Non-Conformity Report
Format No. QS/FM/03
Rev.1
Page 1 of 2
IDENTIFICATION
ProjectTitle:
JobNo.: Date:
Client: NCR ReportNo:
Subject: NCR IssuedTo:
Originator: Contractor/Vendor:
Location: Reference Document:
Found During What Activity
☐IncomingInspection ☐ InProcessInspection ☐ Final Inspection ☐Other(s)_____________________
DECRIPTION
OF
NON-CONFORMANCE
Description of the nonconformity & possible root causes (Note the applicable specifications, standards,
requirements, procedures, references, drawings, activities, etc.; use a continuation page if necessary)
Name: Signature &Date
PROPOSED
DISPOSITION
☐ Use as Is
☐ Repair/ Rework
☐ Reject
☐ Returnto Vendor
☐ Other_________________________________
________________________________________
________________________________________
PROPSED CORRECTIVE ACTION
☐ By RSATPL ☐ BY Vendor
ROOTCAUSE
ANALYSIS
Name: Signature &Date
CORRECTIVE
ACTION
Name: Signature &Date
Non-Conformity Report
Format No. QS/FM/03
Rev.1
Page 2 of 2
CLOSURE
OF
NON-
CONFORMITY
Verification of Implementation of CA
Name: Signature &Date
Annexure
Sl.NO Description Remarks

More Related Content

What's hot

CONCRETE PUMP & EXTENSION PIPELINE Form # HSEQ - CPC Rev 2.docx
CONCRETE PUMP & EXTENSION PIPELINE Form # HSEQ - CPC Rev 2.docxCONCRETE PUMP & EXTENSION PIPELINE Form # HSEQ - CPC Rev 2.docx
CONCRETE PUMP & EXTENSION PIPELINE Form # HSEQ - CPC Rev 2.docxDwarika Bhushan Sharma
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.maqsood1459
 
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103Safe Rise
 
Wind Turbine Inspection Solutions: At the Heart of Your Process
Wind Turbine Inspection Solutions: At the Heart of Your ProcessWind Turbine Inspection Solutions: At the Heart of Your Process
Wind Turbine Inspection Solutions: At the Heart of Your ProcessOlympus IMS
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007Tonni Bruce
 
Medevac Safety - Helecopter
Medevac Safety - HelecopterMedevac Safety - Helecopter
Medevac Safety - HelecopterVASS Yukon
 
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxOFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxDwarika Bhushan Sharma
 
fidic-flow-chart.pptx
fidic-flow-chart.pptxfidic-flow-chart.pptx
fidic-flow-chart.pptxssuserb337ce1
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type suresh tusia
 
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docxDE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docxDwarika Bhushan Sharma
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineIEI GSC
 
Method statement painting
Method statement painting Method statement painting
Method statement painting Daniel SLSA CLA
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
 
Mind map the_9_key_elements_video_05_pre-commissioning
Mind map the_9_key_elements_video_05_pre-commissioningMind map the_9_key_elements_video_05_pre-commissioning
Mind map the_9_key_elements_video_05_pre-commissioningsakol kai
 
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docxTOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docxDwarika Bhushan Sharma
 

What's hot (20)

Job Hazard Analysis (JSA)
Job Hazard Analysis (JSA)Job Hazard Analysis (JSA)
Job Hazard Analysis (JSA)
 
NDT Level – II in RT, UT MT, PT Courses
NDT Level – II in RT, UT MT, PT CoursesNDT Level – II in RT, UT MT, PT Courses
NDT Level – II in RT, UT MT, PT Courses
 
CONCRETE PUMP & EXTENSION PIPELINE Form # HSEQ - CPC Rev 2.docx
CONCRETE PUMP & EXTENSION PIPELINE Form # HSEQ - CPC Rev 2.docxCONCRETE PUMP & EXTENSION PIPELINE Form # HSEQ - CPC Rev 2.docx
CONCRETE PUMP & EXTENSION PIPELINE Form # HSEQ - CPC Rev 2.docx
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.
 
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103
 
Wind Turbine Inspection Solutions: At the Heart of Your Process
Wind Turbine Inspection Solutions: At the Heart of Your ProcessWind Turbine Inspection Solutions: At the Heart of Your Process
Wind Turbine Inspection Solutions: At the Heart of Your Process
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
 
Pipeline construction management
Pipeline construction managementPipeline construction management
Pipeline construction management
 
Medevac Safety - Helecopter
Medevac Safety - HelecopterMedevac Safety - Helecopter
Medevac Safety - Helecopter
 
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxOFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
 
fidic-flow-chart.pptx
fidic-flow-chart.pptxfidic-flow-chart.pptx
fidic-flow-chart.pptx
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type
 
Introduction_to_NDT
Introduction_to_NDTIntroduction_to_NDT
Introduction_to_NDT
 
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docxDE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
 
Method statement painting
Method statement painting Method statement painting
Method statement painting
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
 
Grp installation procedure
Grp installation procedureGrp installation procedure
Grp installation procedure
 
