SlideShare a Scribd company logo
Soknorm Chan
46 Canton Street Lowell, MA 01851
normchan@hotmail.com
Cell: (978) 483-8868 & Home: (978) 455-7953
EMPLOYMENT
Americraft Carton, Inc. Lowell, MA
Mar 2015- Nov 2015
Sheeter Press
• Setting up Maxson sheeter press for size alignment to cut.
• Pushing 50-72 diameter rolls on to it rail.
• Operating clamp and fork truck.
• All order traveler are required to kept logged onto the computer data system.
MetalCrafter Methuen, MA
Dec 2014 – Mar 2015
Machine Shop (Contract)
• Properly inserted and removed particles from CNC machines.
• Inspected particles daily according to blueprint specifications using various measuring
tools.
• Followed QSR / GMP / ISO and OSHA requirements and regulations.
• Used hand tools for sanding, grinding, deburring and tapping.
Phillips Healthcare Andover, MA
April 2014 – Oct 2014
Electro-Mechanical Assembler / Test Technician (Contract)
• Managed product technical issues to identify root cause and determine appropriate
solutions.
• Engaged in cross-functional / cross-product teams to investigate and resolve issues.
• Worked directly with customers to resolve product problems.
• Evaluated repairs and complaints to provide feedback to Engineering and Manufacturing
for corrective action or further investigation.
• Lead and drive business teams to implement supportability improvements.
• Develop timely and effective Customer Service Discontinuance Product Plans to insure
field and customers are properly prepared to manage the end of life phase of the product life
cycle.
• Excellent interpersonal, written and verbal communication skills.
• Experience in a customer facing role with demonstrated ability to meet internal and
external customer requirements.
• Organized and able to work effectively as part of a team in a fast-paced environment.
• Proficient with computers, office tools, and network infrastructure / configuration.
• Experience working with an FDA regulated medical device and regulatory
processes.
• Promoted the use of 6 S and implemented safe work practices.
Entegris Billerica, MA
May 2013 – Dec 2013
Chemist Engineer Assistant (Contract)
• Monitored work area and employees’ performance for adherence to safety procedures,
work restrictions, cleanliness and potential hazards to include correct use of hand tools,
equipment and machinery.
• Investigated and evaluated quality defects to determine appropriate action.
• Investigated CARs; recommended and implemented solutions to improve quality.
• Assisted in writing document change orders and manufacturing / part instructions.
• Implemented and monitored continuous quality improvement activities including waste
and cost reduction, equipment and tool efficiencies and human resource planning.
• Identified / implemented cycle time and yield improvement for process optimization.
• Processed documentation (operating procedures, test specifications, test methods,
component drawings, etc.)
• Assisted in providing process training to direct labor force.
• Maintained process capacity models – identified constraints and capital equipment needs.
• Used Kaizen to reduce waste in all operations.
• Used PDCA, visual management, Kanban, and TAKT to monitor production
requirements and resources to provide on-time delivery.
• Coordinated design, purchase and implementation with emphasis on design of fixtures.
• Partnered with R&D and Business Unit Leaders to ensure effective planning and
communication of new product development programs and RTM objectives to meet required
project time-lines.
• Followed QSR / GMP / ISO and OSHA requirements and regulations.
Innovative Foto Salem, NH
Jan 2012 – June 2012
Electro-Mechanical Assembly (Contract)
• Read work orders and Bill of Materials (B.O.M) verbally before prepping.
• Assembled photo booth frames using the panels from the router shop.
• Wire harnessing for electronic connection – monitored video splitters, speakers, printers,
and multiple outlet boxes.
• Used various hand tools, power tools and building accessories.
• Followed QSR / GMP / ISO and OSHA requirements and regulations.
