The document provides an agenda for a lecture or seminar on control systems. The topics to be covered include:
1. A Harvard Business case study on Verizon to discuss control systems.
2. Summarizing and closing the lecture/seminar.
3. The document also includes other seminar materials on organizing for innovation, systems thinking, learning organizations, and knowledge management.