SlideShare a Scribd company logo
1 of 8
Download to read offline
MV-10 
www.dok-ing.com
Designed for 
mine clearance 
The MV-10 is designed to perform one task 
only - mine clearance. It is not a modifi ed 
construction machine or tank, it is original 
double tool system for humanitarian demining. 
The MV-10 Double Tool Mine Clearance System is designed to clear various 
types of terrain containing antipersonnel (AP) mines, antitank (AT) mines, and 
unexploded ordnance (UXO). 
The operating tools for digging and mine clearance consist of a flail tool attachment 
and tiller tool attachment, or a double flail tool attachment. These are fi xed in front 
of the system and are specifi cally designed to detonate or destroy the mines and 
UXO as the MV-10 moves forward. 
02 / DOK-ING MV-10
READY TO USE RIGHT AWAY 
Only few minutes are required to unload the MV-10 from 
any transportational asset and to begin with mechanical 
clearance activities. 
The MV-10 requires no special preparation activities or 
additional personnel. 
SAFETY RIDES FIRST 
The MV-10 system weights up to 20 tons, based 
on its confi guration, with excellent cross country 
performance. It is controlled by a single operator 
through a remote control unit. This system provides 
the best possible protection for the operator. By 
ensuring the operator is well clear of the MV-10 or 
inside a protected vehicle, we can be certain that 
should a mine (particularly anti-tank) be detonated, 
people will be protected from even minor injuries 
or health issues that can arise from being in close 
proximity to the blast. 
Only one operator and two mechanics are required 
for transport, operation and repairs/maintenance. 
DOK-ING MV-10 / 03
MV-10 at glance 
HARDOX Deflector 
• Resistant to explosions of AP and AT mines 
• Protects MV-10 from damage 
• Reduces the dispersal area of exploded mines 
04 / DOK-ING MV-10 
Remote control aerial 
• Operational range: 1500 m 
in the line of sight 
Standard Tool 
• Flail (front) & Tiller tool (back) 
Additional Tool Attachments 
• Blade/gripper tool 
• Roller tool 
Blade/gripper tool Roller tool
Lifting points 
Machine armor plates of special 
steel resistant to: 
• Wear 
• Fragments of exploded mines 
• Standard ammunition 
DOK-ING MV-10 / 05 
Standard Remote Control Unit 
• Operational range: 1500 m in the 
line of sight 
• Complete control of all functions 
• Battery capacity: 16 hours 
Deep profi le tracks 
• Can be equipped with track pads 
suitable for driving on hard surfaces 
Electronic 
components 
• Sealed - 
completely 
protected from 
dust, humidity, 
water and 
temperature
PROTECTION 
The MV-10 Double Tool Mine 
Clearance System is clad with 
the special Swedish HARDOX 
400 armor plates. The MV-10 is 
therefore highly resistant to the 
fragmentation of landmines. 
The experience has shown that, 
when working properly, when an 
anti-tank mine is detonated, there 
is no permanent damage to the 
working tools of the MV-10 system. 
06 / DOK-ING MV-10 
DOUBLE 
EFFECTIVENESS 
Because of its dimensions, excellent 
maneuverability, high engine power, and 
low track-ground pressure, the MV-10 can 
work year round in almost all conditions 
(-19ºC - +54ºC, 100% relative humidity), and 
it is not susceptible to damage by rain, snow 
or hail. 
The MV-10 normally uses both tools - a 
rotating flail tool, designed to activate or 
shatter AP and AT mines, and rotating tiller 
tool, designed as a secondary activation 
method and at the same time to keep the 
digging depth constant. A flail and tiller unit 
can also work one at a time and rotation of 
tools is forward and backward. 
SIMPLE TRANSPORT 
Road transport of the MV-10 is done using a standard flat-bed trailer. 
The MV-10 system can also be transported within the C-130 Hercules. 
For transport by sea, it can be restrained in similar ways to road 
transport plus it has lifting points to enable it to be craned aboard.
POST SALE 
SERVICES 
TRAINING 
DOK-ING has a vast experience in landmine clearance 
of various types of terrain. The acquired knowledge, 
expertise and experience are being passed over to 
the new ‘MV-10 teams’ so that they can as soon 
as possible start with safe and effi cient landmine 
clearance activities. DOK-ING’s standard training 
course lasts 2 weeks, either in Croatia or in countries 
where the MV-10 systems will be used. Because of 
the short training period for personnel, education 
costs for MV-10 operators are extremely low. 
MAINTENANCE 
The MV-10 is easily accessible for inspection, 
maintenance, trouble-shooting, repair and/or 
replacement. Maintenance and repairs can be carried 
out on the fi eld or in workshop conditions. The tools 
required for repairs and maintenance are standard 
wrenches and additional specially modifi ed tools. 
Damage resulting from AP or AT mine detonations is 
usually minor in nature and can be corrected with a 
minimum expenditure of time and materials. 
SPARE PARTS 
As a commitment to providing a high quality service 
to our customers, DOKING maintains adequate 
stocks of parts on our premises, has its own in-house 
service capabilities and can send a team at short 
notice to any location in the world. 
DOK-ING MV-10 / 07
MV-10 TECHNICAL CHARACTERISTICS 
Dimensions (L x W x H) 
Prime mover 4606 x 2240 x 2100 mm 
Prime mover with tool 7226 x 2975 x 2129 mm 
MV-10 Ground Clearance 
Up to bottom armor protection 390 mm 
Weight 
Prime mover 15.5 metric tons 
Prime mover with flail/tiller tool 20 metric tons 
Engine 
Caterpillar C18 6-cylinder, in-line, turbo-charged diesel 4-stroke, direct injection, water 
DOK-ING Ltd. 
Kanalski put 1, 10000 Zagreb, Croatia 
T +385 1 2481 300 / F +385 1 2481 303 
info@dok-ing.com / www.dok-ing.com 
cooled 
Power rating 571 kW (766 HP) at 2100 rpm 
Direction of rotation Clockwise 
Torque 3450 Nm at 1400 rpm 
Engine weight 1673 kg 
Coolant 60 liters 
Oil 68 liters 
Fuel capacity 480 liters 
Fuel consumption 25 - 50 liters/hour 
Power transmission 
Power transmission Hydrostatic system 
To tracks and flail Independent drives for propulsion and flail operation 
Hydraulic fluid 430 liters 
Track gearbox oil 2 x 2 liters 
Working (clearance) speed 0 - 3 km/hour 
Maximum transport speed 10 km/hour 
Flail rotation velocity 0 - 800 rpm 
Tiller rotation velocity 0 - 350 rpm 
Gearbox 
Gearbox oil 5.5 liters 
Mine cleararing capacity 
Clearing width 2450 mm 
Average depth 350 - 600 mm 
Clearing capacity Up to 7000 m²/h 
7826 
2100 
2975 
2240 
7226

