SlideShare a Scribd company logo
My Status and References of Submarine Networks.
Details of References from ASN Alcatel France – Pt. Ketrosden Triasmitra – OSI –PLN
(Year 1984 until 2015)
1. – 1984 – Total French Company: Project in Abu-Dhabi & Sarhja and Dubai,
With Comex Company and Les Cables de Lyon (ALCO) in charge for installation
of Submarine Cable Prototype of this composite cable power 20 kV with cable
pair’s 12 and Optical fiber 8 core. Off Shore between plate forms to plate forms
near boundary Iraq.
2. – 1992 - Pt. Indosat & International Consortium: Sea Me We 2. Optical Fiber
Submarine Cable System.(Earthing and Cable Installation at Ancol Jakarata)
3. – 1995 – Pt. Indosat: SKKL – JS, Jakarta Ancol – Surabaya Banyu -Urip.
Optical Fiber Submarine cable installation and shore end, Earthing cable System,
land cable installation from BMH to the Station.
4. – 1995 – Pt.Indosat, Telstra, Optus. JASURAUS Project, Optical Fiber
Submarine Cable, installation of Earthing System, Installation of cable Land
BMH to Station.
5. – 1996 – Pt. Telkom: Northern Route Project, Java – Bali and Java – Sumatra.
Optical Fiber Submarine system. Survey and Supervision of landing of cable,
installation of cable Land and splicing until commissioning.
6. – 1997 – Pt. Indosat: Sea Me We 3, Project Optical Fiber Submarine Cable.
Jakarta Ancol (Earthing System, installation of cable Land)
7. – 1998 – Pt. Telkom: Northern Route Project. Reparation of Submarine cable
damaged between Java and Bali. I involve for repair of Telecom cable with Pirelli
Cavi and France Telecom. Request the authorizations by local authorities, start
route survey with Pirelli by ship. Prepare submarine cable spare 5000 m on drum
cable transportation by route Jakarta – Bali, Removing existing cable damaged by
tiers and installation of new cable. Landing Submarine Shore end, Installation of
Cable Land, splicing & testing and commissioning with Pt.Telkom.
8. 1998 – Pt. PLN /Pirelli Cavi Company Installation of Power cable 150 kV single
core 6 cables or 2 circuits with pilots cables between Gilimanuk – Ketapang at
Java – Bali Shore end bolts sites.
9. – 2006 – Pt.Tbk Indosat: Jakasusi and Jasutra Project. I m subcontractor of
(ASN) Alcatel Submarine Network. Details Surveys and permits, authorizations
on site for implementation of Beach Manhole and Earthing system in Java,
Borneo & Celebes and Sumatra In charge for installation of Earthing System,
cable Land and Optical fiber installation from BMH to the Indosat Station. Cable
markers installation in beach, Additional support services for ASN.
10. – 2007 – Alcatel Submarine Networks Indonesia: As built drawings for all
system Jakasusi and Jasasuka Project of 3 landing point.
- 10) - 2012 – 2014 Pt. Ketrosden Triasmitra Indonesia
Based at Jakarta and Batam for Marine.
(Submarine Cable Deployment Company) – Jakarta/Batam (Indonesia)
Deputy Director of Department Submarine cable
Leading a team of 25 people in the Submarine cable division, responsible for:
Submarine cable deployment projects totaling more than 1.500 km of cables, including
marine survey, Desktop study, authorization permits, equipment purchasing, SITACS
locations and construction of BMH. Loading cable, main laid services, 8 shore-ends,
grounding system, Marine maintenance of B2JS and OSP more than 1200 km,
Construction of NOC, testing, commissioning, and more.
Reference Projects: B2JS (Jakarta – Bangka – Batam – Bintan – Singapore) submarine
cable deployment, JBCS Java – Bali (Negara – Muncar) JIBACS (Jambi – Batam) LTCS
(Luwuk – Tutuyan) Nord of Celebes.
Two years we got 15 cables cuts already restored by Pt Ketrosden Triasmitra. Telkom
operator such as Pt.Moratel, XL Axiata & Pt.Telkom Indonesia.
- 11) - 2014 - Ocean Specialists Incorpored (OSI) at Singapore and USA.
Responsible of marine deployment for repair of submarine cable cut
Location: Tahiti - Hawaii (French Polynesia)
Consultant of OPT Tahiti Papetee: Repair of submarine cable (sun fault) Installation of
new shore end changing some part of cable 580 m at Papenoo section Tahiti to Hawaii.
- 12) - 2015 – PLN.E consultant of Project Batam – Bintan Indonesia.
Cable Power 150 kV between Tanjung Kasam Batam – Tanjung Sauh Island 2 circuits
3340 m and Ngenang Island– Tanjung Taloh Bintan two circuits 5500 m
Responsible from PLN E of Marine deployment for Viscas consortium and cable
engineer for installation.Main lay service installation with Asian Protector from ACPL
Installation of cable by injector and rock saw. Shore end (8) and installation of concrete
covers protections less than 28 m water depth along 10700 m
Mounting and jointing two circuits & Sealing end (24) and testing until commissioning.
Christian Chene

