Risicomanagement in Onderhoud




Wat levert Risicomanagement eigenlijk op?

                                                Onderhoud op basis van Risico
                                                         30 September 2009
                                                       Marc Hoppenbrouwers
                                                        Managing Consultant
                                                               Mainnovation



                                                       Experts in Value Driven Maintenance®

                © Copyright Mainnovation 2009
© Copyright Mainnovation 2009
Piper Alpha (Wikipedia)
• Piper Alpha was a North Sea oil production platform operated by Occidental Petroleum (Caledonia)
  Ltd.[1] The platform began production in 1976[2], first as an oil platform and then later converted to
  gas production. An explosion and resulting fire destroyed it on July 6, 1988, killing 167 men,[3] with
  only 59 survivors. The death toll includes 2 crewmen of a rescue vessel.[4] Total insured loss was
  about £1.7 billion (US$ 3.4 billion). To date it is the world's worst offshore oil disaster in terms both of
  lives lost and impact to industry.[5] At the time of the disaster the platform accounted for around 10%
  of the oil and gas production from the North Sea.
• A new gas pipeline was built in the weeks before the 6 July explosion, and while this work disrupted
  the normal routine, the platform was operated as normal. The discovery of a small gas leak was not
  unusual and no cause for concern. Because the platform was completely destroyed, and many of those
  involved died, analysis of events can only suggest a possible chain of events based on known facts.
  Some witnesses to the events question the official timeline.[10]
• 12:00 p.m. Two Condensate pumps on the platform, designated A and B, compressed the gas for
  transport to the coast. On the morning of July 6, Pump A's pressure safety valve (PSV #504) was
  removed for routine maintenance. The pump's fortnightly overhaul was planned but had not started.
  The open Condensate pipe was temporarily sealed with a blind flange (flat metal disc). Because the
  work could not be completed by 6:00 p.m., the blind flange remained in place. The on-duty engineer
  filled out a permit which stated that Pump A was not ready and must not be switched on under any
  circumstances.
• 6:00 p.m. The day shift ended, and the night shift started with 62 men running Piper Alpha. As he
  found the on-duty custodian busy, the engineer neglected to inform him of the condition of Pump A.
  Instead he placed the permit in the control centre and left. This permit disappeared and was not
  found. Coincidentally there was another permit issued for the general overhaul of Pump A that had
  not yet begun.

• Etc.


                                        © Copyright Mainnovation 2009
Agenda

1   Wat is de impact van risico’s ?


2   Hoe kan ik de risico’s effectief managen ?


3   Hoe stel ik de juiste prioriteiten ?


4   Hoeveel is goed genoeg ?


5   Wat levert risicomanagement op ?




                         © Copyright Mainnovation 2009
BP Texas City




  © Copyright Mainnovation 2009
BP Texas City




  © Copyright Mainnovation 2009
Risico’s in de bedrijfsvoering van assets
  • De bedrijfsvoering van assets is blootgesteld
    aan risico’s op verschillende niveau’s:
        – Strategisch: macro economisch klimaat
        – Tactisch: effectieve inzet van assets
        – Operationeel: storingen aan assets
                                                                                       Bron AD, 30 Juli 2009
  • Verstoringen van de bedrijfsvoering hebben
    vaak een negatief effect op het bedrijf, de
    werknemers en de omgeving
                                                                                      Bron NOS, 17 Juni 2009
  • Wat kan leiden tot persoonlijke, materiële,
    financiële of imago schade voor het bedrijf……
                                                                                       Bron VID, 5 Juni 2009




                                                                                     Bron Volkskrant, 7 April 2009
                                                                                          Volkskrant,



SINT MAARTENSDIJK – In een pindafabriek aan de           (Novum) - Het ongeluk
Nijverheidsweg in Sint Maartensdijk woedt sinds          met een goederentrein bij
zaterdagavond een enorme brand. De brand gaat            het Amsterdamse
gepaard met explosies en tot Bergen op Zoom en           Muiderpoortstation in
zelfs Arnemuiden is de rookontwikkeling te zien.         november is vermoedelijk
Omdat de pinda’s maar blijven gloeien, denkt de          veroorzaakt door
brandweer dat de brand nog enkele dagen kan duren.       ondeugdelijke wagons.
                                                     © Copyright Mainnovation 2009
Agenda

1   Wat is de impact van risico’s ?


2   Hoe kan ik risico’s effectief managen ?


3   Hoe stel ik de juiste prioriteiten ?


4   Hoeveel is goed genoeg ?


5   Wat levert risicomanagement op ?




                         © Copyright Mainnovation 2009
De rol van Onderhoud

• Onderhoud kan een belangrijke rol spelen
  bij het beheersen van risico’s voor de
  bedrijfsvoering op alle niveaus:
   – Op strategisch niveau kan onderhoud
     bijdragen aan de bedrijfsdoelstellingen en
     economische waarde creëren voor het bedrijf

   – Op tactisch niveau kan onderhoud bijdragen
     aan een optimale inzet van de assets,
     waardoor minimale reserve voor opvangen
     van risico’s nodig is

   – Op operationeel niveau kan onderhoud helpen
     de betrouwbaarheid van de assets verhogen,
     en daarmee de kans of de gevolgen van
     storingen beperken




                            © Copyright Mainnovation 2009
Hoeveel onderhoud is nodig?

• Ons buikgevoel zegt dat onderhoud
  belangrijk is…
  “Zonder onderhoud geen productie en geen
  veilige werkomgeving”

• De kosten van onderhoud zijn zichtbaar
  maar vaak is het lastig om het effect van
  goed onderhoud te kwantificeren

• De onderhoudsmanager spreekt vaak
  onvoldoende de taal van de directie

• Met als gevaar dat vooral wordt gestuurd op
  beperking van de onderhoudskosten …




                           © Copyright Mainnovation 2009
Agenda

1   Wat is de impact van risico’s ?


2   Hoe kan ik de risico’s effectief managen ?


3   Hoe stel ik de juiste prioriteiten ?


4   Hoeveel is goed genoeg ?


5   Wat levert risicomanagement op ?




                         © Copyright Mainnovation 2009
Waardecreatie door onderhoud




         © Copyright Mainnovation 2009
Waarde en marktwerking

    Branche                                        Landspecifieke SHE
karakteristieken                                   wet- en regelgeving




   Economisch
klimaat branche                                    Lokale beschikbaarheid
                                                          resources




                   © Copyright Mainnovation 2009
Wat is waarde?


              Waarde
                 =
        De som van alle vrije
      toekomstige kasstromen,
        verdisconteerd naar
              vandaag




                                                     FSHE,t x ( CFAU,t + CFCC,t + CFRA,t + CFSHE,t)
Waardepotentieel =
                                        ∑                                           -



                                                                                              (1+rt        )t
                                                                                                                    -




 FSHE,t      = SHE-factor in year t (% fulfillment of SHE regulations, or: 1 – risk of losing license to operate)
   CFAU,t    = change in free future cash flow in year t from improving asset utilization (AU)
   CFCC,t    = change in free future cash flow in year t from improving cost control (CC)
   CFRA,t    = change in free future cash flow in year t from improving resource allocation (RA)
   CFSHE,t   = change in free future cash flow in year t from improving Safety, Health & Environment (SHE)
 r           = internal hurdle rate


                                                              © Copyright Mainnovation 2009
Onderhoudsstrategie bepaling met VDM
• Op strategisch niveau wordt bepaald waar
  de focus van onderhoud dient te liggen

• Hoe bepaalt de marktsituatie de
  onderhoudsstrategie?

• Welke activiteiten resulteren in de meeste
  toegevoegde waarde?

• Waar liggen de risico’s voor de
  bedrijfsvoering?

• Hoe kunnen we het hoger management
  overtuigen de juiste beslissingen te nemen?




