Mobile No.: +91-9985758609, +91-9738297413 P.NABI RASOOL
E-mail: nabirasool63@gmail.com (PIPING STRESS ENGINEER)
PROFESSIONAL SUMMARY
Possessing 5.6 years of engineering experience in the field of Oil and Gas (Offshore & Onshore),
Refinery & Power plant domains with special exposure to piping stress analysis.
WORK EXPERIENCE
Present Company : TECNICAS REUNIDAS – VALDEL ENGINEERING (June-2015 to Till date)
Location : Bangalore
Designation : Piping Stress Engineer
Previous Company : PETROFAC ENGINEERING SERVICES INDIA Pvt Ltd.(Jan-2015 to June 2015)
Location : Chennai
Designation : Piping Stress Engineer
Previous Company : SGK Techno Ventures Pvt Ltd. (Jully-2011 to Jan-2015)
Location : Hyderabad
Designation : Piping Stress Engineer
EDUCATIONAL QUALIFICATION
Bachelors in Mechanical Engineering, April 2011, from VVIT (JNTU), Hyderabad, A.P, Passed in
First class with Distinction.
Diploma in Mechanical Engineering May 2008, from SBTET, Hyderabad
TECHNICAL SKILLS
Software’s known
- Caesar-II version 7.1, 6.10, 5.3
- PDMS 12.0
- SP3D VERSON 6.0
Auto cad
SPR (Review Software)
Navis work (Review Software)
MS OFFICE
Familiar with: -
- International Design codes & Dimensional standards.
Viz: ANSI/ASME, API & there use in design, analysis and calculation
KEY RESPONSIBILITIES
Understand work scope, create piping model using Caesar II as per piping stress specification.
Co-relate between P&ID, 3D Model & Isometrics.
Optimizing the routing of critical lines with support and layout feasibility studies.
Identifying stress critical lines from the P&ID and preparing line index as per the project
specification
Reviewing Static and Dynamic Analysis of Stress systems
Building of load cases for performing piping analysis as per piping stress specification.
Perform Wind, Seismic & Snow analysis.
Analysis of Fired heaters inlet and outlet lines and Reciprocating compressors, Centrifugal
Compressors.
Executing Stress Analysis of lines connected to Heat exchanger, Reboiler, Column, Vessels,
storage Tanks, Reactors, Air fin coolers, Pumps and Skid turbines.
Analyzing high temperature lines connected to Compressors, steam turbine and to qualify
nozzle according to NEMA standards, alignment check, flange leakage check and frequency
requirements.
Stress analysis of lines for operating and towing conditions as per project specifications.
Static analysis of Seismic & two phase flow (Slug/Plug) lines of piping systems
Conducting Dynamic analysis for two phase slug flow lines to avoid flow induced vibrations
using response spectrum method
Performing analysis of Buried line etc.
Performing wind, WRC calculations, Trunnion check and Flange leakage check
Preparation of Pipe Rack and Structural Loading data to Civil
Preparing Equipment platform loading drawing and piping clip information for hot and Cold
Equipments as per piping support requirements.
Preparation of structure loading and steel requirements for civil input.
IFC Isometrics back check for stress and support requirements.
Selection of spring supports and vendor spring GAD review.
Preparation of stress analysis final Reports.
PROJECTS HANDLED
Project #1
Project : PETRONAS (RAPID) PROJECT Package-3 (Jun'15 –Feb’16)
Unit : Cracked Naphtha hydro treating (CNHT)
S/W used : CAESAR-II (Version- 2014).
Key Responsibilities:
Stress analysis of critical lines connected to fire heaters, Reactors, Air coolers, columns, Pumps,
Exchangers, and Reboilers.
Analysis of buried trench network
Civil loading information of pipe rack, Plat form and structures.
Preparation of Stress analysis reports.
Interaction and co-ordination with other Departments
Project #2
Project : FADHILI GAS PLANT (Feb’16 – Till date)
Unit : D46
End-user : SAUDI ARAMCO
S/W used : CAESAR-II (Version- 2016).
Key Responsibilities:
Stress analysis of critical lines connected to API 650 TANKS, Pipe rack, PSV lines, Vessels,
Pumps, Turbine line.
Analysis of ANSI PUMPS.
Civil loading information of pipe rack, Plat form, Equipment clip details and structures.
Interaction and co-ordination with other Departments
Project #3
Project : JAZAN REFINERY TANKS CONSTRUCTION PROJECT. (Jan'15 –Jun’15)
Client : SAUDI ARAMCO
S/W used : CAESAR-II (Version- 5.3).
Key Responsibilities
Perform Flexibility Analysis of Critical Pipes.
Perform Analysis for API 650 Tanks and API 610 Pumps.
Generating Stress isometrics.
Preparation of Stress analysis reports.
Preparation of Nozzle load sheet.
Civil loading information of Plat form details and structures.
