SlideShare a Scribd company logo
Paul
Soukaseum
ME/IE Intern
Automated Systems and
Robotics A.S.
Industrial and Systems
Engineering B.S.
University of Minnesota
• Oshkosh Corporation Classification: Unrestricted
What Is ME/IE?
Director: Todd Roughsedge
Team: Vijay, Ben, Peter, Camron, Dan, Sean, Sravan, Jigs/Fixtures
• Stands for Manufacturing Engineering/Industrial Engineering
• Design manufacturing jigs or fixtures
• Offer production support on new and existing product
• Standardize work
• Study capacities and utilization
• Cost justification
• Improve workflow
2
Paul Soukaseum 8/16/2015
• Oshkosh Corporation Classification: Unrestricted
Internship Project
3
8/16/2015Paul Soukaseum
Prototype Support for Meridian
• Meridian Process Improvements
 Part and BOM Audit
 Build Sequence
 CI using 6 Sigma Methodology
• Meridian Fixtures/Jigs
 Modifying Existing Fixtures
 Creating New Fixtures
• Oshkosh Corporation Classification: Unrestricted
Observing Meridian Production
4
8/16/2015Paul Soukaseum
Process
Improvement
Based off observations of the
Meridian
• Oshkosh Corporation Classification: Unrestricted
Fastenal Part/BOM Audit
6
8/16/2015Paul Soukaseum
Problem:
To make sure Fastenal parts for the Meridian is stocked for production
Approach:
• Gather the all Fastenal/Aeroquip part numbers in PMPF
• Compare to Meridian BOM
• Find the “Missing Part”
• Create BIR for BOM mistakes
• Create locations for Parts Needed
• Oshkosh Corporation Classification: Unrestricted
Benefits from Part/BOM Audit
Improvement:
• BIR created to have R&D Engineering review parts list before
giving them a location (Cost)
7
8/16/2015Paul Soukaseum
10,132 Total Fastenal Parts
337 Bins in PMPF
227 Fastenal/Aeroquip Unique Bins
377 Meridian Parts in PMPF
15 Meridian Fastenal Parts
w/ No Match
• Oshkosh Corporation Classification: Unrestricted
Hydraulic Line Build Sequencing
Problem:
To simplify the hydraulic line assembly. It’s difficult and
confusing.
Approach:
• Create build instruction
• Make it visual
• Label the hydraulic lines to correspond with build
instruction
• Implement Build instruction and audit the results
8
8/16/2015Paul Soukaseum
• Oshkosh Corporation Classification: Unrestricted
Value in Build Sequencing
9
8/16/2015Paul Soukaseum
• Improvement:
• Reduction in task time (Delivery)
• Simplification of task (Quality)
• Easier for the production worker (Morale)
• Oshkosh Corporation Classification: Unrestricted
Process
Improvement
Meridian improvement using 6
sigma methodology
• Oshkosh Corporation Classification: Unrestricted
DMAIC: Boomerang Alignment
Define:
Find the root cause of the poor fit when installing the ejector hydraulic
cylinder and to correct it.
11
8/16/2015Paul Soukaseum
Define Non-Conforming as:
“If they have to use the tap or ream
out any of the holes”
• Oshkosh Corporation Classification: Unrestricted
DMAIC: Boomerang Alignment
12
8/16/2015Paul Soukaseum
Measure:
• The fixture is also the boomerang part
• Measure parts to assure they are good
• Boomerang:
# 9,8,37,35,36 = 1.8 < Cpk < 10
• Laser-cut Sidewall:
Laser cut part is oversized to 0.81”
Bolts are 0.75”
• Oshkosh Corporation Classification: Unrestricted
DMAIC: Boomerang Alignment
Analyze:
• Solidworks Motion to study variance
Scenario 1 P{NonConf}= 85%
Scenario 2 P{NonConf}= 62%
13
8/16/2015Paul Soukaseum
• Oshkosh Corporation Classification: Unrestricted
DMAIC: Boomerang Alignment
Improve:
From the Analyze step, there are reasons to believe that it is
the fixture or the oversize hole in the laser cut sheets
Design new fixture and use Hypothesis Testing:
• Introduce new fixture & use Bernoulli distribution function
(Discrete Event) to determine the p-value.
• H0: p<0.05 or <1 defect out of 20
14
8/16/2015Paul Soukaseum
• Oshkosh Corporation Classification: Unrestricted
Value in DMAIC: Process Control
Improvements and Control:
• 62% reduction in the likely-hood of non-conforming alignment
(Quality/Delivery)
• Fixture is lighter (Morale)
• Error proofing for Scenario 1, lowers risk of 85% Non-Con (Quality)
• Production are not complaining about bad fit (Morale)
15
8/16/2015Paul Soukaseum
• Oshkosh Corporation Classification: Unrestricted
Fixture Design
and Build
Based off the manufacturing
needs of the Meridian
• Oshkosh Corporation Classification: Unrestricted
17
8/16/2015Paul Soukaseum
Fixture Improvement Process
Production needs a solution to a problem
Collect Input from Shop and Cross Functional team
