OEE ( Overall Equipment Effectiveness) manoji@yahoo.com
OEE : [Availability % ] X [Performance %] X [ Quality %]
a b c
Down Time Loss
A) How to calculate OEE ? Speed Loss
Quality Loss
a) Machine Availability
TYPES OF LOSSES ( Part of Six big Losses) - Read below for six big losses
Breakdowns : 1. Tooling Failures
2. Unplanned Maintenance
3. General Breakdowns
4. Equipment Failures
Setup & Adjustments: 1. Setup / Changeover This should address under
2.Materail Shortage setup time reduction
3.Operator Shortage programs
4.Major Adjustments
5.Warm-Up Time
b) Machine Performance%
Let's assume machine makes 1000 PCS during 5.00Hours of Work
Please note that we consider the production only during up-time
Machine Standard rate ( PCS) : 300PCS/HOUR
Current Performance ( PCS) : 1000PCS/5 HOURS
200PCS/HOUR
Machine Performance % : (200/300)X100 %
66.7%
TYPES OF LOSSES ( Part of Six big Losses)
Small Stops 1. Obstructed Product Flow
2. Components Jams
3. Misdeeds This includes stops that are
4. Sensor Blocks under five minutes and not
5. Delivery Blocked require maintence
6. Cleaning / Checking personal for recitification
Reduced Speed or 1. Rough Running
Slow Cycles 2.Below nameplate capacity
3.Under design capacity
4.Equipment Wear
5.Operator Inefficiency
c) Quality %
Let's assume machine makes 1000 PCS during 5.00Hours of Work
and 200 PCS are rejected by QAD.
Total Produced during 5.00 Hours ( PCS) : 1000
Quality Rejected ( PCS) : 200
Quality % : accepted products /total products
80.0%
TYPES OF LOSSES ( Part of Six big Losses)
Porduction Rejects 1. Scrap
2. Rework
3. In-process damage Rejctions during Steady
4. In-process expiration state production
5. Incorrect assembly
Startup Rejects 1. Scrap Rejects during worm-up
2.Rework start-up, other early
3. In-process damage production , may be improper
4. In-process expiration set-up…..etc
5. Incorrect assembly
OEE : [Availability % ] X [Perfomance %] X [ Quality %]
0.794X0.667X0.800
42.4%
B) Six Big Losses
http://www.oee.com/images/pt-oee-six-big-losses.png
C) How to Address SIX Big Losses ?
Breakdowns : Eliminating unplanned down-time is important in improving OEE.
You can use Pareto Charts to prioratize the severe losees and Root Cause Analysis for
solutions.
Setup and Adjustments:
This is measured between last good part produced before setup to first good part
produced after setup. Tracking setup time is important to reduce this loss togather with
an active program to reduce this time such as SMED ( Single Minute Exchange of Dies)
( Eg : Use of prefabricated setups , Magnetic clamps on Injection modling MC)
Small Stops ad Reduced Speeds :
This is very difficut to record and monitor . Comparing completed cycle times and
ideal cycle time , errant cycles can be spotted. Then , RCA ,PDCA , DMAIC , 8D
problem solving can be used.
Startup Rejects and Production Rejects: Startup Rejects and Production Rejects are two different things
root causes are also different between startup and steady-state production. Parts require
any kind of reworks are rejects . Often a six sigma program can be used to bring the
quality to near perfect level.
D) How to calculate OEE in plant ?
Let's say a plant can have few machines,
OEE: [Available Time MC1+Available Time MC2….]/[Scheduled Time MC1+Scheduled Time MC1…..]
X[Current Performance MC1+MC2…]/[Rated Performance MC1+MC2..]X[Approved Quantity MC1+
MC2…]/[Total Quantity MC1+MC2..]
E) How to calculate OEE in a Group of Plants?
Let's say a group of companes has three plant assets,
OEE : [OEE1+OEE2+OEE3]/3
F) What is world class OEE Levels ?
Availability 90%
Performance 95%
Quality 99.9%
OEE 85%
G) Visual OEE
Plant floor real time display of live OEE data for maximum team involvement.
http://www.vorne.com/
Reference
http://www.smartandon.com/files/OEE.jpg
http://www.oee.com/images/pt-oee-six-big-losses.png
http://www.vorne.com/

More Related Content

Similar to OEE

H0432045055
H0432045055H0432045055
H0432045055
theijes
 
Just in-time systems
Just in-time systemsJust in-time systems
Just in-time systemsswati Mahajan
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET Journal
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
RahbiMalek
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
hossam hassanein
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET Journal
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentation
guest03d3e3
 
The six big losses - lean tool
The six big losses  - lean toolThe six big losses  - lean tool
The six big losses - lean tool
Prashant Uttarkar
 
Flexible Manufacturing System Design
Flexible Manufacturing System DesignFlexible Manufacturing System Design
Flexible Manufacturing System Design
Rahul Surajith (ラーフル)
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
Jason Corder
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
Parsec_Automation_Corp
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
Corey Vodvarka
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel Equipment
IRJET Journal
 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenancevivekmsmech
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET Journal
 
