SlideShare a Scribd company logo
NORVEL M. MARASIGAN
Abrahan Street. Aplaya
Bauan, Batangas
Philippines
Email Ad : norvelmarasigan67@yahoo.com
PERSONAL PROFILE:
POSITION DESIRED : PIPING SUPERVISOR
Place of Birth : Abrahan St. Aplaya
Bauan, Batangas
Date of Birth : March 06, 1967
Age : 48 y/o
Civil Status : Married
Height : 5’5”
Weight : 150 lbs.
Religion : Roman Catholic
Nationality : Filipino
Name of Wife : Divirose C. Marasigan
Number of Children : Three (3)
Language Spoken/Written : Tagalog and English
Skills : Computer Literate
Telephone Number : +6343-728-0391
Cell Phone Number : 09497623737 & 09995630475
Passport Number : EC2366850
EDUCATIONAL ATTAINMENT
TERTIARY LEVEL : Lyceum of Batangas
(4th Year Undergraduate- BS Marine
Transportation)
SECONDARY LEVEL : Bauan High School
1980-1984
PRIMARY LEVEL : West Bauan Central School
1974-1980
WORK EXPERIENCES:
Company : SK Engineering & Construction Co.ltd
Position : Piping Supervisor
Project : WASIT GAS PROJECT
Khursaniya,Saudi Arabia
Inclusive Date : January 12, 2014 – August 11, 2014
Reason of Leaving : Resigned
Duties and Responsibilities:
Assigned for construction and monitoring of UG-C/S pipings of
TEG/SULM for chemical drain lines. In-charge also in AG piperack,co-ordination
activities for prefabrication, erection of pipe spools, preparation of planning of equipment
and resources in order to meet contractual schedule, in charge of fabricationmerection
priority activities, able to punch list for completion of erection, In charge to manage the
progress evaluation in consultation with the Client representative.
Company : GS ENGINEERING & CONSTRUCTION
CORPORATION ( GS E & C )
Position : Piping Supervisor
Project : RRE-2 EXPANSION PROJECT
( RUWAIS, UAE )
Inclusive Date : March 29,2011 – May 07, 2013
Reason of Leaving : Finished Contract
Duties and Responsibilities:
Assigned for construction and monitoring of UG-GRE pipings at the
trench.Secure for the lamination and alignment of pipe line as per required RECIPE of
the pipe. Making punchlist and assigned for witness of Hydro Testing of pipe line.
Supervised the AG piping of GRE,GRV,Carbon Steel,Stainless Steeel and Alloy Steel
at the pipe rack.
Company : GS ENGINEERING & CONSTRUCTION
CORPORATION ( GS E & C )
Position : Piping Supervisor
Project : SALALAH METHANOL PROJECT
: ( Sultanate of Oman )
Inclusive Date : June 14, 2008 – December 20, 2009
Reason of Leaving : Finished Project
Duties and Responsibilities:
Assigned for construction and supervise of all utility lines prior for hydro
testing. Monitored and checked actual situation on site of some modified drawings to be
changed by field engineers. Assigned also for line checking by test packages, issued
punch lists and punch clearings before allowed to offer to clients for testing. Witnessed
also for pneumatic and hydro – testing offered to the clients.
Company : A.M.C. INDUSTRIAL
CONSTRUCTION CO. Ltd.
(M.H.I. MITSUBISHI)
Position : Piping Supervisor
Project : AR- RAZI PLANT- V METHANOL
PROJECT
Inclusive Date : November 02, 2007-
January 31, 2008
Reason of Leaving : Finished Contract
Duties and Responsibilities:
Assigned in the field woks for preparation in hydro and pneumatic testing
as per test packages. Supervise and witness for internal testing of line as per test pack and
supervision on punch killing works before allowed the line for test. Supervise also for
line checking as per test package and coordinate with the ENGINEERING
DEPARTMENT based on the drawing conflict.
Company : SAUDI TECHINT LTD.
Position : Piping Supervisor
Project : HARADH GOSP III PROJECT
Inclusive Date : April 1,2005- April 11, 2006
Reason of Leaving : Finished Project
Duties and Responsibilities:
Supervision of the area handled together with the workers. Responsible
the job assignment to be given to all FOREMAN. Given instruction regarding the job to
be done daily. Supervisor, foreman, workers must have coordination that is one thing
needed. Supervisor must be responsible to the area he handled and must be strict to
workers.
Company : DAEWOO ENGINEERING &
CONSTRUCTION CO. LTD
Position : Piping Supervisor
Project : WAFA LIBYAN GAS PLANT
Inclusive Date : Sept. 17, 2003- Sept. 02, 2004
Reason of Leaving : Finished Project
Duties and Responsibilities:
Assigned in field works both erection and installation of pipe spools and
valves. Checking the proper job for the workers. Erection must be done carefully to
prevent accident. Must have coordination with the FOREMEN and workers. Coordinate
with the Engineering Department based on the drawing that has conflict. Coordination
with existing job on the area. Given immediate action on what area needed. Supervision
on the daily job assignment to be issued to all FOREMAN. Calculation of the job when it
is supposed to be done. Always advanced to the target date.
Company : DESCON ENGINEERING CO. LTD
Position : Piping Supervisor
Project : QATAR GAS DEBOTTLE-