Validate Loading Sequence
Validate Clamping Plan vs Actual Jig
Develop Concept for Cross Functional Team Approval
Detail Design, Drawings and Part Order
Build and System Integration, Update Work Instruction
Setup the Jig to Nominal and Build Part for Quality Validation
• Oshkosh Corporation Classification: Unrestricted
Requirement Analysis
18
8/16/2015Paul Soukaseum
Analysis:
• Problem Statements
• Needs/Functions
• Requirements to Functions
• Load Seq. and Clamping Plan
• Designs/Revisions to Design
My Designs:
• Tower 1 Adjustable End stop
• Winnebago Roof Fixture
Modification
• Riceville Rotating Weld Fixture
Foot Pedal
• Hydraulic Valve Lifting Device
• Oshkosh Corporation Classification: Unrestricted
Winnebago Fixture Upgrade
Problem Statement:
The contract manufacturer contacted us
with an opportunity to improve the roof
fixture.
Revision to Design:
• 3 Panel End-Stops
• 10 Extended bracing
• 2 Clamps and brackets
• 4 Rack and pinion covers
19
8/16/2015Paul Soukaseum
• Oshkosh Corporation Classification: Unrestricted
Value in Winnebago Upgrade
20
8/16/2015Paul Soukaseum
Improvement:
• Contract manufacturer issues are addressed (Morale/Delivery)
• Additional end stops and clamping hold parts securely (Quality)
x10 x3
x2x4
• Oshkosh Corporation Classification: Unrestricted
Tower 1 End Stop Upgrade
Problem Statement:
Tower 1 needed end-stops for the
Meridian and I saw an opportunity to
consolidate the end-stops and lower
variability.
Revision to Design:
• 1.5” Wider roller
• Threaded end with locker
• Extra offset hole
• Longer Pins
• 4X for all sides
21
8/16/2015Paul Soukaseum
• Oshkosh Corporation Classification: Unrestricted
Tower 1 End Stop Upgrade
22
8/16/2015Paul Soukaseum
Improvements:
• 42.2% Reduction in Setup Time (Delivery)
– Increase capacity
– Increase production efficiency
• Setup Process Simplification (Quality)
• Additional Error proofing (Quality)
• Adjustability for Yearly Calibration (Quality)
• Oshkosh Corporation Classification: Unrestricted
Riceville Foot Pedal Upgrade
Problem Statement:
The foot pedal could be activated
accidently, which is a safety issue.
Revision to Design:
• Remove current pedal
• New pedal to the outside of active
working area
• Add a drive shaft
• 2X for similar fixture
23
8/16/2015Paul Soukaseum
SAFETY ISSUE
• Oshkosh Corporation Classification: Unrestricted
Benefit from Foot Pedal Upgrade
Improvement:
• 98.2% Reduction in Risk Priority Number in the function (Safety)
24
8/16/2015Paul Soukaseum
Oshkosh PFMEA
• Oshkosh Corporation Classification: Unrestricted
Hydraulic Valve Lifting Device
Problem Statement:
Operator must lift and manage the
175lb Meridian hydraulic valve, OSHA
requires a lifting device
Design
• Pivot bearing to rotate valve
• 20mm threaded attachment
• Safe for lifting 175lb valve
• Test with a 5x safety factor
25
8/16/2015Paul Soukaseum
175lb
Hydraulic Valve
• Oshkosh Corporation Classification: Unrestricted
Value in Valve Lifting Device
26
8/16/2015Paul Soukaseum
Improvements:
• Dennis uses it and Safety approves (Morale)
• Reduction in physical exertion (Safety)
• Safety hazard prevention (Safety)
• Tested “Homemade Tool” (Safety)
• Oshkosh Corporation Classification: Unrestricted
Take away
• Oshkosh Corporation Classification: Unrestricted
The Take Away
What I learned:
• Process of new product launch from the manufacturing perspective
• Hands on person
• School of common sense
• More knowledge about all the roles of ME/IE
• Application from what I’ve learned in school
• More about Oshkosh and McNeilus
• How to ride a long board
McNeilus Benefits
• Improve areas of: Safety, Quality, Delivery, Cost, Morale
28
Paul Soukaseum 8/16/2015
• Oshkosh Corporation Classification: Unrestricted
The Take Away
Future Goals:
• Finish last year of schooling
• Get more involved with Automation/Engineering
• Get more Involved with Process Improvement (Stats/DFSS)
Overall:
• Great people (interns and employees)
• Great experience
29
Paul Soukaseum 8/16/2015
• Oshkosh Corporation Classification: Unrestricted
Acknowledgements:
• Director/Mentor: Todd Roughsedge
• Everyone in ME/IE, Vijayakumar Kittuswamy, Peter Howard and
Ben Horejsi
• Jigs and Fixtures: Jim, Brian and Dave
• Quality Team
• PFMEA: Jim Luraghi
• Safety: Ross Coberly
• Materials: Justin Carlson
• Production: Seng and Eli
30
Paul Soukaseum 8/16/2015
• Oshkosh Corporation Classification: Unrestricted
Presentation
Over