                              © Copyright Mainnovation 2009
Onderhoudsstrategie in de praktijk

• Akzo Nobel Intervet met hoofdvestiging in Boxmeer
  (overgenomen door Schering Plough Animal Health,
  overgenomen door Merck) is een toonaangevende
  producent van hoogwaardige diergeneesmiddelen
• FDA wet- en regelgeving (21-CFR Part-11) stelt hoge
  eisen aan de verantwoording en het beheer van het
  gekozen onderhoudsconcept
• Voor GMP-kritische equipments dient men expliciet
  vast te leggen waarom men kiest voor een
  preventieve of correctieve actie
• Daarnaast dienen wijzigingen in het
  onderhoudsconcept proactief beheerd en
  traceerbaar te zijn
• Het door Mainnovation gefaciliteerde RCM-
  programma heeft geleid tot het behalen van het
  FDA-certificaat …
• .. en heeft tevens tot efficiëntieverbetering geleid
  agv van betere communicatie tussen Onderhoud en
  Productie



                                    © Copyright Mainnovation 2009
Onderhoudsstrategie in de praktijk
• DSM, een wereldwijd opererend bedrijf in Life Science
  en High performance Materialen had in 2001 meer dan
  150 productie locaties met een vervangingswaarde
  €12 miljard
• Uit een VDM Audit bleek dat de dominante
  waardedrijver kostenbeheersing was
• In de onderhoudsstrategie werden de volgende
  waarde doorbraken gedefinieerd:
    • Ontwikkeling en invoering van standaard werk processen
      voor:
          •   Installatiegericht budgetteren
          •   Prioriteitstelling voor planning
          •   Termijn verlenging voor onderhoudsstops (RBI)
          •   Opstellen van onderhoudsconcepten (RCM)
          •   Integratie van de reserve delen keten
    • Standaardisatie van SAP PM gebaseerd op de standaard
      werkprocessen
    • Jaarlijkse evaluatie van de onderhoudsstrategie op basis
      van interne benchmarking en waarde bepaling
• In 2003 (2 jaar later!) heeft DSM een verlaging van het
  onderhoudsbudget gerealiseerd met 30%.
  Dit is gelijk aan jaarlijkse besparing van €80 miljoen

                                                                               17
                                               © Copyright Mainnovation 2009
Agenda

1   Wat is de impact van risico’s ?


2   Hoe kan ik risico’s effectief managen ?


3   Hoe stel ik de juiste prioriteiten ?


4   Hoeveel is goed genoeg ?


5   Wat levert risicomanagement op ?




                         © Copyright Mainnovation 2009
Reliability Engineering

• Op tactisch niveau wordt bepaald hoe de
  assets optimaal ingezet kunnen worden

• Hoeveel capaciteit wordt door de markt
  verlangd?

• Wat zijn de randvoorwaarden vanuit SHE?

• Wat is de optimale asset portfolio om aan
  de behoefte van de markt te voldoen?

• Welke risico’s lopen we die de gewenste
  output bedreigen?

• Wat hebben we aan reservecapaciteit
  nodig?



                              © Copyright Mainnovation 2009
Reliability Engineering


                    Business Strategy

LT Asset Strategy




                                                       Value Optimization
                     Reliability
                     Engineering




                     Data Management




                       © Copyright Mainnovation 2009
Reliability Engineering
Asset strategy    Business goals                                             Benchmarking   Value review



   Financial       1.   Value ranking system                                 Preparation
   forecasts            2. Value potential system

                                 3. Risk matrix
   LT Asset
                                  4. Collect basic data
   portfolio
                                    5. Asset decomposition
                                                                                RCM / RCA      Top N
Life cycle cost                         6. Functions & Failures                             performance
   analysis                                                                                    killers
                                         7a. FMECA             7b. RCA

                                               8. Critical spares analysis                     Top N
                                                                                            cost drivers
  Condition                                           9. Setup PM Plans
  monitoring
                                                      10. Operator asset care
                            Resource
                            Planning                      11. Workload balancing
                                                                                                KPI
                                                              12. Optimise stock level       definition

                                                                13. Asset based budgeting
Asset Valuation
                                                                     14. Value simulation




Master data       Data cleaning                                          Data upload        Registration




                                       © Copyright Mainnovation 2009
Asset optimalisatie in de praktijk
• Centocor is een J&J company met productie locaties voor
  monoklonale antilichamen in de VS, Ierland en Leiden
• De Farmaceutische markt verandert de laatste jaren sterk
  door druk op prijzen van medicijnen, wijzigingen in de
  regelgeving en een vertraagde marktvraag
• De O&M strategie was in het verleden gericht op hoge
  groeiverwachtingen; in de huidige markt wordt een risico
  gebaseerde aanpak gehanteerd om de O&M kosten in lijn
  te brengen met de marktrisico’s.                                                                          6
                                                                                                                     N+3




• In 2008 is AURA* gestart om de overcapaciteit
                                                                                                                             N+2
                                                                                                            5                                                Unfavorable




                                                                                    number washers/ costs
  gecontroleerd omlaag te brengen. De Life Cycle Costs                                                      4
                                                                                                                                 N+1




  voor bedrijfsvoering, onderhoud en buitengebruikstelling
  zijn vergeleken voor N en N+1 scenario’s (N = minimaal #
                                                                                                                                                                                 N
                                                                                                            3

  benodigde productie/utility machines). De strategie voor
  onderhoud is geoptimaliseerd met APMC** methodiek.                                                            Favorable


  Verschillende stappen van deactiveren van overtollige                                                                     25                                             380


  machines zijn in kaart gebracht om de optimale kosten-                                                                               Downtime / risk (Euro’s *1000)


  risico balans te bepalen
• Mogelijke besparingen van ruim 10% op de totale Life
  Cycle Costs zijn geïdentificeerd. Dit resulteert in een
  totale besparing van meer van 1 miljoen Euro per jaar
    *AURA = Availability Utility Risk Alignment
    **APMC = Asset Performance Management Concept

                                                    © Copyright Mainnovation 2009
Asset optimalisatie in de praktijk

• Waterschap de Dommel bezit 68 Gemalen, 8 zuiveringen
  & 1 slibverwerking verdeeld over 9 geografische locaties
• Masterplan 2012: Centraal, procesgestuurde organisatie
  met de focus op voorspelbaarheid en controle over de
  instandhouding van assets & -kosten
• November 2007: VDM Asset Management opgestart met
  als doel inzicht te krijgen in de instandhoudingkosten
  voor de periode van 2008-2012 op basis van risico
  gebaseerde installatie beheerconcepten
• Vanuit de asset breakdown structuur is per locatie een
  LT Asset Plan (LTAP) opgesteld, op basis van de huidige
  expertise; een investeringsprognose per asset op
  ’onderbuik gevoel’. Hieruit wordt een asset life cycle
  scenario berekend met de maximale netto contante
  waarde
• Via gerichte pilots worden middels een aan FMEA
  gerelateerde analyse onderhoudsconcepten ontwikkeld.
  Deze zullen de in het LTAP 5-jaars investeringsprognose
  ‘op onderbuik’ vervangen


                                                                     23
                                     © Copyright Mainnovation 2009
Agenda

1   Wat is de impact van risico’s ?


2   Hoe kan ik risico’s effectief managen ?


3   Hoe stel ik de juiste prioriteiten ?


4   Hoeveel is goed genoeg ?


5   Wat levert risicomanagement op ?




                         © Copyright Mainnovation 2009
Risico gedreven onderhoud
• Op operationeel niveau dienen de risico’s op                                                                               Ontwikkelen beslissingsmodel
                                                                                                                             Ontwikkelen beslissingsmodel



  storingen geïnventariseerd te worden                                                                                        Doelstellingen
                                                                                                                               Doelstellingen
                                                                                                                                                       Calculatie
                                                                                                                                                        Calculatie
                                                                                                                                                       gegevens
                                                                                                                                                        gegevens
                                                                                                                                                                             Risico
                                                                                                                                                                              Risico
                                                                                                                                                                            matrices
                                                                                                                                                                             matrices




• Risico gedreven onderhoud gaat uit van                                                                 Ontwikkelen effectieve en efficiënte maatregelen
                                                                                                         Ontwikkelen effectieve en efficiënte maatregelen