More Related Content

What's hot

A New Route for Submarine Cables
A New Route for Submarine CablesA New Route for Submarine Cables
A New Route for Submarine Cables
MyNOG
 
Under the sea
Under the seaUnder the sea
Under the seaSycoFoamy
 
PTC15 OM Overview Part 2
PTC15 OM Overview Part 2PTC15 OM Overview Part 2
PTC15 OM Overview Part 2
SCCLA
 
Malaysia: A New Submarine Cable Route by Tan Tze Meng
Malaysia: A New Submarine Cable Route by Tan Tze MengMalaysia: A New Submarine Cable Route by Tan Tze Meng
Malaysia: A New Submarine Cable Route by Tan Tze Meng
MyNOG
 
PTC 14 O&M Overview Final
PTC 14 O&M Overview FinalPTC 14 O&M Overview Final
PTC 14 O&M Overview Final
SCCLA
 
4G Business Readiness: LTE Opportunities and Challenges in Asia | www.solidi...
4G Business Readiness: LTE Opportunities and Challenges in Asia |  www.solidi...4G Business Readiness: LTE Opportunities and Challenges in Asia |  www.solidi...
4G Business Readiness: LTE Opportunities and Challenges in Asia | www.solidi...
Solidiance
 
Offshore wind and marine energy workshop280212 presentación javier marqués
Offshore wind and marine energy workshop280212 presentación javier marquésOffshore wind and marine energy workshop280212 presentación javier marqués
Offshore wind and marine energy workshop280212 presentación javier marquésBritish Embassy Madrid
 
Managing Electromagnetic Spectrum Training
Managing Electromagnetic Spectrum TrainingManaging Electromagnetic Spectrum Training
Managing Electromagnetic Spectrum Training
fcapaci
 
Janet access infrastructure
Janet access infrastructureJanet access infrastructure
Janet access infrastructure
Jisc
 
Connecting cape town v3.0.pptx
Connecting cape town v3.0.pptxConnecting cape town v3.0.pptx
Connecting cape town v3.0.pptx
Brian Pinnock
 

What's hot (11)

A New Route for Submarine Cables
A New Route for Submarine CablesA New Route for Submarine Cables
A New Route for Submarine Cables
 
Under the sea
Under the seaUnder the sea
Under the sea
 
PTC15 OM Overview Part 2
PTC15 OM Overview Part 2PTC15 OM Overview Part 2
PTC15 OM Overview Part 2
 
Malaysia: A New Submarine Cable Route by Tan Tze Meng
Malaysia: A New Submarine Cable Route by Tan Tze MengMalaysia: A New Submarine Cable Route by Tan Tze Meng
Malaysia: A New Submarine Cable Route by Tan Tze Meng
 
PTC 14 O&M Overview Final
PTC 14 O&M Overview FinalPTC 14 O&M Overview Final
PTC 14 O&M Overview Final
 
4G Business Readiness: LTE Opportunities and Challenges in Asia | www.solidi...
4G Business Readiness: LTE Opportunities and Challenges in Asia |  www.solidi...4G Business Readiness: LTE Opportunities and Challenges in Asia |  www.solidi...
4G Business Readiness: LTE Opportunities and Challenges in Asia | www.solidi...
 