More Related Content

Viewers also liked

Global beta ventures Short Deck
Global beta ventures Short DeckGlobal beta ventures Short Deck
Global beta ventures Short Deck
David Siegel
 
Verb phrase 17 aug 2015-sispayenni
Verb phrase 17 aug 2015-sispayenniVerb phrase 17 aug 2015-sispayenni
Verb phrase 17 aug 2015-sispayenni
mamayenni15
 
B05
B05B05
What
WhatWhat
مقایسه روشهای طراحی لرزه ای براساس عملکرد
مقایسه روشهای طراحی لرزه ای براساس عملکردمقایسه روشهای طراحی لرزه ای براساس عملکرد
مقایسه روشهای طراحی لرزه ای براساس عملکرد
arian2020
 
Dengue liza
Dengue lizaDengue liza
Dengue liza
Dr. Liza Bulsara
 
Slide Master Pop up 1
Slide Master Pop up 1Slide Master Pop up 1
Slide Master Pop up 1
mamayenni15
 
Slide ppt - pop up 1
Slide ppt - pop up 1Slide ppt - pop up 1
Slide ppt - pop up 1
mamayenni15
 
Amphitheatre Taman Botani Negara Shah Alam
Amphitheatre Taman Botani Negara Shah AlamAmphitheatre Taman Botani Negara Shah Alam
Amphitheatre Taman Botani Negara Shah Alam
Mirza Qayyum
 
The Newcomb Machine
The Newcomb MachineThe Newcomb Machine
The Newcomb Machine
David Siegel
 
naar resultaatgerichte teams sant
naar resultaatgerichte teams santnaar resultaatgerichte teams sant
naar resultaatgerichte teams santPatricia Can
 
Melanau Hubungan Etnik 2016
Melanau Hubungan Etnik 2016Melanau Hubungan Etnik 2016
Melanau Hubungan Etnik 2016
Mirza Qayyum
 
Building Construction 1 Project 1 2016
Building Construction 1 Project 1 2016Building Construction 1 Project 1 2016
Building Construction 1 Project 1 2016
Mirza Qayyum
 
West syndrome
West syndrome West syndrome
West syndrome
Dr. Liza Bulsara
 
Lykke Crowdfund I
Lykke Crowdfund ILykke Crowdfund I
Lykke Crowdfund I
David Siegel
 
Portal hypertension paediatrics
Portal hypertension paediatricsPortal hypertension paediatrics
Portal hypertension paediatrics
Dr. Liza Bulsara
 
Richard Olsen lykke slides
Richard Olsen lykke slidesRichard Olsen lykke slides
Richard Olsen lykke slides
David Siegel
 

Viewers also liked (18)

Global beta ventures Short Deck
Global beta ventures Short DeckGlobal beta ventures Short Deck
Global beta ventures Short Deck
 