                                                                                                                                                                                                                        ?
  risico’s in de bedrijfsvoering                                                    Systeem-
                                                                                     Systeem-
                                                                                 eigenschappen
                                                                                                     Storingsvormen
                                                                                                      Storingsvormen
                                                                                                        & effecten
                                                                                                                                      !!
                                                                                                                            Onacceptabele
                                                                                                                              Onacceptabele
                                                                                                                            storingsvormen
                                                                                                                                                     Effectieve
                                                                                                                                                      Effectieve
                                                                                                                                                    maatregelen
                                                                                                                                                                           Financiële
                                                                                                                                                                            Financiële
                                                                                                                                                                         consequenties
                                                                                                                                                                                              Geselecteerde
                                                                                                                                                                                               Geselecteerde
                                                                                                                                                                                               maatregelen
                                                                                                                                                                                                                        ?
                                                                                                                                                                                                                 Te verwachten
                                                                                                                                                                                                                  Te verwachten
                                                                                                                                                                                                                   resultaten
                                                                                  eigenschappen          & effecten          storingsvormen          maatregelen          consequenties         maatregelen         resultaten



                                                                                                                             Implementeren maatregelen
                                                                                                                              Implementeren maatregelen



           Risico = kans * effect                                                                                    Preventief
                                                                                                                      Preventief
                                                                                                                     onderhoud
                                                                                                                      onderhoud
                                                                                                                                            Eenmalige
                                                                                                                                             Eenmalige
                                                                                                                                           maatregelen
                                                                                                                                            maatregelen
                                                                                                                                                                   Voorraad
                                                                                                                                                                    Voorraad
                                                                                                                                                                 aanpassingen
                                                                                                                                                                  aanpassingen
                                                                                                                                                                                      Jaarlijkse
                                                                                                                                                                                       Jaarlijkse
                                                                                                                                                                                      budgetten
                                                                                                                                                                                       budgetten



                                                                                         ®
                                                                                 VDM Alligned



• De kans op verstoringen in de bedrijfsvoering                                                                                                                     RCM the KT-way…
  wordt bepaald door het ontwerp, de operatie                               www.mainnovation.com                                      www.kepner-tregoe.com

  en de onderhoudsstatus van de assets
                                                                                                                       Consequences per value driver                                                           Probability

• Storingen hebben mogelijk effect op:
                                                                                                                        Consequences per value driver                                                           Probability
                                                                                                                                                                        Resource
                                                                                                                                                                         Resource
                                                                                                                                                                       allocation
                                                                                                                                                                         allocation
                                                                                                                                                 SHEQ              (additional costs
                                                                                                                                                   SHEQ              (additional costs
                                                                                              Asset Utilization  Cost Control               (Safety, Health,      for spare parts and
                                                                                               Asset Utilization  Cost Control               (Safety, Health,      for spare parts and

   • Veiligheid, Gezondheid, Welzijn, Milieu                                                 (production, speed (maintenance
                                                                                              (production, speed (maintenance
                                                                                              & quality losses)
                                                                                               & quality losses)
                                                                                                                    costs)
                                                                                                                     costs)
                                                                                                                                             Environment,
                                                                                                                                              Environment,
                                                                                                                                                Quality)
                                                                                                                                                 Quality)
                                                                                                                                                                        effort of
                                                                                                                                                                          effort of
                                                                                                                                                                      contractors)
                                                                                                                                                                       contractors)
                                                                                                                                                                                          Hardly
                                                                                                                                                                                           Hardly
                                                                                                                                                                                          [yearly]
                                                                                                                                                                                           [yearly]
                                                                                                                                                                                                       Small
                                                                                                                                                                                                        Small
                                                                                                                                                                                                      [monthly]
                                                                                                                                                                                                       [monthly]
                                                                                                                                                                                                                     Quite often
                                                                                                                                                                                                                      Quite often
                                                                                                                                                                                                                       [weekly]
                                                                                                                                                                                                                        [weekly]
                                                                                                                                                                                                                                    Frequent
                                                                                                                                                                                                                                     Frequent
                                                                                                                                                                                                                                    [every shift]
                                                                                                                                                                                                                                      [every shift]
                                                                                                                                       Q: affects appearance
                                                                                                                                        Q: affects appearance


   • Technische beschikbaarheid
                                                                                                                                       only
                                                                                                                                        only
                                                                                                                                       Q: rework < 1 box           operator
                                                                                                                                        Q: rework < 1 box           operator
                                                                          1 Small            DT < 15 min            cost < 500 £       E: product spill < nugget local tradesmen          Acceptable
                                                                           1 Small            DT < 15 min            cost < 500 £       E: product spill < nugget local tradesmen          Acceptable
                                                                                                                                       Q: rework < 1 pallet
                                                                                                                                        Q: rework < 1 pallet
                                                                                                                                       E: product spill > nugget


   • Onderhoudskosten
                                                                                                                                        E: product spill > nugget
                                                                                                                    500 £ < cost <     S: minor injury, first aid
                                                                                                                     500 £ < cost <     S: minor injury, first aid
                                                                          22 Acceptable
                                                                              Acceptable
                                                                                             15 min < DT < 2 hrs
                                                                                              15 min < DT < 2 hrs
                                                                                                                    2000 £
                                                                                                                     2000 £
                                                                                                                                       req'd
                                                                                                                                        req'd
                                                                                                                                                                   engineers
                                                                                                                                                                    engineers




                                                                 Effect
                                                                Effect
                                                                                                                                       Q: internal QA investig.


   • Inzet van middelen
                                                                                                                                        Q: internal QA investig.
                                                                                                                                       E: minor product spill
                                                                                                                                        E: minor product spill
                                                                                                                   2000 £ < cost <     E: internal investig.     technical support
                                                                                                                    2000 £ < cost <     E: internal investig.     technical support
                                                                          3 Serious          2 hrs < DT < 8 hours 5000 £               S: internal investig.     group                                                   Unacceptable
                                                                                                                                                                                                                          Unacceptable
                                                                           3 Serious          2 hrs < DT < 8 hours 5000 £               S: internal investig.     group
                                                                                                                                       Q: recall
                                                                                                                                        Q: recall


• De effecten worden gekwantificeerd en met
                                                                                                                                       Q: batch lost
                                                                                                                                        Q: batch lost
                                                                                                                                       E: large product spill
                                                                                                                                        E: large product spill
                                                                          44 Unacceptable DT > > 8 hrs
                                                                              Unacceptable DT
                                                                                               8 hrs                cost > 5000 £
                                                                                                                     cost > 5000 £
                                                                                                                                       S: Lost time accident
                                                                                                                                        S: Lost time accident
                                                                                                                                                                  OEM
                                                                                                                                                                   OEM



  behulp van kansberekening kunnen risico’s
  worden bepaald en afgewogen tegen de
  optimale onderhoudsinspanning


                                © Copyright Mainnovation 2009
Value Driven RCM

                 Wat is de optimale verhouding tussen preventief en correctief onderhoud?


                                                                                             en
                                                                            a le          ost




                                                    um
                                                                                        sk
                                                                         Tot rhoud




                                                 tim
totale onderhoudskosten




                                                                               e
                                                                          ond




                                               op
                                               en
                                                                                       e      ten
                                                                                   tiev skos

                                            st
                                         Ko
                                                                                 n
                                                                            eve houd
                                                                          Pr er
                                                                           ond


                                                                         Correctiev
                                                                                    e
                                                                         onderhoud
                                                                                    skosten +
                                                                         gevolgkos
                                                                                   ten

                                                    % Preventief onderhoud



                                                                                                    26
                                         © Copyright Mainnovation 2009
Value Driven RCM in de praktijk
Asset Performance Management Concept
                                                                                                      Definitie fase
Lokatie:
Nitro Ltd. Milwaukee
                                                                                      Equipment            value         Calculation        Risk
Technisch systeem:                                                                     targets            potential      parameters        matrices
Nitro Truck

Technisch deelsysteem:                                                                            Ontwikkelingsfase
Nitro Pompsysteem
                                                                                            !                                                               ?
Laatste revisiedatum:
                                                  Equipment       Failure modes       Unacceptable         Effective       Financial          Selected   Simulated     simulated
24/09/2009                                      characteristics    and effects        failure modes         actions      consequences          actions    results        value

Opgesteld door:
Mainnovation                                                                                          Uitwerkingsfase
                                                                                                                                                                                   voorbeeld: 20%
munteenheid       €                                                               Clustered46,948.98 and
                                                                                             PM  Repair                 MRO Stock        Equipment                                 kostenbesparing
                                                                                    activities  other actions          adjustments      based budget




   VDM® Alligned



                                               RCM the KT-way…                                                                                                       HELP


www.mainnovation.com
                    52,470.00   www.kepner-tregoe.com
                                                                                                                                                           99,000.00




                                                                                          15,840.00


                                                                                                                                                                                                     27
                                                                                      © Copyright Mainnovation 2009
Waarde potentieel ipv risico’s
                      Stem faaleffecten af op VDM analyse!


