SlideShare a Scribd company logo
SIMJAESHENEngineerCivil&Structural 22A, Persiaran Cempaka Sari 10, Taman Cempaka, 31400 Ipoh, Perak
M: +6017-551 7687 E: jaeshen_sim@hotmail.com
SUMMARY & CAREER OBJECTIVES
A high talented and dedicated Civil Engineer with diversified domain projects in Civil Engineering ranging from
medium to large scale industries which gave me an in depth understanding for handling various domain areas in
Civil Engineering. I have handled various critical and challenging projects from design stage to implementation stage
and ensured that the projects gets implemented as per specification in stipulated time with quality. Having equipped
and expertise with various latest engineering tools and techniques, cost evaluation techniques and tools which I
applied in my professional career to produce cost effective solutions for my organization I worked with. I can handle
high pressure environments with ease and open mind and also a good team player. I have efficient communication
skill to present my point precisely to listeners.
I am mature professional with strong commitment to career and seeking to obtain a position with large company that
will provide the experience, opportunity, and take on challenging, creative and diversified projects.
EDUCATION
University : UniversitiTenagaNasional
Level : Bachelor of Civil Engineering (Hons)
Graduated : 2009
PERSONAL ATTRIBUTES
 Accuracy and attention to details
 Good problem solving and analytical skills
 Ability to work round the clock
 Blend well with others and a good team player
EMPLOYMENT HISTORY
November 2009 ~ Present : Civil & Structural Engineer
SNA Consult Sdn. Bhd.
SNA Consult Sdn. Bhd. is a medium sized company that offers engineering and construction solution to meet the
needs of our clients.
**List of projects are listed as attached
April 2008 ~ June 2008 : Industrial Trainee
IOI Properties Sdn. Bhd.
IOI Properties Sdn. Bhd. is one of the top developer that strive to achieve responsible commercial success by
satisfying the customers’ needs, cultivating mutually beneficial relationship with other business associates, caring for
society and the environment as well. The following is the project and my involvement:-
i) Marriott Hotel’s Ballroom Extension Project
 Involved in planning, coordination and supervision upon completion of Marriott Hotel’s
Ballroom Extension Project
 Carried our studies and comparison between QLASSIC and CONQUAS
EngineerCivil&Structural
Name : Ir. Yong Kok Wai
Tel No. : +6017-272 1299
Position : Associates
Company : SNA Consult Sdn. Bhd.
Name : Tan Phei Ling
Tel No. : +6017-258 3299
Position : Associates
Company : SNA Consult Sdn. Bhd.
SKILLS
Category Name Proficiency
Administrative Microsoft Words Advanced
Microsoft Power Points Advanced
Microsoft Excel Advanced
Microsoft Projects Intermediate
Engineering Esteem Advanced
AutoCad Advanced
Orion Intermediate
Language English Good (Speaking & Writing)
Malay Good (Speaking & Writing)
Chinese Good (Speaking Only)
REFERENCES
EMPLOYMENT HISTORY
November 2009 ~ Present : Civil & Structural Engineer
SNA Consult Sdn. Bhd.
SNA Consult Sdn. Bhd. is a medium sized company that offers engineering and construction solution to meet the needs of
our clients.
Responsibilities:-
As a consultant, I worked with diversified projects in civil engineering namely project related to residential,
commercial and also industrial projects. This gave me deep understanding on business areas on all these areas. I
used separate approach and techniques for each domain as the rules, code and costing technique for each project
differs. In addition to that, I’m also responsible for bringing the project from design stage to final implementation
stage. I monitored and ensured that the development is done as per specification without violating local council
standards and engineering specifications as well. I coordinated and supervised engineers, contractors and my team
and made the process clear that I get the report of daily activity by end of the day.
List of Projects and Involvement:
i) Structural Engineer for 9 Unit Superlink House in Cheras Messrs Jiwa Mewah Sdn. Bhd. (Subsidiary Company
of Hata Holdings Sdn. Bhd.)
 Developed structural design for 3 storey of superlink house that satisfy technical specifications
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
ii) Civil & Structural Engineer for 4 Blocks of Apartment Consist of 156 Units in Nilai, Negeri Sembilan Messrs
PK Properties Sdn. Bhd. (Subsidiary Company of BBN Development Sdn. Bhd.)
 Developed structural design that satisfy technical specifications
 Developed civil design that involved realignment of drainage and sewerage discharge and road design
as well.
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
iii) Civil & Structural Engineer for 48 Units of Shop Lot in Nilai, Negeri Sembilan Messrs Nilai Resources Sdn.
Bhd. (Subsidiary Company of BBN Development Sdn. Bhd.)
 Developed structural design for 2 storey of shop lot that satisfy technical specifications
