SlideShare a Scribd company logo
1 of 2
ProjectConnections.com Template Change Control Form
INTRODUCTION: Change Control Form
The Form Starts on the Following Page
What This Is
Form for documenting a change someone is requesting be made to a project or to a system, product, or
service being delivered by a project.
The forms sections provide space to:
 Describe the change, the reason for it, and what the change would affect in terms of project
deliverables and documentation, as well as what resource time would be needed to implement and
validate the change.
 And space to track all the change impacts to completion (major implementation tasks and document
updates).
 Officially sign off on the change.
Why It’s Useful
Projects are often plagued by "scope creep" – changes get made with out review, adding to the work of
the project, and sometimes delaying the schedule, increasing the costs, or causing late issues to arise.
Companies use change control to make sure the impact of any proposed change to the project definition,
or specific components of the project (such as hardware or software deliverables, or a business process
associated with a service) are thoroughly understood, carefully considered, and formally approved in
some fashion. The change control form in this template file shows the type of information the team should
get on a proposed change to fully understand its impact.
Change control usually grows more stringent as a project progresses, in order to protect the project
against late, disruptive changes.
How to Use It
1. Establish a process by which changes will be proposed and reviewed using the change control form.
The process should ensure that proposed changes are reviewed frequently enough to keep the
project moving.
2. The details of each section of the form should be customized for your project types and project
deliverables – i.e., for what the output of your projects is, whether product, system, service, etc.
3. Provide the form to team members and others who might need to submit a change.
4. This form can also be used when you are using contractors or outside firms to do work on your
project. In this case that outside party would be required to provide the information relevant to the
work they're performing.
5. Identify who should be involved in reviewing various types of changes. Document that in simple
guidelines.
6. After the impacts have been considered, use the bottom portion of the form to document the decision
on this change: approved or not, and why. The signature lines at the bottom become the official
signoff on that decision.
7. File the change forms as important project records.
The Form Starts on the Following Page
Copyright 2002-2006 Emprend Inc/ ProjectConnections.com Page 1
Permission for Members to use personally according to our Terms of Service
ProjectConnections.com Template Change Control Form
Change Control Form
Change Request #: ____________________ Project: _______________________
CHANGE REQUEST INITIATION: Originator: __________________ Phone#: (___)__________ email: ___________________
Date Submitted: ____/____/____ System/Product/Service Name: _________________________ Version Number: _________________
CONFIGURATION ITEM: Software: ___ Firmware: ___ Hardware: ___ Documentation: ___
Other: _______________
CHANGE TYPE: New Requirement: ___ Requirement Change: ___ Design Change: __ Other: _______________________
REASON: Legal: ___ Market: ___ Performance: ___ Customer Request: ___ Defect: ______ Other: _________________
PRIORITY: Emergency: ______ Urgent: ______ Routine: ______ Date Required: ____/____/____
CHANGE DESCRIPTION: (Detail functional and/or technical information. Use attachment if necessary.)
Attachments: Yes / No
TECHNICAL EVALUATION: (Use attachment to explain changes, impact on other entities, impact on performance etc.)
Received By: ___________ Date Received: ___/___/___ Assigned To: _______________________ Date Assigned: ___/___/___
Type of Software/Hardware/etc. Affected_________________________________________________________________________
Modules/Screens/Tables/Files Affected: _________________________________________________________________________
Documentation Affected: Section # Page # Date Completed Initial
Requirements Specification ___________ ________ ______/______/______ _______
System Design Specification ___________ ________ ______/______/______ _______
System Test Plan ___________ ________ ______/______/______ _______
Training Plan ___________ ________ ______/______/______ _______
User System Reference Manual ___________ ________ ______/______/______ _______
System Maintenance Manual ___________ ________ ______/______/______ _______
Other (Specify) ___________ ________ ______/______/______ _______
TIME ESTIMATES to make the change: (Use attachment if necessary.)
Lifecycle Stage Est. Time Act. Time Date Comp. Remarks
Analysis/Design __________ __________ ____/____/____ ___________________________________
Coding/Testing __________ __________ ____/____/____ ___________________________________
Acceptance __________ __________ ____/____/____ ___________________________________
Total Hours: ________ ________ ______________________________
Project Impact Analysis Needed: Yes / No (If yes, include impact on budget, resources, schedule, risk etc.)
APPROVALS: Change Approved: ______ Change Not Approved: ______ Hold (Future Enhancement): ______
1. Signature ____________________________________________ Date: ____/____/____
2. Signature ____________________________________________ Date: ____/____/____
3. Signature ____________________________________________ Date: ____/____/____
Copyright 2002-2006 Emprend Inc/ ProjectConnections.com Page 2
Permission for Members to use personally according to our Terms of Service