NECKLING PRO. (QATAR
SHUTDOWN PROJ.)
Inclusive Date : February 10, 2003- June 09, 2003
Reason of Leaving : Completion of Project
Duties and Responsibilities:
Responsible to get and return the permit to work before and after starting
any work assignments. Assign and supervise in hot tapping and boring. Install, erect and
fit-up the split-tee flanges with reinforcing pad, split-nozzle at operating and live line.
Plan for giving work assignment for their respective groups at all times, conduct and
advise to the workers for their safety and perform everyday the toolbox meeting.
Company : SUNG CHANG CO. LTD
Position : Piping Supervisor
Project : ABU DHABI WATER AND ELECTRIC
AUTHORITY (ADWEA)
Inclusive Date : May 29, 2001 – August 14, 2001
Reason of Leaving : Emergency Leave
Duties and Responsibilities:
Responsible for giving work assignment at all times to respective groups.
Responsible for maintaining the behavior of workers and advising the safety, rules and
regulations of the company. Assign for the fabricating, installing and erecting the fire
protection line in above and underground level with regards to the drawings.
Company : DAELIM SAUDI ARABIA CO.LTD
Position : Piping Supervisor
Project : PETROKEMYA OLEFINS III
EXPANSION PROJECT
Inclusive Date : May 24, 2000- November 09, 2000
Reason of Leaving : Finished Contract
Duties and Responsibilities:
Handled erection and installation of pipes spools and valves. Responsible
on the daily job assignment of the workers. Given instruction to all workers on the area
handled. Immediate action regarding the job that has problems and conflict. Coordinate
with the Engineering Department Workers must be given the coordinates of the plan to
easily find out where the location of their job to be done. Responsible for the job
assignment to be issued to all FOREMEN assigned in the area. Checking on the workers
are doing. Supervised the job or the area handled.
Company : DAELIM TAIWAN, R.O.C.
Position : Piping Supervisor
Project : FORMOSA REFINERY PROJECT
MAI-LIAO TAIWAN R.O.C.
Inclusive Date : January 13, 1999- Jan. 14, 2000
Reason of Leaving : Finished Contract
Duties and Responsibilities:
Responsible for maintaining the behavior workers and advice always the
safety rules and regulations of the company. Prepare always the job assignment of their
respective groups. Assign in the fabrication shop for fabricating spools, as per required in
the drawings. Assigned also in the site area for constructing the lines of alloy pipes and
stainless steels on the pipe rack, as per required in the drawings.
Company : DAELIM MALAYSIA SDN.BHD
Position : Piping Supervisor
Project : GPP 5 & 6 GAS PROCESSING
PLANT, KM 8, P.O. BOX 63,24300
KERTEH, TERENGGANU
DARUL IMAN, MALAYSIA
Inclusive Date : June 21, 1997- Dec. 20, 1998
Reason of Leaving : Finish Contract and Project
Duties and Responsibilities:
Assigned for preparing and making test packages. Assign for inspections
of test documents with regards to piping system. Assign also for preparing some
documents with regards the comments for mechanical completions.
Company : DAELIM SAUDI ARABIA CO.LTD.
Position : Piping Foreman
Project : EXPANSION OF BERRI GAS
PLANT AL-JUBAIL, K.S.A.
Inclusive Date : March 27, 1996- March 27, 1997
Reason of Leaving : Finish Contract
Duties and Responsibilities:
Responsible for maintaining the behavior of workers and advice always
the safety rules and regulations of the company. Perform for the job distributions to the
workers at all times. Assigned at the fabrication shop for fabricating pipes and fittings as
spool.
Company : SAUDI DEVELOPMENT
MAINTENANCE CO.
Position : Pipe Fitter- LEADMAN
Project : AIR BASE FACILITIES AND
HARD BOMB DHAHRAN AIR
BATIN, SAUDI ARABIA
Inclusive Date : July 19, 1993 – Sept. 19, 1994
Reason of Leaving : Completion of Project
Duties and Responsibilities:
Installing and fabricating of all utility lines regarding the isometric
drawings, lay-outing and installing of pumps equipment in their designated location.
Installing of firehouse protection of their wall location.
Company : PNOC DOCKYARD AND
ENGINEERING CORPORATION
: San Roque, Bauan, Batangas
Position : Ship Fitter
Inclusive Date Nov. 18, 1989 – Dec.16, 1990
Reason of Leaving : Completion of Project
Duties and Responsibilities:
Repairing parts of barge, fittings and installing required plates. Installing of
all utility line inside the barge.
Company : AG&P
: San Roque, Bauan, Batangas
Position : Pipe Fitter
Inclusive Date : Nov. 07, 1987 – March 20, 1989
Reason of Leaving : Reduction
Duties and Responsibilities:
Cutting , grinding and fitting of pipes for the required in the drawing.
Installing and fabricating of girders, box, columns stiffeners, etc.
I hereby certify that the above information is true and correct to the best of my
knowledge and belief.
____________________________________
NORVEL M. MARASIGAN
Norvel Marasigan 2015