 Developed civil design that involved realignment of drainage and sewerage discharge and road design
as well.
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
iv) Civil & Structural Engineer for 3 Blocks of Apartment in Nilai, Negeri Sembilan Messrs PK Properties Sdn.
Bhd. (Subsidiary Company of BBN Development Sdn. Bhd.)
 Developed structural and foundation design for 2 blocks of 4 strorey apartment and 1 block of 10
storey apartment that satisfy technical specifications
 Developed a design that takes account of wind loading for the high rise apartment
 Developed civil design that involved realignment of drainage and sewerage discharge and road design
as well
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
v) Civil & Structural Engineer for 12 Units of Semi Detached House in Nilai, Negeri Sembilan Messrs PK
Properties Sdn. Bhd. (Subsidiary Company of BBN Development Sdn. Bhd.)
 Developed structural design for 2 storey of semi-detached house that satisfy technical specifications
 Developed civil design that involved realignment of drainage and sewerage discharge and road design
as well.
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
vi) Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Glenmarie, Shah Alam
Messrs Pok Brothers Sdn. Bhd.
 Developed structural design for extension of the factory that satisfy technical
 Developed civil design that involved realignment of drainage and sewerage discharge and road design
as well
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic c
 Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects
are complying with engineering technical specifications and meet Client’s needs as well.
 Conducted and closely collaborated with local councils for submission, inspection and CCC
application as well upon completion of this factory.
vii) Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Meru, Klang Messrs Etika
Dairies Sdn. Bhd.
 Developed a structural design for extension of the factory that satisfy technical specifications
 Developed civil design that involved realignment of drainage and sewerage discharge and road design
as well
 Closely collaborated with other consultants an
facility and timely, economic completion, according to public and council regulations
 Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects
are complying with engineering technical specifications and meet Client’s needs as well
 Conducted and closely collaborated with local councils for submission, inspection and CCC
application as well upon completion of this factory
viii) Civil & Structural for residential an
Development Sdn. Bhd.
 Developed structural design for 4 storey shop lot and 2 blocks of 7 storey of condominium that satisfy
technical satisfaction
 Developed civil design that involved new
design as well
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulat
Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Glenmarie, Shah Alam
Messrs Pok Brothers Sdn. Bhd.
Developed structural design for extension of the factory that satisfy technical
Developed civil design that involved realignment of drainage and sewerage discharge and road design
Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects
are complying with engineering technical specifications and meet Client’s needs as well.
and closely collaborated with local councils for submission, inspection and CCC
application as well upon completion of this factory.
Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Meru, Klang Messrs Etika
Developed a structural design for extension of the factory that satisfy technical specifications
Developed civil design that involved realignment of drainage and sewerage discharge and road design
Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations
Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects
g with engineering technical specifications and meet Client’s needs as well
Conducted and closely collaborated with local councils for submission, inspection and CCC
application as well upon completion of this factory
Civil & Structural for residential and commercial development in Brinchang, Cameron Highland Messrs LTT
Developed structural design for 4 storey shop lot and 2 blocks of 7 storey of condominium that satisfy
technical satisfaction
Developed civil design that involved new master planning design for drainage and sewerage and road
Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulat
Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Glenmarie, Shah Alam
Developed structural design for extension of the factory that satisfy technical specifications
Developed civil design that involved realignment of drainage and sewerage discharge and road design
Closely collaborated with other consultants and construction contractors to ensure both safety of the
ompletion, according to public and council regulations.
Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects
are complying with engineering technical specifications and meet Client’s needs as well.
and closely collaborated with local councils for submission, inspection and CCC
Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Meru, Klang Messrs Etika
Developed a structural design for extension of the factory that satisfy technical specifications
Developed civil design that involved realignment of drainage and sewerage discharge and road design
d construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations
Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects
g with engineering technical specifications and meet Client’s needs as well
Conducted and closely collaborated with local councils for submission, inspection and CCC
d commercial development in Brinchang, Cameron Highland Messrs LTT
Developed structural design for 4 storey shop lot and 2 blocks of 7 storey of condominium that satisfy
master planning design for drainage and sewerage and road
Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations
ix) Civil & Structural for residential and commercial development in Semenyih Messrs AmalanSetar Sdn. Bhd.
 Developed structural design for 2 storey shop lot and 2 storey of terrace house that satisfy technical
specifications
 Developed civil design that involved new master planning design for drainage and sewerage and road
design as well
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations
x) Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Sungai Buloh Messrs Far
East Paper Sdn. Bhd.
 Developed structural design for extension of the factory that satisfy technical specifications
 Developed civil design that involved realignment of drainage and sewerage discharge and road design
as well
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
 Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the
projects are complying with engineering technical specifications and meet Client’s needs as well.
 Conducted and closely collaborated with local councils for submission, inspection and CCC
application as well upon completion of this factory.
xi) Civil, Structural & Project Engineer for Ipoh Parade Mall Reburbishment Works in Ipoh Messrs Lion Ipoh
Parade
 Developed structural design that involve additional support for new escalators, new structure for lift
lobby, staircase and etc
 Developed structural design for new cinema structures that involve cinema new structural design and
taking account of the existing load of the structure and foundation that satisfy technical specifications.
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
 Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the
projects are complying with engineering technical specifications and meet Client’s needs as well.
 Conducted and closely collaborated with local councils for submission, inspection and CCC
application as well upon completion of this factory.
xii) Civil, Structural & Project Engineer for Klang Parade Mall Reburbishment Works in Klang Messrs Lion Klang
Parade
 Developed structural design that involve additional support for new escalators, new structure for lift
lobby, staircase and etc
 Developed structural design for new cinema structures that involve cinema new structural design and
taking account of the existing load of the structure and foundation that satisfy technical specifications.
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
 Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the
projects are complying with engineering technical specifications and meet Client’s needs as well.
 Conducted and closely collaborated with local councils for submission, inspection and CCC
application as well upon completion of this factory.
xiii) Civil, Structural & Project Engineer for Seremban Parade Mall Reburbishment Works in Seremban Messrs Lion
Seremban Parade
 Developed structural design that involve additional support for new escalators, new structure for lift
lobby, staircase and etc
 Developed structural design for new cinema structures that involve cinema new structural design and
taking account of the existing load of the structure and foundation that satisfy technical specifications.
 Closely collaborated with other consultants and construction contractors to ensure both safety of the
facility and timely, economic completion, according to public and council regulations.
 Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the
projects are complying with engineering technical specifications and meet Client’s needs as well.
 Conducted and closely collaborated with local councils for submission, inspection and CCC
application as well upon completion of this factory.
April 2008 ~ June 2008 : Industrial Trainee
IOI Properties Sdn. Bhd.
IOI Properties Sdn. Bhd. is one of the top developer that strive to achieve responsible commercial success by satisfying the
customers’ needs, cultivating mutually beneficial relationship with other business associates, caring for society and the
environment as well. The following is the project and my involvement:-
i) Marriott Hotel’s Ballroom Extension Project
 Involved in planning, coordination and supervision upon completion of Marriott Hotel’s Ballroom
Extension Project
 Carried our studies and comparison between QLASSIC and CONQUAS

