The document provides information about Nevada Railroad Materials Inc. and conducting internal compliance audits of railroad track inspection processes. It discusses evaluating track inspection qualification and frequency, speed of inspections, audit of inspection records, rail flaw detection processes, rail joint inspections, heat monitoring of continuous welded rail, and ensuring compliance with FRA regulations. The goal is to thoroughly review inspection and maintenance processes to identify any issues before the FRA conducts an audit, in order to maintain a safe infrastructure for passengers, employees and nearby communities. Additional inspection and consulting services are also described.
This plan is uploaded to be use as a sample to help people to get an idea. This internal audit plan is prepared for an automotive business activity. I hope it will be useful.
sales audit,sales cycle,collection cycle,audit sales,test ot control,detect fraud,lapping,control interno,internal control,advance business consulting, http://mba4help.com, jose cintron
10. Additional Services
NRM provided inspector to conduct a full Part 213 inspection of the entire track structure. (An
internal inspection BEFORE the FRA inspection)
◦ This could take a week, or four weeks depending on multiple variables which should be discussed prior to
scheduling the inspection.
State of Good Repair Assessment
◦ NRM can provide an inspector who will conduct a full or sample SOGR assessment. SOGR assessments are ideal
when an agency wants to keep track of the condition of the track structure prior to, during, and after the term
of a contract has ended or is ending in the near future. This allows the agency to make a determination as to
the condition of the track before, and after the term of the contract. NRM can also make recommendations
after the inspection in order to help make decisions to extend the life of the physical plant. Ratings are typically
between 1 and 5, and color coded. A baseline inspection should be performed, and periodic inspections to
assess if the condition has improved, or degraded.
Capital Tie Maintenance Program
◦ NRM utilizes state of the art systems which allow our inspectors to grade each and every railroad tie between
MP locations. The condition is logged into a ruggedized palm top pilot. The inspection data is uploaded into a
software program provided by Zeta-Tech. From this software system, NRM is able to make a recommendation
on tie replacement using a number of variables such as:
◦ Replace every 2, 3, 4, 5 tie clusters
◦ Build a capital tie replacement program to bring class up to a higher class for speed increases.
◦ Build a capital tie replacement program for minor maintenance.
Part 214 – On Track Safety Program
◦ Is your Part 214 program in full compliance with the new regulations?
Part 213.7 Training and Qualification
◦ Includes OJT Training Program, Classroom Training, and hands on application in the field.