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
ssuser72dffc
 
The+complete+guide+to+simple+oee
The+complete+guide+to+simple+oeeThe+complete+guide+to+simple+oee
The+complete+guide+to+simple+oeeGalland Tolentino
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET Journal
 

Similar to OEE (20)

H0432045055
H0432045055H0432045055
H0432045055
 
Just in-time systems
Just in-time systemsJust in-time systems
Just in-time systems
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
6Sigma
6Sigma6Sigma
6Sigma
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentation
 
The six big losses - lean tool
The six big losses  - lean toolThe six big losses  - lean tool
The six big losses - lean tool
 
Flexible Manufacturing System Design
Flexible Manufacturing System DesignFlexible Manufacturing System Design
Flexible Manufacturing System Design
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
Design lean sysm
Design lean sysmDesign lean sysm
Design lean sysm
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel Equipment
 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
 
The+complete+guide+to+simple+oee
The+complete+guide+to+simple+oeeThe+complete+guide+to+simple+oee
The+complete+guide+to+simple+oee
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 

OEE

  • 1. OEE ( Overall Equipment Effectiveness) manoji@yahoo.com OEE : [Availability % ] X [Performance %] X [ Quality %] a b c Down Time Loss A) How to calculate OEE ? Speed Loss Quality Loss a) Machine Availability TYPES OF LOSSES ( Part of Six big Losses) - Read below for six big losses Breakdowns : 1. Tooling Failures 2. Unplanned Maintenance 3. General Breakdowns 4. Equipment Failures Setup & Adjustments: 1. Setup / Changeover This should address under 2.Materail Shortage setup time reduction 3.Operator Shortage programs 4.Major Adjustments 5.Warm-Up Time b) Machine Performance% Let's assume machine makes 1000 PCS during 5.00Hours of Work Please note that we consider the production only during up-time Machine Standard rate ( PCS) : 300PCS/HOUR Current Performance ( PCS) : 1000PCS/5 HOURS 200PCS/HOUR Machine Performance % : (200/300)X100 % 66.7%
  • 2. TYPES OF LOSSES ( Part of Six big Losses) Small Stops 1. Obstructed Product Flow 2. Components Jams 3. Misdeeds This includes stops that are 4. Sensor Blocks under five minutes and not 5. Delivery Blocked require maintence 6. Cleaning / Checking personal for recitification Reduced Speed or 1. Rough Running Slow Cycles 2.Below nameplate capacity 3.Under design capacity 4.Equipment Wear 5.Operator Inefficiency c) Quality % Let's assume machine makes 1000 PCS during 5.00Hours of Work and 200 PCS are rejected by QAD. Total Produced during 5.00 Hours ( PCS) : 1000 Quality Rejected ( PCS) : 200 Quality % : accepted products /total products 80.0% TYPES OF LOSSES ( Part of Six big Losses) Porduction Rejects 1. Scrap 2. Rework 3. In-process damage Rejctions during Steady 4. In-process expiration state production 5. Incorrect assembly Startup Rejects 1. Scrap Rejects during worm-up 2.Rework start-up, other early 3. In-process damage production , may be improper 4. In-process expiration set-up…..etc 5. Incorrect assembly OEE : [Availability % ] X [Perfomance %] X [ Quality %] 0.794X0.667X0.800 42.4%
  • 3. B) Six Big Losses http://www.oee.com/images/pt-oee-six-big-losses.png C) How to Address SIX Big Losses ? Breakdowns : Eliminating unplanned down-time is important in improving OEE. You can use Pareto Charts to prioratize the severe losees and Root Cause Analysis for solutions. Setup and Adjustments: This is measured between last good part produced before setup to first good part produced after setup. Tracking setup time is important to reduce this loss togather with an active program to reduce this time such as SMED ( Single Minute Exchange of Dies) ( Eg : Use of prefabricated setups , Magnetic clamps on Injection modling MC) Small Stops ad Reduced Speeds : This is very difficut to record and monitor . Comparing completed cycle times and ideal cycle time , errant cycles can be spotted. Then , RCA ,PDCA , DMAIC , 8D problem solving can be used. Startup Rejects and Production Rejects: Startup Rejects and Production Rejects are two different things root causes are also different between startup and steady-state production. Parts require any kind of reworks are rejects . Often a six sigma program can be used to bring the quality to near perfect level. D) How to calculate OEE in plant ? Let's say a plant can have few machines, OEE: [Available Time MC1+Available Time MC2….]/[Scheduled Time MC1+Scheduled Time MC1…..] X[Current Performance MC1+MC2…]/[Rated Performance MC1+MC2..]X[Approved Quantity MC1+ MC2…]/[Total Quantity MC1+MC2..] E) How to calculate OEE in a Group of Plants? Let's say a group of companes has three plant assets, OEE : [OEE1+OEE2+OEE3]/3 F) What is world class OEE Levels ? Availability 90% Performance 95% Quality 99.9% OEE 85%
  • 4. G) Visual OEE Plant floor real time display of live OEE data for maximum team involvement. http://www.vorne.com/ Reference http://www.smartandon.com/files/OEE.jpg http://www.oee.com/images/pt-oee-six-big-losses.png http://www.vorne.com/