More Related Content

What's hot

SAUDI ARAMCO INDUSTRIAL LIGHTING USING DIALUX 4.11 - DAY ONE
SAUDI ARAMCO INDUSTRIAL LIGHTING USING DIALUX 4.11 - DAY ONESAUDI ARAMCO INDUSTRIAL LIGHTING USING DIALUX 4.11 - DAY ONE
SAUDI ARAMCO INDUSTRIAL LIGHTING USING DIALUX 4.11 - DAY ONEMichael Santiago
 
ITC 16 Zone Voice Evacuation & PA Sound System
ITC 16 Zone Voice Evacuation & PA Sound SystemITC 16 Zone Voice Evacuation & PA Sound System
ITC 16 Zone Voice Evacuation & PA Sound SystemSimon Lin
 
Guidelines for electrical wiring in residential buildings
Guidelines for electrical wiring in residential buildings Guidelines for electrical wiring in residential buildings
Guidelines for electrical wiring in residential buildings Vijay Kumar
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
ISAS system for transformer fire fighting
ISAS system for transformer fire fightingISAS system for transformer fire fighting
ISAS system for transformer fire fightingValeriy Ivanov
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
Cpc 100 user manual
Cpc 100 user manualCpc 100 user manual
Cpc 100 user manualSARAVANAN A
 
Kreowanie wizerunku marki w mediach społecznościowych
Kreowanie wizerunku marki w mediach społecznościowychKreowanie wizerunku marki w mediach społecznościowych
Kreowanie wizerunku marki w mediach społecznościowychKatarzyna Adamkiewicz
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana Muhammad Zahid
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cvHamad Talhaa
 

What's hot (20)

E&I Engineer CV
E&I Engineer CVE&I Engineer CV
E&I Engineer CV
 
Emergency Evacuation of Non-Ambulant Persons from Hospitals, Care Homes, Hosp...
Emergency Evacuation of Non-Ambulant Persons from Hospitals, Care Homes, Hosp...Emergency Evacuation of Non-Ambulant Persons from Hospitals, Care Homes, Hosp...
Emergency Evacuation of Non-Ambulant Persons from Hospitals, Care Homes, Hosp...
 