More Related Content

What's hot

updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
Larry Bisa
 
Allan Dick - rigging foreman
Allan Dick - rigging foremanAllan Dick - rigging foreman
Allan Dick - rigging foreman
ALLAN DICK ESTERA
 
Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.
Saifulrizan Bin Annuar
 
Resume of sadiq nawaz
Resume of sadiq nawazResume of sadiq nawaz
Resume of sadiq nawaz
Sadiq Khan
 
Bestwork Company Profile
Bestwork Company ProfileBestwork Company Profile
Bestwork Company Profile
LEVIPANOL
 
Pareman Plato Tarigan's CV
Pareman Plato Tarigan's CVPareman Plato Tarigan's CV
Pareman Plato Tarigan's CV
Juma_Toras
 
Experince Certificate
Experince CertificateExperince Certificate
Experince Certificate
Zubair Noor
 
Azhar iqbal qc_inspector
Azhar iqbal qc_inspectorAzhar iqbal qc_inspector
Azhar iqbal qc_inspector
zafar210113
 
CV_SHIBU.NS_19-01-2016
CV_SHIBU.NS_19-01-2016CV_SHIBU.NS_19-01-2016
CV_SHIBU.NS_19-01-2016
Shibu N Surendranaath
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
Ahmad Hadi
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
Kenrick Ramos
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
Ahmed Youssef
 
Ahmed Marouf experience certificate
Ahmed Marouf experience certificateAhmed Marouf experience certificate
Ahmed Marouf experience certificate
Archirodon Group N.V.
 
CV_Arijanto EP_2016
CV_Arijanto EP_2016CV_Arijanto EP_2016
CV_Arijanto EP_2016
ARIJANTO PRATOMO
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
Gurunathan Somu
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
Roy Encallado
 
\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv
\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv
\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv
guestdf4432
 
Henz final resume 4 genset
Henz final resume 4 gensetHenz final resume 4 genset
Henz final resume 4 genset
Henjie Amores
 
Amer Zubair - QS
Amer Zubair - QSAmer Zubair - QS
Amer Zubair - QS
Amer Zubair
 
Certificate Format Samples
Certificate Format Samples Certificate Format Samples
Certificate Format Samples
Azmeel Contracting Company
 

What's hot (20)

updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
 
Allan Dick - rigging foreman
Allan Dick - rigging foremanAllan Dick - rigging foreman
Allan Dick - rigging foreman
 
Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.
 
Resume of sadiq nawaz
Resume of sadiq nawazResume of sadiq nawaz
Resume of sadiq nawaz
 
Bestwork Company Profile
Bestwork Company ProfileBestwork Company Profile
Bestwork Company Profile
 
Pareman Plato Tarigan's CV
Pareman Plato Tarigan's CVPareman Plato Tarigan's CV
Pareman Plato Tarigan's CV
 
Experince Certificate
Experince CertificateExperince Certificate
Experince Certificate
 
Azhar iqbal qc_inspector
Azhar iqbal qc_inspectorAzhar iqbal qc_inspector
Azhar iqbal qc_inspector
 