Wakefield Pelham, NH
Dec 2011 – Jan 2012
Machine Shop (Contract)
• Properly inserted and removed particles from CNC machines.
• Inspected particles daily according to blueprint specifications using various measuring
tools.
• Followed QSR / GMP / ISO and OSHA requirements and regulations.
• Used hand tools for sanding, grinding, deburring and tapping.
Nova Biomedical Burlington, MA
Aug 2011 – Nov 2011
Machine Operator (Contract)
• Wore a smock before entering the clean working environment.
• Operated CNC laser machinery.
• Followed FDA / QSR / GMP and OSHA requirements and regulations.
• Performed microscope inspection on gold sheets; OGP and ICT.
Majilite Corporation Dracut, MA
June 2011 – Aug 2011
Extrusion Operation (Contract)
• Inspected for defects including discoloration and contamination.
• Used the crank and roll carts before loading into the machine.
• Properly loaded paper onto the extrusion machine.
• Quickly inspected colors for accuracy while operating the machine.
• Followed QSR / GMP and OSHA requirements.
Cambridge Tools North Billerica, MA
Sept 2010 – Dec 2010
Machine Shop (Contract)
• Properly inserted and removed particles from CNC machines.
• Inspected particles daily according to blueprint specifications using various measuring
tools.
• Followed QSR / GMP / ISO and OSHA requirements and regulations.
• Used hand tools for sanding, grinding, deburring and tapping.
Evergreen Solar Devens, MA
Aug 2009 – Aug 2010
Team Lead – E/M Assembler (contract-perm, never perm because company outsourced to China)
• Maintained and oversaw assembly lines to achieve weekly and monthly goals.
• Responsible for troubleshooting the HMI touch screen.
• Assembled frames onto the Kuka Robot panels.
• Installed panels along with J-Box order before testing with inspire and Graphikon.
• Performed final visual inspection.
• Wore PPE Tyvek jacket and smock and gloves in clean working environment.
• Reworked solar panels.
• Used small hand tools like tweezers, pliers, soldering iron, etc.
• Followed QSR / GMP / ISO and OSHA requirements and regulations.
United Parcel Service Chelmsford, MA
June 2009 –Aug 2009
Warehouse (part-time)
• Maintained the flexibility to load and unload trucks.
• Inspected the packages for damages.
• Unloaded packages over the conveyor belts before scanning the label to its destination.
Bell Microproducts Acton, MA
Feb 2009 – April 2009
Material Handler (contract)
• Followed QSR / GMP / ISO and OSHA regulations.
• Wore static resistant smock clothing in the clean working environment area.
• Performed daily cycle counts and accurate inventory transactions.
• Managed workload to comply with both internal and external customer requirements.
• Operated forklift.
L3 Communications Essco Acton, MA
Sept 2006 – April 2008
QC / Assembler (company sold, layoff)
• Submitted inspection reports on Microsoft Excel and sent to management through
Outlook.
• Performed welding, cutting, grinding and deburring on materials.
• Operated automated equipment to assemble and inspect a labor of productions.
• Followed blueprints and material specifications.
• Operated Faro arm and laser machine in a clean room station and followed ISO 9001.
• Wore steel toe shoes, Tyvek jump suit, safety glasses, mask and ear protection for safety.
• Calibration on FARO Laser machines and used electro-microscopes for naked eye vision.
• Followed ISO 9001, ISO 1345 requirements and regulations.
3M Chelmsford, MA
Jan 2006 – June 2006
Machine Operator (Contract)
• Processed production extrusion machine and operated spooling and splice machines.
• Used various hand tools for measurement.
• Record data using Microsoft Excel.
W.K. Hillquist Hudson, NH
April 2002 – Dec 2004
Machine Operator
• Responsible for inserting threads, identifying defects (discoloration), and for deburring
material.
• Packaged and labeled or products.
• Operated injection molding machines for production.
EDUCATION
ITT Technical Institute Woburn, MA 2007-
postpone
• Computer Electronic Technology
Centennial High School Peoria, AZ
2007
• High School diploma