SAUDI ARAMCO INDUSTRIAL LIGHTING USING DIALUX 4.11 - DAY ONE
SAUDI ARAMCO INDUSTRIAL LIGHTING USING DIALUX 4.11 - DAY ONESAUDI ARAMCO INDUSTRIAL LIGHTING USING DIALUX 4.11 - DAY ONE
SAUDI ARAMCO INDUSTRIAL LIGHTING USING DIALUX 4.11 - DAY ONE
 
Power System Earthing Guide
Power System Earthing GuidePower System Earthing Guide
Power System Earthing Guide
 
ITC 16 Zone Voice Evacuation & PA Sound System
ITC 16 Zone Voice Evacuation & PA Sound SystemITC 16 Zone Voice Evacuation & PA Sound System
ITC 16 Zone Voice Evacuation & PA Sound System
 
Guidelines for electrical wiring in residential buildings
Guidelines for electrical wiring in residential buildings Guidelines for electrical wiring in residential buildings
Guidelines for electrical wiring in residential buildings
 
Fire safety
Fire safety Fire safety
Fire safety
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
Resume-Wail
Resume-WailResume-Wail
Resume-Wail
 
ISAS system for transformer fire fighting
ISAS system for transformer fire fightingISAS system for transformer fire fighting
ISAS system for transformer fire fighting
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
Cpc 100 user manual
Cpc 100 user manualCpc 100 user manual
Cpc 100 user manual
 
Fire Alarm System, BMS
Fire Alarm System, BMSFire Alarm System, BMS
Fire Alarm System, BMS
 
Kreowanie wizerunku marki w mediach społecznościowych
Kreowanie wizerunku marki w mediach społecznościowychKreowanie wizerunku marki w mediach społecznościowych
Kreowanie wizerunku marki w mediach społecznościowych
 
ELV ENGINEER RESUME
ELV ENGINEER RESUMEELV ENGINEER RESUME
ELV ENGINEER RESUME
 
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad IbrahimElectrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Fire safety FM 200
Fire safety FM 200Fire safety FM 200
Fire safety FM 200
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cv
 

Similar to MV-10

Dok ing mv-10 double tool mine clearance system, croatia
Dok ing mv-10 double tool mine clearance system, croatiaDok ing mv-10 double tool mine clearance system, croatia
Dok ing mv-10 double tool mine clearance system, croatiahindujudaic
 
GustoMSC_brochureNG5500XLD.pdf
GustoMSC_brochureNG5500XLD.pdfGustoMSC_brochureNG5500XLD.pdf
GustoMSC_brochureNG5500XLD.pdfssuser47b2ce
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013Hans Holkenborg
 
Th430 specification-sheet-english
Th430 specification-sheet-englishTh430 specification-sheet-english
Th430 specification-sheet-englishMiltonPrieto5
 
aly hegazi CV
aly hegazi CV aly hegazi CV
aly hegazi CV ALI khlifA
 
Catalogue rời con lăn Rulmeca
Catalogue rời con lăn RulmecaCatalogue rời con lăn Rulmeca
Catalogue rời con lăn RulmecaRulmeca Việt Nam
 
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Abdul Basith C
 
Brochure SURFACE DRIVE SYSTEM
Brochure SURFACE DRIVE SYSTEMBrochure SURFACE DRIVE SYSTEM
Brochure SURFACE DRIVE SYSTEMemmanuelle bezzi
 
Product catalog of Industrial Winch
Product catalog of Industrial WinchProduct catalog of Industrial Winch
Product catalog of Industrial WinchMarek Daniel
 
CK2030_WESS004803_1012.pdf
CK2030_WESS004803_1012.pdfCK2030_WESS004803_1012.pdf
CK2030_WESS004803_1012.pdfkabalkabal1
 
Jarque eilers construction cv
Jarque eilers construction cvJarque eilers construction cv
Jarque eilers construction cvJarque Eilers
 
