipment Logistics Labor Force Source: Verax “A construction slot in OSX’s shipyard is worth more than gold” 9
  • 10.
    Strategic Partner: HyundaiHeavy Industries OSX Shipbuilding Unit under development in partnership with the largest shipbuilder in the world Rationale and Overview Why Hyundai? Efficiency Comparison  10% equity investment in OSX  Proven track record: founded in  Significant upside potential Shipbuilding Unit 1972 for OSX  Largest shipbuilder in the HHI Offshore division processes  State-of-the-art technology — world: 10% market share (2010) 550,000 tons of steel/year in  Transfer of know-how and  Delivered more than 1,600 2,500,000 m² training vessels to more than 250 ship — OSX should process in its initial  Accelerate learning curve: owners in 47 countries to date stage 180,000 tons of steel/year distill 38 years of experience  One of the leaders in offshore and integrate 220,000 tons/year equipment fabrication in the in 2,000,000 m² into 2 years world, handling over 100  Efficiency gains could drive  Technology and services turnkey EPIC projects for more potential processing capacity contract for shipyard design than 30 oil and gas majors expansion and transfer of know-how for  Delivered FPSO’s and fixed platforms to clients such as  OSX’s goal is to reach Asian at least 10 years productivity levels after two ExxonMobil, Petrobras, Shell, Chevron and BP years of operation 10
  • 11.
    Açu Industrial Complex Anew cluster for the offshore and heavy industry 11
  • 12.
    Açu Site  US$1.7 bn investment  Steel processing capacity of 180,000 ton/year and assembly capacity of 220,000 ton/year  Up to 3,525 m water front (2,400 m in first phase)  Conceptual design approved by Hyundai Heavy Industries 12
  • 13.
    Açu Site: CompetitiveAdvantages  Welding economies: 18m steel plate, 56% less welding, savings of US$ 3.5 MM/FPSO  Energy savings: 30% estimated reduction (US$ 4.0 MM/year)  Weather conditions: Less than 30% of rainy days per year  Soil advantages: less foundation required  Integration slots: Up to 3,525m of quay allowing simultaneous integration of 9 FPSOs and the construction of 8 WHPs. (6 FPSOs and 2,400m at 1st phase)  Proximity to Campos Basin: approximately 150 km 13
  • 14.
    Product Portfolio Description Main Systems for Standardization Target • Floating Production Storage and OSX Flex Engineering Offloading • Conceived to process oils of different FPSO • Hull: conversion of oil tanker or characteristics (different API grade, gas/oil new-build ratio, water/oil ratio Sister Vessels • Tension-Leg Wellhead Platform • Reduction in project time and conversion costs TLWP • Suited for deepwater environments • Accelerates the learning curve in the operation and maintenance • Wellhead Platform or fixed WHP’s Standardization production platforms in general WHP •Optimization of assembly and fabrication • Suited for shallow-water environments •Designed to operate in a range of water depths • Drilling units for exploration Equipment Standardization Drillships • Heavily demanded in ultra- • Key systems deepwater • Supplied with increased security and speed systems in the long run • Navigation transportation unit • Pre negotiated contracts with minimum demand Tankers • Demand for long course guaranteed navigation units, cabotage, • Inventory and maintenance optimization relievers and production platforms 14
  • 15.
    ITN –Naval TechnologyInstitute The ITN is designed to have 4 areas of activity. Phase I began during the 3rd quarter 2011  Phase I- Qualification and Training — on 1st July 2011, OSX entered into an agreement with FIRJAN for the training of up to 3.100 pepole in 23 job functions (welders, mechanics, among others) — in this first phase, SENAI’s facilities and faculty in the city of Campos shall be utilized as well as mobile units in São João da Barra — classes shall commence in 2012 — estimated investment for this phase is approx. R$ 12.7 million 15
  • 16.
    ITN –Naval TechnologyInstitute  Phase II- Training at UCN Açu: — contemplates several training activities, technical assistance and supervision of operations in partnership with Hyundai (40 specialists based in Brazil for 5 years) — 50 employees from UCN Açu to be trained at Hyundai’s shipyard in Ulsan, South Korea — construction of ITN at UCN Açu, with an area of approximately 1,800 m2 — facilities for workshops, labs, classrooms, auditorium and library — implementation of systems for simulation of operations of offshore units Phase 1 – Employee Training ➜ Shipbuilding ➜ Operation & Maintenance of naval units Phase 2 – Knowledge, Dedication Technology & Inovation Timeline 16
  • 17.
    ITN –Naval TechnologyInstitute  Phase III- Supply Chain Strengthening — Identification of suppliers that have the potential to develop new materials, equipment and innovative work methodologies, focused on OSX’s potential demand  Phase IV- Technological Innovation — The ITN will establish partnerships with Brazilian and international academic institutions, focused on the development and assimilation of new technologies. Fase 2 – Conhecimento, Tecnologia e Inovação 17