Verb phrase 17 aug 2015-sispayenni
Verb phrase 17 aug 2015-sispayenniVerb phrase 17 aug 2015-sispayenni
Verb phrase 17 aug 2015-sispayenni
 
B05
B05B05
B05
 
What
WhatWhat
What
 
مقایسه روشهای طراحی لرزه ای براساس عملکرد
مقایسه روشهای طراحی لرزه ای براساس عملکردمقایسه روشهای طراحی لرزه ای براساس عملکرد
مقایسه روشهای طراحی لرزه ای براساس عملکرد
 
Dengue liza
Dengue lizaDengue liza
Dengue liza
 
Slide Master Pop up 1
Slide Master Pop up 1Slide Master Pop up 1
Slide Master Pop up 1
 
Slide ppt - pop up 1
Slide ppt - pop up 1Slide ppt - pop up 1
Slide ppt - pop up 1
 
Amphitheatre Taman Botani Negara Shah Alam
Amphitheatre Taman Botani Negara Shah AlamAmphitheatre Taman Botani Negara Shah Alam
Amphitheatre Taman Botani Negara Shah Alam
 
The Newcomb Machine
The Newcomb MachineThe Newcomb Machine
The Newcomb Machine
 
thz-boekje[1]
thz-boekje[1]thz-boekje[1]
thz-boekje[1]
 
naar resultaatgerichte teams sant
naar resultaatgerichte teams santnaar resultaatgerichte teams sant
naar resultaatgerichte teams sant
 
Melanau Hubungan Etnik 2016
Melanau Hubungan Etnik 2016Melanau Hubungan Etnik 2016
Melanau Hubungan Etnik 2016
 
Building Construction 1 Project 1 2016
Building Construction 1 Project 1 2016Building Construction 1 Project 1 2016
Building Construction 1 Project 1 2016
 
West syndrome
West syndrome West syndrome
West syndrome
 
Lykke Crowdfund I
Lykke Crowdfund ILykke Crowdfund I
Lykke Crowdfund I
 
Portal hypertension paediatrics
Portal hypertension paediatricsPortal hypertension paediatrics
Portal hypertension paediatrics
 
Richard Olsen lykke slides
Richard Olsen lykke slidesRichard Olsen lykke slides
Richard Olsen lykke slides
 

Similar to Oshkosh Internship

Final Presentation - Senior Design Project
Final Presentation - Senior Design ProjectFinal Presentation - Senior Design Project
Final Presentation - Senior Design Project
Tyler Lemonds
 
Resume-steer
Resume-steerResume-steer
Resume-steer
Madhu Ranjini HR
 
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact OutcomesThe ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
Kaysun Corporation
 
Jeff Garrigues Portfolio
Jeff Garrigues PortfolioJeff Garrigues Portfolio
Jeff Garrigues Portfolio
JeffreyGarrigues
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
Jermaine Brown
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1
Eric Reneker
 
The ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process FlowThe ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process Flow
Kaysun Corporation
 
Piping Technology General Presentation
Piping Technology General PresentationPiping Technology General Presentation
Piping Technology General Presentation
Piping Technology & Products, Inc.
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016
Yatheesh J R
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016
Yatheesh J R
 
Engineering portfolio
Engineering portfolioEngineering portfolio
Engineering portfolio
Shriram Vasudevan
 
ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process
ASQ Reliability Division
 
Design Engineer (Mechanical) Valve Design, Manufacturing Industry
Design Engineer (Mechanical) Valve Design, Manufacturing IndustryDesign Engineer (Mechanical) Valve Design, Manufacturing Industry
Design Engineer (Mechanical) Valve Design, Manufacturing Industry
Amarjit Rajeshirke
 
Understanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyUnderstanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard Chitty
NSW Environment and Planning
 
Milan Shah Work Portfolio
Milan Shah Work PortfolioMilan Shah Work Portfolio
Milan Shah Work Portfolio
Milan Shah
 
Ashrae standards development
Ashrae standards development Ashrae standards development
Ashrae standards development
ASHRAE Rajasthan Chapter
 
QIC-Summit_ITP-Presentation_Rev-1.0.pptx
QIC-Summit_ITP-Presentation_Rev-1.0.pptxQIC-Summit_ITP-Presentation_Rev-1.0.pptx
QIC-Summit_ITP-Presentation_Rev-1.0.pptx
ShubhamShukla221709
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
Matthew portfolio
Matthew portfolioMatthew portfolio
Matthew portfolio
Matthew Allen
 