Project #4
Project : CPF TOP SIDES - OFF GAS RECOVERY COMPRESSOR PACKAGE
Client : WASCO ENGINEERING SERVICES SINGAPORE PTE LTD
End User : SAMSUNG HEAVY INDUSTRIES
S/W used : CAESAR-II (Version- 6.10).
Key Responsibilities
Preparation of critical line list.
Preparation of Load cases.
Perform Analysis for Reciprocating compressors, Exchangers and PSV lines.
Generating Stress isometrics
Preparation of Stress analysis reports.
Project #5
Project : KRAKEN FIELD DEVELOPMENT FPSO
Client : AKER SOLUTIONS
End User : BUMIARMADA
S/W used : CAESAR-II (Version- 6.10).
Key Responsibilities
Preparation of critical line list.
Preparation of Load cases.
Perform Analysis for Course filters, Exchangers, Pumps and Vessels.
Generating Stress isometrics
Preparation of Stress analysis reports.
Preparation of pipe support drawings.
Project #6
Project Title : FPSO CIDADE DE SANTOS MV20
Client : MODEC INTERNATIONAL LLC
End user : PETROBRAS
S/W used : CAESAR-II (Version- 5.1)
Key Responsibilities:
Review for Piping P&IDs, GADs and isometrics.
Perform Flexibility Analysis of Critical Pipes and confirming the piping loads on sensitive
equipments.
Generating Stress isometrics.
Preparation of Stress analysis reports.
Project #7
Project Title : FPSO CIDADE DE SANTOS MV18
Client : MODEC INTERNATIONAL LLC
End user : PETROBRAS
S/W used : CAESAR-II (Version- 5.1)
Key Responsibilities:
Preparation of critical line list for stress analysis
Checking Piping P&IDs, GADs and isometrics.
Perform Flexibility Analysis of Critical Pipes and confirming the piping loads on sensitive
equipments do not exceed the allowable values of corresponding codes or vendor data and to
prevent failure of pipe work supports and leakage of joints from over stress or fatigue.
Generating Stress isometrics
Preparation of Stress analysis reports.
Personal Details:
Highest Qualification : B.Tech (Mechanical), in APRIL 2011
Permanent Address : H No: 4-38/D, Lalmanpalli
Krishnagiri mandal, Kurnool Dist,
Andhra Pradesh, India.
Present Address : H.NO-759, 14
th
cross, 16
th
main
BTM Layout, Bangalore.
Nationality : Indian
Passport number : K6875486
Date:
Place: Bangalore. (P.NABI RASOOL)

Nabi Rasool.CV

  • 1.
    Mobile No.: +91-9985758609,+91-9738297413 P.NABI RASOOL E-mail: nabirasool63@gmail.com (PIPING STRESS ENGINEER) PROFESSIONAL SUMMARY Possessing 5.6 years of engineering experience in the field of Oil and Gas (Offshore & Onshore), Refinery & Power plant domains with special exposure to piping stress analysis. WORK EXPERIENCE Present Company : TECNICAS REUNIDAS – VALDEL ENGINEERING (June-2015 to Till date) Location : Bangalore Designation : Piping Stress Engineer Previous Company : PETROFAC ENGINEERING SERVICES INDIA Pvt Ltd.(Jan-2015 to June 2015) Location : Chennai Designation : Piping Stress Engineer Previous Company : SGK Techno Ventures Pvt Ltd. (Jully-2011 to Jan-2015) Location : Hyderabad Designation : Piping Stress Engineer EDUCATIONAL QUALIFICATION Bachelors in Mechanical Engineering, April 2011, from VVIT (JNTU), Hyderabad, A.P, Passed in First class with Distinction. Diploma in Mechanical Engineering May 2008, from SBTET, Hyderabad TECHNICAL SKILLS Software’s known - Caesar-II version 7.1, 6.10, 5.3 - PDMS 12.0 - SP3D VERSON 6.0 Auto cad SPR (Review Software) Navis work (Review Software) MS OFFICE Familiar with: - - International Design codes & Dimensional standards. Viz: ANSI/ASME, API & there use in design, analysis and calculation KEY RESPONSIBILITIES Understand work scope, create piping model using Caesar II as per piping stress specification. Co-relate between P&ID, 3D Model & Isometrics. Optimizing the routing of critical lines with support and layout feasibility studies. Identifying stress critical lines from the P&ID and preparing line index as per the project specification
  • 2.