CV_SHIBU.NS_19-01-2016
CV_SHIBU.NS_19-01-2016CV_SHIBU.NS_19-01-2016
CV_SHIBU.NS_19-01-2016
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Ahmed Marouf experience certificate
Ahmed Marouf experience certificateAhmed Marouf experience certificate
Ahmed Marouf experience certificate
 
CV_Arijanto EP_2016
CV_Arijanto EP_2016CV_Arijanto EP_2016
CV_Arijanto EP_2016
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv
\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv
\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv
 
Henz final resume 4 genset
Henz final resume 4 gensetHenz final resume 4 genset
Henz final resume 4 genset
 
Amer Zubair - QS
Amer Zubair - QSAmer Zubair - QS
Amer Zubair - QS
 
Certificate Format Samples
Certificate Format Samples Certificate Format Samples
Certificate Format Samples
 

Similar to Norvel Marasigan 2015

MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
Midel Dalangin
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
Mateo Laurel
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
randy lapuhapu
 
FIELD SUPERVISOR
FIELD SUPERVISORFIELD SUPERVISOR
FIELD SUPERVISOR
Randy Esteban
 
resume'
resume'resume'
resume'
Enrico Valdez
 
cv nour
cv nourcv nour
cv nour
Mohammad Nour
 
cv nour
cv nourcv nour
cv nour
Mohammad Nour
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
othman sulaiman
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
rosdi baharuddin
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
bannichensavier savier
 
MCV
MCVMCV
CV
CVCV
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
Siow Chon Wah
 
SABRI CV
SABRI CVSABRI CV
SABRI CV
Sabri Da
 
updated cvjim
updated cvjimupdated cvjim
updated cvjim
Jim Pamposa
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
Sundara Vadivel
 
NEW UPDATE RESUME
NEW UPDATE RESUMENEW UPDATE RESUME
NEW UPDATE RESUME
MOHD NASIR AWANG
 
Cv 2021 parbhakar-hse officer-supervisor 2021
Cv 2021 parbhakar-hse officer-supervisor 2021Cv 2021 parbhakar-hse officer-supervisor 2021
Cv 2021 parbhakar-hse officer-supervisor 2021
Prabhakar Gaikwad
 
Keith Youngs Resume 2015
Keith Youngs Resume 2015Keith Youngs Resume 2015
Keith Youngs Resume 2015
Keith Youngs
 
Resume of ECP
Resume of ECPResume of ECP
Resume of ECP
Emmanuel Pagorogon
 

Similar to Norvel Marasigan 2015 (20)

MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
FIELD SUPERVISOR
FIELD SUPERVISORFIELD SUPERVISOR
FIELD SUPERVISOR
 
resume'
resume'resume'
resume'
 
cv nour
cv nourcv nour
cv nour
 
cv nour
cv nourcv nour
cv nour
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
MCV
MCVMCV
MCV
 
CV
CVCV
CV
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
SABRI CV
SABRI CVSABRI CV
SABRI CV
 
updated cvjim
updated cvjimupdated cvjim
updated cvjim
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
NEW UPDATE RESUME
NEW UPDATE RESUMENEW UPDATE RESUME
NEW UPDATE RESUME
 
Cv 2021 parbhakar-hse officer-supervisor 2021
Cv 2021 parbhakar-hse officer-supervisor 2021Cv 2021 parbhakar-hse officer-supervisor 2021
Cv 2021 parbhakar-hse officer-supervisor 2021
 
Keith Youngs Resume 2015
Keith Youngs Resume 2015Keith Youngs Resume 2015
Keith Youngs Resume 2015
 