Presentation
PresentationPresentation
Presentation
 
Offshore wind and marine energy workshop280212 presentación javier marqués
Offshore wind and marine energy workshop280212 presentación javier marquésOffshore wind and marine energy workshop280212 presentación javier marqués
Offshore wind and marine energy workshop280212 presentación javier marqués
 
Managing Electromagnetic Spectrum Training
Managing Electromagnetic Spectrum TrainingManaging Electromagnetic Spectrum Training
Managing Electromagnetic Spectrum Training
 
Janet access infrastructure
Janet access infrastructureJanet access infrastructure
Janet access infrastructure
 
Connecting cape town v3.0.pptx
Connecting cape town v3.0.pptxConnecting cape town v3.0.pptx
Connecting cape town v3.0.pptx
 

Viewers also liked

6 S Consultants V1 0
6 S Consultants V1 06 S Consultants V1 0
6 S Consultants V1 0lozlis
 
Pacnet Jan 2011
Pacnet Jan 2011Pacnet Jan 2011
Pacnet Jan 2011
Scottwinkler
 
Cable Solutions Worldwide
Cable Solutions WorldwideCable Solutions Worldwide
Cable Solutions WorldwideDavid Gill
 
Submarine cables structuring and financing options
Submarine cables   structuring and financing optionsSubmarine cables   structuring and financing options
Submarine cables structuring and financing options
Amy Walls
 
What's Next in Growth? 2016
What's Next in Growth? 2016What's Next in Growth? 2016
What's Next in Growth? 2016
Andrew Chen
 
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
Barry Feldman
 

Viewers also liked (6)

6 S Consultants V1 0
6 S Consultants V1 06 S Consultants V1 0
6 S Consultants V1 0
 
Pacnet Jan 2011
Pacnet Jan 2011Pacnet Jan 2011
Pacnet Jan 2011
 
Cable Solutions Worldwide
Cable Solutions WorldwideCable Solutions Worldwide
Cable Solutions Worldwide
 
Submarine cables structuring and financing options
Submarine cables   structuring and financing optionsSubmarine cables   structuring and financing options
Submarine cables structuring and financing options
 
What's Next in Growth? 2016
What's Next in Growth? 2016What's Next in Growth? 2016
What's Next in Growth? 2016
 
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business32 Ways a Digital Marketing Consultant Can Help Grow Your Business
32 Ways a Digital Marketing Consultant Can Help Grow Your Business
 

Similar to My Status and References of Submarine Cable

Rohit_kumar_shah_optical_fiber_under_sea_ppt.pptx
Rohit_kumar_shah_optical_fiber_under_sea_ppt.pptxRohit_kumar_shah_optical_fiber_under_sea_ppt.pptx
Rohit_kumar_shah_optical_fiber_under_sea_ppt.pptx
RohitKumarShah6
 
NWU and SA Telecoms
NWU and SA TelecomsNWU and SA Telecoms
NWU and SA Telecoms
Wilhelm van Belkum
 
CV- Vinu Kumar
CV- Vinu KumarCV- Vinu Kumar
CV- Vinu KumarViNu Kumar
 
Kloofzight installation
Kloofzight installationKloofzight installation
Kloofzight installationWilf Dickinson
 
Presentataion Oil&Gas Telecommunications Conference - Radio LInk Project
Presentataion  Oil&Gas Telecommunications Conference - Radio LInk Project Presentataion  Oil&Gas Telecommunications Conference - Radio LInk Project
Presentataion Oil&Gas Telecommunications Conference - Radio LInk Project
Andrea Vallavanti
 
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_vaPresentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_vaAndrea Vallavanti
 
Huawei Training for Dialog Reginal Staff-1
Huawei  Training for Dialog Reginal Staff-1Huawei  Training for Dialog Reginal Staff-1
Huawei Training for Dialog Reginal Staff-1Fazal Junkeer
 
Petrohans Company Experience Presentation
Petrohans Company Experience PresentationPetrohans Company Experience Presentation
Petrohans Company Experience Presentation
hvandruten
 
Petrohans Company Experience Presentation 2011
Petrohans Company Experience Presentation 2011Petrohans Company Experience Presentation 2011
Petrohans Company Experience Presentation 2011
hvandruten
 