Voorbeeld van een matrix voor                                   Voorbeeld van een matrix voor
niet dominante waardedrijver,                                     dominante waardedrijver,
     stilstanden in dit geval                                   Onderhoudskosten in dit geval




                                                                                                28
                                © Copyright Mainnovation 2009
Focus op waarde ‘killers’..




                                        29
        © Copyright Mainnovation 2009
Kies effectieve beheersmaatregelen…




                                             30
             © Copyright Mainnovation 2009
…en bereken resultaten en waardepotentieel




 Door sterke focus kan het 80% van het werkelijke waarde potentieel in 20%
            van de tijd van een ‘klassieke’ RCM aanpak bereiken




                                                                             31
                           © Copyright Mainnovation 2009
Reliability Centered Maintenance
• Sinds november 1996 maakt DAF Trucks N.V. deel uit
  van PACCAR Inc., één van ’s-werelds grootste en
  meest succesvolle producenten van zware trucks.
  DAF Trucks is hard op weg om de grootste
  truckproducent van Europa te worden.
• In Eindhoven, is de productie van motoren en
  componenten geconcentreerd, evenals assemblage.
  In het Belgische Westerlo worden de assen en cabines
  geproduceerd. Van daaruit worden ze rechtstreeks
  aangeleverd in Eindhoven, ‘ready to drop’.
• In 2004 heeft DAF een world class maintenance
  traject ingezet om de groeiende vraag naar Trucks te
  kunnen bijbenen. Speerpunt van dit verbetertraject
  is Reliability Engineering.                                       Resultaten Pilot (kwantitatief)
                                                                                     (kwantitatief)

• De RE werkprocessen zijn gestroomlijnd en                           130
                                                                      uur
                                                                             Stilstandsduur
                                                                                    per jaar
                                                                                               3241
                                                                                                       Aantal storingen
                                                                                                                per jaar


  geüniformeerd over de 5 productiefabrieken van DAF.                             55,6

  RCM pilots zijn op een groot aantal kritische machines
                                                                                  uur

                                                                                                             320

  uitgevoerd met als doel een verdubbeling van de
  MTBF en een halvering van de MTTR.                                 Zonder
                                                                     preventief
                                                                     onderhoud
                                                                                  Met
                                                                                  preventief
                                                                                  onderhoud
                                                                                               Zonder
                                                                                               preventief
                                                                                               onderhoud
                                                                                                            Met
                                                                                                            preventief
                                                                                                            onderhoud


• Door de economische crisis is de dominante
  waardedrijver naar kostenbesparing verschoven



                                    © Copyright Mainnovation 2009
Kritische Reservedelen Analyse
• Onderdelen segmentatie in 4 segmenten met
  gerichte ketenstrategie per segment:
   –   Consumables
   –   Niet-kritische items
   –   Kritische items
   –   Strategische delen

• Kenmerken van kritische/strategische delen
   –   Risico op stilstand                                           Costs

   –   Lange levertijden                                                                                    Total
                                                                                                            costs
   –   Duur                                                                                                 Stock costs

   –   Laag verbruik > 1 jaar of hoge MTBF
                                                                                                            Risk
                                                                                                            costs
• Risico inschatting door Weibull analyse                                     0         1       2          3
                                                                                        Number of Critical Spares
                                                              • Risk Costs based on Probability Stock out x Stock out costs
                                                                                                            Stockout
                                                              • Stock keeping costs based on Carrying costs x Purchase costs
• Optimum geeft balans tussen:
  Voorraadkosten <-> risico op misgrijpen


                                    © Copyright Mainnovation 2009
Reservedelen optimalisatie

• In 2007 is begonnen met de bouw van een nieuwe
  energiecentrale ‘Sloecentrale’ door DELTA en EDF.
  De geplande start van productie is eind 2009. De
  totale capaciteit is 870 MW, gelijk aan 2 miljoen
  huishoudens
• Siemens AG is hoofdaannemer voor het project. In de
  commissiefase heeft Siemens een lijst strategische,
  kritische en aanbevolen reservedelen aangeboden
• Het management van de Sloecentrale heeft een
  second opinion gevraagd voor het bestellen van de
  aanbevolen lijst twv ~ 4 MEur.
• In een korte SLO analyse zijn de optimale
  voorraadhoogtes bepaald voor de strategische
  reservedelen. Uit de analyse bleek:
   – Aanbevolen voorraadhoogtes waren vaak te hoog, wat
     leidt tot te hoge kosten
   – Enkele kritische onderdelen ontbraken of kregen te lage
     voorraadhoogte, wat leidt tot onacceptabel risico
• De optimale onderdelen mix gaf een potentiële
  besparing van ca 400 kEur



                                     © Copyright Mainnovation 2009
Agenda

1   Wat is de impact van risico’s ?


2   Hoe kan ik risico’s effectief managen ?


3   Hoe stel ik de juiste prioriteiten ?


4   Hoeveel is goed genoeg ?


5   Wat levert risicomanagement op ?




                         © Copyright Mainnovation 2009
Crisis

“When written in Chinese the word crisis is composed of
 two characters. One represents danger, and the other
 represents opportunity.”




       Indianapolis April 12, 1959




                                © Copyright Mainnovation 2009
Reliability Engineering Seminar

          Hoe betrouwbaar is ons machinepark?

                                   Rotterdam
                                   April 2010




• Wat is de toestand van de installatie betrouwbaarheid van de Nederlandse en
  Belgische industrie, infrastructuur en vloot beheerders?
• Wat is de invloed van installatie betrouwbaarheid op de waarde van het
  machinepark en het bedrijf?
• Wat zijn mogelijk maatregelen om de betrouwbaarheid te verhogen?




                            © Copyright Mainnovation 2009

More Related Content

Viewers also liked

Maintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixMaintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixRicky Smith CMRP, CMRT
 
Failure analysis
Failure analysisFailure analysis
Failure analysisJoel Mandel
 
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Maturity Matrix   2013 versionPreventive Maintenance Maturity Matrix   2013 version
Preventive Maintenance Maturity Matrix 2013 versionRicky Smith CMRP, CMRT
 
Lean production-system
Lean production-systemLean production-system
Lean production-systemSusan Gray
 
Lecture 1 introduction to failure analysis
Lecture 1 introduction to failure analysisLecture 1 introduction to failure analysis
Lecture 1 introduction to failure analysisbingrazonado
 
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Julie Rampello
 
Operations and-maintenance-best-practices
Operations and-maintenance-best-practicesOperations and-maintenance-best-practices
Operations and-maintenance-best-practicesNikhil Nangia
 
Mangosteen key performance indicators
Mangosteen key performance indicatorsMangosteen key performance indicators
Mangosteen key performance indicatorsRetno Astuti
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenancevishakeb
 
KEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORKEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORspeedcars
 

Viewers also liked (13)

Maintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixMaintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity Matrix
 
Failure analysis
Failure analysisFailure analysis
Failure analysis
 
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Maturity Matrix   2013 versionPreventive Maintenance Maturity Matrix   2013 version
Preventive Maintenance Maturity Matrix 2013 version
 