More Related Content

Similar to Change controlform

Software Project Management: Configuration Management
Software Project Management: Configuration ManagementSoftware Project Management: Configuration Management
Software Project Management: Configuration ManagementMinhas Kamal
 
How to configure Change management flow Whizible SEM
How to configure Change management flow Whizible SEMHow to configure Change management flow Whizible SEM
How to configure Change management flow Whizible SEMamol1748
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0Aditya Pandey
 
Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805Udaya Kumar
 
Assisit with devlopment.pptx
Assisit with devlopment.pptxAssisit with devlopment.pptx
Assisit with devlopment.pptxTadeseBeyene
 
src
srcsrc
srcCCSE
 
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...kndnewguade
 
5 steps project change control process
5 steps project change control process5 steps project change control process
5 steps project change control processPM Majik
 
27 pso business_requirements
27 pso business_requirements27 pso business_requirements
27 pso business_requirementsMarcelo Mesti
 
Techno functional dcoument template v1.0
Techno functional dcoument template v1.0Techno functional dcoument template v1.0
Techno functional dcoument template v1.0Avinash Kadam
 
Pirana V3 - Changes
Pirana V3 - ChangesPirana V3 - Changes
Pirana V3 - Changesleechris58
 
Maintenance Scheduling Software
Maintenance Scheduling Software Maintenance Scheduling Software
Maintenance Scheduling Software Mohammad Hijazi
 
Softwareenggineering lab manual
Softwareenggineering lab manualSoftwareenggineering lab manual
Softwareenggineering lab manualVivek Kumar Sinha
 
Environment & Release Management
Environment & Release ManagementEnvironment & Release Management
Environment & Release Managementelliando dias
 
SAD_UnitII.docx
SAD_UnitII.docxSAD_UnitII.docx
SAD_UnitII.docx8759000398
 
Reading Summary - Software Requirements + Characteristics of Well Written Req...
Reading Summary - Software Requirements + Characteristics of Well Written Req...Reading Summary - Software Requirements + Characteristics of Well Written Req...
Reading Summary - Software Requirements + Characteristics of Well Written Req...Artemisa Yescas Engler
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTAlessandro Rinaldi
 

Similar to Change controlform (20)

Software Project Management: Configuration Management
Software Project Management: Configuration ManagementSoftware Project Management: Configuration Management
Software Project Management: Configuration Management
 
How to configure Change management flow Whizible SEM
How to configure Change management flow Whizible SEMHow to configure Change management flow Whizible SEM
How to configure Change management flow Whizible SEM
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0
 
Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805
 
Assisit with devlopment.pptx
Assisit with devlopment.pptxAssisit with devlopment.pptx
Assisit with devlopment.pptx
 
Reqs analysis
Reqs analysisReqs analysis
Reqs analysis
 
src
srcsrc
src
 
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
 
FAQs on Billings and Project Milestones
FAQs on Billings and Project MilestonesFAQs on Billings and Project Milestones
FAQs on Billings and Project Milestones
 