M017159094
M017159094M017159094
M017159094
IOSR Journals
 
Proposal Laying Fiber Optic for Cables along Railways Tracks in Sudan
Proposal Laying Fiber Optic for Cables along Railways Tracks in SudanProposal Laying Fiber Optic for Cables along Railways Tracks in Sudan
Proposal Laying Fiber Optic for Cables along Railways Tracks in Sudan
IOSR Journals
 

Similar to My Status and References of Submarine Cable (20)

Rohit_kumar_shah_optical_fiber_under_sea_ppt.pptx
Rohit_kumar_shah_optical_fiber_under_sea_ppt.pptxRohit_kumar_shah_optical_fiber_under_sea_ppt.pptx
Rohit_kumar_shah_optical_fiber_under_sea_ppt.pptx
 
NWU and SA Telecoms
NWU and SA TelecomsNWU and SA Telecoms
NWU and SA Telecoms
 
SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV
 
Abdallah Al Sagheir Cv
Abdallah Al Sagheir CvAbdallah Al Sagheir Cv
Abdallah Al Sagheir Cv
 
Saeed Jalal CV
Saeed Jalal CVSaeed Jalal CV
Saeed Jalal CV
 
CV- Vinu Kumar
CV- Vinu KumarCV- Vinu Kumar
CV- Vinu Kumar
 
Kloofzight installation
Kloofzight installationKloofzight installation
Kloofzight installation
 
kamilcv[1]
kamilcv[1]kamilcv[1]
kamilcv[1]
 
Presentataion Oil&Gas Telecommunications Conference - Radio LInk Project
Presentataion  Oil&Gas Telecommunications Conference - Radio LInk Project Presentataion  Oil&Gas Telecommunications Conference - Radio LInk Project
Presentataion Oil&Gas Telecommunications Conference - Radio LInk Project
 
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_vaPresentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
Presentazione OIL and GAS Telecommunications Conference rev 6 marzo_va
 
Huawei Training for Dialog Reginal Staff-1
Huawei  Training for Dialog Reginal Staff-1Huawei  Training for Dialog Reginal Staff-1
Huawei Training for Dialog Reginal Staff-1
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
0 0 0 CV 01-2-2016
0 0 0 CV 01-2-20160 0 0 CV 01-2-2016
0 0 0 CV 01-2-2016
 
MIG CV (Mar 2016)
MIG CV (Mar 2016)MIG CV (Mar 2016)
MIG CV (Mar 2016)
 
CV Yudi Syah Putra OS
CV Yudi Syah Putra OSCV Yudi Syah Putra OS
CV Yudi Syah Putra OS
 
Petrohans Company Experience Presentation
Petrohans Company Experience PresentationPetrohans Company Experience Presentation
Petrohans Company Experience Presentation
 
Petrohans Company Experience Presentation 2011
Petrohans Company Experience Presentation 2011Petrohans Company Experience Presentation 2011
Petrohans Company Experience Presentation 2011
 
M017159094
M017159094M017159094
M017159094
 
Proposal Laying Fiber Optic for Cables along Railways Tracks in Sudan
Proposal Laying Fiber Optic for Cables along Railways Tracks in SudanProposal Laying Fiber Optic for Cables along Railways Tracks in Sudan
Proposal Laying Fiber Optic for Cables along Railways Tracks in Sudan
 