Lean production-system
Lean production-systemLean production-system
Lean production-system
 
Lecture 1 introduction to failure analysis
Lecture 1 introduction to failure analysisLecture 1 introduction to failure analysis
Lecture 1 introduction to failure analysis
 
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
 
Operations and-maintenance-best-practices
Operations and-maintenance-best-practicesOperations and-maintenance-best-practices
Operations and-maintenance-best-practices
 
Mangosteen key performance indicators
Mangosteen key performance indicatorsMangosteen key performance indicators
Mangosteen key performance indicators
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
 
KEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORKEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATOR
 
Building maintenance
Building maintenanceBuilding maintenance
Building maintenance
 

Similar to Nvdo Rm Seminar Marc Hoppenbrouwers 20090930

De bowstar methodiek
De bowstar methodiekDe bowstar methodiek
De bowstar methodiekCoThink
 
Bowstar methodolgy of Pims International
Bowstar methodolgy of Pims InternationalBowstar methodolgy of Pims International
Bowstar methodolgy of Pims InternationalJaap Trouw
 
Capeton Scenario Planning Workshop
Capeton Scenario Planning WorkshopCapeton Scenario Planning Workshop
Capeton Scenario Planning WorkshopCapeton
 
Rinus Vader - Assetmanagement: waar kapitaalgoederen doen waarvoor ze bedoeld...
Rinus Vader - Assetmanagement: waar kapitaalgoederen doen waarvoor ze bedoeld...Rinus Vader - Assetmanagement: waar kapitaalgoederen doen waarvoor ze bedoeld...
Rinus Vader - Assetmanagement: waar kapitaalgoederen doen waarvoor ze bedoeld...Expertisecentrum FM
 
Opslagtanks 2015
Opslagtanks 2015Opslagtanks 2015
Opslagtanks 2015Barbara Kr
 
Nationaal ICT Event 2010: presentatie Erik Heersink, I- Real B.V.
Nationaal ICT Event 2010: presentatie Erik Heersink, I- Real B.V.Nationaal ICT Event 2010: presentatie Erik Heersink, I- Real B.V.
Nationaal ICT Event 2010: presentatie Erik Heersink, I- Real B.V.FuturistBarbara.com
 
Waarom Acquisitie-strategie loont
Waarom Acquisitie-strategie loontWaarom Acquisitie-strategie loont
Waarom Acquisitie-strategie loontMaarten Vijverberg
 
Integriteit Sterkte Is Zwakte 1
Integriteit Sterkte Is Zwakte 1Integriteit Sterkte Is Zwakte 1
Integriteit Sterkte Is Zwakte 1Arnold De Groot
 
P. Noordhoek - Hoog betrouwbaar organiseren (HRO)
P. Noordhoek - Hoog betrouwbaar organiseren (HRO)P. Noordhoek - Hoog betrouwbaar organiseren (HRO)
P. Noordhoek - Hoog betrouwbaar organiseren (HRO)INK Utrecht
 
Presentatie Beheer Leidingen
Presentatie Beheer LeidingenPresentatie Beheer Leidingen
Presentatie Beheer LeidingenRudy_Dijkstra
 
BN AMRO rapport Raising the bars, oktober 2008
BN AMRO rapport Raising the bars, oktober 2008BN AMRO rapport Raising the bars, oktober 2008
BN AMRO rapport Raising the bars, oktober 2008ABN AMRO
 
Artikel TIM vakblad Ivo van der Gaag
Artikel TIM vakblad Ivo van der GaagArtikel TIM vakblad Ivo van der Gaag
Artikel TIM vakblad Ivo van der GaagIvo van der Gaag
 
Presentatie Beheer Linkedin [Compatibiliteitsmodus]
Presentatie Beheer Linkedin [Compatibiliteitsmodus]Presentatie Beheer Linkedin [Compatibiliteitsmodus]
Presentatie Beheer Linkedin [Compatibiliteitsmodus]Rudy_Dijkstra
 
Keynote Zien Is Doen
Keynote Zien Is DoenKeynote Zien Is Doen
Keynote Zien Is DoenChris Bannink
 
Content Republic Methodologie
Content Republic MethodologieContent Republic Methodologie
Content Republic Methodologiecontentrepublic
 
Implementatieplan point one phase 2 2010 tcm24-329804
Implementatieplan point one phase 2 2010 tcm24-329804Implementatieplan point one phase 2 2010 tcm24-329804
Implementatieplan point one phase 2 2010 tcm24-329804Kennisalliantie
 

Similar to Nvdo Rm Seminar Marc Hoppenbrouwers 20090930 (20)

De bowstar methodiek
De bowstar methodiekDe bowstar methodiek
De bowstar methodiek
 
Bowstar methodolgy of Pims International
Bowstar methodolgy of Pims InternationalBowstar methodolgy of Pims International
Bowstar methodolgy of Pims International
 
Capeton Scenario Planning Workshop
Capeton Scenario Planning WorkshopCapeton Scenario Planning Workshop
Capeton Scenario Planning Workshop
 
Rinus Vader - Assetmanagement: waar kapitaalgoederen doen waarvoor ze bedoeld...
Rinus Vader - Assetmanagement: waar kapitaalgoederen doen waarvoor ze bedoeld...Rinus Vader - Assetmanagement: waar kapitaalgoederen doen waarvoor ze bedoeld...
Rinus Vader - Assetmanagement: waar kapitaalgoederen doen waarvoor ze bedoeld...
 
Opslagtanks 2015
Opslagtanks 2015Opslagtanks 2015
Opslagtanks 2015
 
Nationaal ICT Event 2010: presentatie Erik Heersink, I- Real B.V.
Nationaal ICT Event 2010: presentatie Erik Heersink, I- Real B.V.Nationaal ICT Event 2010: presentatie Erik Heersink, I- Real B.V.
Nationaal ICT Event 2010: presentatie Erik Heersink, I- Real B.V.
 
Waarom Acquisitie-strategie loont
Waarom Acquisitie-strategie loontWaarom Acquisitie-strategie loont
Waarom Acquisitie-strategie loont
 
Integriteit Sterkte Is Zwakte 1
Integriteit Sterkte Is Zwakte 1Integriteit Sterkte Is Zwakte 1
Integriteit Sterkte Is Zwakte 1
 
Fontys gastcollege risicomanagement
Fontys gastcollege risicomanagementFontys gastcollege risicomanagement
Fontys gastcollege risicomanagement
 
Automatiseren met rendement
Automatiseren met rendementAutomatiseren met rendement
Automatiseren met rendement
 
P. Noordhoek - Hoog betrouwbaar organiseren (HRO)
P. Noordhoek - Hoog betrouwbaar organiseren (HRO)P. Noordhoek - Hoog betrouwbaar organiseren (HRO)
P. Noordhoek - Hoog betrouwbaar organiseren (HRO)
 
Presentatie Beheer Leidingen
Presentatie Beheer LeidingenPresentatie Beheer Leidingen
Presentatie Beheer Leidingen
 
BN AMRO rapport Raising the bars, oktober 2008
BN AMRO rapport Raising the bars, oktober 2008BN AMRO rapport Raising the bars, oktober 2008
BN AMRO rapport Raising the bars, oktober 2008
 
Stork amc iso55000
Stork amc iso55000Stork amc iso55000
Stork amc iso55000
 
Artikel TIM vakblad Ivo van der Gaag
Artikel TIM vakblad Ivo van der GaagArtikel TIM vakblad Ivo van der Gaag
Artikel TIM vakblad Ivo van der Gaag
 
Presentatie Beheer Linkedin [Compatibiliteitsmodus]
Presentatie Beheer Linkedin [Compatibiliteitsmodus]Presentatie Beheer Linkedin [Compatibiliteitsmodus]
Presentatie Beheer Linkedin [Compatibiliteitsmodus]
 
Keynote Zien Is Doen
Keynote Zien Is DoenKeynote Zien Is Doen
Keynote Zien Is Doen
 