More Related Content

What's hot

RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
Manish Sabane
 
resume with daewoo
resume with daewooresume with daewoo
resume with daewoo
redentor gaupo
 
New cv of syed mohammed for project manager civil post august' 2016
New cv of syed mohammed for project manager civil post  august' 2016New cv of syed mohammed for project manager civil post  august' 2016
New cv of syed mohammed for project manager civil post august' 2016
syedmohd77
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
yusuf khan
 
CV sultan(Q)
CV sultan(Q)CV sultan(Q)
CV sultan(Q)
Md.Sultan Uddin
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
Mohammad Sarowar
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
Ramanuja R
 
CV 11.10.16
CV 11.10.16CV 11.10.16
CV 11.10.16
Anupam Sen
 
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
MohamadSethFarabi Is seth
 
Iftikhar Hussain CV
Iftikhar Hussain CVIftikhar Hussain CV
Iftikhar Hussain CV
Iftikhar Hussain
 
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3
Benjamin Leavy
 
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
Masood Baig Mirza
 
Application of Project Manager-Peng Sher Seong
Application of Project Manager-Peng Sher SeongApplication of Project Manager-Peng Sher Seong
Application of Project Manager-Peng Sher Seong
Peng Sher Seong
 
Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...
Tan Jaden
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
bernabe chun
 
CV
CVCV

What's hot (16)

RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
resume with daewoo
resume with daewooresume with daewoo
resume with daewoo
 
New cv of syed mohammed for project manager civil post august' 2016
New cv of syed mohammed for project manager civil post  august' 2016New cv of syed mohammed for project manager civil post  august' 2016
New cv of syed mohammed for project manager civil post august' 2016
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
 
CV sultan(Q)
CV sultan(Q)CV sultan(Q)
CV sultan(Q)
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
CV 11.10.16
CV 11.10.16CV 11.10.16
CV 11.10.16
 
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
 
Iftikhar Hussain CV
Iftikhar Hussain CVIftikhar Hussain CV
Iftikhar Hussain CV
 
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3
 
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
 
Application of Project Manager-Peng Sher Seong
Application of Project Manager-Peng Sher SeongApplication of Project Manager-Peng Sher Seong
Application of Project Manager-Peng Sher Seong
 
Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
 
CV
CVCV
CV
 

Similar to My Resume

CV
CVCV
CV
CVCV
CV
CVCV
CV
CVCV
John CV
John CVJohn CV
John CV
John W.
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
vimal nc
 
CV
CVCV
Thousiq Ahmed civil engineer
Thousiq Ahmed civil  engineerThousiq Ahmed civil  engineer
Thousiq Ahmed civil engineer
Thousiq Ahmed
 
Ahmed Abdallah Resume
Ahmed Abdallah ResumeAhmed Abdallah Resume
Ahmed Abdallah Resume
Ahmed Ibrahim, PMP
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
Abdullah Reddy Baddam
 
Siva Sankaran Menon - Resume
Siva Sankaran Menon - ResumeSiva Sankaran Menon - Resume
Siva Sankaran Menon - Resume
Sivasankaran menon
 
Update CV
Update CVUpdate CV
Update CV
Muhammad Waseem
 
Cv henry oppong
Cv henry oppongCv henry oppong
Cv henry oppong
Henry Henryoppong84
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
Mohamed Abdelaziz
 
DESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILEDESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILE
Bhauso Desai
 
resume of suresh
resume of sureshresume of suresh
resume of suresh
koti Suresh_Koti123
 
Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
Bishoy Wagdy Aziz
 
CV updated 28.07.2016
CV updated 28.07.2016CV updated 28.07.2016
CV updated 28.07.2016
Purushothaman karuna
 
Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)
vinay sinha
 
CV Up Dated 15 Pic
CV Up Dated 15 PicCV Up Dated 15 Pic
CV Up Dated 15 Pic
Pranay Bhowmik
 

Similar to My Resume (20)

CV
CVCV
CV
 
CV
CVCV
CV
 
CV
CVCV
CV
 
CV
CVCV
CV
 
John CV
John CVJohn CV
John CV
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
CV
CVCV
CV
 
Thousiq Ahmed civil engineer
Thousiq Ahmed civil  engineerThousiq Ahmed civil  engineer
Thousiq Ahmed civil engineer
 
Ahmed Abdallah Resume
Ahmed Abdallah ResumeAhmed Abdallah Resume
Ahmed Abdallah Resume
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
 