Matthew's Portfolio
Matthew's PortfolioMatthew's Portfolio
Matthew's Portfolio
Matthew Allen
 

Similar to Oshkosh Internship (20)

Final Presentation - Senior Design Project
Final Presentation - Senior Design ProjectFinal Presentation - Senior Design Project
Final Presentation - Senior Design Project
 
Resume-steer
Resume-steerResume-steer
Resume-steer
 
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact OutcomesThe ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
 
Jeff Garrigues Portfolio
Jeff Garrigues PortfolioJeff Garrigues Portfolio
Jeff Garrigues Portfolio
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1
 
The ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process FlowThe ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process Flow
 
Piping Technology General Presentation
Piping Technology General PresentationPiping Technology General Presentation
Piping Technology General Presentation
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016
 
Engineering portfolio
Engineering portfolioEngineering portfolio
Engineering portfolio
 
ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process
 
Design Engineer (Mechanical) Valve Design, Manufacturing Industry
Design Engineer (Mechanical) Valve Design, Manufacturing IndustryDesign Engineer (Mechanical) Valve Design, Manufacturing Industry
Design Engineer (Mechanical) Valve Design, Manufacturing Industry
 
Understanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyUnderstanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard Chitty
 
Milan Shah Work Portfolio
Milan Shah Work PortfolioMilan Shah Work Portfolio
Milan Shah Work Portfolio
 
Ashrae standards development
Ashrae standards development Ashrae standards development
Ashrae standards development
 
QIC-Summit_ITP-Presentation_Rev-1.0.pptx
QIC-Summit_ITP-Presentation_Rev-1.0.pptxQIC-Summit_ITP-Presentation_Rev-1.0.pptx
QIC-Summit_ITP-Presentation_Rev-1.0.pptx
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
Matthew portfolio
Matthew portfolioMatthew portfolio
Matthew portfolio
 
Matthew's Portfolio
Matthew's PortfolioMatthew's Portfolio
Matthew's Portfolio
 

Recently uploaded

AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
eygkup
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
jennifermiller8137
 
Skoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda PerthSkoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda Perth
Perth City Skoda
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
mymwpc
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
vaibhavsrivastava482521
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdfManual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
GermanValentini1
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
bouvoy
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
MarynaYurchenko2
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
78tq3hi2
 
TRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electricalTRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electrical
JohnCarloPajarilloKa
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
78tq3hi2
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
jennifermiller8137
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
afkxen
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
wstatus456
 
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdffinal-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
Ashfaq Ahmad
 
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
mymwpc
 
Globalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full resultsGlobalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full results
vaterland
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
Forth
 

Recently uploaded (20)

AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
 
Skoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda PerthSkoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda Perth
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdfManual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
 
TRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electricalTRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electrical
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
 
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdffinal-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
 
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
 
Globalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full resultsGlobalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full results
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
 