More Related Content

What's hot

Nashef-John-formatted111
Nashef-John-formatted111Nashef-John-formatted111
Nashef-John-formatted111JOHN NASHEF
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
Stephen Perkins
 
Sabrina Soung Resume updates
Sabrina Soung Resume updatesSabrina Soung Resume updates
Sabrina Soung Resume updatessabrina soung
 
Nitin Singh (Resume)
Nitin Singh (Resume)Nitin Singh (Resume)
Nitin Singh (Resume)Nitin singh
 
Amy Walton's resume 2016
Amy Walton's resume 2016Amy Walton's resume 2016
Amy Walton's resume 2016Amy Walton
 
Dennis Revised Resume
Dennis  Revised ResumeDennis  Revised Resume
Dennis Revised ResumeDennis Hayden
 
Untitleddocument (2)
Untitleddocument (2)Untitleddocument (2)
Untitleddocument (2)R.L. Harris
 
JOHN_J_KISIC_RESUME
JOHN_J_KISIC_RESUMEJOHN_J_KISIC_RESUME
JOHN_J_KISIC_RESUMEJohn Kisic
 

What's hot (19)

Nashef-John-formatted111
Nashef-John-formatted111Nashef-John-formatted111
Nashef-John-formatted111
 
sean-dy-resume Maching ME
sean-dy-resume Maching MEsean-dy-resume Maching ME
sean-dy-resume Maching ME
 
AWEH EZEKIEL C.V.
AWEH EZEKIEL C.V.AWEH EZEKIEL C.V.
AWEH EZEKIEL C.V.
 
Steven E Kerchner0120
Steven E Kerchner0120Steven E Kerchner0120
Steven E Kerchner0120
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
Sabrina Soung Resume updates
Sabrina Soung Resume updatesSabrina Soung Resume updates
Sabrina Soung Resume updates
 
Resume fitter
Resume  fitterResume  fitter
Resume fitter
 
Nitin Singh (Resume)
Nitin Singh (Resume)Nitin Singh (Resume)
Nitin Singh (Resume)
 
Amy Walton's resume 2016
Amy Walton's resume 2016Amy Walton's resume 2016
Amy Walton's resume 2016
 
pierce resumedec2014
pierce resumedec2014pierce resumedec2014
pierce resumedec2014
 
Dennis Revised Resume
Dennis  Revised ResumeDennis  Revised Resume
Dennis Revised Resume
 
RESUME
RESUMERESUME
RESUME
 
MJP Resume
MJP ResumeMJP Resume
MJP Resume
 
Phineas_CV_-_Copy
Phineas_CV_-_CopyPhineas_CV_-_Copy
Phineas_CV_-_Copy
 
Untitleddocument (2)
Untitleddocument (2)Untitleddocument (2)
Untitleddocument (2)
 
JOHN_J_KISIC_RESUME
JOHN_J_KISIC_RESUMEJOHN_J_KISIC_RESUME
JOHN_J_KISIC_RESUME
 
Resume _ Sathishkumar
Resume _ SathishkumarResume _ Sathishkumar
Resume _ Sathishkumar
 
RahulNavale
RahulNavaleRahulNavale
RahulNavale
 
Project engineer C.V.
Project engineer C.V.Project engineer C.V.
Project engineer C.V.
 

Viewers also liked

Prachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_ConsultantPrachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_ConsultantPrachi Goel
 
JDMR Panic selling or dispersion
JDMR Panic selling or dispersionJDMR Panic selling or dispersion
JDMR Panic selling or dispersionJeff McKeown, PMP
 
Measuring Instruments Project
Measuring Instruments ProjectMeasuring Instruments Project
Measuring Instruments Project
Alfonso Figueroa
 
CO2 Reduction in a Calciner Reactor at a Cement Factory Memorandum
CO2 Reduction in a Calciner Reactor at a Cement Factory MemorandumCO2 Reduction in a Calciner Reactor at a Cement Factory Memorandum
CO2 Reduction in a Calciner Reactor at a Cement Factory Memorandum
Alfonso Figueroa
 
Bioreactor Technical Memorandum Report
Bioreactor Technical Memorandum ReportBioreactor Technical Memorandum Report
Bioreactor Technical Memorandum Report
Alfonso Figueroa
 
Prachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_ConsultantPrachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_ConsultantPrachi Goel
 
Hydraulics Team Full-Technical Lab Report
Hydraulics Team Full-Technical Lab ReportHydraulics Team Full-Technical Lab Report
Hydraulics Team Full-Technical Lab Report
Alfonso Figueroa
 
Aris y los castillos.
Aris y los castillos.Aris y los castillos.
Aris y los castillos.
catilaura
 
High Fructose Corn Syrup (HFCS) Process Plant Project
High Fructose Corn Syrup (HFCS) Process Plant ProjectHigh Fructose Corn Syrup (HFCS) Process Plant Project
High Fructose Corn Syrup (HFCS) Process Plant Project
Alfonso Figueroa
 