Qteq Cataloque
Qteq CataloqueQteq Cataloque
Qteq Cataloqueyovaraj
 

Similar to MV-10 (20)

MV-4
MV-4MV-4
MV-4
 
MVF-5
MVF-5MVF-5
MVF-5
 
XLP
XLPXLP
XLP
 
Dok ing mv-10 double tool mine clearance system, croatia
Dok ing mv-10 double tool mine clearance system, croatiaDok ing mv-10 double tool mine clearance system, croatia
Dok ing mv-10 double tool mine clearance system, croatia
 
Mi-ST
Mi-STMi-ST
Mi-ST
 
GustoMSC_brochureNG5500XLD.pdf
GustoMSC_brochureNG5500XLD.pdfGustoMSC_brochureNG5500XLD.pdf
GustoMSC_brochureNG5500XLD.pdf
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013
 
Th430 specification-sheet-english
Th430 specification-sheet-englishTh430 specification-sheet-english
Th430 specification-sheet-english
 
aly hegazi CV
aly hegazi CV aly hegazi CV
aly hegazi CV
 
Catalogue rời con lăn Rulmeca
Catalogue rời con lăn RulmecaCatalogue rời con lăn Rulmeca
Catalogue rời con lăn Rulmeca
 
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)
 
Brochure SURFACE DRIVE SYSTEM
Brochure SURFACE DRIVE SYSTEMBrochure SURFACE DRIVE SYSTEM
Brochure SURFACE DRIVE SYSTEM
 
SURFACE DRIVE SYSTEM
SURFACE DRIVE SYSTEMSURFACE DRIVE SYSTEM
SURFACE DRIVE SYSTEM
 
Product catalog of Industrial Winch
Product catalog of Industrial WinchProduct catalog of Industrial Winch
Product catalog of Industrial Winch
 
CK2030_WESS004803_1012.pdf
CK2030_WESS004803_1012.pdfCK2030_WESS004803_1012.pdf
CK2030_WESS004803_1012.pdf
 
CV OT
CV OTCV OT
CV OT
 
OT Resume
OT ResumeOT Resume
OT Resume
 
PHIL VAN DEVENTER RESUME
PHIL VAN DEVENTER RESUMEPHIL VAN DEVENTER RESUME
PHIL VAN DEVENTER RESUME
 
Jarque eilers construction cv
Jarque eilers construction cvJarque eilers construction cv
Jarque eilers construction cv
 