Siva Sankaran Menon - Resume
Siva Sankaran Menon - ResumeSiva Sankaran Menon - Resume
Siva Sankaran Menon - Resume
 
Update CV
Update CVUpdate CV
Update CV
 
Cv henry oppong
Cv henry oppongCv henry oppong
Cv henry oppong
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
DESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILEDESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILE
 
resume of suresh
resume of sureshresume of suresh
resume of suresh
 
Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
 
CV updated 28.07.2016
CV updated 28.07.2016CV updated 28.07.2016
CV updated 28.07.2016
 
Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)
 
CV Up Dated 15 Pic
CV Up Dated 15 PicCV Up Dated 15 Pic
CV Up Dated 15 Pic
 

My Resume

  • 1. SIMJAESHENEngineerCivil&Structural 22A, Persiaran Cempaka Sari 10, Taman Cempaka, 31400 Ipoh, Perak M: +6017-551 7687 E: jaeshen_sim@hotmail.com SUMMARY & CAREER OBJECTIVES A high talented and dedicated Civil Engineer with diversified domain projects in Civil Engineering ranging from medium to large scale industries which gave me an in depth understanding for handling various domain areas in Civil Engineering. I have handled various critical and challenging projects from design stage to implementation stage and ensured that the projects gets implemented as per specification in stipulated time with quality. Having equipped and expertise with various latest engineering tools and techniques, cost evaluation techniques and tools which I applied in my professional career to produce cost effective solutions for my organization I worked with. I can handle high pressure environments with ease and open mind and also a good team player. I have efficient communication skill to present my point precisely to listeners. I am mature professional with strong commitment to career and seeking to obtain a position with large company that will provide the experience, opportunity, and take on challenging, creative and diversified projects. EDUCATION University : UniversitiTenagaNasional Level : Bachelor of Civil Engineering (Hons) Graduated : 2009 PERSONAL ATTRIBUTES  Accuracy and attention to details  Good problem solving and analytical skills  Ability to work round the clock  Blend well with others and a good team player EMPLOYMENT HISTORY November 2009 ~ Present : Civil & Structural Engineer SNA Consult Sdn. Bhd. SNA Consult Sdn. Bhd. is a medium sized company that offers engineering and construction solution to meet the needs of our clients. **List of projects are listed as attached April 2008 ~ June 2008 : Industrial Trainee IOI Properties Sdn. Bhd. IOI Properties Sdn. Bhd. is one of the top developer that strive to achieve responsible commercial success by satisfying the customers’ needs, cultivating mutually beneficial relationship with other business associates, caring for society and the environment as well. The following is the project and my involvement:- i) Marriott Hotel’s Ballroom Extension Project  Involved in planning, coordination and supervision upon completion of Marriott Hotel’s Ballroom Extension Project  Carried our studies and comparison between QLASSIC and CONQUAS
  • 2. EngineerCivil&Structural Name : Ir. Yong Kok Wai Tel No. : +6017-272 1299 Position : Associates Company : SNA Consult Sdn. Bhd. Name : Tan Phei Ling Tel No. : +6017-258 3299 Position : Associates Company : SNA Consult Sdn. Bhd. SKILLS Category Name Proficiency Administrative Microsoft Words Advanced Microsoft Power Points Advanced Microsoft Excel Advanced Microsoft Projects Intermediate Engineering Esteem Advanced AutoCad Advanced Orion Intermediate Language English Good (Speaking & Writing) Malay Good (Speaking & Writing) Chinese Good (Speaking Only) REFERENCES
  • 3. EMPLOYMENT HISTORY November 2009 ~ Present : Civil & Structural Engineer SNA Consult Sdn. Bhd. SNA Consult Sdn. Bhd. is a medium sized company that offers engineering and construction solution to meet the needs of our clients. Responsibilities:- As a consultant, I worked with diversified projects in civil engineering namely project related to residential, commercial and also industrial projects. This gave me deep understanding on business areas on all these areas. I used separate approach and techniques for each domain as the rules, code and costing technique for each project differs. In addition to that, I’m also responsible for bringing the project from design stage to final implementation stage. I monitored and ensured that the development is done as per specification without violating local council standards and engineering specifications as well. I coordinated and supervised engineers, contractors and my team and made the process clear that I get the report of daily activity by end of the day. List of Projects and Involvement: i) Structural Engineer for 9 Unit Superlink House in Cheras Messrs Jiwa Mewah Sdn. Bhd. (Subsidiary Company of Hata Holdings Sdn. Bhd.)  Developed structural design for 3 storey of superlink house that satisfy technical specifications  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations.