Content Republic Methodologie
Content Republic MethodologieContent Republic Methodologie
Content Republic Methodologie
 
Implementatieplan point one phase 2 2010 tcm24-329804
Implementatieplan point one phase 2 2010 tcm24-329804Implementatieplan point one phase 2 2010 tcm24-329804
Implementatieplan point one phase 2 2010 tcm24-329804
 
Combi support
Combi supportCombi support
Combi support
 

Nvdo Rm Seminar Marc Hoppenbrouwers 20090930

  • 1. Risicomanagement in Onderhoud Wat levert Risicomanagement eigenlijk op? Onderhoud op basis van Risico 30 September 2009 Marc Hoppenbrouwers Managing Consultant Mainnovation Experts in Value Driven Maintenance® © Copyright Mainnovation 2009
  • 3. Piper Alpha (Wikipedia) • Piper Alpha was a North Sea oil production platform operated by Occidental Petroleum (Caledonia) Ltd.[1] The platform began production in 1976[2], first as an oil platform and then later converted to gas production. An explosion and resulting fire destroyed it on July 6, 1988, killing 167 men,[3] with only 59 survivors. The death toll includes 2 crewmen of a rescue vessel.[4] Total insured loss was about £1.7 billion (US$ 3.4 billion). To date it is the world's worst offshore oil disaster in terms both of lives lost and impact to industry.[5] At the time of the disaster the platform accounted for around 10% of the oil and gas production from the North Sea. • A new gas pipeline was built in the weeks before the 6 July explosion, and while this work disrupted the normal routine, the platform was operated as normal. The discovery of a small gas leak was not unusual and no cause for concern. Because the platform was completely destroyed, and many of those involved died, analysis of events can only suggest a possible chain of events based on known facts. Some witnesses to the events question the official timeline.[10] • 12:00 p.m. Two Condensate pumps on the platform, designated A and B, compressed the gas for transport to the coast. On the morning of July 6, Pump A's pressure safety valve (PSV #504) was removed for routine maintenance. The pump's fortnightly overhaul was planned but had not started. The open Condensate pipe was temporarily sealed with a blind flange (flat metal disc). Because the work could not be completed by 6:00 p.m., the blind flange remained in place. The on-duty engineer filled out a permit which stated that Pump A was not ready and must not be switched on under any circumstances. • 6:00 p.m. The day shift ended, and the night shift started with 62 men running Piper Alpha. As he found the on-duty custodian busy, the engineer neglected to inform him of the condition of Pump A. Instead he placed the permit in the control centre and left. This permit disappeared and was not found. Coincidentally there was another permit issued for the general overhaul of Pump A that had not yet begun. • Etc. © Copyright Mainnovation 2009
  • 4. Agenda 1 Wat is de impact van risico’s ? 2 Hoe kan ik de risico’s effectief managen ? 3 Hoe stel ik de juiste prioriteiten ? 4 Hoeveel is goed genoeg ? 5 Wat levert risicomanagement op ? © Copyright Mainnovation 2009
  • 5. BP Texas City © Copyright Mainnovation 2009
  • 6. BP Texas City © Copyright Mainnovation 2009
  • 7. Risico’s in de bedrijfsvoering van assets • De bedrijfsvoering van assets is blootgesteld aan risico’s op verschillende niveau’s: – Strategisch: macro economisch klimaat – Tactisch: effectieve inzet van assets – Operationeel: storingen aan assets Bron AD, 30 Juli 2009 • Verstoringen van de bedrijfsvoering hebben vaak een negatief effect op het bedrijf, de werknemers en de omgeving Bron NOS, 17 Juni 2009 • Wat kan leiden tot persoonlijke, materiële, financiële of imago schade voor het bedrijf…… Bron VID, 5 Juni 2009 Bron Volkskrant, 7 April 2009 Volkskrant, SINT MAARTENSDIJK – In een pindafabriek aan de (Novum) - Het ongeluk Nijverheidsweg in Sint Maartensdijk woedt sinds met een goederentrein bij zaterdagavond een enorme brand. De brand gaat het Amsterdamse gepaard met explosies en tot Bergen op Zoom en Muiderpoortstation in zelfs Arnemuiden is de rookontwikkeling te zien. november is vermoedelijk Omdat de pinda’s maar blijven gloeien, denkt de veroorzaakt door brandweer dat de brand nog enkele dagen kan duren. ondeugdelijke wagons. © Copyright Mainnovation 2009
  • 8. Agenda 1 Wat is de impact van risico’s ? 2 Hoe kan ik risico’s effectief managen ? 3 Hoe stel ik de juiste prioriteiten ? 4 Hoeveel is goed genoeg ? 5 Wat levert risicomanagement op ? © Copyright Mainnovation 2009
  • 9. De rol van Onderhoud • Onderhoud kan een belangrijke rol spelen bij het beheersen van risico’s voor de bedrijfsvoering op alle niveaus: – Op strategisch niveau kan onderhoud bijdragen aan de bedrijfsdoelstellingen en economische waarde creëren voor het bedrijf – Op tactisch niveau kan onderhoud bijdragen aan een optimale inzet van de assets, waardoor minimale reserve voor opvangen van risico’s nodig is – Op operationeel niveau kan onderhoud helpen de betrouwbaarheid van de assets verhogen, en daarmee de kans of de gevolgen van storingen beperken © Copyright Mainnovation 2009
  • 10. Hoeveel onderhoud is nodig? • Ons buikgevoel zegt dat onderhoud belangrijk is… “Zonder onderhoud geen productie en geen veilige werkomgeving” • De kosten van onderhoud zijn zichtbaar maar vaak is het lastig om het effect van goed onderhoud te kwantificeren • De onderhoudsmanager spreekt vaak onvoldoende de taal van de directie • Met als gevaar dat vooral wordt gestuurd op beperking van de onderhoudskosten … © Copyright Mainnovation 2009
  • 11. Agenda 1 Wat is de impact van risico’s ? 2 Hoe kan ik de risico’s effectief managen ? 3 Hoe stel ik de juiste prioriteiten ? 4 Hoeveel is goed genoeg ? 5 Wat levert risicomanagement op ? © Copyright Mainnovation 2009
  • 12. Waardecreatie door onderhoud © Copyright Mainnovation 2009
  • 13. Waarde en marktwerking Branche Landspecifieke SHE karakteristieken wet- en regelgeving Economisch klimaat branche Lokale beschikbaarheid resources © Copyright Mainnovation 2009
  • 14. Wat is waarde? Waarde = De som van alle vrije toekomstige kasstromen, verdisconteerd naar vandaag FSHE,t x ( CFAU,t + CFCC,t + CFRA,t + CFSHE,t) Waardepotentieel = ∑ - (1+rt )t - FSHE,t = SHE-factor in year t (% fulfillment of SHE regulations, or: 1 – risk of losing license to operate) CFAU,t = change in free future cash flow in year t from improving asset utilization (AU) CFCC,t = change in free future cash flow in year t from improving cost control (CC) CFRA,t = change in free future cash flow in year t from improving resource allocation (RA) CFSHE,t = change in free future cash flow in year t from improving Safety, Health & Environment (SHE) r = internal hurdle rate © Copyright Mainnovation 2009
  • 15. Onderhoudsstrategie bepaling met VDM • Op strategisch niveau wordt bepaald waar de focus van onderhoud dient te liggen • Hoe bepaalt de marktsituatie de onderhoudsstrategie? • Welke activiteiten resulteren in de meeste toegevoegde waarde? • Waar liggen de risico’s voor de bedrijfsvoering? • Hoe kunnen we het hoger management overtuigen de juiste beslissingen te nemen? © Copyright Mainnovation 2009