    Reviewing Static andDynamic Analysis of Stress systems Building of load cases for performing piping analysis as per piping stress specification. Perform Wind, Seismic & Snow analysis. Analysis of Fired heaters inlet and outlet lines and Reciprocating compressors, Centrifugal Compressors. Executing Stress Analysis of lines connected to Heat exchanger, Reboiler, Column, Vessels, storage Tanks, Reactors, Air fin coolers, Pumps and Skid turbines. Analyzing high temperature lines connected to Compressors, steam turbine and to qualify nozzle according to NEMA standards, alignment check, flange leakage check and frequency requirements. Stress analysis of lines for operating and towing conditions as per project specifications. Static analysis of Seismic & two phase flow (Slug/Plug) lines of piping systems Conducting Dynamic analysis for two phase slug flow lines to avoid flow induced vibrations using response spectrum method Performing analysis of Buried line etc. Performing wind, WRC calculations, Trunnion check and Flange leakage check Preparation of Pipe Rack and Structural Loading data to Civil Preparing Equipment platform loading drawing and piping clip information for hot and Cold Equipments as per piping support requirements. Preparation of structure loading and steel requirements for civil input. IFC Isometrics back check for stress and support requirements. Selection of spring supports and vendor spring GAD review. Preparation of stress analysis final Reports. PROJECTS HANDLED Project #1 Project : PETRONAS (RAPID) PROJECT Package-3 (Jun'15 –Feb’16) Unit : Cracked Naphtha hydro treating (CNHT) S/W used : CAESAR-II (Version- 2014). Key Responsibilities: Stress analysis of critical lines connected to fire heaters, Reactors, Air coolers, columns, Pumps, Exchangers, and Reboilers. Analysis of buried trench network Civil loading information of pipe rack, Plat form and structures. Preparation of Stress analysis reports. Interaction and co-ordination with other Departments Project #2 Project : FADHILI GAS PLANT (Feb’16 – Till date) Unit : D46 End-user : SAUDI ARAMCO S/W used : CAESAR-II (Version- 2016). Key Responsibilities: Stress analysis of critical lines connected to API 650 TANKS, Pipe rack, PSV lines, Vessels, Pumps, Turbine line. Analysis of ANSI PUMPS. Civil loading information of pipe rack, Plat form, Equipment clip details and structures. Interaction and co-ordination with other Departments
  • 3.
    Project #3 Project :JAZAN REFINERY TANKS CONSTRUCTION PROJECT. (Jan'15 –Jun’15) Client : SAUDI ARAMCO S/W used : CAESAR-II (Version- 5.3). Key Responsibilities Perform Flexibility Analysis of Critical Pipes. Perform Analysis for API 650 Tanks and API 610 Pumps. Generating Stress isometrics. Preparation of Stress analysis reports. Preparation of Nozzle load sheet. Civil loading information of Plat form details and structures. Project #4 Project : CPF TOP SIDES - OFF GAS RECOVERY COMPRESSOR PACKAGE Client : WASCO ENGINEERING SERVICES SINGAPORE PTE LTD End User : SAMSUNG HEAVY INDUSTRIES S/W used : CAESAR-II (Version- 6.10). Key Responsibilities Preparation of critical line list. Preparation of Load cases. Perform Analysis for Reciprocating compressors, Exchangers and PSV lines. Generating Stress isometrics Preparation of Stress analysis reports. Project #5 Project : KRAKEN FIELD DEVELOPMENT FPSO Client : AKER SOLUTIONS End User : BUMIARMADA S/W used : CAESAR-II (Version- 6.10). Key Responsibilities Preparation of critical line list. Preparation of Load cases. Perform Analysis for Course filters, Exchangers, Pumps and Vessels. Generating Stress isometrics Preparation of Stress analysis reports. Preparation of pipe support drawings. Project #6 Project Title : FPSO CIDADE DE SANTOS MV20 Client : MODEC INTERNATIONAL LLC End user : PETROBRAS S/W used : CAESAR-II (Version- 5.1)
  • 4.
    Key Responsibilities: Review forPiping P&IDs, GADs and isometrics. Perform Flexibility Analysis of Critical Pipes and confirming the piping loads on sensitive equipments. Generating Stress isometrics. Preparation of Stress analysis reports. Project #7 Project Title : FPSO CIDADE DE SANTOS MV18 Client : MODEC INTERNATIONAL LLC End user : PETROBRAS S/W used : CAESAR-II (Version- 5.1) Key Responsibilities: Preparation of critical line list for stress analysis Checking Piping P&IDs, GADs and isometrics. Perform Flexibility Analysis of Critical Pipes and confirming the piping loads on sensitive equipments do not exceed the allowable values of corresponding codes or vendor data and to prevent failure of pipe work supports and leakage of joints from over stress or fatigue. Generating Stress isometrics Preparation of Stress analysis reports. Personal Details: Highest Qualification : B.Tech (Mechanical), in APRIL 2011 Permanent Address : H No: 4-38/D, Lalmanpalli Krishnagiri mandal, Kurnool Dist, Andhra Pradesh, India. Present Address : H.NO-759, 14 th cross, 16 th main BTM Layout, Bangalore. Nationality : Indian Passport number : K6875486 Date: Place: Bangalore. (P.NABI RASOOL)