Oshkosh Internship

  • 1. Paul Soukaseum ME/IE Intern Automated Systems and Robotics A.S. Industrial and Systems Engineering B.S. University of Minnesota
  • 2. • Oshkosh Corporation Classification: Unrestricted What Is ME/IE? Director: Todd Roughsedge Team: Vijay, Ben, Peter, Camron, Dan, Sean, Sravan, Jigs/Fixtures • Stands for Manufacturing Engineering/Industrial Engineering • Design manufacturing jigs or fixtures • Offer production support on new and existing product • Standardize work • Study capacities and utilization • Cost justification • Improve workflow 2 Paul Soukaseum 8/16/2015
  • 3. • Oshkosh Corporation Classification: Unrestricted Internship Project 3 8/16/2015Paul Soukaseum Prototype Support for Meridian • Meridian Process Improvements  Part and BOM Audit  Build Sequence  CI using 6 Sigma Methodology • Meridian Fixtures/Jigs  Modifying Existing Fixtures  Creating New Fixtures
  • 4. • Oshkosh Corporation Classification: Unrestricted Observing Meridian Production 4 8/16/2015Paul Soukaseum
  • 6. • Oshkosh Corporation Classification: Unrestricted Fastenal Part/BOM Audit 6 8/16/2015Paul Soukaseum Problem: To make sure Fastenal parts for the Meridian is stocked for production Approach: • Gather the all Fastenal/Aeroquip part numbers in PMPF • Compare to Meridian BOM • Find the “Missing Part” • Create BIR for BOM mistakes • Create locations for Parts Needed
  • 7. • Oshkosh Corporation Classification: Unrestricted Benefits from Part/BOM Audit Improvement: • BIR created to have R&D Engineering review parts list before giving them a location (Cost) 7 8/16/2015Paul Soukaseum 10,132 Total Fastenal Parts 337 Bins in PMPF 227 Fastenal/Aeroquip Unique Bins 377 Meridian Parts in PMPF 15 Meridian Fastenal Parts w/ No Match
  • 8. • Oshkosh Corporation Classification: Unrestricted Hydraulic Line Build Sequencing Problem: To simplify the hydraulic line assembly. It’s difficult and confusing. Approach: • Create build instruction • Make it visual • Label the hydraulic lines to correspond with build instruction • Implement Build instruction and audit the results 8 8/16/2015Paul Soukaseum
  • 9. • Oshkosh Corporation Classification: Unrestricted Value in Build Sequencing 9 8/16/2015Paul Soukaseum • Improvement: • Reduction in task time (Delivery) • Simplification of task (Quality) • Easier for the production worker (Morale)
  • 10. • Oshkosh Corporation Classification: Unrestricted Process Improvement Meridian improvement using 6 sigma methodology
  • 11. • Oshkosh Corporation Classification: Unrestricted DMAIC: Boomerang Alignment Define: Find the root cause of the poor fit when installing the ejector hydraulic cylinder and to correct it. 11 8/16/2015Paul Soukaseum Define Non-Conforming as: “If they have to use the tap or ream out any of the holes”
  • 12. • Oshkosh Corporation Classification: Unrestricted DMAIC: Boomerang Alignment 12 8/16/2015Paul Soukaseum Measure: • The fixture is also the boomerang part • Measure parts to assure they are good • Boomerang: # 9,8,37,35,36 = 1.8 < Cpk < 10 • Laser-cut Sidewall: Laser cut part is oversized to 0.81” Bolts are 0.75”
  • 13. • Oshkosh Corporation Classification: Unrestricted DMAIC: Boomerang Alignment Analyze: • Solidworks Motion to study variance Scenario 1 P{NonConf}= 85% Scenario 2 P{NonConf}= 62% 13 8/16/2015Paul Soukaseum
  • 14. • Oshkosh Corporation Classification: Unrestricted DMAIC: Boomerang Alignment Improve: From the Analyze step, there are reasons to believe that it is the fixture or the oversize hole in the laser cut sheets Design new fixture and use Hypothesis Testing: • Introduce new fixture & use Bernoulli distribution function (Discrete Event) to determine the p-value. • H0: p<0.05 or <1 defect out of 20 14 8/16/2015Paul Soukaseum
  • 15. • Oshkosh Corporation Classification: Unrestricted Value in DMAIC: Process Control Improvements and Control: • 62% reduction in the likely-hood of non-conforming alignment (Quality/Delivery) • Fixture is lighter (Morale) • Error proofing for Scenario 1, lowers risk of 85% Non-Con (Quality) • Production are not complaining about bad fit (Morale) 15 8/16/2015Paul Soukaseum
  • 16. • Oshkosh Corporation Classification: Unrestricted Fixture Design and Build Based off the manufacturing needs of the Meridian
