INCA Conference
16th October 2019
www.obelisk.com 3
www.obelisk.com
Our Services – Fixed Line
We offer a fully integrated service of survey, design, build, upgrade
and maintenance of telecoms infrastructure and critical assets
DESIGN
• Use of the latest design GIS
database and survey tools
• On-site fibre splice teams have
access to the latest optical straight
line diagrams and splice matrices
• Low level designs are generated in a
format that allows the client to
visually see the proposed optical
network design
BUILD
• Specialists in large scale complex
infrastructure projects
• Significant experience in delivering
turnkey Engineering, Procurement &
Construction contracts
• Use of state of the art software and tools
to allow full project visibility
• Accurate reporting enables us to meet
critical time to Market (TTM) and On Time
Delivery (OTD) requirements
MAINTAIN
• Fast Response – 24 hour support 7
days a week
• Skilled resources – qualified
engineers, nationwide geographic
spread
• Flexibility – tailored maintenance
programmes
• Reporting – detailed reports and
photographic evidence
www.obelisk.com
Our Services – Mobile
We offer a fully integrated service of survey, design, build, upgrade
and maintenance of telecoms infrastructure and critical assets
DESIGN
• Full site survey
• Full suite of CAD drawings
• Soil investigation
• Rooftop and tower remedial work
design
• Comprehensive safety file per site
• Structural sign off
• Stealth & bespoke solution design
• H&S upgrade design
BUILD
• Acquisition, town planning, construction,
rigging, commissioning
• Greenfield sites, structure
redevelopments, site relocations, multiple
operator consolidations
• Both wireless and fixed line technologies
• Delivery, installation, commissioning and
integration of all telecoms technologies
across multiple vendors
MAINTAIN
• Comprehensive maintenance service
across all aspects of telecoms plant,
equipment, networks and customer
premises equipment
• Fast Response – 24/7/365 urgent
response to customer requirements
• Co-ordination – centralised,
controlled scheduling and dispatch of
maintenance team
www.obelisk.com
FTTH – To date
40,000
Homes passed to
date
Forecasted
Delivery
per Qtr.
50,000
Homes in Build
- 40,000 passed to date – since January 2017
- All infrastructure types uses
- Underground Ducting
- Overhead Power Lines
- Façade
- PIA
- 50,000 homes in build to be delivered by March
2020 currently on programme
- Fixed price model with KPI’s on safety, quality &
delivery.
www.obelisk.com
Design – Survey - Build
50,000 Homes
150,000 Surveys
3 Tier pricing
Fixed & Firm
Forecasted
Delivery of
“Connectable
Homes”
On the Ground
Resources
Overhead Linesman
Civils Contractors
Splicers
Riggers
Supervision
Façade 12%
of build
Delivered 6,000
FTTP using
Façade
Design, Survey, Training & Mobilisation - 12 Month Period
Forecasted delivery
www.obelisk.com
Timescales
Design Methodology
Design to
Cost
Cost per Connectable Home
Volume
Business Plan
Requirements
Use of 3rd Party Assets
Location
3rd Party Asset Re-
use & survey
Design Survey
Desk Top Design
Wayleaves and
Consents
Availability of trained
resource
High Level Design
Low Level Design
Volume
Cost per Connectable Home
Build
Pack
Project Plan
Contracting Partners
Mobilisation
3rd Party consents
Training
Network Handover
Cost per Connectable Home
Health and Safety
Quality /Supervision
Test
Build/Deployment
Hand Over Pack
Selection of
Contractor/s and cost
verification
Procurement Strategy
Network
Operation
Take - Up
ConfirmedBudgetedForecasted
Build to Cost
Model for success
www.obelisk.com
• Clear concise Scope of work
• Single Point of Contact in each
organisation
• Equal management reporting structure
• Clear payment mechanism
• Forecasted work with 30% float
• Joint Responsibility matrix
Win or Lose • Forecasted delivery of Connectable
Home
• Resource profile
• Quality management
• Local Authority interface
Timescales
Design Methodology
Design to
Cost
Cost per ConnectableHome
Volume
Business Plan
Requirements
Use of 3rd Party Assets
Location
3rd Party Asset Re-
use & survey
Design Survey
Desk Top Design
Wayleaves and Consents
Availability of trained
resource
High Level Design
Low Level Design
Volume
Cost per ConnectableHome
Build
Pack
Project Plan
ContractingPartners
Mobilisation
3rd Party consents
Training
Network Handover
Cost per ConnectableHome
Health and Safety
Quality /Supervision
Test
Build/Deployment
Hand Over Pack
Selection of Contractor/s
and cost verification
Procurement Strategy
Network
Operation
Take - Up
ConfirmedBudgetedForecasted
Build to Cost
Expertise & Decision Making
For office locations and
contact information, visit
www.obelisk.com/contact
E: info@obelisk.com
W: www.obelisk.com

Obelisk

  • 1.