Mind map the_9_key_elements_video_05_pre-commissioning
Mind map the_9_key_elements_video_05_pre-commissioningMind map the_9_key_elements_video_05_pre-commissioning
Mind map the_9_key_elements_video_05_pre-commissioning
 
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docxTOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI  Rev 2 -.docx
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
 

Similar to Ncr new format

DENR Self monitoring report (SMR) Quarterly Report Form
DENR Self monitoring report (SMR) Quarterly Report FormDENR Self monitoring report (SMR) Quarterly Report Form
DENR Self monitoring report (SMR) Quarterly Report FormSonman Environmental Services
 
src
srcsrc
srcCCSE
 
Powers - Cert of Completion - 09-18-08
Powers - Cert of Completion - 09-18-08Powers - Cert of Completion - 09-18-08
Powers - Cert of Completion - 09-18-08Justin Cook
 
BSA515r3 - HWE WebsiteContract PlanInitiating Office.docx
BSA515r3 - HWE WebsiteContract PlanInitiating Office.docxBSA515r3 - HWE WebsiteContract PlanInitiating Office.docx
BSA515r3 - HWE WebsiteContract PlanInitiating Office.docxAASTHA76
 
27 pso business_requirements
27 pso business_requirements27 pso business_requirements
27 pso business_requirementsMarcelo Mesti
 
E9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.docE9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.docPeterIyere2
 
Service levelagreementtemplate v8
Service levelagreementtemplate v8Service levelagreementtemplate v8
Service levelagreementtemplate v8Aditya Pandey
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Kipcon Inc.
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
masaa general process checklist-v2
masaa general process checklist-v2masaa general process checklist-v2
masaa general process checklist-v2Jan Hauters
 

Similar to Ncr new format (20)

DENR Self monitoring report (SMR) Quarterly Report Form
DENR Self monitoring report (SMR) Quarterly Report FormDENR Self monitoring report (SMR) Quarterly Report Form
DENR Self monitoring report (SMR) Quarterly Report Form
 
src
srcsrc
src
 
Powers - Cert of Completion - 09-18-08
Powers - Cert of Completion - 09-18-08Powers - Cert of Completion - 09-18-08
Powers - Cert of Completion - 09-18-08
 
BSA515r3 - HWE WebsiteContract PlanInitiating Office.docx
BSA515r3 - HWE WebsiteContract PlanInitiating Office.docxBSA515r3 - HWE WebsiteContract PlanInitiating Office.docx
BSA515r3 - HWE WebsiteContract PlanInitiating Office.docx
 
27 pso business_requirements
27 pso business_requirements27 pso business_requirements
27 pso business_requirements
 
User acceptance-report
User acceptance-reportUser acceptance-report
User acceptance-report
 
E9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.docE9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.doc
 
Work permit
Work permitWork permit
Work permit
 
Presentación1
Presentación1Presentación1
Presentación1
 
Gc hv-011 rev.a01
Gc hv-011 rev.a01Gc hv-011 rev.a01
Gc hv-011 rev.a01
 
F cpa-01
F cpa-01F cpa-01
F cpa-01
 
Service levelagreementtemplate v8
Service levelagreementtemplate v8Service levelagreementtemplate v8
Service levelagreementtemplate v8
 
Change controlform
Change controlformChange controlform
Change controlform
 
tendering
 tendering tendering
tendering
 
Change Control Form
Change Control FormChange Control Form
Change Control Form
 
SHOWROOM PRESENTATION (2)
SHOWROOM PRESENTATION (2)SHOWROOM PRESENTATION (2)
SHOWROOM PRESENTATION (2)
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
masaa general process checklist-v2
masaa general process checklist-v2masaa general process checklist-v2
masaa general process checklist-v2
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Ncr new format

  • 1. Non-Conformity Report Format No. QS/FM/03 Rev.1 Page 1 of 2 IDENTIFICATION ProjectTitle: JobNo.: Date: Client: NCR ReportNo: Subject: NCR IssuedTo: Originator: Contractor/Vendor: Location: Reference Document: Found During What Activity ☐IncomingInspection ☐ InProcessInspection ☐ Final Inspection ☐Other(s)_____________________ DECRIPTION OF NON-CONFORMANCE Description of the nonconformity & possible root causes (Note the applicable specifications, standards, requirements, procedures, references, drawings, activities, etc.; use a continuation page if necessary) Name: Signature &Date PROPOSED DISPOSITION ☐ Use as Is ☐ Repair/ Rework ☐ Reject ☐ Returnto Vendor ☐ Other_________________________________ ________________________________________ ________________________________________ PROPSED CORRECTIVE ACTION ☐ By RSATPL ☐ BY Vendor ROOTCAUSE ANALYSIS Name: Signature &Date CORRECTIVE ACTION Name: Signature &Date
  • 2. Non-Conformity Report Format No. QS/FM/03 Rev.1 Page 2 of 2 CLOSURE OF NON- CONFORMITY Verification of Implementation of CA Name: Signature &Date Annexure Sl.NO Description Remarks