5 steps project change control process
5 steps project change control process5 steps project change control process
5 steps project change control process
 
27 pso business_requirements
27 pso business_requirements27 pso business_requirements
27 pso business_requirements
 
Techno functional dcoument template v1.0
Techno functional dcoument template v1.0Techno functional dcoument template v1.0
Techno functional dcoument template v1.0
 
Pirana V3 - Changes
Pirana V3 - ChangesPirana V3 - Changes
Pirana V3 - Changes
 
Maintenance Scheduling Software
Maintenance Scheduling Software Maintenance Scheduling Software
Maintenance Scheduling Software
 
Softwareenggineering lab manual
Softwareenggineering lab manualSoftwareenggineering lab manual
Softwareenggineering lab manual
 
Environment & Release Management
Environment & Release ManagementEnvironment & Release Management
Environment & Release Management
 
Print report
Print reportPrint report
Print report
 
SAD_UnitII.docx
SAD_UnitII.docxSAD_UnitII.docx
SAD_UnitII.docx
 
Reading Summary - Software Requirements + Characteristics of Well Written Req...
Reading Summary - Software Requirements + Characteristics of Well Written Req...Reading Summary - Software Requirements + Characteristics of Well Written Req...
Reading Summary - Software Requirements + Characteristics of Well Written Req...
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
 

Recently uploaded

EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfLars Albertsson
 
Unveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystUnveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystSamantha Rae Coolbeth
 
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...shivangimorya083
 
Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingNeil Barnes
 
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一ffjhghh
 
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfMarket Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfRachmat Ramadhan H
 
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...Florian Roscheck
 
Predicting Employee Churn: A Data-Driven Approach Project Presentation
Predicting Employee Churn: A Data-Driven Approach Project PresentationPredicting Employee Churn: A Data-Driven Approach Project Presentation
Predicting Employee Churn: A Data-Driven Approach Project PresentationBoston Institute of Analytics
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSAishani27
 
Invezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz1
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPramod Kumar Srivastava
 
Aminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
Aminabad Call Girl Agent 9548273370 , Call Girls Service LucknowAminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
Aminabad Call Girl Agent 9548273370 , Call Girls Service Lucknowmakika9823
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfMarinCaroMartnezBerg
 
04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationships04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationshipsccctableauusergroup
 
Log Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptxLog Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptxJohnnyPlasten
 

Recently uploaded (20)

EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdf
 
Unveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystUnveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data Analyst
 
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
 
Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data Storytelling
 
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
 
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfMarket Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
 
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
 
Predicting Employee Churn: A Data-Driven Approach Project Presentation
Predicting Employee Churn: A Data-Driven Approach Project PresentationPredicting Employee Churn: A Data-Driven Approach Project Presentation
Predicting Employee Churn: A Data-Driven Approach Project Presentation
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICS
 
E-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptxE-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptx
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
Invezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signals
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
 
Aminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
Aminabad Call Girl Agent 9548273370 , Call Girls Service LucknowAminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
Aminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
 
04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationships04242024_CCC TUG_Joins and Relationships
04242024_CCC TUG_Joins and Relationships
 
Log Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptxLog Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptx
 