Resume of ECP
Resume of ECPResume of ECP
Resume of ECP
 

Norvel Marasigan 2015

  • 1. NORVEL M. MARASIGAN Abrahan Street. Aplaya Bauan, Batangas Philippines Email Ad : norvelmarasigan67@yahoo.com PERSONAL PROFILE: POSITION DESIRED : PIPING SUPERVISOR Place of Birth : Abrahan St. Aplaya Bauan, Batangas Date of Birth : March 06, 1967 Age : 48 y/o Civil Status : Married Height : 5’5” Weight : 150 lbs. Religion : Roman Catholic Nationality : Filipino Name of Wife : Divirose C. Marasigan Number of Children : Three (3) Language Spoken/Written : Tagalog and English Skills : Computer Literate Telephone Number : +6343-728-0391 Cell Phone Number : 09497623737 & 09995630475 Passport Number : EC2366850 EDUCATIONAL ATTAINMENT TERTIARY LEVEL : Lyceum of Batangas (4th Year Undergraduate- BS Marine Transportation) SECONDARY LEVEL : Bauan High School 1980-1984 PRIMARY LEVEL : West Bauan Central School 1974-1980
  • 2. WORK EXPERIENCES: Company : SK Engineering & Construction Co.ltd Position : Piping Supervisor Project : WASIT GAS PROJECT Khursaniya,Saudi Arabia Inclusive Date : January 12, 2014 – August 11, 2014 Reason of Leaving : Resigned Duties and Responsibilities: Assigned for construction and monitoring of UG-C/S pipings of TEG/SULM for chemical drain lines. In-charge also in AG piperack,co-ordination activities for prefabrication, erection of pipe spools, preparation of planning of equipment and resources in order to meet contractual schedule, in charge of fabricationmerection priority activities, able to punch list for completion of erection, In charge to manage the progress evaluation in consultation with the Client representative. Company : GS ENGINEERING & CONSTRUCTION CORPORATION ( GS E & C ) Position : Piping Supervisor Project : RRE-2 EXPANSION PROJECT ( RUWAIS, UAE ) Inclusive Date : March 29,2011 – May 07, 2013 Reason of Leaving : Finished Contract Duties and Responsibilities: Assigned for construction and monitoring of UG-GRE pipings at the trench.Secure for the lamination and alignment of pipe line as per required RECIPE of the pipe. Making punchlist and assigned for witness of Hydro Testing of pipe line. Supervised the AG piping of GRE,GRV,Carbon Steel,Stainless Steeel and Alloy Steel at the pipe rack. Company : GS ENGINEERING & CONSTRUCTION CORPORATION ( GS E & C ) Position : Piping Supervisor Project : SALALAH METHANOL PROJECT : ( Sultanate of Oman ) Inclusive Date : June 14, 2008 – December 20, 2009 Reason of Leaving : Finished Project
  • 3. Duties and Responsibilities: Assigned for construction and supervise of all utility lines prior for hydro testing. Monitored and checked actual situation on site of some modified drawings to be changed by field engineers. Assigned also for line checking by test packages, issued punch lists and punch clearings before allowed to offer to clients for testing. Witnessed also for pneumatic and hydro – testing offered to the clients. Company : A.M.C. INDUSTRIAL CONSTRUCTION CO. Ltd. (M.H.I. MITSUBISHI) Position : Piping Supervisor Project : AR- RAZI PLANT- V METHANOL PROJECT Inclusive Date : November 02, 2007- January 31, 2008 Reason of Leaving : Finished Contract Duties and Responsibilities: Assigned in the field woks for preparation in hydro and pneumatic testing as per test packages. Supervise and witness for internal testing of line as per test pack and supervision on punch killing works before allowed the line for test. Supervise also for line checking as per test package and coordinate with the ENGINEERING DEPARTMENT based on the drawing conflict. Company : SAUDI TECHINT LTD. Position : Piping Supervisor Project : HARADH GOSP III PROJECT Inclusive Date : April 1,2005- April 11, 2006 Reason of Leaving : Finished Project Duties and Responsibilities: Supervision of the area handled together with the workers. Responsible the job assignment to be given to all FOREMAN. Given instruction regarding the job to be done daily. Supervisor, foreman, workers must have coordination that is one thing needed. Supervisor must be responsible to the area he handled and must be strict to workers.
  • 4. Company : DAEWOO ENGINEERING & CONSTRUCTION CO. LTD Position : Piping Supervisor Project : WAFA LIBYAN GAS PLANT Inclusive Date : Sept. 17, 2003- Sept. 02, 2004 Reason of Leaving : Finished Project Duties and Responsibilities: Assigned in field works both erection and installation of pipe spools and valves. Checking the proper job for the workers. Erection must be done carefully to prevent accident. Must have coordination with the FOREMEN and workers. Coordinate with the Engineering Department based on the drawing that has conflict. Coordination with existing job on the area. Given immediate action on what area needed. Supervision on the daily job assignment to be issued to all FOREMAN. Calculation of the job when it is supposed to be done. Always advanced to the target date. Company : DESCON ENGINEERING CO. LTD Position : Piping Supervisor Project : QATAR GAS DEBOTTLE- NECKLING PRO. (QATAR SHUTDOWN PROJ.) Inclusive Date : February 10, 2003- June 09, 2003 Reason of Leaving : Completion of Project Duties and Responsibilities: Responsible to get and return the permit to work before and after starting any work assignments. Assign and supervise in hot tapping and boring. Install, erect and fit-up the split-tee flanges with reinforcing pad, split-nozzle at operating and live line. Plan for giving work assignment for their respective groups at all times, conduct and advise to the workers for their safety and perform everyday the toolbox meeting. Company : SUNG CHANG CO. LTD Position : Piping Supervisor Project : ABU DHABI WATER AND ELECTRIC AUTHORITY (ADWEA) Inclusive Date : May 29, 2001 – August 14, 2001 Reason of Leaving : Emergency Leave
  • 5. Duties and Responsibilities: Responsible for giving work assignment at all times to respective groups. Responsible for maintaining the behavior of workers and advising the safety, rules and regulations of the company. Assign for the fabricating, installing and erecting the fire protection line in above and underground level with regards to the drawings. Company : DAELIM SAUDI ARABIA CO.LTD Position : Piping Supervisor Project : PETROKEMYA OLEFINS III EXPANSION PROJECT Inclusive Date : May 24, 2000- November 09, 2000 Reason of Leaving : Finished Contract Duties and Responsibilities: Handled erection and installation of pipes spools and valves. Responsible on the daily job assignment of the workers. Given instruction to all workers on the area handled. Immediate action regarding the job that has problems and conflict. Coordinate with the Engineering Department Workers must be given the coordinates of the plan to easily find out where the location of their job to be done. Responsible for the job assignment to be issued to all FOREMEN assigned in the area. Checking on the workers are doing. Supervised the job or the area handled. Company : DAELIM TAIWAN, R.O.C. Position : Piping Supervisor Project : FORMOSA REFINERY PROJECT MAI-LIAO TAIWAN R.O.C. Inclusive Date : January 13, 1999- Jan. 14, 2000 Reason of Leaving : Finished Contract Duties and Responsibilities: Responsible for maintaining the behavior workers and advice always the safety rules and regulations of the company. Prepare always the job assignment of their respective groups. Assign in the fabrication shop for fabricating spools, as per required in the drawings. Assigned also in the site area for constructing the lines of alloy pipes and stainless steels on the pipe rack, as per required in the drawings.
  • 6. Company : DAELIM MALAYSIA SDN.BHD Position : Piping Supervisor Project : GPP 5 & 6 GAS PROCESSING PLANT, KM 8, P.O. BOX 63,24300 KERTEH, TERENGGANU DARUL IMAN, MALAYSIA Inclusive Date : June 21, 1997- Dec. 20, 1998 Reason of Leaving : Finish Contract and Project Duties and Responsibilities: Assigned for preparing and making test packages. Assign for inspections of test documents with regards to piping system. Assign also for preparing some documents with regards the comments for mechanical completions. Company : DAELIM SAUDI ARABIA CO.LTD. Position : Piping Foreman Project : EXPANSION OF BERRI GAS PLANT AL-JUBAIL, K.S.A. Inclusive Date : March 27, 1996- March 27, 1997 Reason of Leaving : Finish Contract Duties and Responsibilities: Responsible for maintaining the behavior of workers and advice always the safety rules and regulations of the company. Perform for the job distributions to the workers at all times. Assigned at the fabrication shop for fabricating pipes and fittings as spool. Company : SAUDI DEVELOPMENT MAINTENANCE CO. Position : Pipe Fitter- LEADMAN Project : AIR BASE FACILITIES AND HARD BOMB DHAHRAN AIR BATIN, SAUDI ARABIA Inclusive Date : July 19, 1993 – Sept. 19, 1994 Reason of Leaving : Completion of Project Duties and Responsibilities:
  • 7. Installing and fabricating of all utility lines regarding the isometric drawings, lay-outing and installing of pumps equipment in their designated location. Installing of firehouse protection of their wall location. Company : PNOC DOCKYARD AND ENGINEERING CORPORATION : San Roque, Bauan, Batangas Position : Ship Fitter Inclusive Date Nov. 18, 1989 – Dec.16, 1990 Reason of Leaving : Completion of Project Duties and Responsibilities: Repairing parts of barge, fittings and installing required plates. Installing of all utility line inside the barge. Company : AG&P : San Roque, Bauan, Batangas Position : Pipe Fitter Inclusive Date : Nov. 07, 1987 – March 20, 1989 Reason of Leaving : Reduction Duties and Responsibilities: Cutting , grinding and fitting of pipes for the required in the drawing. Installing and fabricating of girders, box, columns stiffeners, etc. I hereby certify that the above information is true and correct to the best of my knowledge and belief. ____________________________________ NORVEL M. MARASIGAN