My Status and References of Submarine Cable

  • 1. My Status and References of Submarine Networks. Details of References from ASN Alcatel France – Pt. Ketrosden Triasmitra – OSI –PLN (Year 1984 until 2015) 1. – 1984 – Total French Company: Project in Abu-Dhabi & Sarhja and Dubai, With Comex Company and Les Cables de Lyon (ALCO) in charge for installation of Submarine Cable Prototype of this composite cable power 20 kV with cable pair’s 12 and Optical fiber 8 core. Off Shore between plate forms to plate forms near boundary Iraq. 2. – 1992 - Pt. Indosat & International Consortium: Sea Me We 2. Optical Fiber Submarine Cable System.(Earthing and Cable Installation at Ancol Jakarata) 3. – 1995 – Pt. Indosat: SKKL – JS, Jakarta Ancol – Surabaya Banyu -Urip. Optical Fiber Submarine cable installation and shore end, Earthing cable System, land cable installation from BMH to the Station. 4. – 1995 – Pt.Indosat, Telstra, Optus. JASURAUS Project, Optical Fiber Submarine Cable, installation of Earthing System, Installation of cable Land BMH to Station. 5. – 1996 – Pt. Telkom: Northern Route Project, Java – Bali and Java – Sumatra. Optical Fiber Submarine system. Survey and Supervision of landing of cable, installation of cable Land and splicing until commissioning. 6. – 1997 – Pt. Indosat: Sea Me We 3, Project Optical Fiber Submarine Cable. Jakarta Ancol (Earthing System, installation of cable Land) 7. – 1998 – Pt. Telkom: Northern Route Project. Reparation of Submarine cable damaged between Java and Bali. I involve for repair of Telecom cable with Pirelli Cavi and France Telecom. Request the authorizations by local authorities, start route survey with Pirelli by ship. Prepare submarine cable spare 5000 m on drum cable transportation by route Jakarta – Bali, Removing existing cable damaged by tiers and installation of new cable. Landing Submarine Shore end, Installation of Cable Land, splicing & testing and commissioning with Pt.Telkom. 8. 1998 – Pt. PLN /Pirelli Cavi Company Installation of Power cable 150 kV single core 6 cables or 2 circuits with pilots cables between Gilimanuk – Ketapang at Java – Bali Shore end bolts sites.
  • 2. 9. – 2006 – Pt.Tbk Indosat: Jakasusi and Jasutra Project. I m subcontractor of (ASN) Alcatel Submarine Network. Details Surveys and permits, authorizations on site for implementation of Beach Manhole and Earthing system in Java, Borneo & Celebes and Sumatra In charge for installation of Earthing System, cable Land and Optical fiber installation from BMH to the Indosat Station. Cable markers installation in beach, Additional support services for ASN. 10. – 2007 – Alcatel Submarine Networks Indonesia: As built drawings for all system Jakasusi and Jasasuka Project of 3 landing point. - 10) - 2012 – 2014 Pt. Ketrosden Triasmitra Indonesia Based at Jakarta and Batam for Marine. (Submarine Cable Deployment Company) – Jakarta/Batam (Indonesia) Deputy Director of Department Submarine cable Leading a team of 25 people in the Submarine cable division, responsible for: Submarine cable deployment projects totaling more than 1.500 km of cables, including marine survey, Desktop study, authorization permits, equipment purchasing, SITACS locations and construction of BMH. Loading cable, main laid services, 8 shore-ends, grounding system, Marine maintenance of B2JS and OSP more than 1200 km, Construction of NOC, testing, commissioning, and more. Reference Projects: B2JS (Jakarta – Bangka – Batam – Bintan – Singapore) submarine cable deployment, JBCS Java – Bali (Negara – Muncar) JIBACS (Jambi – Batam) LTCS (Luwuk – Tutuyan) Nord of Celebes. Two years we got 15 cables cuts already restored by Pt Ketrosden Triasmitra. Telkom operator such as Pt.Moratel, XL Axiata & Pt.Telkom Indonesia. - 11) - 2014 - Ocean Specialists Incorpored (OSI) at Singapore and USA. Responsible of marine deployment for repair of submarine cable cut Location: Tahiti - Hawaii (French Polynesia) Consultant of OPT Tahiti Papetee: Repair of submarine cable (sun fault) Installation of new shore end changing some part of cable 580 m at Papenoo section Tahiti to Hawaii. - 12) - 2015 – PLN.E consultant of Project Batam – Bintan Indonesia. Cable Power 150 kV between Tanjung Kasam Batam – Tanjung Sauh Island 2 circuits 3340 m and Ngenang Island– Tanjung Taloh Bintan two circuits 5500 m Responsible from PLN E of Marine deployment for Viscas consortium and cable engineer for installation.Main lay service installation with Asian Protector from ACPL Installation of cable by injector and rock saw. Shore end (8) and installation of concrete covers protections less than 28 m water depth along 10700 m Mounting and jointing two circuits & Sealing end (24) and testing until commissioning. Christian Chene