Presentacion proyecto final etica de la gerencia
Presentacion proyecto final etica de la gerenciaPresentacion proyecto final etica de la gerencia
Presentacion proyecto final etica de la gerencia
Jeynette Alejandra Solorzano Arias
 
Forced Convection Full-Technical Lab Report
Forced Convection Full-Technical Lab ReportForced Convection Full-Technical Lab Report
Forced Convection Full-Technical Lab Report
Alfonso Figueroa
 

Viewers also liked (12)

JDMR Overview 02-02-09
JDMR Overview 02-02-09JDMR Overview 02-02-09
JDMR Overview 02-02-09
 
Prachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_ConsultantPrachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_Consultant
 
JDMR Panic selling or dispersion
JDMR Panic selling or dispersionJDMR Panic selling or dispersion
JDMR Panic selling or dispersion
 
Measuring Instruments Project
Measuring Instruments ProjectMeasuring Instruments Project
Measuring Instruments Project
 
CO2 Reduction in a Calciner Reactor at a Cement Factory Memorandum
CO2 Reduction in a Calciner Reactor at a Cement Factory MemorandumCO2 Reduction in a Calciner Reactor at a Cement Factory Memorandum
CO2 Reduction in a Calciner Reactor at a Cement Factory Memorandum
 
Bioreactor Technical Memorandum Report
Bioreactor Technical Memorandum ReportBioreactor Technical Memorandum Report
Bioreactor Technical Memorandum Report
 
Prachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_ConsultantPrachi Goel_SAP Technical_Consultant
Prachi Goel_SAP Technical_Consultant
 
Hydraulics Team Full-Technical Lab Report
Hydraulics Team Full-Technical Lab ReportHydraulics Team Full-Technical Lab Report
Hydraulics Team Full-Technical Lab Report
 
Aris y los castillos.
Aris y los castillos.Aris y los castillos.
Aris y los castillos.
 
High Fructose Corn Syrup (HFCS) Process Plant Project
High Fructose Corn Syrup (HFCS) Process Plant ProjectHigh Fructose Corn Syrup (HFCS) Process Plant Project
High Fructose Corn Syrup (HFCS) Process Plant Project
 
Presentacion proyecto final etica de la gerencia
Presentacion proyecto final etica de la gerenciaPresentacion proyecto final etica de la gerencia
Presentacion proyecto final etica de la gerencia
 
Forced Convection Full-Technical Lab Report
Forced Convection Full-Technical Lab ReportForced Convection Full-Technical Lab Report
Forced Convection Full-Technical Lab Report
 

Similar to Norm_s_resume

Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATDTravis Lucas
 
Younis Atari resume Sept 2015
Younis Atari resume Sept  2015Younis Atari resume Sept  2015
Younis Atari resume Sept 2015Younis Atari
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
sachin tagalpallewar
 
Tamer Akl C.V
Tamer Akl C.VTamer Akl C.V
Tamer Akl C.VTamer Akl
 
Brett L Carter Cover Resume
Brett L Carter Cover ResumeBrett L Carter Cover Resume
Brett L Carter Cover ResumeBrett Carter
 
John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John Reeves
 
robertstcresume05-09
robertstcresume05-09robertstcresume05-09
robertstcresume05-09Robert Stone
 
Anthony R. Moore 06_24_16
Anthony R. Moore  06_24_16Anthony R. Moore  06_24_16
Anthony R. Moore 06_24_16Anthony Moore
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resumeSteve Majors
 

Similar to Norm_s_resume (20)

new hemant chauhan
new hemant chauhannew hemant chauhan
new hemant chauhan
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATD
 
Resume2015
Resume2015Resume2015
Resume2015
 
Younis Atari resume Sept 2015
Younis Atari resume Sept  2015Younis Atari resume Sept  2015
Younis Atari resume Sept 2015
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
CV2015 Linkedin
CV2015 LinkedinCV2015 Linkedin
CV2015 Linkedin
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
JDH
JDHJDH
JDH
 
Tamer Akl C.V
Tamer Akl C.VTamer Akl C.V
Tamer Akl C.V
 
Lawanson Oluwasanmi Resume..
Lawanson Oluwasanmi Resume..Lawanson Oluwasanmi Resume..
Lawanson Oluwasanmi Resume..
 