  • 16. Onderhoudsstrategie in de praktijk • Akzo Nobel Intervet met hoofdvestiging in Boxmeer (overgenomen door Schering Plough Animal Health, overgenomen door Merck) is een toonaangevende producent van hoogwaardige diergeneesmiddelen • FDA wet- en regelgeving (21-CFR Part-11) stelt hoge eisen aan de verantwoording en het beheer van het gekozen onderhoudsconcept • Voor GMP-kritische equipments dient men expliciet vast te leggen waarom men kiest voor een preventieve of correctieve actie • Daarnaast dienen wijzigingen in het onderhoudsconcept proactief beheerd en traceerbaar te zijn • Het door Mainnovation gefaciliteerde RCM- programma heeft geleid tot het behalen van het FDA-certificaat … • .. en heeft tevens tot efficiëntieverbetering geleid agv van betere communicatie tussen Onderhoud en Productie © Copyright Mainnovation 2009
  • 17. Onderhoudsstrategie in de praktijk • DSM, een wereldwijd opererend bedrijf in Life Science en High performance Materialen had in 2001 meer dan 150 productie locaties met een vervangingswaarde €12 miljard • Uit een VDM Audit bleek dat de dominante waardedrijver kostenbeheersing was • In de onderhoudsstrategie werden de volgende waarde doorbraken gedefinieerd: • Ontwikkeling en invoering van standaard werk processen voor: • Installatiegericht budgetteren • Prioriteitstelling voor planning • Termijn verlenging voor onderhoudsstops (RBI) • Opstellen van onderhoudsconcepten (RCM) • Integratie van de reserve delen keten • Standaardisatie van SAP PM gebaseerd op de standaard werkprocessen • Jaarlijkse evaluatie van de onderhoudsstrategie op basis van interne benchmarking en waarde bepaling • In 2003 (2 jaar later!) heeft DSM een verlaging van het onderhoudsbudget gerealiseerd met 30%. Dit is gelijk aan jaarlijkse besparing van €80 miljoen 17 © Copyright Mainnovation 2009
  • 18. Agenda 1 Wat is de impact van risico’s ? 2 Hoe kan ik risico’s effectief managen ? 3 Hoe stel ik de juiste prioriteiten ? 4 Hoeveel is goed genoeg ? 5 Wat levert risicomanagement op ? © Copyright Mainnovation 2009
  • 19. Reliability Engineering • Op tactisch niveau wordt bepaald hoe de assets optimaal ingezet kunnen worden • Hoeveel capaciteit wordt door de markt verlangd? • Wat zijn de randvoorwaarden vanuit SHE? • Wat is de optimale asset portfolio om aan de behoefte van de markt te voldoen? • Welke risico’s lopen we die de gewenste output bedreigen? • Wat hebben we aan reservecapaciteit nodig? © Copyright Mainnovation 2009
  • 20. Reliability Engineering Business Strategy LT Asset Strategy Value Optimization Reliability Engineering Data Management © Copyright Mainnovation 2009
  • 21. Reliability Engineering Asset strategy Business goals Benchmarking Value review Financial 1. Value ranking system Preparation forecasts 2. Value potential system 3. Risk matrix LT Asset 4. Collect basic data portfolio 5. Asset decomposition RCM / RCA Top N Life cycle cost 6. Functions & Failures performance analysis killers 7a. FMECA 7b. RCA 8. Critical spares analysis Top N cost drivers Condition 9. Setup PM Plans monitoring 10. Operator asset care Resource Planning 11. Workload balancing KPI 12. Optimise stock level definition 13. Asset based budgeting Asset Valuation 14. Value simulation Master data Data cleaning Data upload Registration © Copyright Mainnovation 2009
  • 22. Asset optimalisatie in de praktijk • Centocor is een J&J company met productie locaties voor monoklonale antilichamen in de VS, Ierland en Leiden • De Farmaceutische markt verandert de laatste jaren sterk door druk op prijzen van medicijnen, wijzigingen in de regelgeving en een vertraagde marktvraag • De O&M strategie was in het verleden gericht op hoge groeiverwachtingen; in de huidige markt wordt een risico gebaseerde aanpak gehanteerd om de O&M kosten in lijn te brengen met de marktrisico’s. 6 N+3 • In 2008 is AURA* gestart om de overcapaciteit N+2 5 Unfavorable number washers/ costs gecontroleerd omlaag te brengen. De Life Cycle Costs 4 N+1 voor bedrijfsvoering, onderhoud en buitengebruikstelling zijn vergeleken voor N en N+1 scenario’s (N = minimaal # N 3 benodigde productie/utility machines). De strategie voor onderhoud is geoptimaliseerd met APMC** methodiek. Favorable Verschillende stappen van deactiveren van overtollige 25 380 machines zijn in kaart gebracht om de optimale kosten- Downtime / risk (Euro’s *1000) risico balans te bepalen • Mogelijke besparingen van ruim 10% op de totale Life Cycle Costs zijn geïdentificeerd. Dit resulteert in een totale besparing van meer van 1 miljoen Euro per jaar *AURA = Availability Utility Risk Alignment **APMC = Asset Performance Management Concept © Copyright Mainnovation 2009
  • 23. Asset optimalisatie in de praktijk • Waterschap de Dommel bezit 68 Gemalen, 8 zuiveringen & 1 slibverwerking verdeeld over 9 geografische locaties • Masterplan 2012: Centraal, procesgestuurde organisatie met de focus op voorspelbaarheid en controle over de instandhouding van assets & -kosten • November 2007: VDM Asset Management opgestart met als doel inzicht te krijgen in de instandhoudingkosten voor de periode van 2008-2012 op basis van risico gebaseerde installatie beheerconcepten • Vanuit de asset breakdown structuur is per locatie een LT Asset Plan (LTAP) opgesteld, op basis van de huidige expertise; een investeringsprognose per asset op ’onderbuik gevoel’. Hieruit wordt een asset life cycle scenario berekend met de maximale netto contante waarde • Via gerichte pilots worden middels een aan FMEA gerelateerde analyse onderhoudsconcepten ontwikkeld. Deze zullen de in het LTAP 5-jaars investeringsprognose ‘op onderbuik’ vervangen 23 © Copyright Mainnovation 2009
  • 24. Agenda 1 Wat is de impact van risico’s ? 2 Hoe kan ik risico’s effectief managen ? 3 Hoe stel ik de juiste prioriteiten ? 4 Hoeveel is goed genoeg ? 5 Wat levert risicomanagement op ? © Copyright Mainnovation 2009
  • 25. Risico gedreven onderhoud • Op operationeel niveau dienen de risico’s op Ontwikkelen beslissingsmodel Ontwikkelen beslissingsmodel storingen geïnventariseerd te worden Doelstellingen Doelstellingen Calculatie Calculatie gegevens gegevens Risico Risico matrices matrices • Risico gedreven onderhoud gaat uit van Ontwikkelen effectieve en efficiënte maatregelen Ontwikkelen effectieve en efficiënte maatregelen ? risico’s in de bedrijfsvoering Systeem- Systeem- eigenschappen Storingsvormen Storingsvormen & effecten !! Onacceptabele Onacceptabele storingsvormen Effectieve Effectieve maatregelen Financiële Financiële consequenties Geselecteerde Geselecteerde maatregelen ? Te verwachten Te verwachten resultaten eigenschappen & effecten storingsvormen maatregelen consequenties maatregelen resultaten Implementeren maatregelen Implementeren maatregelen Risico = kans * effect Preventief Preventief onderhoud onderhoud Eenmalige Eenmalige maatregelen maatregelen Voorraad Voorraad aanpassingen aanpassingen Jaarlijkse Jaarlijkse budgetten budgetten ® VDM Alligned • De kans op verstoringen in de bedrijfsvoering RCM the KT-way… wordt bepaald door het ontwerp, de operatie www.mainnovation.com www.kepner-tregoe.com en de onderhoudsstatus van de assets Consequences per value driver Probability • Storingen hebben mogelijk effect op: Consequences per value driver Probability Resource Resource allocation allocation SHEQ (additional costs SHEQ (additional costs Asset Utilization Cost Control (Safety, Health, for spare parts and Asset Utilization Cost Control (Safety, Health, for spare parts and • Veiligheid, Gezondheid, Welzijn, Milieu (production, speed (maintenance (production, speed (maintenance & quality losses) & quality losses) costs) costs) Environment, Environment, Quality) Quality) effort of effort of contractors) contractors) Hardly Hardly [yearly] [yearly] Small Small [monthly] [monthly] Quite often Quite often [weekly] [weekly] Frequent Frequent [every shift] [every shift] Q: affects appearance Q: affects appearance • Technische beschikbaarheid only only Q: rework < 1 box operator Q: rework < 1 box operator 1 Small DT < 15 min cost < 500 £ E: product spill < nugget local tradesmen Acceptable 1 Small DT < 15 min cost < 500 £ E: product spill < nugget local tradesmen Acceptable Q: rework < 1 pallet Q: rework < 1 pallet E: product spill > nugget • Onderhoudskosten E: product spill > nugget 500 £ < cost < S: minor injury, first aid 500 £ < cost < S: minor injury, first aid 22 Acceptable Acceptable 15 min < DT < 2 hrs 15 min < DT < 2 hrs 2000 £ 2000 £ req'd req'd engineers engineers Effect Effect Q: internal QA investig. • Inzet van middelen Q: internal QA investig. E: minor product spill E: minor product spill 2000 £ < cost < E: internal investig. technical support 2000 £ < cost < E: internal investig. technical support 3 Serious 2 hrs < DT < 8 hours 5000 £ S: internal investig. group Unacceptable Unacceptable 3 Serious 2 hrs < DT < 8 hours 5000 £ S: internal investig. group Q: recall Q: recall • De effecten worden gekwantificeerd en met Q: batch lost Q: batch lost E: large product spill E: large product spill 44 Unacceptable DT > > 8 hrs Unacceptable DT 8 hrs cost > 5000 £ cost > 5000 £ S: Lost time accident S: Lost time accident OEM OEM behulp van kansberekening kunnen risico’s worden bepaald en afgewogen tegen de optimale onderhoudsinspanning © Copyright Mainnovation 2009
  • 26. Value Driven RCM Wat is de optimale verhouding tussen preventief en correctief onderhoud? en a le ost um sk Tot rhoud tim totale onderhoudskosten e ond op en e ten tiev skos st Ko n eve houd Pr er ond Correctiev e onderhoud skosten + gevolgkos ten % Preventief onderhoud 26 © Copyright Mainnovation 2009
  • 27. Value Driven RCM in de praktijk Asset Performance Management Concept Definitie fase Lokatie: Nitro Ltd. Milwaukee Equipment value Calculation Risk Technisch systeem: targets potential parameters matrices Nitro Truck Technisch deelsysteem: Ontwikkelingsfase Nitro Pompsysteem ! ? Laatste revisiedatum: Equipment Failure modes Unacceptable Effective Financial Selected Simulated simulated 24/09/2009 characteristics and effects failure modes actions consequences actions results value Opgesteld door: Mainnovation Uitwerkingsfase voorbeeld: 20% munteenheid € Clustered46,948.98 and PM Repair MRO Stock Equipment kostenbesparing activities other actions adjustments based budget VDM® Alligned RCM the KT-way… HELP www.mainnovation.com 52,470.00 www.kepner-tregoe.com 99,000.00 15,840.00 27 © Copyright Mainnovation 2009
  • 28. Waarde potentieel ipv risico’s Stem faaleffecten af op VDM analyse! Voorbeeld van een matrix voor Voorbeeld van een matrix voor niet dominante waardedrijver, dominante waardedrijver, stilstanden in dit geval Onderhoudskosten in dit geval 28 © Copyright Mainnovation 2009
  • 29. Focus op waarde ‘killers’.. 29 © Copyright Mainnovation 2009
  • 30. Kies effectieve beheersmaatregelen… 30 © Copyright Mainnovation 2009
  • 31. …en bereken resultaten en waardepotentieel Door sterke focus kan het 80% van het werkelijke waarde potentieel in 20% van de tijd van een ‘klassieke’ RCM aanpak bereiken 31 © Copyright Mainnovation 2009
  • 32. Reliability Centered Maintenance • Sinds november 1996 maakt DAF Trucks N.V. deel uit van PACCAR Inc., één van ’s-werelds grootste en meest succesvolle producenten van zware trucks. DAF Trucks is hard op weg om de grootste truckproducent van Europa te worden. • In Eindhoven, is de productie van motoren en componenten geconcentreerd, evenals assemblage. In het Belgische Westerlo worden de assen en cabines geproduceerd. Van daaruit worden ze rechtstreeks aangeleverd in Eindhoven, ‘ready to drop’. • In 2004 heeft DAF een world class maintenance traject ingezet om de groeiende vraag naar Trucks te kunnen bijbenen. Speerpunt van dit verbetertraject is Reliability Engineering. Resultaten Pilot (kwantitatief) (kwantitatief) • De RE werkprocessen zijn gestroomlijnd en 130 uur Stilstandsduur per jaar 3241 Aantal storingen per jaar geüniformeerd over de 5 productiefabrieken van DAF. 55,6 RCM pilots zijn op een groot aantal kritische machines uur 320 uitgevoerd met als doel een verdubbeling van de MTBF en een halvering van de MTTR. Zonder preventief onderhoud Met preventief onderhoud Zonder preventief onderhoud Met preventief onderhoud • Door de economische crisis is de dominante waardedrijver naar kostenbesparing verschoven © Copyright Mainnovation 2009
  • 33. Kritische Reservedelen Analyse • Onderdelen segmentatie in 4 segmenten met gerichte ketenstrategie per segment: – Consumables – Niet-kritische items – Kritische items – Strategische delen • Kenmerken van kritische/strategische delen – Risico op stilstand Costs – Lange levertijden Total costs – Duur Stock costs – Laag verbruik > 1 jaar of hoge MTBF Risk costs • Risico inschatting door Weibull analyse 0 1 2 3 Number of Critical Spares • Risk Costs based on Probability Stock out x Stock out costs Stockout • Stock keeping costs based on Carrying costs x Purchase costs • Optimum geeft balans tussen: Voorraadkosten <-> risico op misgrijpen © Copyright Mainnovation 2009
  • 34. Reservedelen optimalisatie • In 2007 is begonnen met de bouw van een nieuwe energiecentrale ‘Sloecentrale’ door DELTA en EDF. De geplande start van productie is eind 2009. De totale capaciteit is 870 MW, gelijk aan 2 miljoen huishoudens • Siemens AG is hoofdaannemer voor het project. In de commissiefase heeft Siemens een lijst strategische, kritische en aanbevolen reservedelen aangeboden • Het management van de Sloecentrale heeft een second opinion gevraagd voor het bestellen van de aanbevolen lijst twv ~ 4 MEur. • In een korte SLO analyse zijn de optimale voorraadhoogtes bepaald voor de strategische reservedelen. Uit de analyse bleek: – Aanbevolen voorraadhoogtes waren vaak te hoog, wat leidt tot te hoge kosten – Enkele kritische onderdelen ontbraken of kregen te lage voorraadhoogte, wat leidt tot onacceptabel risico • De optimale onderdelen mix gaf een potentiële besparing van ca 400 kEur © Copyright Mainnovation 2009
  • 35. Agenda 1 Wat is de impact van risico’s ? 2 Hoe kan ik risico’s effectief managen ? 3 Hoe stel ik de juiste prioriteiten ? 4 Hoeveel is goed genoeg ? 5 Wat levert risicomanagement op ? © Copyright Mainnovation 2009
  • 36. Crisis “When written in Chinese the word crisis is composed of two characters. One represents danger, and the other represents opportunity.” Indianapolis April 12, 1959 © Copyright Mainnovation 2009
  • 37. Reliability Engineering Seminar Hoe betrouwbaar is ons machinepark? Rotterdam April 2010 • Wat is de toestand van de installatie betrouwbaarheid van de Nederlandse en Belgische industrie, infrastructuur en vloot beheerders? • Wat is de invloed van installatie betrouwbaarheid op de waarde van het machinepark en het bedrijf? • Wat zijn mogelijk maatregelen om de betrouwbaarheid te verhogen? © Copyright Mainnovation 2009