  • 17. • Oshkosh Corporation Classification: Unrestricted 17 8/16/2015Paul Soukaseum Fixture Improvement Process Production needs a solution to a problem Collect Input from Shop and Cross Functional team Validate Loading Sequence Validate Clamping Plan vs Actual Jig Develop Concept for Cross Functional Team Approval Detail Design, Drawings and Part Order Build and System Integration, Update Work Instruction Setup the Jig to Nominal and Build Part for Quality Validation
  • 18. • Oshkosh Corporation Classification: Unrestricted Requirement Analysis 18 8/16/2015Paul Soukaseum Analysis: • Problem Statements • Needs/Functions • Requirements to Functions • Load Seq. and Clamping Plan • Designs/Revisions to Design My Designs: • Tower 1 Adjustable End stop • Winnebago Roof Fixture Modification • Riceville Rotating Weld Fixture Foot Pedal • Hydraulic Valve Lifting Device
  • 19. • Oshkosh Corporation Classification: Unrestricted Winnebago Fixture Upgrade Problem Statement: The contract manufacturer contacted us with an opportunity to improve the roof fixture. Revision to Design: • 3 Panel End-Stops • 10 Extended bracing • 2 Clamps and brackets • 4 Rack and pinion covers 19 8/16/2015Paul Soukaseum
  • 20. • Oshkosh Corporation Classification: Unrestricted Value in Winnebago Upgrade 20 8/16/2015Paul Soukaseum Improvement: • Contract manufacturer issues are addressed (Morale/Delivery) • Additional end stops and clamping hold parts securely (Quality) x10 x3 x2x4
  • 21. • Oshkosh Corporation Classification: Unrestricted Tower 1 End Stop Upgrade Problem Statement: Tower 1 needed end-stops for the Meridian and I saw an opportunity to consolidate the end-stops and lower variability. Revision to Design: • 1.5” Wider roller • Threaded end with locker • Extra offset hole • Longer Pins • 4X for all sides 21 8/16/2015Paul Soukaseum
  • 22. • Oshkosh Corporation Classification: Unrestricted Tower 1 End Stop Upgrade 22 8/16/2015Paul Soukaseum Improvements: • 42.2% Reduction in Setup Time (Delivery) – Increase capacity – Increase production efficiency • Setup Process Simplification (Quality) • Additional Error proofing (Quality) • Adjustability for Yearly Calibration (Quality)
  • 23. • Oshkosh Corporation Classification: Unrestricted Riceville Foot Pedal Upgrade Problem Statement: The foot pedal could be activated accidently, which is a safety issue. Revision to Design: • Remove current pedal • New pedal to the outside of active working area • Add a drive shaft • 2X for similar fixture 23 8/16/2015Paul Soukaseum SAFETY ISSUE
  • 24. • Oshkosh Corporation Classification: Unrestricted Benefit from Foot Pedal Upgrade Improvement: • 98.2% Reduction in Risk Priority Number in the function (Safety) 24 8/16/2015Paul Soukaseum Oshkosh PFMEA
  • 25. • Oshkosh Corporation Classification: Unrestricted Hydraulic Valve Lifting Device Problem Statement: Operator must lift and manage the 175lb Meridian hydraulic valve, OSHA requires a lifting device Design • Pivot bearing to rotate valve • 20mm threaded attachment • Safe for lifting 175lb valve • Test with a 5x safety factor 25 8/16/2015Paul Soukaseum 175lb Hydraulic Valve
  • 26. • Oshkosh Corporation Classification: Unrestricted Value in Valve Lifting Device 26 8/16/2015Paul Soukaseum Improvements: • Dennis uses it and Safety approves (Morale) • Reduction in physical exertion (Safety) • Safety hazard prevention (Safety) • Tested “Homemade Tool” (Safety)
  • 27. • Oshkosh Corporation Classification: Unrestricted Take away
  • 28. • Oshkosh Corporation Classification: Unrestricted The Take Away What I learned: • Process of new product launch from the manufacturing perspective • Hands on person • School of common sense • More knowledge about all the roles of ME/IE • Application from what I’ve learned in school • More about Oshkosh and McNeilus • How to ride a long board McNeilus Benefits • Improve areas of: Safety, Quality, Delivery, Cost, Morale 28 Paul Soukaseum 8/16/2015
  • 29. • Oshkosh Corporation Classification: Unrestricted The Take Away Future Goals: • Finish last year of schooling • Get more involved with Automation/Engineering • Get more Involved with Process Improvement (Stats/DFSS) Overall: • Great people (interns and employees) • Great experience 29 Paul Soukaseum 8/16/2015
  • 30. • Oshkosh Corporation Classification: Unrestricted Acknowledgements: • Director/Mentor: Todd Roughsedge • Everyone in ME/IE, Vijayakumar Kittuswamy, Peter Howard and Ben Horejsi • Jigs and Fixtures: Jim, Brian and Dave • Quality Team • PFMEA: Jim Luraghi • Safety: Ross Coberly • Materials: Justin Carlson • Production: Seng and Eli 30 Paul Soukaseum 8/16/2015
  • 31. • Oshkosh Corporation Classification: Unrestricted Presentation Over