Qteq Cataloque
Qteq CataloqueQteq Cataloque
Qteq Cataloque
 

MV-10

  • 2. Designed for mine clearance The MV-10 is designed to perform one task only - mine clearance. It is not a modifi ed construction machine or tank, it is original double tool system for humanitarian demining. The MV-10 Double Tool Mine Clearance System is designed to clear various types of terrain containing antipersonnel (AP) mines, antitank (AT) mines, and unexploded ordnance (UXO). The operating tools for digging and mine clearance consist of a flail tool attachment and tiller tool attachment, or a double flail tool attachment. These are fi xed in front of the system and are specifi cally designed to detonate or destroy the mines and UXO as the MV-10 moves forward. 02 / DOK-ING MV-10
  • 3. READY TO USE RIGHT AWAY Only few minutes are required to unload the MV-10 from any transportational asset and to begin with mechanical clearance activities. The MV-10 requires no special preparation activities or additional personnel. SAFETY RIDES FIRST The MV-10 system weights up to 20 tons, based on its confi guration, with excellent cross country performance. It is controlled by a single operator through a remote control unit. This system provides the best possible protection for the operator. By ensuring the operator is well clear of the MV-10 or inside a protected vehicle, we can be certain that should a mine (particularly anti-tank) be detonated, people will be protected from even minor injuries or health issues that can arise from being in close proximity to the blast. Only one operator and two mechanics are required for transport, operation and repairs/maintenance. DOK-ING MV-10 / 03
  • 4. MV-10 at glance HARDOX Deflector • Resistant to explosions of AP and AT mines • Protects MV-10 from damage • Reduces the dispersal area of exploded mines 04 / DOK-ING MV-10 Remote control aerial • Operational range: 1500 m in the line of sight Standard Tool • Flail (front) & Tiller tool (back) Additional Tool Attachments • Blade/gripper tool • Roller tool Blade/gripper tool Roller tool
  • 5. Lifting points Machine armor plates of special steel resistant to: • Wear • Fragments of exploded mines • Standard ammunition DOK-ING MV-10 / 05 Standard Remote Control Unit • Operational range: 1500 m in the line of sight • Complete control of all functions • Battery capacity: 16 hours Deep profi le tracks • Can be equipped with track pads suitable for driving on hard surfaces Electronic components • Sealed - completely protected from dust, humidity, water and temperature
  • 6. PROTECTION The MV-10 Double Tool Mine Clearance System is clad with the special Swedish HARDOX 400 armor plates. The MV-10 is therefore highly resistant to the fragmentation of landmines. The experience has shown that, when working properly, when an anti-tank mine is detonated, there is no permanent damage to the working tools of the MV-10 system. 06 / DOK-ING MV-10 DOUBLE EFFECTIVENESS Because of its dimensions, excellent maneuverability, high engine power, and low track-ground pressure, the MV-10 can work year round in almost all conditions (-19ºC - +54ºC, 100% relative humidity), and it is not susceptible to damage by rain, snow or hail. The MV-10 normally uses both tools - a rotating flail tool, designed to activate or shatter AP and AT mines, and rotating tiller tool, designed as a secondary activation method and at the same time to keep the digging depth constant. A flail and tiller unit can also work one at a time and rotation of tools is forward and backward. SIMPLE TRANSPORT Road transport of the MV-10 is done using a standard flat-bed trailer. The MV-10 system can also be transported within the C-130 Hercules. For transport by sea, it can be restrained in similar ways to road transport plus it has lifting points to enable it to be craned aboard.
  • 7. POST SALE SERVICES TRAINING DOK-ING has a vast experience in landmine clearance of various types of terrain. The acquired knowledge, expertise and experience are being passed over to the new ‘MV-10 teams’ so that they can as soon as possible start with safe and effi cient landmine clearance activities. DOK-ING’s standard training course lasts 2 weeks, either in Croatia or in countries where the MV-10 systems will be used. Because of the short training period for personnel, education costs for MV-10 operators are extremely low. MAINTENANCE The MV-10 is easily accessible for inspection, maintenance, trouble-shooting, repair and/or replacement. Maintenance and repairs can be carried out on the fi eld or in workshop conditions. The tools required for repairs and maintenance are standard wrenches and additional specially modifi ed tools. Damage resulting from AP or AT mine detonations is usually minor in nature and can be corrected with a minimum expenditure of time and materials. SPARE PARTS As a commitment to providing a high quality service to our customers, DOKING maintains adequate stocks of parts on our premises, has its own in-house service capabilities and can send a team at short notice to any location in the world. DOK-ING MV-10 / 07
  • 8. MV-10 TECHNICAL CHARACTERISTICS Dimensions (L x W x H) Prime mover 4606 x 2240 x 2100 mm Prime mover with tool 7226 x 2975 x 2129 mm MV-10 Ground Clearance Up to bottom armor protection 390 mm Weight Prime mover 15.5 metric tons Prime mover with flail/tiller tool 20 metric tons Engine Caterpillar C18 6-cylinder, in-line, turbo-charged diesel 4-stroke, direct injection, water DOK-ING Ltd. Kanalski put 1, 10000 Zagreb, Croatia T +385 1 2481 300 / F +385 1 2481 303 info@dok-ing.com / www.dok-ing.com cooled Power rating 571 kW (766 HP) at 2100 rpm Direction of rotation Clockwise Torque 3450 Nm at 1400 rpm Engine weight 1673 kg Coolant 60 liters Oil 68 liters Fuel capacity 480 liters Fuel consumption 25 - 50 liters/hour Power transmission Power transmission Hydrostatic system To tracks and flail Independent drives for propulsion and flail operation Hydraulic fluid 430 liters Track gearbox oil 2 x 2 liters Working (clearance) speed 0 - 3 km/hour Maximum transport speed 10 km/hour Flail rotation velocity 0 - 800 rpm Tiller rotation velocity 0 - 350 rpm Gearbox Gearbox oil 5.5 liters Mine cleararing capacity Clearing width 2450 mm Average depth 350 - 600 mm Clearing capacity Up to 7000 m²/h 7826 2100 2975 2240 7226