Change controlform

  • 1. ProjectConnections.com Template Change Control Form INTRODUCTION: Change Control Form The Form Starts on the Following Page What This Is Form for documenting a change someone is requesting be made to a project or to a system, product, or service being delivered by a project. The forms sections provide space to:  Describe the change, the reason for it, and what the change would affect in terms of project deliverables and documentation, as well as what resource time would be needed to implement and validate the change.  And space to track all the change impacts to completion (major implementation tasks and document updates).  Officially sign off on the change. Why It’s Useful Projects are often plagued by "scope creep" – changes get made with out review, adding to the work of the project, and sometimes delaying the schedule, increasing the costs, or causing late issues to arise. Companies use change control to make sure the impact of any proposed change to the project definition, or specific components of the project (such as hardware or software deliverables, or a business process associated with a service) are thoroughly understood, carefully considered, and formally approved in some fashion. The change control form in this template file shows the type of information the team should get on a proposed change to fully understand its impact. Change control usually grows more stringent as a project progresses, in order to protect the project against late, disruptive changes. How to Use It 1. Establish a process by which changes will be proposed and reviewed using the change control form. The process should ensure that proposed changes are reviewed frequently enough to keep the project moving. 2. The details of each section of the form should be customized for your project types and project deliverables – i.e., for what the output of your projects is, whether product, system, service, etc. 3. Provide the form to team members and others who might need to submit a change. 4. This form can also be used when you are using contractors or outside firms to do work on your project. In this case that outside party would be required to provide the information relevant to the work they're performing. 5. Identify who should be involved in reviewing various types of changes. Document that in simple guidelines. 6. After the impacts have been considered, use the bottom portion of the form to document the decision on this change: approved or not, and why. The signature lines at the bottom become the official signoff on that decision. 7. File the change forms as important project records. The Form Starts on the Following Page Copyright 2002-2006 Emprend Inc/ ProjectConnections.com Page 1 Permission for Members to use personally according to our Terms of Service
  • 2. ProjectConnections.com Template Change Control Form Change Control Form Change Request #: ____________________ Project: _______________________ CHANGE REQUEST INITIATION: Originator: __________________ Phone#: (___)__________ email: ___________________ Date Submitted: ____/____/____ System/Product/Service Name: _________________________ Version Number: _________________ CONFIGURATION ITEM: Software: ___ Firmware: ___ Hardware: ___ Documentation: ___ Other: _______________ CHANGE TYPE: New Requirement: ___ Requirement Change: ___ Design Change: __ Other: _______________________ REASON: Legal: ___ Market: ___ Performance: ___ Customer Request: ___ Defect: ______ Other: _________________ PRIORITY: Emergency: ______ Urgent: ______ Routine: ______ Date Required: ____/____/____ CHANGE DESCRIPTION: (Detail functional and/or technical information. Use attachment if necessary.) Attachments: Yes / No TECHNICAL EVALUATION: (Use attachment to explain changes, impact on other entities, impact on performance etc.) Received By: ___________ Date Received: ___/___/___ Assigned To: _______________________ Date Assigned: ___/___/___ Type of Software/Hardware/etc. Affected_________________________________________________________________________ Modules/Screens/Tables/Files Affected: _________________________________________________________________________ Documentation Affected: Section # Page # Date Completed Initial Requirements Specification ___________ ________ ______/______/______ _______ System Design Specification ___________ ________ ______/______/______ _______ System Test Plan ___________ ________ ______/______/______ _______ Training Plan ___________ ________ ______/______/______ _______ User System Reference Manual ___________ ________ ______/______/______ _______ System Maintenance Manual ___________ ________ ______/______/______ _______ Other (Specify) ___________ ________ ______/______/______ _______ TIME ESTIMATES to make the change: (Use attachment if necessary.) Lifecycle Stage Est. Time Act. Time Date Comp. Remarks Analysis/Design __________ __________ ____/____/____ ___________________________________ Coding/Testing __________ __________ ____/____/____ ___________________________________ Acceptance __________ __________ ____/____/____ ___________________________________ Total Hours: ________ ________ ______________________________ Project Impact Analysis Needed: Yes / No (If yes, include impact on budget, resources, schedule, risk etc.) APPROVALS: Change Approved: ______ Change Not Approved: ______ Hold (Future Enhancement): ______ 1. Signature ____________________________________________ Date: ____/____/____ 2. Signature ____________________________________________ Date: ____/____/____ 3. Signature ____________________________________________ Date: ____/____/____ Copyright 2002-2006 Emprend Inc/ ProjectConnections.com Page 2 Permission for Members to use personally according to our Terms of Service