SlideShare a Scribd company logo
Adapting to future impacts of climate
change and screening adaptation projects
and programmes - key concepts and
principles (part 1)
Workshop ‘Smart Decision-Making for Climate Change Adaptation Supported by Multi-Criteria Analysis’
Presented by Martin Rokitzki
(PlanAdapt, International consultant)
Adaptation - What types of interventions?
Adaptation - What types of interventions?
Adaptation continuum
Dealing with Uncertainty – Managing Risks
• Diversification
• Adaptive management
• Learning – iterative processes - flexibility
• No or low-regret
• (Indication of) Trends can be sufficient to make decisions - other
sectors that constantly make decisions under uncertainty, e.g.
finance/ insurance sector
• Better access to insurance and compensation mechanisms
Risk perception
• Risk perception – psychological (behavioral economics), risk-specific,
time-specific, resource-specific
• Risk screening of projects – Are the project outcomes threatened by
climate risk?
• 3 types of outcomes:
• Project implementation can go ahead as planned;
• Project design needs to be modified;
• Project should not go ahead.
Low regret – robust adadptation
• Robust adaptation measures are defined as measures which satisfy a
number of “robustness principles” such as
• (i) low regret,
• (ii) reversible and flexible (to keep the cost of being wrong about future
climate change as low as possible),
• (iii) incorporate safety or security margins to design criteria, and
• (iv) employ “soft” (e.g., institutional and planning solutions.
Risk of maladaptation
• Example: Malawi risk insurance failed
to make payments due to flawed
design of payment conditions
Trade-offs / conflicting criteria
• Example: The most profitable is often not the most environmentally-
friendly or socially inclusive or healthiest, e.g. use fertilizer or
pesticide in agriculture - ‘fallacy of win-win-win’
• Good decision-making considers them and makes them explicit
• Trade-off game: http://esgame.unige.ch/

More Related Content

More from UNDP Climate

Climate Change Adaptation in the Arab States
Climate Change Adaptation in the Arab StatesClimate Change Adaptation in the Arab States
Climate Change Adaptation in the Arab States
UNDP Climate
 
National Adaptation Plans in Uruguay - A Sectoral Approach
National Adaptation Plans in Uruguay - A Sectoral ApproachNational Adaptation Plans in Uruguay - A Sectoral Approach
National Adaptation Plans in Uruguay - A Sectoral Approach
UNDP Climate
 
Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...
Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...
Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...
UNDP Climate
 
UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...
UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...
UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...
UNDP Climate
 
Climate Finance - National Adaptation Plans under the UNFCCC Process - Webinar
Climate Finance - National Adaptation Plans under the UNFCCC Process - WebinarClimate Finance - National Adaptation Plans under the UNFCCC Process - Webinar
Climate Finance - National Adaptation Plans under the UNFCCC Process - Webinar
UNDP Climate
 
UNDP-FAO Integrating Agriculture in National Adaptation Plans Highlights
UNDP-FAO Integrating Agriculture in National Adaptation Plans HighlightsUNDP-FAO Integrating Agriculture in National Adaptation Plans Highlights
UNDP-FAO Integrating Agriculture in National Adaptation Plans Highlights
UNDP Climate
 
Uruguay Case Study - NAP-Ag Programme
Uruguay Case Study - NAP-Ag ProgrammeUruguay Case Study - NAP-Ag Programme
Uruguay Case Study - NAP-Ag Programme
UNDP Climate
 
FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...
FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...
FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...
UNDP Climate
 
Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...
Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...
Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...
UNDP Climate
 
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomesThailand UNDP-GIZ workshop on CBA - Appraisal outcomes
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
UNDP Climate
 
Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...
UNDP Climate
 
Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...
UNDP Climate
 
Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...
UNDP Climate
 
Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...
Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...
Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...
UNDP Climate
 
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
UNDP Climate
 
Thailand UNDP-GIZ workshop on CBA - A review of conduction cost-benefit analysis
Thailand UNDP-GIZ workshop on CBA - A review of conduction cost-benefit analysisThailand UNDP-GIZ workshop on CBA - A review of conduction cost-benefit analysis
Thailand UNDP-GIZ workshop on CBA - A review of conduction cost-benefit analysis
UNDP Climate
 
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - The Colombian Clim...
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - The Colombian Clim...NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - The Colombian Clim...
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - The Colombian Clim...
UNDP Climate
 
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - Lessons and Challe...
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - Lessons and Challe...NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - Lessons and Challe...
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - Lessons and Challe...
UNDP Climate
 
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows
NAP-Ag Webinar - Tracking Domestic Climate Finance FlowsNAP-Ag Webinar - Tracking Domestic Climate Finance Flows
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows
UNDP Climate
 
Uganda Case Study - NAP-Ag COP23 presentation
Uganda Case Study - NAP-Ag COP23 presentationUganda Case Study - NAP-Ag COP23 presentation
Uganda Case Study - NAP-Ag COP23 presentation
UNDP Climate
 

More from UNDP Climate (20)

Climate Change Adaptation in the Arab States
Climate Change Adaptation in the Arab StatesClimate Change Adaptation in the Arab States
Climate Change Adaptation in the Arab States
 
National Adaptation Plans in Uruguay - A Sectoral Approach
National Adaptation Plans in Uruguay - A Sectoral ApproachNational Adaptation Plans in Uruguay - A Sectoral Approach
National Adaptation Plans in Uruguay - A Sectoral Approach
 
Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...
Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...
Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...
 
UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...
UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...
UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...
 
Climate Finance - National Adaptation Plans under the UNFCCC Process - Webinar
Climate Finance - National Adaptation Plans under the UNFCCC Process - WebinarClimate Finance - National Adaptation Plans under the UNFCCC Process - Webinar
Climate Finance - National Adaptation Plans under the UNFCCC Process - Webinar
 
UNDP-FAO Integrating Agriculture in National Adaptation Plans Highlights
UNDP-FAO Integrating Agriculture in National Adaptation Plans HighlightsUNDP-FAO Integrating Agriculture in National Adaptation Plans Highlights
UNDP-FAO Integrating Agriculture in National Adaptation Plans Highlights
 
Uruguay Case Study - NAP-Ag Programme
Uruguay Case Study - NAP-Ag ProgrammeUruguay Case Study - NAP-Ag Programme
Uruguay Case Study - NAP-Ag Programme
 
FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...
FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...
FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...
 
Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...
Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...
Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...
 
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomesThailand UNDP-GIZ workshop on CBA - Appraisal outcomes
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
 
Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...
 
Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...
 
Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...
 
Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...
Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...
Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...
 
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
 
Thailand UNDP-GIZ workshop on CBA - A review of conduction cost-benefit analysis
Thailand UNDP-GIZ workshop on CBA - A review of conduction cost-benefit analysisThailand UNDP-GIZ workshop on CBA - A review of conduction cost-benefit analysis
Thailand UNDP-GIZ workshop on CBA - A review of conduction cost-benefit analysis
 
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - The Colombian Clim...
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - The Colombian Clim...NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - The Colombian Clim...
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - The Colombian Clim...
 
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - Lessons and Challe...
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - Lessons and Challe...NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - Lessons and Challe...
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows - Lessons and Challe...
 
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows
NAP-Ag Webinar - Tracking Domestic Climate Finance FlowsNAP-Ag Webinar - Tracking Domestic Climate Finance Flows
NAP-Ag Webinar - Tracking Domestic Climate Finance Flows
 
Uganda Case Study - NAP-Ag COP23 presentation
Uganda Case Study - NAP-Ag COP23 presentationUganda Case Study - NAP-Ag COP23 presentation
Uganda Case Study - NAP-Ag COP23 presentation
 

Recently uploaded

A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
Cori Faklaris
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
Christina Parmionova
 
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptxPAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS_Team
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
uu1psyf6
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
Energy for One World
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Jamesadhikaram land matter consultancy 9447464502
 
PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
ahcitycouncil
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
ssuser05e8f3
 
About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).
Christina Parmionova
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
yemqpj
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
ahcitycouncil
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
ahcitycouncil
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
CFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon CanadaCFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon Canada
pmenzies
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
Scalabrini Institute for Human Mobility in Africa
 

Recently uploaded (20)

A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
 
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptxPAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
 
PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
 
About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
CFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon CanadaCFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon Canada
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 

National Adaptation Plans Thailand - Adapting to future impacts of climate change

  • 1. Adapting to future impacts of climate change and screening adaptation projects and programmes - key concepts and principles (part 1) Workshop ‘Smart Decision-Making for Climate Change Adaptation Supported by Multi-Criteria Analysis’ Presented by Martin Rokitzki (PlanAdapt, International consultant)
  • 2. Adaptation - What types of interventions?
  • 3. Adaptation - What types of interventions?
  • 5. Dealing with Uncertainty – Managing Risks • Diversification • Adaptive management • Learning – iterative processes - flexibility • No or low-regret • (Indication of) Trends can be sufficient to make decisions - other sectors that constantly make decisions under uncertainty, e.g. finance/ insurance sector • Better access to insurance and compensation mechanisms
  • 6.
  • 7. Risk perception • Risk perception – psychological (behavioral economics), risk-specific, time-specific, resource-specific • Risk screening of projects – Are the project outcomes threatened by climate risk? • 3 types of outcomes: • Project implementation can go ahead as planned; • Project design needs to be modified; • Project should not go ahead.
  • 8. Low regret – robust adadptation • Robust adaptation measures are defined as measures which satisfy a number of “robustness principles” such as • (i) low regret, • (ii) reversible and flexible (to keep the cost of being wrong about future climate change as low as possible), • (iii) incorporate safety or security margins to design criteria, and • (iv) employ “soft” (e.g., institutional and planning solutions.
  • 9. Risk of maladaptation • Example: Malawi risk insurance failed to make payments due to flawed design of payment conditions
  • 10. Trade-offs / conflicting criteria • Example: The most profitable is often not the most environmentally- friendly or socially inclusive or healthiest, e.g. use fertilizer or pesticide in agriculture - ‘fallacy of win-win-win’ • Good decision-making considers them and makes them explicit • Trade-off game: http://esgame.unige.ch/