Lawanson Oluwasanmi Resume (2)
Lawanson Oluwasanmi Resume (2)Lawanson Oluwasanmi Resume (2)
Lawanson Oluwasanmi Resume (2)
 
Brett L Carter Cover Resume
Brett L Carter Cover ResumeBrett L Carter Cover Resume
Brett L Carter Cover Resume
 
John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)
 
Samaa CV
Samaa CVSamaa CV
Samaa CV
 
robertstcresume05-09
robertstcresume05-09robertstcresume05-09
robertstcresume05-09
 
Anthony R. Moore 06_24_16
Anthony R. Moore  06_24_16Anthony R. Moore  06_24_16
Anthony R. Moore 06_24_16
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
MY CV STEWART N.
MY CV STEWART N.MY CV STEWART N.
MY CV STEWART N.
 
randycordero
randycorderorandycordero
randycordero
 

Norm_s_resume

  • 1. Soknorm Chan 46 Canton Street Lowell, MA 01851 normchan@hotmail.com Cell: (978) 483-8868 & Home: (978) 455-7953 EMPLOYMENT Americraft Carton, Inc. Lowell, MA Mar 2015- Nov 2015 Sheeter Press • Setting up Maxson sheeter press for size alignment to cut. • Pushing 50-72 diameter rolls on to it rail. • Operating clamp and fork truck. • All order traveler are required to kept logged onto the computer data system. MetalCrafter Methuen, MA Dec 2014 – Mar 2015 Machine Shop (Contract) • Properly inserted and removed particles from CNC machines. • Inspected particles daily according to blueprint specifications using various measuring tools. • Followed QSR / GMP / ISO and OSHA requirements and regulations. • Used hand tools for sanding, grinding, deburring and tapping. Phillips Healthcare Andover, MA April 2014 – Oct 2014 Electro-Mechanical Assembler / Test Technician (Contract) • Managed product technical issues to identify root cause and determine appropriate solutions. • Engaged in cross-functional / cross-product teams to investigate and resolve issues. • Worked directly with customers to resolve product problems. • Evaluated repairs and complaints to provide feedback to Engineering and Manufacturing for corrective action or further investigation. • Lead and drive business teams to implement supportability improvements. • Develop timely and effective Customer Service Discontinuance Product Plans to insure field and customers are properly prepared to manage the end of life phase of the product life cycle. • Excellent interpersonal, written and verbal communication skills. • Experience in a customer facing role with demonstrated ability to meet internal and external customer requirements. • Organized and able to work effectively as part of a team in a fast-paced environment. • Proficient with computers, office tools, and network infrastructure / configuration. • Experience working with an FDA regulated medical device and regulatory processes. • Promoted the use of 6 S and implemented safe work practices. Entegris Billerica, MA May 2013 – Dec 2013 Chemist Engineer Assistant (Contract) • Monitored work area and employees’ performance for adherence to safety procedures, work restrictions, cleanliness and potential hazards to include correct use of hand tools, equipment and machinery. • Investigated and evaluated quality defects to determine appropriate action. • Investigated CARs; recommended and implemented solutions to improve quality. • Assisted in writing document change orders and manufacturing / part instructions. • Implemented and monitored continuous quality improvement activities including waste
  • 2. and cost reduction, equipment and tool efficiencies and human resource planning. • Identified / implemented cycle time and yield improvement for process optimization. • Processed documentation (operating procedures, test specifications, test methods, component drawings, etc.) • Assisted in providing process training to direct labor force. • Maintained process capacity models – identified constraints and capital equipment needs. • Used Kaizen to reduce waste in all operations. • Used PDCA, visual management, Kanban, and TAKT to monitor production requirements and resources to provide on-time delivery. • Coordinated design, purchase and implementation with emphasis on design of fixtures. • Partnered with R&D and Business Unit Leaders to ensure effective planning and communication of new product development programs and RTM objectives to meet required project time-lines. • Followed QSR / GMP / ISO and OSHA requirements and regulations. Innovative Foto Salem, NH Jan 2012 – June 2012 Electro-Mechanical Assembly (Contract) • Read work orders and Bill of Materials (B.O.M) verbally before prepping. • Assembled photo booth frames using the panels from the router shop. • Wire harnessing for electronic connection – monitored video splitters, speakers, printers, and multiple outlet boxes. • Used various hand tools, power tools and building accessories. • Followed QSR / GMP / ISO and OSHA requirements and regulations. Wakefield Pelham, NH Dec 2011 – Jan 2012 Machine Shop (Contract) • Properly inserted and removed particles from CNC machines. • Inspected particles daily according to blueprint specifications using various measuring tools. • Followed QSR / GMP / ISO and OSHA requirements and regulations. • Used hand tools for sanding, grinding, deburring and tapping. Nova Biomedical Burlington, MA Aug 2011 – Nov 2011 Machine Operator (Contract) • Wore a smock before entering the clean working environment. • Operated CNC laser machinery. • Followed FDA / QSR / GMP and OSHA requirements and regulations. • Performed microscope inspection on gold sheets; OGP and ICT. Majilite Corporation Dracut, MA June 2011 – Aug 2011 Extrusion Operation (Contract) • Inspected for defects including discoloration and contamination. • Used the crank and roll carts before loading into the machine. • Properly loaded paper onto the extrusion machine. • Quickly inspected colors for accuracy while operating the machine. • Followed QSR / GMP and OSHA requirements. Cambridge Tools North Billerica, MA Sept 2010 – Dec 2010 Machine Shop (Contract)
  • 3. • Properly inserted and removed particles from CNC machines. • Inspected particles daily according to blueprint specifications using various measuring tools. • Followed QSR / GMP / ISO and OSHA requirements and regulations. • Used hand tools for sanding, grinding, deburring and tapping. Evergreen Solar Devens, MA Aug 2009 – Aug 2010 Team Lead – E/M Assembler (contract-perm, never perm because company outsourced to China) • Maintained and oversaw assembly lines to achieve weekly and monthly goals. • Responsible for troubleshooting the HMI touch screen. • Assembled frames onto the Kuka Robot panels. • Installed panels along with J-Box order before testing with inspire and Graphikon. • Performed final visual inspection. • Wore PPE Tyvek jacket and smock and gloves in clean working environment. • Reworked solar panels. • Used small hand tools like tweezers, pliers, soldering iron, etc. • Followed QSR / GMP / ISO and OSHA requirements and regulations. United Parcel Service Chelmsford, MA June 2009 –Aug 2009 Warehouse (part-time) • Maintained the flexibility to load and unload trucks. • Inspected the packages for damages. • Unloaded packages over the conveyor belts before scanning the label to its destination. Bell Microproducts Acton, MA Feb 2009 – April 2009 Material Handler (contract) • Followed QSR / GMP / ISO and OSHA regulations. • Wore static resistant smock clothing in the clean working environment area. • Performed daily cycle counts and accurate inventory transactions. • Managed workload to comply with both internal and external customer requirements. • Operated forklift. L3 Communications Essco Acton, MA Sept 2006 – April 2008 QC / Assembler (company sold, layoff) • Submitted inspection reports on Microsoft Excel and sent to management through Outlook. • Performed welding, cutting, grinding and deburring on materials. • Operated automated equipment to assemble and inspect a labor of productions. • Followed blueprints and material specifications. • Operated Faro arm and laser machine in a clean room station and followed ISO 9001. • Wore steel toe shoes, Tyvek jump suit, safety glasses, mask and ear protection for safety. • Calibration on FARO Laser machines and used electro-microscopes for naked eye vision. • Followed ISO 9001, ISO 1345 requirements and regulations. 3M Chelmsford, MA Jan 2006 – June 2006 Machine Operator (Contract) • Processed production extrusion machine and operated spooling and splice machines. • Used various hand tools for measurement. • Record data using Microsoft Excel.
  • 4. W.K. Hillquist Hudson, NH April 2002 – Dec 2004 Machine Operator • Responsible for inserting threads, identifying defects (discoloration), and for deburring material. • Packaged and labeled or products. • Operated injection molding machines for production. EDUCATION ITT Technical Institute Woburn, MA 2007- postpone • Computer Electronic Technology Centennial High School Peoria, AZ 2007 • High School diploma