  • 2.
  • 3.
    www.obelisk.com Our Services –Fixed Line We offer a fully integrated service of survey, design, build, upgrade and maintenance of telecoms infrastructure and critical assets DESIGN • Use of the latest design GIS database and survey tools • On-site fibre splice teams have access to the latest optical straight line diagrams and splice matrices • Low level designs are generated in a format that allows the client to visually see the proposed optical network design BUILD • Specialists in large scale complex infrastructure projects • Significant experience in delivering turnkey Engineering, Procurement & Construction contracts • Use of state of the art software and tools to allow full project visibility • Accurate reporting enables us to meet critical time to Market (TTM) and On Time Delivery (OTD) requirements MAINTAIN • Fast Response – 24 hour support 7 days a week • Skilled resources – qualified engineers, nationwide geographic spread • Flexibility – tailored maintenance programmes • Reporting – detailed reports and photographic evidence
  • 4.
    www.obelisk.com Our Services –Mobile We offer a fully integrated service of survey, design, build, upgrade and maintenance of telecoms infrastructure and critical assets DESIGN • Full site survey • Full suite of CAD drawings • Soil investigation • Rooftop and tower remedial work design • Comprehensive safety file per site • Structural sign off • Stealth & bespoke solution design • H&S upgrade design BUILD • Acquisition, town planning, construction, rigging, commissioning • Greenfield sites, structure redevelopments, site relocations, multiple operator consolidations • Both wireless and fixed line technologies • Delivery, installation, commissioning and integration of all telecoms technologies across multiple vendors MAINTAIN • Comprehensive maintenance service across all aspects of telecoms plant, equipment, networks and customer premises equipment • Fast Response – 24/7/365 urgent response to customer requirements • Co-ordination – centralised, controlled scheduling and dispatch of maintenance team
  • 5.
    www.obelisk.com FTTH – Todate 40,000 Homes passed to date Forecasted Delivery per Qtr. 50,000 Homes in Build - 40,000 passed to date – since January 2017 - All infrastructure types uses - Underground Ducting - Overhead Power Lines - Façade - PIA - 50,000 homes in build to be delivered by March 2020 currently on programme - Fixed price model with KPI’s on safety, quality & delivery.
  • 6.
    www.obelisk.com Design – Survey- Build 50,000 Homes 150,000 Surveys 3 Tier pricing Fixed & Firm Forecasted Delivery of “Connectable Homes” On the Ground Resources Overhead Linesman Civils Contractors Splicers Riggers Supervision Façade 12% of build Delivered 6,000 FTTP using Façade Design, Survey, Training & Mobilisation - 12 Month Period Forecasted delivery
  • 7.
    www.obelisk.com Timescales Design Methodology Design to Cost Costper Connectable Home Volume Business Plan Requirements Use of 3rd Party Assets Location 3rd Party Asset Re- use & survey Design Survey Desk Top Design Wayleaves and Consents Availability of trained resource High Level Design Low Level Design Volume Cost per Connectable Home Build Pack Project Plan Contracting Partners Mobilisation 3rd Party consents Training Network Handover Cost per Connectable Home Health and Safety Quality /Supervision Test Build/Deployment Hand Over Pack Selection of Contractor/s and cost verification Procurement Strategy Network Operation Take - Up ConfirmedBudgetedForecasted Build to Cost Model for success
  • 8.
    www.obelisk.com • Clear conciseScope of work • Single Point of Contact in each organisation • Equal management reporting structure • Clear payment mechanism • Forecasted work with 30% float • Joint Responsibility matrix Win or Lose • Forecasted delivery of Connectable Home • Resource profile • Quality management • Local Authority interface Timescales Design Methodology Design to Cost Cost per ConnectableHome Volume Business Plan Requirements Use of 3rd Party Assets Location 3rd Party Asset Re- use & survey Design Survey Desk Top Design Wayleaves and Consents Availability of trained resource High Level Design Low Level Design Volume Cost per ConnectableHome Build Pack Project Plan ContractingPartners Mobilisation 3rd Party consents Training Network Handover Cost per ConnectableHome Health and Safety Quality /Supervision Test Build/Deployment Hand Over Pack Selection of Contractor/s and cost verification Procurement Strategy Network Operation Take - Up ConfirmedBudgetedForecasted Build to Cost Expertise & Decision Making
  • 9.