  • 4. ii) Civil & Structural Engineer for 4 Blocks of Apartment Consist of 156 Units in Nilai, Negeri Sembilan Messrs PK Properties Sdn. Bhd. (Subsidiary Company of BBN Development Sdn. Bhd.)  Developed structural design that satisfy technical specifications  Developed civil design that involved realignment of drainage and sewerage discharge and road design as well.  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations. iii) Civil & Structural Engineer for 48 Units of Shop Lot in Nilai, Negeri Sembilan Messrs Nilai Resources Sdn. Bhd. (Subsidiary Company of BBN Development Sdn. Bhd.)  Developed structural design for 2 storey of shop lot that satisfy technical specifications  Developed civil design that involved realignment of drainage and sewerage discharge and road design as well.  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations.
  • 5. iv) Civil & Structural Engineer for 3 Blocks of Apartment in Nilai, Negeri Sembilan Messrs PK Properties Sdn. Bhd. (Subsidiary Company of BBN Development Sdn. Bhd.)  Developed structural and foundation design for 2 blocks of 4 strorey apartment and 1 block of 10 storey apartment that satisfy technical specifications  Developed a design that takes account of wind loading for the high rise apartment  Developed civil design that involved realignment of drainage and sewerage discharge and road design as well  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations. v) Civil & Structural Engineer for 12 Units of Semi Detached House in Nilai, Negeri Sembilan Messrs PK Properties Sdn. Bhd. (Subsidiary Company of BBN Development Sdn. Bhd.)  Developed structural design for 2 storey of semi-detached house that satisfy technical specifications  Developed civil design that involved realignment of drainage and sewerage discharge and road design as well.  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations.
  • 6. vi) Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Glenmarie, Shah Alam Messrs Pok Brothers Sdn. Bhd.  Developed structural design for extension of the factory that satisfy technical  Developed civil design that involved realignment of drainage and sewerage discharge and road design as well  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic c  Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects are complying with engineering technical specifications and meet Client’s needs as well.  Conducted and closely collaborated with local councils for submission, inspection and CCC application as well upon completion of this factory. vii) Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Meru, Klang Messrs Etika Dairies Sdn. Bhd.  Developed a structural design for extension of the factory that satisfy technical specifications  Developed civil design that involved realignment of drainage and sewerage discharge and road design as well  Closely collaborated with other consultants an facility and timely, economic completion, according to public and council regulations  Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects are complying with engineering technical specifications and meet Client’s needs as well  Conducted and closely collaborated with local councils for submission, inspection and CCC application as well upon completion of this factory viii) Civil & Structural for residential an Development Sdn. Bhd.  Developed structural design for 4 storey shop lot and 2 blocks of 7 storey of condominium that satisfy technical satisfaction  Developed civil design that involved new design as well  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulat Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Glenmarie, Shah Alam Messrs Pok Brothers Sdn. Bhd. Developed structural design for extension of the factory that satisfy technical Developed civil design that involved realignment of drainage and sewerage discharge and road design Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations. Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects are complying with engineering technical specifications and meet Client’s needs as well. and closely collaborated with local councils for submission, inspection and CCC application as well upon completion of this factory. Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Meru, Klang Messrs Etika Developed a structural design for extension of the factory that satisfy technical specifications Developed civil design that involved realignment of drainage and sewerage discharge and road design Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects g with engineering technical specifications and meet Client’s needs as well Conducted and closely collaborated with local councils for submission, inspection and CCC application as well upon completion of this factory Civil & Structural for residential and commercial development in Brinchang, Cameron Highland Messrs LTT Developed structural design for 4 storey shop lot and 2 blocks of 7 storey of condominium that satisfy technical satisfaction Developed civil design that involved new master planning design for drainage and sewerage and road Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulat Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Glenmarie, Shah Alam Developed structural design for extension of the factory that satisfy technical specifications Developed civil design that involved realignment of drainage and sewerage discharge and road design Closely collaborated with other consultants and construction contractors to ensure both safety of the ompletion, according to public and council regulations. Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects are complying with engineering technical specifications and meet Client’s needs as well. and closely collaborated with local councils for submission, inspection and CCC Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Meru, Klang Messrs Etika Developed a structural design for extension of the factory that satisfy technical specifications Developed civil design that involved realignment of drainage and sewerage discharge and road design d construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects g with engineering technical specifications and meet Client’s needs as well Conducted and closely collaborated with local councils for submission, inspection and CCC d commercial development in Brinchang, Cameron Highland Messrs LTT Developed structural design for 4 storey shop lot and 2 blocks of 7 storey of condominium that satisfy master planning design for drainage and sewerage and road Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations
  • 7. ix) Civil & Structural for residential and commercial development in Semenyih Messrs AmalanSetar Sdn. Bhd.  Developed structural design for 2 storey shop lot and 2 storey of terrace house that satisfy technical specifications  Developed civil design that involved new master planning design for drainage and sewerage and road design as well  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations x) Civil, Structural & Project Engineer for Factory Extension and Renovation Works in Sungai Buloh Messrs Far East Paper Sdn. Bhd.  Developed structural design for extension of the factory that satisfy technical specifications  Developed civil design that involved realignment of drainage and sewerage discharge and road design as well  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations.  Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects are complying with engineering technical specifications and meet Client’s needs as well.  Conducted and closely collaborated with local councils for submission, inspection and CCC application as well upon completion of this factory. xi) Civil, Structural & Project Engineer for Ipoh Parade Mall Reburbishment Works in Ipoh Messrs Lion Ipoh Parade  Developed structural design that involve additional support for new escalators, new structure for lift lobby, staircase and etc  Developed structural design for new cinema structures that involve cinema new structural design and taking account of the existing load of the structure and foundation that satisfy technical specifications.  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations.  Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects are complying with engineering technical specifications and meet Client’s needs as well.  Conducted and closely collaborated with local councils for submission, inspection and CCC application as well upon completion of this factory.
  • 8. xii) Civil, Structural & Project Engineer for Klang Parade Mall Reburbishment Works in Klang Messrs Lion Klang Parade  Developed structural design that involve additional support for new escalators, new structure for lift lobby, staircase and etc  Developed structural design for new cinema structures that involve cinema new structural design and taking account of the existing load of the structure and foundation that satisfy technical specifications.  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations.  Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects are complying with engineering technical specifications and meet Client’s needs as well.  Conducted and closely collaborated with local councils for submission, inspection and CCC application as well upon completion of this factory.
  • 9. xiii) Civil, Structural & Project Engineer for Seremban Parade Mall Reburbishment Works in Seremban Messrs Lion Seremban Parade  Developed structural design that involve additional support for new escalators, new structure for lift lobby, staircase and etc  Developed structural design for new cinema structures that involve cinema new structural design and taking account of the existing load of the structure and foundation that satisfy technical specifications.  Closely collaborated with other consultants and construction contractors to ensure both safety of the facility and timely, economic completion, according to public and council regulations.  Lead a team that consists of M&E consultants, Contractors and Clerk of Works in ensuring the projects are complying with engineering technical specifications and meet Client’s needs as well.  Conducted and closely collaborated with local councils for submission, inspection and CCC application as well upon completion of this factory. April 2008 ~ June 2008 : Industrial Trainee IOI Properties Sdn. Bhd. IOI Properties Sdn. Bhd. is one of the top developer that strive to achieve responsible commercial success by satisfying the customers’ needs, cultivating mutually beneficial relationship with other business associates, caring for society and the environment as well. The following is the project and my involvement:- i) Marriott Hotel’s Ballroom Extension Project  Involved in planning, coordination and supervision upon completion of Marriott Hotel’s Ballroom Extension Project  Carried our studies and comparison between QLASSIC and CONQUAS