SlideShare a Scribd company logo
Quality Control Form
Inspector Name:	 NEO Monitor Name: 	 Job Number:
Client Name:	 Address:	 Phone:	 Date:
Contractor Name	 Blower Door:	 Lead Safe:	 Knob and Tube Wiring:
PRE: POST: Building Tightness Limit: £YES	 £NO £YES	 £NO
Fuel Type:	 Combustion Appliances
£Nat. Gas	 £Oil 	 £Propane	 £Electric 	 £Other: £Stove	 £Water Heater 	 £Fireplace	 £Console Heater (size:	 Btus)
	YES	 NO	 ATTIC
FORM
WX1
Insulation Added Proper Depth
Vents (1 free ft. per 6002’
)
Damming
Heat Shield
Density Sample
Information at Opening (company name, date, no. of bags, square footage, R-value)
Access Treated (minimum 13’ X 20’) R-19
	 KNEE WALLS
Access Treated
Information All Openings
Vapor Barrier Facing Warm Side
Density Sample
General Air Sealing
	 Nebraska Energy Office — White Copy		 	 Local Agency — Canary Copy	 	 Crew/Contractor — Pink Copy
	 SIDE WALLS
Density Sample
General Air Sealing
Thermal Image
	 FOUNDATION/BASEMENTS/CRAWL SPACE
Floor Insulation
Crawl Space/Basement Wall Insulated
Sill Box Insulation (more than 2” in depth)
Ledge Walls (24” on top of ground moisture barrier)
	 LIGHTING/CO — COMBUSTABLE DETECTORS
CFL
CO Detector
Doors
Windows
Duct Work
	 COMBUSTABLE APPLIANCE ZONE
CO Reading:	 Water Heater	
	Furnace	
	 Stove/Range	 	 	
Draft
Pressure						
Efficiency (%)
Confined Space
Test Gas Leaks
Venting
NEO 6-21-11 Revised 05-27-14
Supercedes NEO 6-21-11 Revised 03-06-12
Additional Comments:
All measures completed Some measures completed while on site Further measures must be completed within 10 business days
State of Nebraska Weatherization Assistance Program
Agency:
£BVCAP	 £CAPLSC	 £CAPMN	 £CAPWN	 £CNCS	 £NENCAP	 £NWCAP	 £SENCA
This material was prepared with the support of the U.S. Department of Energy (DOE), Low Income Weatherization Assistance Program Grant No. DE-EE0000137. However, any opinions findings
conclusions or recommendations expressed herein are those of the author and do not necessarily reflect the views of DOE.

More Related Content

Similar to Nebrask qci checklist

Elements Of A Masonry Forensic Investigation Ryan Biggs
Elements Of A Masonry Forensic Investigation Ryan BiggsElements Of A Masonry Forensic Investigation Ryan Biggs
Elements Of A Masonry Forensic Investigation Ryan Biggs
Martin Demarest
 
Detailing : Floor Assemblies
Detailing : Floor AssembliesDetailing : Floor Assemblies
Detailing : Floor Assemblies
Todd Wyatt
 

Similar to Nebrask qci checklist (7)

Moving Towards More Energy Efficient Building Enclosures - Part 9 and Beyond
Moving Towards More Energy Efficient Building Enclosures - Part 9 and BeyondMoving Towards More Energy Efficient Building Enclosures - Part 9 and Beyond
Moving Towards More Energy Efficient Building Enclosures - Part 9 and Beyond
 
Moving Towards more Energy Efficient Wood-frame Building Enclosure
Moving Towards more Energy Efficient Wood-frame Building EnclosureMoving Towards more Energy Efficient Wood-frame Building Enclosure
Moving Towards more Energy Efficient Wood-frame Building Enclosure
 
Elements Of A Masonry Forensic Investigation Ryan Biggs
Elements Of A Masonry Forensic Investigation Ryan BiggsElements Of A Masonry Forensic Investigation Ryan Biggs
Elements Of A Masonry Forensic Investigation Ryan Biggs
 
Good Energy Haus
Good Energy HausGood Energy Haus
Good Energy Haus
 
Detailing : Floor Assemblies
Detailing : Floor AssembliesDetailing : Floor Assemblies
Detailing : Floor Assemblies
 
Thermal Performance
Thermal PerformanceThermal Performance
Thermal Performance
 
Lexington Pkwy Passive House Plus
Lexington Pkwy Passive House PlusLexington Pkwy Passive House Plus
Lexington Pkwy Passive House Plus
 

Recently uploaded

一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
enbam
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
aveka1
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
enbam
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
enbam
 
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
enbam
 

Recently uploaded (20)

一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
Elderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolElderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnool
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Honeycomb for The Hive Design Inspirations
Honeycomb for The Hive Design InspirationsHoneycomb for The Hive Design Inspirations
Honeycomb for The Hive Design Inspirations
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
 
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
 

Nebrask qci checklist

  • 1. Quality Control Form Inspector Name: NEO Monitor Name: Job Number: Client Name: Address: Phone: Date: Contractor Name Blower Door: Lead Safe: Knob and Tube Wiring: PRE: POST: Building Tightness Limit: £YES £NO £YES £NO Fuel Type: Combustion Appliances £Nat. Gas £Oil £Propane £Electric £Other: £Stove £Water Heater £Fireplace £Console Heater (size: Btus) YES NO ATTIC FORM WX1 Insulation Added Proper Depth Vents (1 free ft. per 6002’ ) Damming Heat Shield Density Sample Information at Opening (company name, date, no. of bags, square footage, R-value) Access Treated (minimum 13’ X 20’) R-19 KNEE WALLS Access Treated Information All Openings Vapor Barrier Facing Warm Side Density Sample General Air Sealing Nebraska Energy Office — White Copy Local Agency — Canary Copy Crew/Contractor — Pink Copy SIDE WALLS Density Sample General Air Sealing Thermal Image FOUNDATION/BASEMENTS/CRAWL SPACE Floor Insulation Crawl Space/Basement Wall Insulated Sill Box Insulation (more than 2” in depth) Ledge Walls (24” on top of ground moisture barrier) LIGHTING/CO — COMBUSTABLE DETECTORS CFL CO Detector Doors Windows Duct Work COMBUSTABLE APPLIANCE ZONE CO Reading: Water Heater Furnace Stove/Range Draft Pressure Efficiency (%) Confined Space Test Gas Leaks Venting NEO 6-21-11 Revised 05-27-14 Supercedes NEO 6-21-11 Revised 03-06-12 Additional Comments: All measures completed Some measures completed while on site Further measures must be completed within 10 business days State of Nebraska Weatherization Assistance Program Agency: £BVCAP £CAPLSC £CAPMN £CAPWN £CNCS £NENCAP £NWCAP £SENCA This material was prepared with the support of the U.S. Department of Energy (DOE), Low Income Weatherization Assistance Program Grant No. DE-EE0000137. However, any opinions findings conclusions or recommendations expressed herein are those of the author and do not necessarily reflect the views of DOE.